CN103382723B - 加筋土挡墙墙面平整度控制的施工方法 - Google Patents
加筋土挡墙墙面平整度控制的施工方法 Download PDFInfo
- Publication number
- CN103382723B CN103382723B CN201310317404.9A CN201310317404A CN103382723B CN 103382723 B CN103382723 B CN 103382723B CN 201310317404 A CN201310317404 A CN 201310317404A CN 103382723 B CN103382723 B CN 103382723B
- Authority
- CN
- China
- Prior art keywords
- reinforced earth
- earth bulkhead
- muscle material
- panel
- bulkhead panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Retaining Walls (AREA)
Abstract
本发明具体为一种加筋土挡墙墙面平整度控制的施工方法,解决了现有加筋土挡墙墙面平整度不易控制的问题。采用如下步骤:a、预制预留竖向通孔的加筋土挡墙面板;b、将底层加筋土挡墙面板浆砌在混凝土基础上;c、加筋土挡墙面板外侧一定距离外摊铺填料,接着铺设筋材,随后在筋材之上的一定距离外摊铺填料,整平碾压密实;对加筋土挡墙面板外侧一定距离内进行补填;d、安装上一层加筋土挡墙面板时,将销钉插入竖向通孔中,拧紧顶紧螺栓;按照c步骤进行作业至填筑完成后,取出销钉并松开顶紧螺栓,移开约束梁;e、重复d步骤至最后一层加筋土挡墙面板施工完成。本发明通过合理的工艺步骤实现了加筋土挡墙墙面的平整度有效控制。
Description
技术领域
本发明涉及加筋土挡墙的施工方法,具体为一种加筋土挡墙墙面平整度控制的施工方法。
背景技术
加筋土即在填土中加入一定数量的具有抗拉性能的材料(筋),已于上世纪广泛应用于填筑体工程中。加筋土挡墙是加筋土技术与支挡结构有机结合的一种轻型挡护形式,具有结构轻巧、受力合理、基础处理要求低、结构柔性好、能较好地适应地基变形和地震、建造成本低、节省占地等特点,倍受工程界青眯,被作为公路、铁路、水利、矿山等填筑地段的轻型支挡结构形式之一。
加筋土挡墙属非常规结构,其应用概率远远低于普通支挡结构,一般施工单位接触该类工程机会较少,施工经验储备严重不足。
加筋土挡墙是利用面板、填料、筋材三者的平衡关系形成的自稳结构(利用填料固定筋材尾部、利用筋材保持面板稳定,同时提高填料的抗剪强度从而提高结构的稳定性、利用混凝土面板对填料和筋材提供保护)。加筋土挡墙施工由面板安装(除第一层与基础之间浆砌外,其余层间均为干砌)、铺设筋材、填土碾压等工序组成,通过逐层循环施工完成。其施工技术先进、质量控制要求高。
加筋土挡墙施工结束后常出现墙面不平整的现象,当加筋土挡墙墙面出现较大变形(横向变形超过墙高的2%)时,将严重影响结构的正常使用。
对完工的加筋土挡墙变形进行长期观察和研究发现,加筋土挡墙的墙面变形可分为施工变形和后期变形两部分。经分析认为,影响加筋土挡墙平整度的因素较多,筋材与面板的连接、筋材的初始张紧效果、填料的摊铺及碾压横向挤压作用、筋材受到干扰对面板的牵动作用等施工原因,均会对墙面早期平整度产生不良影响;筋材的强度、筋材的应变和蠕变特性、筋材材质的均匀性、填料本身的粘滞性及内摩擦角特性等设计原因,均是导致墙面后期不平整的影响因素。
设计原因导致的墙面后期不平整,可通过合理选材(筋材和填料)、调整设计参数加以预控,调整每层筋材配筋量使应力应变基本一致,可达到控制墙面的后期变形均匀性的目的,但无法彻底消除材料蠕变带来的后期变形,还可计算出筋材的应变产生的各层面板横向变形量,提供施工参考。
施工原因导致的墙面不平整问题,其中筋材与面板的连接、筋材的预张紧、面板附近填料压实造成对面板的横向挤压,筋材受到施工干扰对面板的牵动作用等均是影响墙面平整度的重要因素,但由于工程机会较少,国内没有专业施工队伍,技术储备不足等原因,目前,尚没有较为理想而有效的控制加筋土挡墙墙面平整度的施工方法。
发明内容
本发明为了解决现有加筋土挡墙墙面平整度不易控制的问题,提供了一种加筋土挡墙墙面平整度控制的施工方法。
本发明是采用如下技术方案实现的:加筋土挡墙墙面平整度控制的施工方法,采用如下步骤:a、预制预留竖向通孔的加筋土挡墙面板;b、在混凝土基础上精确放出砌筑边线,将底层加筋土挡墙面板浆砌在混凝土基础上;c、加筋土挡墙面板外侧一定距离外摊铺填料至筋材设计高程填筑碾压密实,接着铺设筋材,筋材前端与加筋土挡墙面板连接牢固,筋材后端用张紧设备临时固定,并保持各筋材松紧度一致,随后在筋材之上的一定距离外摊铺填料,整平碾压密实;待筋材尾部被填筑层固定牢固后对加筋土挡墙面板外侧一定距离内进行补填;d、安装上一层加筋土挡墙面板时,先将开口向下的槽钢状约束梁扣在该加筋土挡墙面板顶面上,约束梁上固定有向侧面开口的槽钢状导向架,导向架内穿有插入所有加筋土挡墙面板竖向通孔中的销钉,拧紧约束梁侧壁的顶紧螺栓;随后按照c步骤进行作业至填筑完成后,取出销钉并松开顶紧螺栓,移开约束梁;e、重复d步骤至最后一层加筋土挡墙面板施工完成。
利用约束梁作为加筋土挡墙面板的直线定位器,顶紧螺栓保证每块面板外侧(加筋土挡墙外露面)与约束梁密贴,将同一层面板外侧控制在同一条直线上;利用约束梁的刚度,消除面板安装的组砌误差和施工干扰,保证单层墙面纵向平顺;利用竖向通孔、销钉实现面板砌筑层与稳定层之间平整度控制,将砌筑层、稳定层面板临时连成一体,借助底层已填筑碾压完成面板的稳定性和顶层约束梁的刚度,提高整体抗施工干扰能力,防止面板受到干扰后出现向内或向外的移位;利用导向架将销钉控制在竖直方向上;利用面板背后分步填筑的方法,减小填筑、碾压对墙面的施工干扰,实现加筋土挡墙墙面平整度的有效控制。
本发明通过合理的工艺步骤实现了加筋土挡墙墙面的平整度有效控制,操作过程省时省力,提高了施工效率,适用于公路、铁路等钢筋混凝土预制面板加筋土挡墙施工。
附图说明
图1为本发明的结构示意图。
图中:1-竖向通孔,2-加筋土挡墙面板,3-混凝土基础,4-填料,5-筋材,6-约束梁,7-导向架,8-销钉,9-顶紧螺栓。
具体实施方式
加筋土挡墙墙面平整度控制的施工方法,采用如下步骤:a、预制预留竖向通孔1的加筋土挡墙面板2;b、在混凝土基础3上精确放出砌筑边线,将底层加筋土挡墙面板2浆砌在混凝土基础3上;c、加筋土挡墙面板2外侧一定距离外摊铺填料4至筋材5设计高程填筑碾压密实,接着铺设筋材5,筋材5前端与加筋土挡墙面板2连接牢固,筋材5后端用张紧设备临时固定,并保持各筋材松紧度一致,随后在筋材5之上的一定距离外摊铺填料4,整平碾压密实;待筋材5尾部被填筑层固定牢固后对加筋土挡墙面板2外侧一定距离内进行补填;d、安装上一层加筋土挡墙面板2时,先将开口向下的槽钢状约束梁6扣在该加筋土挡墙面板2顶面上,约束梁6上固定有向侧面开口的槽钢状导向架7,导向架7内穿有插入所有加筋土挡墙面板2竖向通孔1中的销钉8,拧紧约束梁1侧壁的顶紧螺栓9;随后按照c步骤进行作业至填筑完成后,取出销钉8并松开顶紧螺栓9,移开约束梁6;e、重复d步骤至最后一层加筋土挡墙面板2施工完成。
具体实施过程中,每块加筋土挡墙面板2设置有两个顶紧螺栓9,且穿有两个销钉8。
Claims (1)
1.一种加筋土挡墙墙面平整度控制的施工方法,其特征在于:采用如下步骤:a、预制预留竖向通孔(1)的加筋土挡墙面板(2);b、在混凝土基础(3)上精确放出砌筑边线,将底层加筋土挡墙面板(2)浆砌在混凝土基础(3)上;c、加筋土挡墙面板(2)外侧一定距离外摊铺填料(4)至筋材(5)设计高程填筑碾压密实,接着铺设筋材(5),筋材(5)前端与加筋土挡墙面板(2)连接牢固,筋材(5)后端用张紧设备临时固定,并保持各筋材松紧度一致,随后在筋材(5)之上的一定距离外摊铺填料(4),整平碾压密实;待筋材(5)尾部被填筑层固定牢固后对加筋土挡墙面板(2)外侧一定距离内进行补填;d、安装上一层加筋土挡墙面板(2)时,先将开口向下的槽钢状约束梁(6)扣在该加筋土挡墙面板(2)顶面上,约束梁(6)上固定有向侧面开口的槽钢状导向架(7),导向架(7)内穿有插入所有加筋土挡墙面板(2)竖向通孔(1)中的销钉(8),拧紧约束梁(1)侧壁的顶紧螺栓(9);随后按照c步骤进行作业至填筑完成后,取出销钉(8)并松开顶紧螺栓(9),移开约束梁(6);e、重复d步骤至最后一层加筋土挡墙面板(2)施工完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310317404.9A CN103382723B (zh) | 2013-07-26 | 2013-07-26 | 加筋土挡墙墙面平整度控制的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310317404.9A CN103382723B (zh) | 2013-07-26 | 2013-07-26 | 加筋土挡墙墙面平整度控制的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103382723A CN103382723A (zh) | 2013-11-06 |
CN103382723B true CN103382723B (zh) | 2015-08-19 |
Family
ID=49490635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310317404.9A Expired - Fee Related CN103382723B (zh) | 2013-07-26 | 2013-07-26 | 加筋土挡墙墙面平整度控制的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103382723B (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202610833U (zh) * | 2012-07-04 | 2012-12-19 | 重庆永固建筑科技发展有限公司 | 建筑用加筋带挡墙槽形面板 |
KR101283985B1 (ko) * | 2013-02-19 | 2013-07-09 | 주식회사 동운산업 | 2중지압판을 이용한 절토사면 수평저항 옹벽블록 결속장치와 이를 이용한 옹벽시공방법 |
-
2013
- 2013-07-26 CN CN201310317404.9A patent/CN103382723B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202610833U (zh) * | 2012-07-04 | 2012-12-19 | 重庆永固建筑科技发展有限公司 | 建筑用加筋带挡墙槽形面板 |
KR101283985B1 (ko) * | 2013-02-19 | 2013-07-09 | 주식회사 동운산업 | 2중지압판을 이용한 절토사면 수평저항 옹벽블록 결속장치와 이를 이용한 옹벽시공방법 |
Non-Patent Citations (2)
Title |
---|
加筋土挡墙在变电站场地平整工程中的应用;刘向导;《山西建筑》;20061231;第32卷(第23期);第113-114页第2节 * |
浅谈加筋土挡土墙施工方法;罗玲;《建筑技术开发》;20040630;第31卷(第6期);第65页第4.2.3.2、4.2.4节 * |
Also Published As
Publication number | Publication date |
---|---|
CN103382723A (zh) | 2013-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201011B (zh) | 一种复合锚定板挡土墙及其施工方法 | |
CN103256060B (zh) | 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 | |
CN112343106A (zh) | 一种高层建筑沉降加固抬升纠偏的施工方法 | |
CN102444130B (zh) | 深基坑工程中的快速换撑施工方法 | |
CN107524159A (zh) | 一种混合式加筋挡土墙 | |
CN107130607A (zh) | 建筑物地下室支护 | |
WO2020248429A1 (zh) | 一种筏板基础高层建筑物加固抬升方法 | |
CN102817621B (zh) | 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 | |
CN105064157A (zh) | 软土地区高速铁路路基沉降整治方法 | |
CN204024678U (zh) | 一种隧道支护设备 | |
CN104674863A (zh) | 一种对深基坑开挖范围内既有市政管廊的加固方法 | |
CN109056790A (zh) | 桩托三层挡土墙结构及施工方法 | |
CN102587410B (zh) | 钢筋混凝土挡土墙设计施工方法 | |
CN205171528U (zh) | 可回收基坑支护结构 | |
CN105714678A (zh) | 一种复合式重力锚碇 | |
CN101215840B (zh) | 飞机式基础加固予力工法 | |
CN106917358B (zh) | 一种斜拉桥主梁组合施工方法及其配重结构体系 | |
CN103382723B (zh) | 加筋土挡墙墙面平整度控制的施工方法 | |
CN204081064U (zh) | 一种地下室夹层结构 | |
CN107503326B (zh) | 水库人工堤坝的施工装置及施工方法 | |
CN205012596U (zh) | 一种防地面不均匀沉降结构 | |
CN201801880U (zh) | 异型组合截面桩变截面变刚度承台结构 | |
CN110258675B (zh) | 建筑物条形基础箱型复合地基加固纠偏方法 | |
CN111963197B (zh) | 一种三软煤层无煤柱开采沿空留巷巷道支护方法 | |
CN210459229U (zh) | 一种深基坑内支撑装配式换撑施工工装 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20190726 |