CN103389258B - A kind of accounting method of large-scale cubic metre of earth and stone waste rate - Google Patents

A kind of accounting method of large-scale cubic metre of earth and stone waste rate Download PDF

Info

Publication number
CN103389258B
CN103389258B CN201310344540.7A CN201310344540A CN103389258B CN 103389258 B CN103389258 B CN 103389258B CN 201310344540 A CN201310344540 A CN 201310344540A CN 103389258 B CN103389258 B CN 103389258B
Authority
CN
China
Prior art keywords
waste
volume
quality
hole
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310344540.7A
Other languages
Chinese (zh)
Other versions
CN103389258A (en
Inventor
刘翼
郑炳旭
李战军
崔晓荣
罗伟涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Lianshao Construction Engineering (Group) Co., Ltd.
Original Assignee
Grand Mining Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grand Mining Industry Co Ltd filed Critical Grand Mining Industry Co Ltd
Priority to CN201310344540.7A priority Critical patent/CN103389258B/en
Publication of CN103389258A publication Critical patent/CN103389258A/en
Application granted granted Critical
Publication of CN103389258B publication Critical patent/CN103389258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses the accounting method of a kind of large-scale cubic metre of earth and stone waste rate, its step is as follows: first, the bulk density of survey calculation dregs, smooth level ground, surface at need to be selected in the deslagging field of the side's of measurement amount, dig out the hole of a certain depth, plastic foil is spread in the hole dug, the hole dug is filled with the water through accurately metering, guarantee horizontal plane and hole flush with outer surface, add up clean consumption of pouring water in cheating, volume due to dregs is equal to the volume of water, then the bulk density of dregs is equal to the quality clean quality divided by water of dregs.Then survey calculation waste rate, the mass ratio of waste rate equal to waste quality and qualified building stones quality with waste quality and ratio, the volume ratio of waste rate be equal to waste volume and qualified building stones volume with waste volume and ratio.The present invention can solve to be accurately measured bulk density and the natural density of waste by the method that scene test is measured, thus accurately calculates the technical problem of waste rate.

Description

A kind of accounting method of large-scale cubic metre of earth and stone waste rate
Technical field
The present invention relates to the accounting method to large-scale cubic metre of earth and stone waste rate in explosion quarry engineering, be specifically related to by large-scale soil The field experiment of the cubic meter of stone measures the density of waste and adjusts a cubic meter experimental technique for waste rate.
Background technology
In explosion quarry engineering, waste rate is an important parameter in earth and rock works, particularly at the large-scale cubic metre of earth and stone In engineering, weigh the important indicator of engineering explosion effect quality especially.Waste rate is the ratio of waste and whole quarrying massif, Can be volume ratio or mass ratio, generally refer to volume ratio.For same seat massif, waste rate height explanation massif can Adopting qualified building stones few, waste rate low explanation demolition effect is good, and the recoverable qualified building stones of massif are many.At conventional large-scale soil In rock blasting engineering, before massif is exploited, often massif can be adopted qualified building stones and be estimated, it was predicted that massif is qualified The output capacity of building stones or the waste rate of defective building stones.Owing to how many outputs of building stones qualified before commencement of works is difficult to comment Estimate, the most typically assess the waste rate of engineering.The waste rate of engineering mainly by the working experience of appraiser according to rock mass The physical propertys such as kind, rate of decay, cranny development degree are predicted.As rate of decay height then waste rate is big, qualified stone The output capacity of material is the lowest, otherwise then waste rate is little, and the output capacity of qualified building stones is the highest.So result of prediction is the most accurate, Often can not get checking accurately and effectively, because the basic data massif side amount needed for waste rate that calculates is due to the error measured The most inaccurate very greatly, also the most doubtful by the reliability of its calculated waste rate.
In actual explosion quarry engineering, owing to being required to be limited by the control of cost and material feeding, explosion quarrying is closed often Lattice building stones transport to stock ground after demolition site weighs, and so can accurately measure the quality of qualified building stones, and defective The waste such as building stones and surflaes the most do not weigh metering directly transport deslagging field to, these waste heaps to a certain extent after the most together Measurement side measures, and measures by measuring the side of waste, and the volume metering of waste is also the most accurately.But it is identical that waste rate requires The ratio of unit, waste rate to be calculated, it is necessary to waste side's amount is converted into quality or by qualified building stones mass conversion Cheng Fangliang.But owing to natural density and the bulk density difference of waste are very big, therefore the accurate computational methods of waste rate are Waste side's amount is converted into quality, calculates the waste rate of mass ratio, or converse abandon by measuring the natural density of waste The natural volume of slag, calculates the waste rate of volume ratio.In any case, the density accurately measuring waste is to calculate waste rate Whether accurate key.
Summary of the invention
It is an object of the invention to provide the accounting method of a kind of large-scale cubic metre of earth and stone waste rate, to solve to be measured by scene test Method accurately measure bulk density and the natural density of waste, thus accurately calculate the technical problem of waste rate.
In order to realize foregoing invention purpose, the method applied in the present invention is as follows:
1, the bulk density of survey calculation dregs, need to the side of measurement amount deslagging field in select surface at smooth flatly Face, digs out the hole of a certain depth, is collected and claims its net weight by the dregs dug out, digging during digging pit in hole Spread plastic foil in good hole, fill, with the water through accurately metering, the hole dug, it is ensured that horizontal plane and hole flush with outer surface, Adding up clean consumption of pouring water in cheating, owing to the volume of dregs is equal to the volume of water, and the proportion of water is 1, then the accumulation of dregs is close Degree is equal to the quality clean quality divided by water of dregs;
2, survey calculation waste rate, the volume of waste is drawn by measurement, then the quality of waste is calculated by bulk density Come, and the quality of qualified building stones is by weighing metering, directly comes out, then the mass ratio of waste rate is equal to waste matter Measure with qualified building stones quality with waste quality and ratio;The natural density of waste is measured, by inciting somebody to action with same method test The mass conversion of waste becomes natural volume, and the density of qualified building stones is drawn by measurement, by quality being wholly converted into Volume, then can calculate the volume ratio of waste rate equal to waste volume and qualified building stones volume with waste volume and ratio.
The described generally circular in shape and smooth surface digged pit, diameter and the degree of depth are in the range of 40cm-60cm.
The described experiment digged pit is counted and to be arranged representative some according to deslagging field actual conditions, passes through valid data Analyze their mean value as end value.
Advantages of the present invention is as follows:
The method that the present invention is measured by scene test, accurately measures bulk density and the natural density of waste, solves Calculate the problem of accurately measuring of key foundation data of waste rate, the most on-the-spot test measure also have simple, practical with become The effects such as this is low.
Accompanying drawing explanation
Fig. 1 is the water filling structure schematic diagram of digging pit of the experimental measurement method of the waste bulk density of the present invention.
Detailed description of the invention
In large-scale soilstone ratio exploitation engineering, waste rate is the volume ratio that waste amount accounts for whole exploitation massif, due to In actual recovery process, waste is different with the metering method of qualified building stones, causes measurement unit disunity, in order to unify meter Amount unit, it is important to the density of waste to be accurately measured, the density of waste has multiple, and the most mainly waste is loose Density, bulk density and natural density.
Waste is soil, rock debris and the combination of defective building stones, is to transport behind deslagging field heap layer by layer by transport vehicle Amass, roll frequently owing to piling up time length, automobile, its bulk density more than the loose thickness of waste, but be less than its The natural density before dress is dug on mountain.Owing to waste being likely mingled with the detritus of relatively large 20~30cm, therefore it is required that fetch earth Scope relatively big (diameter and the degree of depth about about 50cm), thus can not use core cutter method and wax seal method, additionally job site The restriction of condition does not has normal sand, and therefore douche experiment is measured more convenient, and waste is described below as a example by douche The test measuring method of bulk density.
Smooth level ground 1, surface at need to be selected in the deslagging field of the side's of measurement amount, mark a diameter about with crooked chisel The circle 2 of 50cm, digs out the round pool 3 of a deep 50cm in circle with sheep pick, the institute will dug out in hole during digging pit There is dregs 4 to collect and claim its net weight mSlag, in the hole dug, spread plastic foil 5, gently press with hand and make plastic foil be close to cheat wall, But avoid cheating interior landwaste and scratch plastic foil, fill, with the water 6 through accurately metering, the hole dug, it is ensured that horizontal plane and hole Flush with outer surface, pour water in statistics hole clean consumption mWater, and the density of water is 1, then the volume of water is vWater=mWater.By Volume in dregs is equal to the volume of water, i.e. vSlag=vWater, then bulk density ρ of dregsPile up=mSlag/vSlag.Waste Volume VSlagCan be drawn by measurement, then quality m of wasteSlagPile up·vSlagCan calculate, and qualified Quality m of building stonesStoneBy metering of weighing, can directly come out, then the mass ratio of waste rate can calculate, I.e. waste rate r of mass ratiom=mSlag/ (mSlag+mStone).The natural density measuring waste can be tested with same method ρ is natural, and by the mass conversion of waste is become natural volume, and the density of qualified building stones is easy to be measured by drainage, By being wholly converted into volume, then can calculate the waste rate of volume ratio
rv=vSlag/ (vSlag+vStone).
According to above dregs density measuring method, arrange according to actual conditions in intending the deslagging field measured and several there is representative Property point test, all data are carried out efficiency analysis, using their mean value as test end value.? When need to select to dig pit in the deslagging field of the side's of measurement amount, the different position on same plane can be selected, it is also possible to selection The plane that the bottom in big or middle hole is limited is tested.The described experiment digged pit is counted will be according to deslagging field actual conditions Representative some is set, by valid data analysis using their mean value as end value.

Claims (1)

1. an accounting method for large-scale cubic metre of earth and stone waste rate, its step is as follows:
1), the bulk density of survey calculation waste, smooth level ground, surface at need to be selected in the deslagging field of the side's of measurement amount, dig out the hole of a certain depth, during digging pit, the waste dug out in hole is collected and claimed its net weight, plastic foil is spread in the hole dug, the hole dug is filled with the water through accurately metering, guarantee horizontal plane and hole flush with outer surface, add up clean consumption of pouring water in cheating, volume due to waste is equal to the volume of water, then the bulk density of waste is equal to the quality clean quality divided by water of waste;
2), survey calculation waste rate, the volume of waste is drawn by measurement, then the quality of waste is calculated by bulk density, and the quality of qualified building stones is by weighing metering, directly come out, then the mass ratio of waste rate equal to waste quality and qualified building stones quality with waste quality and ratio;The natural density of waste is measured with same method test, by the mass conversion of waste is become natural volume, and the density of qualified building stones is drawn by measurement, by quality is wholly converted into volume, then can calculate the volume ratio of waste rate equal to waste volume and qualified building stones volume with waste volume and ratio;
The described generally circular in shape and smooth surface digged pit, diameter and the degree of depth are in the range of 40 cm-60 cm;
The described experiment digged pit is counted and to be arranged representative some according to deslagging field actual conditions, by valid data analysis using their mean value as end value;
When selecting to dig pit in the deslagging field of the side's of measurement amount, the different position on same plane can be selected, it is also possible to select to test in the limited plane in the bottom in big or middle hole.
CN201310344540.7A 2013-08-08 2013-08-08 A kind of accounting method of large-scale cubic metre of earth and stone waste rate Active CN103389258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310344540.7A CN103389258B (en) 2013-08-08 2013-08-08 A kind of accounting method of large-scale cubic metre of earth and stone waste rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310344540.7A CN103389258B (en) 2013-08-08 2013-08-08 A kind of accounting method of large-scale cubic metre of earth and stone waste rate

Publications (2)

Publication Number Publication Date
CN103389258A CN103389258A (en) 2013-11-13
CN103389258B true CN103389258B (en) 2016-09-07

Family

ID=49533594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310344540.7A Active CN103389258B (en) 2013-08-08 2013-08-08 A kind of accounting method of large-scale cubic metre of earth and stone waste rate

Country Status (1)

Country Link
CN (1) CN103389258B (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901691A (en) * 2012-10-26 2013-01-30 江苏建筑职业技术学院 Method for testing compaction coefficient of dry concrete

Also Published As

Publication number Publication date
CN103389258A (en) 2013-11-13

Similar Documents

Publication Publication Date Title
Askrinejad et al. Rainfall induced instabilities: a field experiment on a silty sand slope in northern Switzerland
CN110130300B (en) Method for determining characteristic value of bearing capacity of rammed/compacted fill layer by adopting shear wave velocity
CN102912780A (en) Sandy soil water-immersion testing method for loess collapsible deformation
Yao et al. Study on permeability and collapsibility characteristics of sandy loess in northern Loess Plateau, China
Abdeltawab Karst limestone geohazards in Egypt and Saudi Arabia
CN103389258B (en) A kind of accounting method of large-scale cubic metre of earth and stone waste rate
Kimpritis The control of column diameter and strength in Jet Grouting processes and the influence of ground conditions
Abu-Farsakh et al. Comparison of predicted embankment settlement from piezocone penetration test with field measurement and laboratory estimated
Budetta Stability of an undercut sea-cliff along a Cilento coastal stretch (Campania, Southern Italy)
CN110130301B (en) Method for determining bearing capacity characteristic value of rammed/compacted fill layer
Evans et al. Cone penetration and dilatometer tests to evaluate stresses in a soil-bentonite slurry trench cutoff wall
Tan et al. Investigation of the models of flow through fractured rock masses based on borehole data
Arbanas et al. Rock mass reinforcement systems in open pit excavations in urban areas
Shamet Site Specific Sinkhole risk assessment in Central Florida using Cone Penetrometer Testing
Sievänen Leakage and groutability
Karthikeyan et al. Profiling of heterogeneous soil using the nuclear-density cone penetrometer
Yu et al. Prediction of Embankment Settlement from PCPT Measurements: A Case Study at Courtableau Bridge
Bondarchuk Rock mass behavior under hydropower embankment dams: Results from numerical analyses
Cao et al. Triggering mechanism and dynamic process of water-rock flow in Nanfen waste dump in 2010
Wong et al. Studies of the infiltration and migration of brine in potash tailings
Løseth Tunnel inflow, prognosis, and results-Evaluation of inflow to rock tunnels in the Gothenburg
Rahman An Insight in the Mälarbanan Project: A Study of the Hydrological and Geotechnical Aspects of the Mälarbanan Project
Mets Design of Axially Loaded Piles-European Practice, De Cock & Legrand (eds)© 1997 Balkema, Rotterdam, ISBN 90 5410 8738 The bearing capacity of a single pile-Experience in Estonia
Brixová et al. The resistivity, seismic, geotechnical and geophysical well logging measurements for road cut stability assessment.
Rentzelos Numerical Investigation of Rock Support Arches

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160628

Address after: 511300 Guangdong city of Guangzhou province Zengcheng River Street Light Lianyi Village Road No. 28

Applicant after: Grand mining industry company limited

Address before: 510623 Guangdong city in Guangzhou Province, the Pearl River Metro Huaxia Road No. 49 building, 21 floor of the North Tower of Tianjin Binhai vault

Applicant before: Guangdong Hongda Blasting Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191202

Address after: 417000 Loudi City, Hunan province Louxing Xiang Yang Xi Jie (Lianshao group office building 5 floor)

Patentee after: Hunan Lianshao Construction Engineering (Group) Co., Ltd.

Address before: 511300 Guangdong city of Guangzhou province Zengcheng River Street Light Lianyi Village Road No. 28

Patentee before: Grand mining industry company limited

TR01 Transfer of patent right