The content of the invention
The invention aims to solve some problems that above-mentioned technology is present, and propose the inner-walls of duct of new energy-saving
Ballasting rust remover scheme.
In order to reach the purpose for solving the above problems, technical scheme provides a kind of energy saving pipeline inwall ball blast
Rust remover, it be by the electronic rotation ramming head with blade, sediment transport endless screw apparatus, worm screw sleeve pipe, steel sand retracting device, for sandbox and
Part, sealing device, moveable cart, moveable cart motor, runner, runner motor, track, fixed mount, bracket, motor cabinet, control valve,
The parts such as upper sand device are constituted;Steel sand retracting device is arranged at worm screw sleeve pipe front end, and steel sand retracting device can be with processing pipe fitting
Rotate, and can also move back and forth in the pipeline processed with worm screw sleeve pipe, arrange on the steel sand retracting device
One opening, it is just corresponding with a set opening on worm screw sleeve pipe front end to match, so that the steel sand for being reclaimed can enter snail
In rod bush, the sediment transport endless screw apparatus are arranged in worm screw sleeve pipe, can be under the drive of sediment transport worm screw power motor reductor
Forward or reverse rotation is done in worm screw sleeve pipe, and can be moved back and forth in the pipe fitting of required processing with trocar sheath, worm screw sleeve pipe
Its front end is connected by a connection piece with the electronic rotation ramming head with blade, so that steel sand can be enable to enter into the electronic of blade
In rotation ramming head, steel sand is dished out eliminated rust by the ramming head of high speed rotation, the sediment transport endless screw apparatus and worm set Gutron mistake
One sealing device is simultaneously extended to in sandbox and on a bracket;A kind of energy-conservation described in a kind of energy saving pipeline described in this programme
Inner-walls of duct ballasting rust remover, its setting further comprises to arrange in for sandbox and be mounted with worm screw power motor and reductor and electricity
Frame, the motor via reducer are connected to sediment transport endless screw apparatus, for being also provided with leading in sandbox sand device, for sand hopper, control
Valve, upper sand device, bracket, sand inlet, are connected to control valve for the confession sand hopper in sandbox, on the control valve and worm screw sleeve pipe
Another opening linking, is connected to steel sand and reclaims and lead sand device for the end of the worm screw sleeve pipe in sandbox, and control valve can be used to control
Steel sand enters inbound traffics, upper sand device include sand motor, right angle reductor and be arranged on for the actuating device in sandbox and
Conveyer belt, each sand supplying device, bearing, support.
A kind of energy saving pipeline inwall ballasting rust remover described in this programme, its setting further comprises moveable cart, moveable cart motor,
With runner, runner motor, in moveable cart, runner can hold up processed pipe fitting to runner, in the drive of runner motor
Lower runner is rotated, and processes pipe fitting rotary motion, and moveable cart can hold up each part and back and forth be run in orbit.
The present invention is had the advantages that compared with prior art:
This programme substitutes conveyer belt sediment transport, effect of the sediment transport endless screw apparatus in power motor and reductor with sediment transport worm screw
Sand supplying during lower rotating forward, reclaims sand during reversion, it is convenient to omit longer conveyer belt and substantial amounts of adnexa, saves material, makes sand supplying
Complete with desanding integration, so as to reducing energy consumption, improve work efficiency, this programme is saved using sand reservoir box sand supplying and storage sand
Huge upper sand and lower sand machine and its a large amount of parts and adnexa are omited, the present invention program has not only saved a large amount of mechanical parts etc.
Material, also save substantial amounts of electric energy, be greatly enhanced work efficiency and produce good effect.
The present invention is described in detail below in conjunction with the accompanying drawings:
Fig. 1 is one embodiment of the present of invention overall structure generalized section.
In figure:1 processing pipe fitting, 2 motors, 3 band blades rotation ramming heads, 4 connectors, 5 steel sand retracting devices, 6 worm screw sleeve pipes,
7 sediment transport endless screw apparatus, 8 sealing devices, 9 fixed mounts, 10 supply sandbox, 11 control valves, and 12 supply sand hopper, 13 power motors, and 14 subtract
Fast machine, 15 transporters, 16 conveyer belts, 17 sand supplying devices, 18 right angle reductors, 19 motors, 20 supports, 21 runner motors, 22 turns
Wheel, 23 moveable carts, 24 tracks, 25 moveable carts, 26 moveable cart motors, 27 collection boxes, 28 brackets, 29 moveable carts, 30 lead sand device, and 31
Motor rack, 32 bearings, 33 add sand mouth, 34 dust arresters.
Specific embodiment
Referring to Fig. 1, processing pipe fitting 1 is erected in moveable cart 23 and runner 22, the runner 22 in the presence of runner motor 21
Rotate, the also concomitant rotation of workpiece pipe fitting 1, one end of pipe fitting 1 are placed in sealing device 8, the lower end of sealing device 8 has opening to connect
A collection box 27 is connect, for storing the steel sand of recovery, sealing device is installed in moveable cart 25, and moveable cart motor 26 can drive
Moveable cart 25 is run on the tracks 24, is arranged in moveable cart 29 for sandbox 10 and part, and motor 2 combines band blade rotation and throws
3 can dish out at a high speed steel sand, and band blade rotation ramming head 3 is connected to worm screw sleeve pipe 6 further through connector 4, and steel sand retracting device 5 is pacified
Be mounted on worm screw sleeve pipe 6, on worm screw sleeve pipe 6 arrange one be open, also have on steel sand retracting device 5 opening and with worm screw sleeve pipe
Opening correspondence on 6 is connected, steel sand retracting device 5 can on processing 1 inwall of pipe fitting can concomitant rotation, and can be with worm screw
Sleeve pipe 6 carries out traverse motion in processing 1 inwall of pipe fitting, the steel sand that the electronic ramming head 3 with blade can also be dished out,
From in the middle of the pipe fitting 1 processed it is recycled in worm screw sleeve pipe 6 to be utilized by the opening on worm screw sleeve pipe 6 again;This
In case, worm screw sleeve pipe 6 and sediment transport endless screw apparatus 7 all pass through sealing device 8 and extend to in the middle of sandbox 10, in order to fixed and hold up
Worm screw sleeve pipe 6, has installed fixed mount 9 additional and for the bracket 28 in sandbox, and the end of sediment transport endless screw apparatus 7 is connected to power motor
13rd, power step-down gear 14, the end of worm screw sleeve pipe 6 is also connected with one and leads sand device 30, the steel sand of recovery can be caused each sand supplying device
On 17, set 11 two ends of control valve in for sandbox 10 are connected to respectively opens on sand hopper 12 and worm screw sleeve pipe 6
Mouthful, during steel sand is thereby into worm screw sleeve pipe 6, sand device being also provided with for sandbox, the device includes bearing 32, transmission
Device 15, conveyer belt 16, each sand supplying device 17, and right angle reductor 18, motor 19, support 20, in one end of processing pipe fitting 1, can
Connection dust arrester 34.
During work, from adding sand mouth 33 to add, switch on power steel sand on-off circuit, when power motor 13 and reductor 14 are rotated forward
When, sediment transport endless screw apparatus 7 are rotated forward simultaneously, and upper sand device is started working, and motor 19, right angle reductor 18 drive 16 turns of conveyer belt
It is dynamic, while each sand supplying device 17 being arranged on conveyer belt 16 also begins to rotate, the steel sand in case is delivered to by each sand supplying device 17
In the middle of sand hopper 12, then enter in the middle of worm screw sleeve pipe 6 through control valve 11, sediment transport endless screw apparatus 7 are rotated forward, and steel sand is conveyed
To the electronic ramming head 3 with blade, steel sand is dished out at a high speed carries out rust cleaning operation, and when falling, the steel sand amount of sand in inner-walls of duct meets
During ramming head demand, control valve 11 can cut out sand supplying, and when dynamic retarding motor 13 is inverted, the sediment transport endless screw apparatus 7 are inverted, steel sand
With the reversion of sediment transport endless screw apparatus 7, the end for the worm screw sleeve pipe 6 in sandbox is brought back into by guider 30, then is supplied
Sand device 17 is caught, and is then sent through supplying sand hopper, thus reciprocal sand supplying sediment transport capable of circulation, in one end of processing pipe fitting 1, is connected to one
The dust arrester 34 of activity, works to the dedusting in descaling process, to reach the purpose of clean manufacturing.
Obviously, a kind of energy saving pipeline inwall ballasting rust remover involved by described above is not limited only to the example above, this
Scheme of the invention can also adopt other modes, as above the collection box below the layout and upper husky mode, seal box of each part of husky device
Change of connected mode or control valve of structure and power motor and reductor and sediment transport worm screw etc., involved by the present invention program
And the change that carried out in the essential scope of the present invention of those of ordinary skill, replacements, addition etc. fall within guarantor of the invention
Within the scope of shield.