CN103383306B - 风力发电偏航减速器的仿真模拟实验装置及其方法 - Google Patents
风力发电偏航减速器的仿真模拟实验装置及其方法 Download PDFInfo
- Publication number
- CN103383306B CN103383306B CN201310278471.4A CN201310278471A CN103383306B CN 103383306 B CN103383306 B CN 103383306B CN 201310278471 A CN201310278471 A CN 201310278471A CN 103383306 B CN103383306 B CN 103383306B
- Authority
- CN
- China
- Prior art keywords
- speed reducer
- wind
- measured
- yawing
- reduction unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims description 6
- 239000003638 chemical reducing agent Substances 0.000 claims abstract description 135
- 238000012360 testing method Methods 0.000 claims abstract description 55
- 238000004458 analytical method Methods 0.000 claims abstract description 42
- 238000002474 experimental method Methods 0.000 claims abstract description 23
- 239000000758 substrate Substances 0.000 claims description 10
- 230000001133 acceleration Effects 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 5
- 238000005457 optimization Methods 0.000 abstract description 3
- 238000011056 performance test Methods 0.000 abstract description 3
- 238000010998 test method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Landscapes
- Wind Motors (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310278471.4A CN103383306B (zh) | 2013-07-04 | 2013-07-04 | 风力发电偏航减速器的仿真模拟实验装置及其方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310278471.4A CN103383306B (zh) | 2013-07-04 | 2013-07-04 | 风力发电偏航减速器的仿真模拟实验装置及其方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103383306A CN103383306A (zh) | 2013-11-06 |
CN103383306B true CN103383306B (zh) | 2016-04-20 |
Family
ID=49491156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310278471.4A Active CN103383306B (zh) | 2013-07-04 | 2013-07-04 | 风力发电偏航减速器的仿真模拟实验装置及其方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103383306B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101583703B1 (ko) * | 2014-08-08 | 2016-01-08 | 주식회사 해성굿쓰리 | 감속기 내구성 시험장치 |
CN104533715A (zh) * | 2014-11-19 | 2015-04-22 | 江苏荣基重工科技有限公司 | 船用风电偏航系统 |
KR101655840B1 (ko) * | 2015-02-17 | 2016-09-09 | 우림기계(주) | 굴착장비용 유성기어감속기 시험장치 |
CN108036958A (zh) * | 2017-12-08 | 2018-05-15 | 宁夏天地奔牛实业集团有限公司 | 矿用减速机加载试车方法及矿用减速机加载试车装置 |
CN108896302A (zh) * | 2018-06-15 | 2018-11-27 | 西安工业大学 | 一种舰用面齿轮减速器封闭噪声检测装置 |
CN109655273B (zh) * | 2018-11-06 | 2020-01-21 | 中国船舶重工集团公司第七一一研究所 | 基于cfd的示功图通道效应修正方法 |
CN113227572B (zh) * | 2018-12-20 | 2023-07-25 | 维斯塔斯风力系统有限公司 | 用于测试偏航系统的方法和设备 |
CN109708880B (zh) * | 2019-01-28 | 2024-08-20 | 银川威力传动技术股份有限公司 | 一种偏航减速器试验台静载疲劳试验装置 |
CN111504638A (zh) * | 2020-06-16 | 2020-08-07 | 大连海洋大学 | 一种可实现立卧转换的行星齿轮传动减速机试验台 |
CN116857132B (zh) * | 2023-08-18 | 2024-02-09 | 湖南科技大学 | 一种大型风电机组偏航系统试验台及试验方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006030786A1 (ja) * | 2004-09-13 | 2006-03-23 | Nsk Ltd. | 異常診断装置及び異常診断方法 |
CN101608969B (zh) * | 2009-07-23 | 2011-01-05 | 重庆齿轮箱有限责任公司 | 风电变桨减速器的仿真模拟实验方法、装置 |
CN101832897B (zh) * | 2010-05-12 | 2011-11-23 | 株洲市九洲四维实业有限公司 | 立式风电偏航减速机地面加载模拟装置 |
KR101226501B1 (ko) * | 2011-05-19 | 2013-02-12 | 한국고벨주식회사 | 기어드 모터의 부하 테스트 장치 |
CN203534818U (zh) * | 2013-07-04 | 2014-04-09 | 银川威力减速器有限公司 | 风力发电偏航减速器的仿真模拟实验装置 |
-
2013
- 2013-07-04 CN CN201310278471.4A patent/CN103383306B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103383306A (zh) | 2013-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103383306B (zh) | 风力发电偏航减速器的仿真模拟实验装置及其方法 | |
CN101871844B (zh) | 风力机性能分析与故障模拟实验系统 | |
CN103983454B (zh) | 一种风电机组传动链全工况测试模拟装置 | |
KR101706508B1 (ko) | 풍력 발전기의 피로 해석 및 등가하중 해석 시스템 | |
CN204064694U (zh) | 空中机器人旋翼特性测试装置 | |
CN103604601A (zh) | 基于风电齿轮箱工况模拟的故障诊断试验台 | |
CN101865770B (zh) | 大扭矩大速比混合式减速器测试装置 | |
CN203616120U (zh) | 基于风电齿轮箱工况模拟的故障诊断试验台 | |
CN105372064A (zh) | 工程机械变速箱总成性能检测分析试验台及其试验方法 | |
CN206470066U (zh) | 一种电动汽车动力总成测试台架 | |
CN204740114U (zh) | 一种双馈式风力发电机组轴系振动测试装置 | |
CN107762709B (zh) | 一种水平轴潮流能水轮机水动力性能试验平台及测试方法 | |
CN104132763B (zh) | 具有宏微观力测试功能的行星探测车车轮及受力测试方法 | |
CN105181307A (zh) | 双叶片模型风力发电机实验台及实验方法 | |
CN104215849B (zh) | 一种潮流能发电装置模拟测试平台及测试方法 | |
CN203534818U (zh) | 风力发电偏航减速器的仿真模拟实验装置 | |
CN203745076U (zh) | 便携式无线通讯式双馈风电机组齿轮箱振动测试装置 | |
CN208268009U (zh) | 一种测量风力机非定常流场的装置 | |
CN209838604U (zh) | 一种基于旋转平台风力机叶片应力应变测试装置 | |
Xu et al. | The influence of rotation on natural frequencies of wind turbine blades with pre-bend | |
CN101975662B (zh) | 一种符合iec61400-13标准的风电机组载荷测试系统 | |
CN104729851B (zh) | 一种风力机行星齿轮复杂工况的模拟及测试装置 | |
CN207095858U (zh) | 一种用于驱动电机的轴承试验装置 | |
CN103487184B (zh) | 一种大扭矩电动执行机构的扭矩检测装置 | |
CN206190460U (zh) | 风力发电机导流罩支撑架试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Simulation experiment device of wind power generation yaw speed reducer and method thereof Effective date of registration: 20161215 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan Weili Reducer Machinery Co., Ltd. Registration number: 2016640000003 |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Abo Inventor after: Li Xiang Inventor before: Zheng Xu |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 750002 the Ningxia Hui Autonomous Region high tech Zone, Yinchuan, No. 1 plant room, room 406 Patentee after: Yinchuan power transmission technology Limited by Share Ltd Address before: 750011 the Ningxia Hui Autonomous Region Jinfeng Industrial Park, the new open street, No. 128, Yinchuan Patentee before: Yinchuan Weili Reducer Machinery Co., Ltd. |
|
PM01 | Change of the registration of the contract for pledge of patent right | ||
PM01 | Change of the registration of the contract for pledge of patent right |
Change date: 20171213 Registration number: 2016640000003 Pledgor after: Yinchuan power transmission technology Limited by Share Ltd Pledgor before: Yinchuan Weili Reducer Machinery Co., Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20171215 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: 2016640000003 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Simulation experiment device of wind power generation yaw speed reducer and method thereof Effective date of registration: 20171219 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: 2017640000006 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20181221 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: 2017640000006 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Simulation experiment device of wind power generation yaw speed reducer and method thereof Effective date of registration: 20181225 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: 2018640000005 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20191202 Granted publication date: 20160420 Pledgee: Bank of Ningxia science and technology branch of Limited by Share Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: 2018640000005 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Simulation experiment device of wind power generation yaw speed reducer and method thereof Effective date of registration: 20200116 Granted publication date: 20160420 Pledgee: Ningxia Chuangyi Equity Investment Fund Management Co., Ltd Pledgor: Yinchuan power transmission technology Limited by Share Ltd Registration number: Y2020640000001 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210105 Granted publication date: 20160420 Pledgee: Ningxia Chuangyi Equity Investment Fund Management Co.,Ltd. Pledgor: YINCHUAN WEILI TRANSMISSION TECHNOLOGY Co.,Ltd. Registration number: Y2020640000001 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |