CN103375164B - Method for judging frozen plugging position of pipeline - Google Patents
Method for judging frozen plugging position of pipeline Download PDFInfo
- Publication number
- CN103375164B CN103375164B CN201210109389.4A CN201210109389A CN103375164B CN 103375164 B CN103375164 B CN 103375164B CN 201210109389 A CN201210109389 A CN 201210109389A CN 103375164 B CN103375164 B CN 103375164B
- Authority
- CN
- China
- Prior art keywords
- pressure
- pipeline
- gas
- shunting
- gathering line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000002347 injection Methods 0.000 claims abstract description 16
- 239000007924 injection Substances 0.000 claims abstract description 16
- 230000000903 blocking effect Effects 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000004364 calculation method Methods 0.000 abstract description 2
- 239000007789 gas Substances 0.000 description 30
- 238000010586 diagram Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000000205 computational method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Landscapes
- Pipeline Systems (AREA)
- Pipe Accessories (AREA)
Abstract
The invention discloses a method for judging a frozen and blocked position of a pipeline and gas partial pressure skid-mounted equipment used by the method, which are designed for accurately judging the frozen and blocked position of the pipeline. The method comprises the steps of injecting high-pressure gas in a pressure division tank in the skid-mounted equipment into a pipeline or shunting the gas in the pipeline into the pressure division tank, recording pressure and temperature change values before and after gas injection, and determining the frozen and blocked position of the pipeline through formula calculation. The technical principle is reliable, and the required parameters can be directly obtained by using a metering instrument. The skid-mounted equipment can realize vehicle-mounted mobile operation, compared with the prior art, the technology does not need to excavate pipelines, and has the characteristics of simple and convenient operation, time and labor saving and more accurate result.
Description
Technical field
The present invention relates to determination methods and the partial pressure skid mounted equipment of use thereof of a kind of pipeline frozen block position, belong to gas
Development technique field, field.
Background technology
During the construction of natural gas fields, owing to gas existing condensed liquid and water, when ambient temperature is too low, these liquid and
The water person of being easy to forms hydrate or icing, by line clogging, affects gas well and normally produces.At present, although pipeline method for removing blockage
Numerous, but there is no the effective method accurately judging pipeline frozen block position, it is usually by empirical discriminant method or uses two way classification.Warp
The method of testing is according at pipeline low lying areas, pipeline reducing and the position such as valve is susceptible to the position of blocking and judges with experience
Pipeline frozen block position;Two way classification is to utilize two points of segmentation methods to judge roughly pipeline blocking position, then need repeatedly to excavate pipeline,
Waste time and energy, it is judged that error is relatively large.
Summary of the invention
It is an object of the invention to provide determination methods and the partial pressure skid of use thereof of a kind of pipeline frozen block position
Equipment, its by from dividing potential drop tank to pipeline inject gases at high pressure or separate from pipeline gas in dividing potential drop tank until pressure is put down
Weighing apparatus, goes out the length of blocking pipeline, accurately determines blocking position according to the change calculations of gas pressure and temperature.The present invention's is concrete
Technical scheme is as follows:
Partial pressure skid mounted equipment: being connected by dividing potential drop tank, gas injection pipeline and metering device and form, dividing potential drop tank is to have receiving one
The gas tank of constant-pressure, gas injection pipeline is the center-aisle connecting dividing potential drop tank with surface line, and metering device is by high-precision pressure
Meter and thermometer form.
The computational methods of pipeline frozen block position:
Determine pipeline blocking after, skid mounted equipment is connected with gathering line, inject in gathering line from pressure be P2、
Volume is Qm3A part of gas of dividing potential drop tank, or from gathering line inward pressure P2, volume be Qm3Dividing potential drop tank in shunting
A part of gas, pressure reaches balance.Before assuming gas injection or shunting before gathering line pressure be P1, collector and delivery pipe after gas injection or shunting
Line pressure becomes P3, pipeline diameter is Dmm, seeks frozen block depot siding length l?.
Obtained by the equation of gas state:
Gathering line pressure P1, then: P1V=n1ZRT1,
Skid mounted equipment gas pressure P before gas injection or shunting2, then have: P2Q=n2ZRT, then
After gas injection or shunting balance, pressure is P3, then have: P3(V+Q)=n3ZRT3, then
Wherein, according to mass conservation law, then have: n1+n2=n3
Simultaneous aforesaid equation:
After volume is obtained, pipeline diameter D is it is known that be then easy for showing that frozen block depot siding length l is:
Ground injecting gas or shunt gas that the present invention proposes determine that pipeline choked technique is by dividing potential drop tank in skid mounted equipment
In gases at high pressure are injected into pipeline or by gas distribution in pipeline to dividing potential drop tank, enroll pressure, variations in temperature before and after gas injection
Value, is calculated by formula and determines pipeline frozen block position.This know-why is reliable, and it is straight that required parameter all may utilize measuring instrument
Obtain.Skid-mounted type equipment can realize vehicle-mounted floating operation, and compared with the conventional method, this technology, without excavating pipeline, has
Easy and simple to handle, the time saving and energy saving and the most accurate feature of result.
Accompanying drawing explanation
Fig. 1 is the schematic diagram being injected in gathering line by skid mounted equipment mesohigh gas.
Fig. 2 is by the schematic diagram in gas distribution in gathering line to skid mounted equipment.
Detailed description of the invention
With reference to Fig. 1 and 2, embodiments of the invention are further illustrated:
Embodiment 1:
Partial pressure skid mounted equipment: connected by dividing potential drop tank 1, gas injection pipeline 2 and metering device 3 and form.
After determining pipeline blocking, skid mounted equipment is connected with gathering line, is 1m from pressure 0.1MPa, volume3Dividing potential drop
Tank injects a part of gas (as shown in Figure 1) in gathering line, and pressure reaches balance, and temperature keeps constant.Before assuming gas injection
Gathering line pressure 2.5MPa, after gas injection, pressure becomes 3.3MPa, and pipeline diameter is 50mm, seeks frozen block depot siding length l?.
According to computing formula:
Embodiment 2:
After determining pipeline blocking, skid mounted equipment is connected with gathering line, from gathering line inward pressure 0.1MPa, volume
For 1m3Dividing potential drop tank in shunt a part of gas (as shown in Figure 2), pressure reach balance, temperature keep constant.Before assuming gas injection
Pressure is 2.5MPa, and after shunting, pressure becomes 2.15MPa, and pipeline diameter is 50mm, seeks frozen block depot siding length l?
According to computing formula:
Claims (1)
1. the determination methods of a pipeline frozen block position, it is characterised in that:
After determining pipeline blocking, being connected with gathering line (4) by skid mounted equipment, in gathering line (4), injection from pressure is
P2, volume be Qm3A part of gas of dividing potential drop tank (1), or from gathering line (4) inward pressure P2, volume be Qm3Point
Shunting a part of gas in pressure tank (1), pressure reaches balance;Before assuming gas injection or shunting before gathering line (4) pressure be P1, note
After gas or shunting, gathering line (4) pressure becomes P3, pipeline diameter is Dmm, seeks frozen block depot siding length l;
Obtained by the equation of gas state:
Gathering line pressure P1, then: P1V=n1ZRT1,
Skid mounted equipment gas pressure P before gas injection or shunting2, then have: P2Q=n2ZRT, then
After gas injection or shunting balance, pressure is P3, then have: P3(V+Q)=n3ZRT3, then
Wherein, according to mass conservation law, then have: n1+n2=n3
Simultaneous aforesaid equation:
After volume is obtained, pipeline diameter D is it is known that be then easy for showing that frozen block depot siding length l is:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210109389.4A CN103375164B (en) | 2012-04-13 | 2012-04-13 | Method for judging frozen plugging position of pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210109389.4A CN103375164B (en) | 2012-04-13 | 2012-04-13 | Method for judging frozen plugging position of pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103375164A CN103375164A (en) | 2013-10-30 |
CN103375164B true CN103375164B (en) | 2016-07-13 |
Family
ID=49460943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210109389.4A Active CN103375164B (en) | 2012-04-13 | 2012-04-13 | Method for judging frozen plugging position of pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103375164B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113624391B (en) * | 2020-05-08 | 2023-04-07 | 中国石油天然气股份有限公司 | H in oil field gathering and transportation pipeline 2 S and CO 2 Method for obtaining partial pressure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005031281A3 (en) * | 2003-10-01 | 2005-05-19 | Enea Ente Nuove Tec | Method and apparatus for determining the volume of a container through permeation measures |
CN1673693A (en) * | 2005-04-27 | 2005-09-28 | 中国科学院金属研究所 | Precision calibrating method of container volume |
WO2005114113A2 (en) * | 2004-05-22 | 2005-12-01 | Accu-Gauge Limited | Method and device for measuring the volume of air space in a container |
JP3756919B2 (en) * | 2004-09-07 | 2006-03-22 | 日本ベル株式会社 | How to measure dead volume fluctuation |
CN101470016A (en) * | 2007-12-28 | 2009-07-01 | 中国航天科技集团公司第五研究院第五一〇研究所 | Apparatus for measuring volume by built-in method |
CN202040552U (en) * | 2010-08-12 | 2011-11-16 | 北京知容寓远软件科技有限公司 | System for monitoring the leakage or obstruction of pipeline base on low frequency sound wave |
CN102279028A (en) * | 2011-07-05 | 2011-12-14 | 叶兴林 | Device and method for measuring container volume with high precision |
CN202731898U (en) * | 2012-04-13 | 2013-02-13 | 中国石油天然气股份有限公司 | Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline |
-
2012
- 2012-04-13 CN CN201210109389.4A patent/CN103375164B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005031281A3 (en) * | 2003-10-01 | 2005-05-19 | Enea Ente Nuove Tec | Method and apparatus for determining the volume of a container through permeation measures |
WO2005114113A2 (en) * | 2004-05-22 | 2005-12-01 | Accu-Gauge Limited | Method and device for measuring the volume of air space in a container |
JP3756919B2 (en) * | 2004-09-07 | 2006-03-22 | 日本ベル株式会社 | How to measure dead volume fluctuation |
CN1673693A (en) * | 2005-04-27 | 2005-09-28 | 中国科学院金属研究所 | Precision calibrating method of container volume |
CN101470016A (en) * | 2007-12-28 | 2009-07-01 | 中国航天科技集团公司第五研究院第五一〇研究所 | Apparatus for measuring volume by built-in method |
CN202040552U (en) * | 2010-08-12 | 2011-11-16 | 北京知容寓远软件科技有限公司 | System for monitoring the leakage or obstruction of pipeline base on low frequency sound wave |
CN102279028A (en) * | 2011-07-05 | 2011-12-14 | 叶兴林 | Device and method for measuring container volume with high precision |
CN202731898U (en) * | 2012-04-13 | 2013-02-13 | 中国石油天然气股份有限公司 | Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN103375164A (en) | 2013-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106352931B (en) | The critical flow nozzle flowmeter and measuring method of the respective flow of gas-liquid two-phase in a kind of measurement multiphase flow | |
CN202330233U (en) | Rock core permeability experiment testing arrangement under formation pressure condition | |
CN205277410U (en) | Proppant is spread and is put and flow conductivity integration collimated light source device | |
CN103575631B (en) | Rock permeability test macro and method of testing | |
CN101487831B (en) | Method for fast confirming compact rock core damage | |
CN103969160B (en) | The dynamic leak-off detection system of High Temperature High Pressure foam liquid and detection method thereof | |
CN109236281B (en) | Device and method for detecting annular pressure of gas storage and natural gas well | |
CN105806712B (en) | Hole internal water pressure test device and test macro | |
CN203772304U (en) | Integral monitoring device for gas pressure, gas flow and mining induced stress in coal seam | |
CN104563982A (en) | High-temperature high-pressure dry gas injection longitudinal wave and efficiency testing device and method for gas condensate reservoir | |
CN105136072B (en) | A kind of Tunnel Lining Cracks depth measurement method and measurement apparatus | |
CN109490173B (en) | Uranium tailing pond uranium tailings and permeability testing device and testing method for lower lying rock-soil layer | |
CN104634711A (en) | Rock damage and penetration testing method | |
CN105426666A (en) | Natural gas hydrate dissociation gas release rate calculation method and apparatus | |
CN103375164B (en) | Method for judging frozen plugging position of pipeline | |
CN204419149U (en) | A kind of proppant and acid etching flow conductivity evaluating apparatus | |
CN204511404U (en) | A kind of oil-withdrawal water-injection metering device | |
CN202731898U (en) | Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline | |
CN206114018U (en) | Measure in heterogeneous stream gas -liquid two -phase critical flow nozzle flowmeter of flow separately | |
CN203216550U (en) | Device for measuring two-phase flow of wet steam on ground surface of oil field | |
CN205691428U (en) | Hole internal water pressure test device and test system | |
CN107764591A (en) | A kind of small watershed bayonet socket station runoff and sediment automatic sampling system | |
Cervi et al. | Hydrogeological characterization of peculiar Apenninic springs | |
CN115422857A (en) | Estimation method for gas emission quantity of tunnel face of non-coal gas tunnel | |
CN204877407U (en) | Oil recovery water injection metering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |