CN103375164B - Method for judging frozen plugging position of pipeline - Google Patents

Method for judging frozen plugging position of pipeline Download PDF

Info

Publication number
CN103375164B
CN103375164B CN201210109389.4A CN201210109389A CN103375164B CN 103375164 B CN103375164 B CN 103375164B CN 201210109389 A CN201210109389 A CN 201210109389A CN 103375164 B CN103375164 B CN 103375164B
Authority
CN
China
Prior art keywords
pressure
pipeline
gas
shunting
gathering line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210109389.4A
Other languages
Chinese (zh)
Other versions
CN103375164A (en
Inventor
韩兴刚
王晓荣
王惠
王宪文
冯朋鑫
徐文龙
卢文伟
梁凌云
刘静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201210109389.4A priority Critical patent/CN103375164B/en
Publication of CN103375164A publication Critical patent/CN103375164A/en
Application granted granted Critical
Publication of CN103375164B publication Critical patent/CN103375164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a method for judging a frozen and blocked position of a pipeline and gas partial pressure skid-mounted equipment used by the method, which are designed for accurately judging the frozen and blocked position of the pipeline. The method comprises the steps of injecting high-pressure gas in a pressure division tank in the skid-mounted equipment into a pipeline or shunting the gas in the pipeline into the pressure division tank, recording pressure and temperature change values before and after gas injection, and determining the frozen and blocked position of the pipeline through formula calculation. The technical principle is reliable, and the required parameters can be directly obtained by using a metering instrument. The skid-mounted equipment can realize vehicle-mounted mobile operation, compared with the prior art, the technology does not need to excavate pipelines, and has the characteristics of simple and convenient operation, time and labor saving and more accurate result.

Description

The determination methods of pipeline frozen block position
Technical field
The present invention relates to determination methods and the partial pressure skid mounted equipment of use thereof of a kind of pipeline frozen block position, belong to gas Development technique field, field.
Background technology
During the construction of natural gas fields, owing to gas existing condensed liquid and water, when ambient temperature is too low, these liquid and The water person of being easy to forms hydrate or icing, by line clogging, affects gas well and normally produces.At present, although pipeline method for removing blockage Numerous, but there is no the effective method accurately judging pipeline frozen block position, it is usually by empirical discriminant method or uses two way classification.Warp The method of testing is according at pipeline low lying areas, pipeline reducing and the position such as valve is susceptible to the position of blocking and judges with experience Pipeline frozen block position;Two way classification is to utilize two points of segmentation methods to judge roughly pipeline blocking position, then need repeatedly to excavate pipeline, Waste time and energy, it is judged that error is relatively large.
Summary of the invention
It is an object of the invention to provide determination methods and the partial pressure skid of use thereof of a kind of pipeline frozen block position Equipment, its by from dividing potential drop tank to pipeline inject gases at high pressure or separate from pipeline gas in dividing potential drop tank until pressure is put down Weighing apparatus, goes out the length of blocking pipeline, accurately determines blocking position according to the change calculations of gas pressure and temperature.The present invention's is concrete Technical scheme is as follows:
Partial pressure skid mounted equipment: being connected by dividing potential drop tank, gas injection pipeline and metering device and form, dividing potential drop tank is to have receiving one The gas tank of constant-pressure, gas injection pipeline is the center-aisle connecting dividing potential drop tank with surface line, and metering device is by high-precision pressure Meter and thermometer form.
The computational methods of pipeline frozen block position:
Determine pipeline blocking after, skid mounted equipment is connected with gathering line, inject in gathering line from pressure be P2、 Volume is Qm3A part of gas of dividing potential drop tank, or from gathering line inward pressure P2, volume be Qm3Dividing potential drop tank in shunting A part of gas, pressure reaches balance.Before assuming gas injection or shunting before gathering line pressure be P1, collector and delivery pipe after gas injection or shunting Line pressure becomes P3, pipeline diameter is Dmm, seeks frozen block depot siding length l?.
Obtained by the equation of gas state:
Gathering line pressure P1, then: P1V=n1ZRT1,
Skid mounted equipment gas pressure P before gas injection or shunting2, then have: P2Q=n2ZRT, then
After gas injection or shunting balance, pressure is P3, then have: P3(V+Q)=n3ZRT3, then
Wherein, according to mass conservation law, then have: n1+n2=n3
Simultaneous aforesaid equation: V = P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2 × Q
After volume is obtained, pipeline diameter D is it is known that be then easy for showing that frozen block depot siding length l is:
l = 4 Q πD 2 × P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2
Ground injecting gas or shunt gas that the present invention proposes determine that pipeline choked technique is by dividing potential drop tank in skid mounted equipment In gases at high pressure are injected into pipeline or by gas distribution in pipeline to dividing potential drop tank, enroll pressure, variations in temperature before and after gas injection Value, is calculated by formula and determines pipeline frozen block position.This know-why is reliable, and it is straight that required parameter all may utilize measuring instrument Obtain.Skid-mounted type equipment can realize vehicle-mounted floating operation, and compared with the conventional method, this technology, without excavating pipeline, has Easy and simple to handle, the time saving and energy saving and the most accurate feature of result.
Accompanying drawing explanation
Fig. 1 is the schematic diagram being injected in gathering line by skid mounted equipment mesohigh gas.
Fig. 2 is by the schematic diagram in gas distribution in gathering line to skid mounted equipment.
Detailed description of the invention
With reference to Fig. 1 and 2, embodiments of the invention are further illustrated:
Embodiment 1:
Partial pressure skid mounted equipment: connected by dividing potential drop tank 1, gas injection pipeline 2 and metering device 3 and form.
After determining pipeline blocking, skid mounted equipment is connected with gathering line, is 1m from pressure 0.1MPa, volume3Dividing potential drop Tank injects a part of gas (as shown in Figure 1) in gathering line, and pressure reaches balance, and temperature keeps constant.Before assuming gas injection Gathering line pressure 2.5MPa, after gas injection, pressure becomes 3.3MPa, and pipeline diameter is 50mm, seeks frozen block depot siding length l?.
According to computing formula: l = 4 Q πD 2 × P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2 = 3000 m
Embodiment 2:
After determining pipeline blocking, skid mounted equipment is connected with gathering line, from gathering line inward pressure 0.1MPa, volume For 1m3Dividing potential drop tank in shunt a part of gas (as shown in Figure 2), pressure reach balance, temperature keep constant.Before assuming gas injection Pressure is 2.5MPa, and after shunting, pressure becomes 2.15MPa, and pipeline diameter is 50mm, seeks frozen block depot siding length l?
According to computing formula: l = 4 Q πD 2 × P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2 = 3000 m .

Claims (1)

1. the determination methods of a pipeline frozen block position, it is characterised in that:
After determining pipeline blocking, being connected with gathering line (4) by skid mounted equipment, in gathering line (4), injection from pressure is P2, volume be Qm3A part of gas of dividing potential drop tank (1), or from gathering line (4) inward pressure P2, volume be Qm3Point Shunting a part of gas in pressure tank (1), pressure reaches balance;Before assuming gas injection or shunting before gathering line (4) pressure be P1, note After gas or shunting, gathering line (4) pressure becomes P3, pipeline diameter is Dmm, seeks frozen block depot siding length l;
Obtained by the equation of gas state:
Gathering line pressure P1, then: P1V=n1ZRT1,
Skid mounted equipment gas pressure P before gas injection or shunting2, then have: P2Q=n2ZRT, then
After gas injection or shunting balance, pressure is P3, then have: P3(V+Q)=n3ZRT3, then
Wherein, according to mass conservation law, then have: n1+n2=n3
Simultaneous aforesaid equation: V = P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2 × Q
After volume is obtained, pipeline diameter D is it is known that be then easy for showing that frozen block depot siding length l is:
l = 4 Q πD 2 × P 3 T 1 T 2 - P 2 T 1 T 3 P 1 T 2 T 3 - P 3 T 1 T 2 .
CN201210109389.4A 2012-04-13 2012-04-13 Method for judging frozen plugging position of pipeline Active CN103375164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210109389.4A CN103375164B (en) 2012-04-13 2012-04-13 Method for judging frozen plugging position of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210109389.4A CN103375164B (en) 2012-04-13 2012-04-13 Method for judging frozen plugging position of pipeline

Publications (2)

Publication Number Publication Date
CN103375164A CN103375164A (en) 2013-10-30
CN103375164B true CN103375164B (en) 2016-07-13

Family

ID=49460943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210109389.4A Active CN103375164B (en) 2012-04-13 2012-04-13 Method for judging frozen plugging position of pipeline

Country Status (1)

Country Link
CN (1) CN103375164B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113624391B (en) * 2020-05-08 2023-04-07 中国石油天然气股份有限公司 H in oil field gathering and transportation pipeline 2 S and CO 2 Method for obtaining partial pressure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005031281A3 (en) * 2003-10-01 2005-05-19 Enea Ente Nuove Tec Method and apparatus for determining the volume of a container through permeation measures
CN1673693A (en) * 2005-04-27 2005-09-28 中国科学院金属研究所 Precision calibrating method of container volume
WO2005114113A2 (en) * 2004-05-22 2005-12-01 Accu-Gauge Limited Method and device for measuring the volume of air space in a container
JP3756919B2 (en) * 2004-09-07 2006-03-22 日本ベル株式会社 How to measure dead volume fluctuation
CN101470016A (en) * 2007-12-28 2009-07-01 中国航天科技集团公司第五研究院第五一〇研究所 Apparatus for measuring volume by built-in method
CN202040552U (en) * 2010-08-12 2011-11-16 北京知容寓远软件科技有限公司 System for monitoring the leakage or obstruction of pipeline base on low frequency sound wave
CN102279028A (en) * 2011-07-05 2011-12-14 叶兴林 Device and method for measuring container volume with high precision
CN202731898U (en) * 2012-04-13 2013-02-13 中国石油天然气股份有限公司 Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005031281A3 (en) * 2003-10-01 2005-05-19 Enea Ente Nuove Tec Method and apparatus for determining the volume of a container through permeation measures
WO2005114113A2 (en) * 2004-05-22 2005-12-01 Accu-Gauge Limited Method and device for measuring the volume of air space in a container
JP3756919B2 (en) * 2004-09-07 2006-03-22 日本ベル株式会社 How to measure dead volume fluctuation
CN1673693A (en) * 2005-04-27 2005-09-28 中国科学院金属研究所 Precision calibrating method of container volume
CN101470016A (en) * 2007-12-28 2009-07-01 中国航天科技集团公司第五研究院第五一〇研究所 Apparatus for measuring volume by built-in method
CN202040552U (en) * 2010-08-12 2011-11-16 北京知容寓远软件科技有限公司 System for monitoring the leakage or obstruction of pipeline base on low frequency sound wave
CN102279028A (en) * 2011-07-05 2011-12-14 叶兴林 Device and method for measuring container volume with high precision
CN202731898U (en) * 2012-04-13 2013-02-13 中国石油天然气股份有限公司 Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline

Also Published As

Publication number Publication date
CN103375164A (en) 2013-10-30

Similar Documents

Publication Publication Date Title
CN106352931B (en) The critical flow nozzle flowmeter and measuring method of the respective flow of gas-liquid two-phase in a kind of measurement multiphase flow
CN202330233U (en) Rock core permeability experiment testing arrangement under formation pressure condition
CN205277410U (en) Proppant is spread and is put and flow conductivity integration collimated light source device
CN103575631B (en) Rock permeability test macro and method of testing
CN101487831B (en) Method for fast confirming compact rock core damage
CN103969160B (en) The dynamic leak-off detection system of High Temperature High Pressure foam liquid and detection method thereof
CN109236281B (en) Device and method for detecting annular pressure of gas storage and natural gas well
CN105806712B (en) Hole internal water pressure test device and test macro
CN203772304U (en) Integral monitoring device for gas pressure, gas flow and mining induced stress in coal seam
CN104563982A (en) High-temperature high-pressure dry gas injection longitudinal wave and efficiency testing device and method for gas condensate reservoir
CN105136072B (en) A kind of Tunnel Lining Cracks depth measurement method and measurement apparatus
CN109490173B (en) Uranium tailing pond uranium tailings and permeability testing device and testing method for lower lying rock-soil layer
CN104634711A (en) Rock damage and penetration testing method
CN105426666A (en) Natural gas hydrate dissociation gas release rate calculation method and apparatus
CN103375164B (en) Method for judging frozen plugging position of pipeline
CN204419149U (en) A kind of proppant and acid etching flow conductivity evaluating apparatus
CN204511404U (en) A kind of oil-withdrawal water-injection metering device
CN202731898U (en) Gas partial pressure skid-mounted equipment for judging frozen and blocked position of pipeline
CN206114018U (en) Measure in heterogeneous stream gas -liquid two -phase critical flow nozzle flowmeter of flow separately
CN203216550U (en) Device for measuring two-phase flow of wet steam on ground surface of oil field
CN205691428U (en) Hole internal water pressure test device and test system
CN107764591A (en) A kind of small watershed bayonet socket station runoff and sediment automatic sampling system
Cervi et al. Hydrogeological characterization of peculiar Apenninic springs
CN115422857A (en) Estimation method for gas emission quantity of tunnel face of non-coal gas tunnel
CN204877407U (en) Oil recovery water injection metering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant