CN103388397A - 活动脚手架用双横杆 - Google Patents

活动脚手架用双横杆 Download PDF

Info

Publication number
CN103388397A
CN103388397A CN2013103321211A CN201310332121A CN103388397A CN 103388397 A CN103388397 A CN 103388397A CN 2013103321211 A CN2013103321211 A CN 2013103321211A CN 201310332121 A CN201310332121 A CN 201310332121A CN 103388397 A CN103388397 A CN 103388397A
Authority
CN
China
Prior art keywords
transverse rod
cast steel
steel head
cross tube
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103321211A
Other languages
English (en)
Inventor
吴爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG HENGTE TUBE Co Ltd
Original Assignee
NANTONG HENGTE TUBE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HENGTE TUBE Co Ltd filed Critical NANTONG HENGTE TUBE Co Ltd
Priority to CN2013103321211A priority Critical patent/CN103388397A/zh
Publication of CN103388397A publication Critical patent/CN103388397A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

本发明涉及活动脚手架技术领域,具体涉及活动脚手架用双横杆,包括上横杆以及与所述上横杆两端焊接的铸钢头组件,所述铸钢头组件由于铸钢头本体和与所述铸钢头本体插接的插销组成,所述上横杆的下方设置有下横杆,所述下横杆与上横杆平行设置,所述上横杆与下横杆之间设置多个连接杆,所述多个连接杆均匀间隔设置,所述多个连接杆的两端分别与所述上横杆、下横杆垂直焊接。本发明采用上述结构,通过在上横杆的下方设置下横杆,从而增加整个横杆的稳定性和牢固性,提高承受力,延长其使用寿命,避免出现变形、弯折或折断现象,以及避免造成不安全事故。另外,本发明具有设计合理、结构简单、降低成本等特点。

Description

活动脚手架用双横杆
技术领域
本发明涉及活动脚手架技术领域,具体涉及活动脚手架用双横杆。
背景技术
目前,现有活动脚手架中采用的横杆通常为单根横杆,由于单根横杆在长期使用后其承受力有限,极易出现变形、弯折现象,甚至还会出现折断现象,因而降低了横杆的稳定性和牢固性,从而缩短了横杆的使用寿命,且易造成不安全事故。
发明内容
本发明的目的是提供一种设计合理、结构简单、能够增加稳定性和牢固性、延长使用寿命、避免造成不安全事故的活动脚手架用双横杆。
为了解决背景技术所存在的问题,本发明是采用以下技术方案:活动脚手架用双横杆,包括上横杆以及与所述上横杆两端焊接的铸钢头组件,所述铸钢头组件由于铸钢头本体和与所述铸钢头本体插接的插销组成,所述上横杆的下方设置有下横杆,所述下横杆与上横杆平行设置,所述上横杆与下横杆之间设置多个连接杆,所述多个连接杆均匀间隔设置,所述多个连接杆的两端分别与所述上横杆、下横杆垂直焊接。
进一步地,所述下横杆的长度与所述上横杆的长度相等。
本发明具有以下有益效果:本发明所述的活动脚手架用双横杆,其中,在上横杆的下方设置有下横杆,下横杆与上横杆平行设置,上横杆与下横杆之间设置多个连接杆,多个连接杆均匀间隔设置,多个连接杆的两端分别与上横杆、下横杆垂直焊接;本发明采用上述结构,通过在上横杆的下方设置下横杆,从而增加整个横杆的稳定性和牢固性,提高承受力,延长其使用寿命,避免出现变形、弯折或折断现象,以及避免造成不安全事故。另外,本发明具有设计合理、结构简单、降低成本等特点。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面结合附图对本发明做进一步详细的说明。
如图1所示,活动脚手架用双横杆,包括上横杆1以及与所述上横杆1两端焊接的铸钢头组件,所述铸钢头组件由于铸钢头本体2和与所述铸钢头本体2插接的插销3组成,其中,铸钢头组件的作用在于与脚手架中的立杆连接,使其连接更加可靠、稳定;所述上横杆1的下方设置有下横杆4,所述下横杆4与上横杆1平行设置,所述上横杆1与下横杆4之间设置多个连接杆5,所述多个连接杆5均匀间隔设置,所述多个连接杆5的两端分别与所述上横杆1、下横杆4垂直焊接,其中,多个连接杆不仅具有连接上横杆与下横杆的作用,同时也起到支撑作用,提高整个横杆的承受力;其中,所述下横杆4的长度与所述上横杆1的长度相等,这样设计的目的,使得下横杆均匀受力,支撑上横杆,提高稳定性。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。

Claims (2)

1.活动脚手架用双横杆,包括上横杆(1)以及与所述上横杆(1)两端焊接的铸钢头组件,所述铸钢头组件由于铸钢头本体(2)和与所述铸钢头本体(2)插接的插销(3)组成,其特征在于,所述上横杆(1)的下方设置有下横杆(4),所述下横杆(4)与上横杆(1)平行设置,所述上横杆(1)与下横杆(4)之间设置多个连接杆(5),所述多个连接杆(5)均匀间隔设置,所述多个连接杆(5)的两端分别与所述上横杆(1)、下横杆(4)垂直焊接。
2.根据权利要求1所述的活动脚手架用双横杆,其特征在于,所述下横杆(4)的长度与所述上横杆(1)的长度相等。
CN2013103321211A 2013-08-02 2013-08-02 活动脚手架用双横杆 Pending CN103388397A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103321211A CN103388397A (zh) 2013-08-02 2013-08-02 活动脚手架用双横杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103321211A CN103388397A (zh) 2013-08-02 2013-08-02 活动脚手架用双横杆

Publications (1)

Publication Number Publication Date
CN103388397A true CN103388397A (zh) 2013-11-13

Family

ID=49532809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103321211A Pending CN103388397A (zh) 2013-08-02 2013-08-02 活动脚手架用双横杆

Country Status (1)

Country Link
CN (1) CN103388397A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1153239A (en) * 1966-12-21 1969-05-29 Mills Echafaudages Improvements in or relating to Scaffolding Made Of Prefabricated Elements and to Methods Of Constructing The Same
EP0718452A2 (en) * 1990-12-06 1996-06-26 Leada Acrow Limited Improvements in and relating to scaffolding systems
CN201581627U (zh) * 2009-12-25 2010-09-15 上海外高桥造船有限公司 防护栏杆
CN201722912U (zh) * 2010-07-06 2011-01-26 开平创誉棚架设备有限公司 一种脚手架的横撑杆
CN201771168U (zh) * 2010-09-10 2011-03-23 刘辉 一种支撑架或脚手架用横杆
CA2731277A1 (en) * 2011-01-23 2012-07-23 Martin Lausas Movable safety rail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1153239A (en) * 1966-12-21 1969-05-29 Mills Echafaudages Improvements in or relating to Scaffolding Made Of Prefabricated Elements and to Methods Of Constructing The Same
EP0718452A2 (en) * 1990-12-06 1996-06-26 Leada Acrow Limited Improvements in and relating to scaffolding systems
CN201581627U (zh) * 2009-12-25 2010-09-15 上海外高桥造船有限公司 防护栏杆
CN201722912U (zh) * 2010-07-06 2011-01-26 开平创誉棚架设备有限公司 一种脚手架的横撑杆
CN201771168U (zh) * 2010-09-10 2011-03-23 刘辉 一种支撑架或脚手架用横杆
CA2731277A1 (en) * 2011-01-23 2012-07-23 Martin Lausas Movable safety rail

Similar Documents

Publication Publication Date Title
CN203729202U (zh) 一种组合桥面板
CN203865934U (zh) 一种电杆用滑轮提升机构临时悬挂装置
CN103388397A (zh) 活动脚手架用双横杆
CN203255537U (zh) A字形玻璃架
CN201866508U (zh) 用于钢结构的对角支撑与立杆的节点板
CN203654696U (zh) 定型电梯井道型钢操作平台
CN203160536U (zh) 用于钢结构的系杆机构
CN201344356Y (zh) 一种影视器材用铝型材构件结构
CN203247702U (zh) 一种钢结构支架
CN203906623U (zh) 一种用于弹簧中的弹簧支撑架
CN201924459U (zh) 用于钢结构的连杆机构
CN203247922U (zh) 带斜底撑柱机构的通信铁塔
CN204707615U (zh) 改进的葡萄架
CN201991071U (zh) 用于钢结构的钢平台机构
CN203247938U (zh) 带围栏机构的通信铁塔
CN203411226U (zh) 电缆桥架与通风管道共用吊装装置
CN203247913U (zh) 带底撑机构的通信铁塔
CN203639883U (zh) 高强度型水利工程撑
CN203066835U (zh) 电动伸缩门
CN203308069U (zh) 一种可平移附着式升降脚手架
CN202064443U (zh) 用于钢结构的支撑机构
CN210032903U (zh) 一种玻璃挡板型材
CN207381222U (zh) 一种柱间变压器的支撑平台
CN201925708U (zh) 用于钢结构的立杆
CN203741707U (zh) 一种桥梁检测作业车支撑架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131113