CN103369639A - Base-station control method, device and system - Google Patents

Base-station control method, device and system Download PDF

Info

Publication number
CN103369639A
CN103369639A CN2012100828963A CN201210082896A CN103369639A CN 103369639 A CN103369639 A CN 103369639A CN 2012100828963 A CN2012100828963 A CN 2012100828963A CN 201210082896 A CN201210082896 A CN 201210082896A CN 103369639 A CN103369639 A CN 103369639A
Authority
CN
China
Prior art keywords
base station
little base
carrier wave
turn
little
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100828963A
Other languages
Chinese (zh)
Inventor
徐修强
陈雁
耿婷婷
张舜卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN2012100828963A priority Critical patent/CN103369639A/en
Publication of CN103369639A publication Critical patent/CN103369639A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The embodiment of the invention relates to the technical field of communication and discloses a base-station control method, device and system, wherein the base-station control method includes: determining whether any carrier wave of any section of a macro base station meets a first turn-off condition, if yes, then acquiring information of each micro base station which has an overlapping coverage relation with the carrier wave of the macro base station; determining whether the micro base stations meet a second turn-off condition according to the information of each micro base station, and if yes, notifying the micro base stations which meet the second turn-off condition to execute turn-off operation. Through the base-station control method, device and system, energy consumption of a whole network is reduced.

Description

A kind of base station control method and equipment, system
Technical field
The present invention relates to communication technical field, be specifically related to a kind of base station control method and equipment.
Background technology
At present, along with popularizing and the appearance of intelligent terminal of portable terminal, it is professional that radio communication service has developed into multi-medium data at a high speed from the speech business of low speed.Correspondingly, operator is in order to satisfy growing high power capacity and High Data Rate demand, except the wireless access technology of using more high power capacity and transmission rate, little base station is further disposed in some hot spot regions that tend in the overlay area of macro base station, with upgrade of network service quality and network capacity.Wherein, macro base station adopts the directional antenna configuration usually, so that the overlay area of macro base station generally is divided into many sectors (for example three common sectors or six sectors), and each sector disposes one or more carrier wave usually; And little base station is adopted the omnidirectional antenna configuration usually, and disposes one or more carrier wave.
Find in the practice that the introducing of little base station makes traditional macrocellular network develop into the heterogeneous network that macro base station, little base station coexist, and when greatly promoting network service quality and network capacity, also consumes more whole network energy.
Summary of the invention
The embodiment of the invention provides a kind of base station control method and equipment, for reducing whole net energy consumption.
The embodiment of the invention provides a kind of base station control method on the one hand, comprising:
Whether arbitrary carrier wave judging the arbitrary sector of macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave;
According to the information of described each little base station, judge whether described little base station satisfies the second turn-off criterion, if satisfy described the second turn-off criterion, then notify described little base station to carry out and turn-off operation.
The embodiment of the invention provides a kind of base station control device on the other hand, comprising:
The first judging unit is used for judging whether arbitrary carrier wave of the arbitrary sector of macro base station satisfies the first turn-off criterion;
Acquiring unit is used in the judged result of described the first judging unit obtaining the information that each little base station of overlapping covering relation is arranged with described carrier wave when being;
The second judging unit is used for the information according to described each little base station, judges whether described little base station satisfies the second turn-off criterion;
Notification unit is used in the judged result of described the second judging unit notifying described little base station to carry out to turn-off and operating when being.
The embodiment of the invention provides a kind of base control on the other hand, comprises base station control device, macro base station and at least one little base station, and wherein, there are overlapping covering relation in arbitrary carrier wave and described at least one little base station of the arbitrary sector of described macro base station;
Described base station control device is used for judging whether arbitrary carrier wave of the arbitrary sector of described macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave; And according to the information of described each little base station, judge whether described little base station satisfies the second turn-off criterion, if satisfy described the second turn-off criterion, then notice little base station of satisfying described the second turn-off criterion is carried out and is turn-offed operation;
When described the second turn-off criterion is satisfied in described little base station, described little base station is used for receiving the notice of described base station control device and entering pre-off state, and after the user that will access described little base station migrates to described macro base station, carry out the shutoff operation of described little base station.
In the embodiment of the invention, when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, obtain first the information that each little base station of overlapping covering relation is arranged with this carrier wave, and judge each little base station according to the information of each little base station and whether also satisfy turn-off criterion, if satisfy turn-off criterion, then notice satisfies the first preferential execution shutoff operation of little base station of turn-off criterion.Because little base station is turn-offed the energy-conservation gain of whole net that brings and will be turn-offed much larger than the macro base station carrier wave, therefore when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, the preferential little base station that with this carrier wave overlapping covering relation is arranged and satisfy turn-off criterion of turn-offing can reach the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention, the below will do to introduce simply to the accompanying drawing of required use among the embodiment, apparently, accompanying drawing in the following describes only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1~Fig. 5 is the flow chart of several embodiment of the base station control method that provides of the embodiment of the invention;
Fig. 6 is the method flow diagram of a kind of carrier load information be used to obtaining macro base station of providing of the embodiment of the invention;
Fig. 7~Fig. 8 is the in addition flow chart of 2 embodiment of the base station control method that provides of the embodiment of the invention;
Fig. 9~Figure 11 is the structure chart of several embodiment of the base station control device that provides of the embodiment of the invention;
Figure 12 is the structure chart of an embodiment of the base control that provides of the embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
In actual applications, when the multicarrier configuration is all adopted in each sector of macro base station, then macro base station can be opened the carrier wave turn-off function in professional idle, so that when some carrier waves satisfy turn-off criterion, this carrier load can be moved on other carrier waves in the same coverage (being same sector), then turn-off this carrier wave to reach the energy-conservation purpose of whole net.And in the heterogeneous network of macro base station and the coexistence of little base station, if the little base station in the coverage of a certain sector of macro base station has also been opened turn-off function simultaneously, so little base station needed its load migration to macro base station before turn-offing, if and macro base station is turned off its certain one or more carrier wave already, so that the load of the residue carrier wave of macro base station is higher, and can't carry the load of little base station migration, will cause so little base station to turn-off.Under this scene, if do not take effective control measure, the carrier wave of macro base station is turn-offed and little base station produces the result who mutually suppresses between turn-offing, be unfavorable for that whole net is energy-conservation.In addition, the shutoff that refers to all carrier waves of little base station is turn-offed in said little base station in the embodiment of the invention, that is to say the invisible mode of eating dishes without rice or wine to be in of little base station.But little base station still can keep and control the communication interface between node or other base station, so that each other sending and receiving instruction.
The embodiment of the invention provides a kind of base station control method and equipment, system, can reduce whole net energy consumption.For the ease of understanding the embodiment of the invention of subsequent descriptions, the below introduces first following three kinds of relations.
The first relation: the overlapping covering relation of macro base station carrier wave and little base station.
If it is overlapping covered that a certain carrier wave F of a certain sector of macro base station and little base station B have, then between the carrier wave F of defmacro base station and the little base station B overlapping covering relation is arranged.Further, the same macro base station carrier wave of same sector can have overlapping covering relation with a plurality of little base stations, and also can there be overlapping covering relation same little base station with many carrier waves of a plurality of sectors of a plurality of macro base stations.
The second relation: the overlapping covering relation of macro base station sector and little base station.
If a certain carrier wave F and the little base station B of a certain sector S of macro base station have overlapping covering relation, then between the sector S at the carrier wave F place of defmacro base station and the little base station B overlapping covering relation is arranged.Further, can there be overlapping covering relation the same sector of macro base station with a plurality of little base stations, and also can there be overlapping covering relation same little base station with a plurality of sectors of a plurality of macro base stations.
The third relation: the overlapping covering relation of macro base station and little base station.
If a certain carrier wave F and little base station B of a certain sector of macro base station A have overlapping covering relation, then between defmacro base station A and the little base station B overlapping covering relation is arranged.Correspondingly, same macro base station can have overlapping covering relation with a plurality of little base stations, and also can there be overlapping covering relation same little base station with a plurality of macro base stations.
Need to prove that when there was overlapping covering relation a certain carrier wave of a certain sector of macro base station and little base station, this macro base station is certain to have overlapping covering relation with little base station; Simultaneously, the macro base station sector at this carrier wave place is also certain has overlapping covering relation with little base station; But, macro base station and little base station and overlapping covering relation, all sectors and all carrier waves of not representing this macro base station all have overlapping covering relation with little base station.
Below the base station control method that provides in the embodiment of the invention is described in detail.
See also Fig. 1, the flow chart of an embodiment of the base station control method that provides in the embodiment of the invention is provided Fig. 1.As shown in Figure 1, the method can may further comprise the steps.
Whether arbitrary carrier wave 101, judging the arbitrary sector of macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station of overlapping covering relation is arranged with this carrier wave.
Among the embodiment, whether the load that can judge arbitrary carrier wave of the arbitrary sector of macro base station is lower than the first predetermined threshold value, if, arbitrary carrier wave then determining the arbitrary sector of macro base station satisfies the first turn-off criterion, and then can obtain the information that each little base station of overlapping covering relation is arranged with this carrier wave.This a kind of execution mode can be determined the lower carrier wave of load effectively, can consider then to turn-off this carrier wave to reach the energy-conservation purpose of whole net with on load migration other carrier waves in the same coverage (being same sector) for the lower carrier wave of this load.
Among another embodiment, whether the continuous working period that also can judge arbitrary carrier wave of the arbitrary sector of macro base station surpasses predetermined threshold value, if, arbitrary carrier wave then determining the arbitrary sector of macro base station satisfies the first turn-off criterion, and then can obtain the information that each little base station of overlapping covering relation is arranged with this carrier wave.This a kind of execution mode can be determined the long carrier wave of continuous working period effectively, can consider then to turn-off this carrier wave to reach the energy-conservation purpose of whole net with on load migration other carrier waves in the same coverage (being same sector) for the long carrier wave of this continuous working period.
102, according to the information of each little base station, judge whether this little base station satisfies the second turn-off criterion, if satisfy the second turn-off criterion, then little base station of satisfied the second turn-off criterion of notice is carried out and is turn-offed operation.
Among the embodiment, the information of each little base station can comprise the load information of each little base station, such as the number of users that is in connected state, resource (being power, code channel, Physical Resource Block etc.) utilance etc.Further, the information of each little base station also can comprise load information and the turn-off function state of each little base station simultaneously, wherein, whether the turn-off function state is used to indicate this little base station and allows to be turned off, for example, when the turn-off function state is " ON ", indicate this little base station to allow to be turned off; When the turn-off function state is " NO ", indicate this little base station not allow to be turned off.The embodiment of the invention is follow-up describes how to judge according to the information of each little base station whether this little base station satisfies the second turn-off criterion in detail in connection with specific embodiment.
Among the embodiment, if described the second turn-off criterion is not all satisfied in each little base station, the shutoff operation that then can notify this macro base station to carry out the carrier wave that satisfies the first turn-off criterion is to reach the energy-conservation purpose of whole net.
In base station control method shown in Figure 1, when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, obtain first the information that each little base station of overlapping covering relation is arranged with this carrier wave, and judge each little base station according to the information of each little base station and whether also satisfy turn-off criterion, if satisfy turn-off criterion, then notice satisfies the first preferential execution shutoff operation of little base station of turn-off criterion.Because little base station is turn-offed the energy-conservation gain of whole net that brings and will be turn-offed much larger than the macro base station carrier wave, therefore when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, the preferential little base station that with this carrier wave overlapping covering relation is arranged and satisfy turn-off criterion of turn-offing can reach the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
See also Fig. 2, the flow chart of another embodiment of the base station control method that provides in the embodiment of the invention is provided Fig. 2.In base station control method shown in Figure 2, can carry out this base station control method by the control node, to reach the energy-conservation effect of whole net.Wherein, the control node can be a kind of logic entity, its physics realization can be radio network controller (Radio Network Controller, RNC), also can be OSS (Operation Support System, OSS) etc. core network element also can be macro base station or little base station, and the embodiment of the invention is not construed as limiting.As shown in Figure 2, this base station control method can may further comprise the steps.
201, the control node judges whether arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, if so, and execution in step 202; If not, process ends then.
Wherein, the control node judge specific implementation that whether arbitrary carrier wave of the arbitrary sector of macro base station satisfy turn-off criterion in front embodiment introduce, the embodiment of the invention is not given unnecessary details.
202, the control node obtains the load information that all little base stations of overlapping covering relation are arranged with this carrier wave, and execution in step 203.
Among the embodiment, the control node can send a request message to this carrier wave all little base stations of overlapping covering relation being arranged, and receives and load information that this carrier wave has all little base stations of overlapping covering relation to report respectively.
203, the control node travels through the load information of all little base stations that get access to, and judges whether each little base station satisfies turn-off criterion, and execution in step 204.
Among the embodiment, can be according to the load information of each little base station, whether the load of judging this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station, if so, then turn-off criterion is satisfied in definite this little base station; Otherwise then turn-off criterion is not satisfied in definite this little base station.
If 204 exist little base station of satisfying turn-off criterion, then control node execution in step 205; Otherwise, control node execution in step 206.
205, the control node is notified little base station execution shutoff operation that all satisfy turn-off criterion, and process ends.
The embodiment of the invention is follow-up describes the process that the shutoff operation is carried out in little base station in detail in connection with specific embodiment.
206, control node notice macro base station is carried out the shutoff operation of the carrier wave that satisfies turn-off criterion.
Wherein, macro base station can receive the notice of control node, and carries out the shutoff operation of the carrier wave that satisfies turn-off criterion based on the carrier wave trip algorithm, to reach the energy-conservation purpose of whole net.Because it is general knowledge known in those skilled in the art that macro base station is carried out the specific implementation process of carrier wave shutoff operation, so the embodiment of the invention is not given unnecessary details.
In base station control method shown in Figure 2, when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, obtain first the load information that each little base station of overlapping covering relation is arranged with this carrier wave, and judge each little base station according to the load information of each little base station and whether also satisfy turn-off criterion, if satisfy turn-off criterion, then notice satisfies the first preferential execution shutoff operation of little base station of turn-off criterion.Because little base station is turn-offed the energy-conservation gain of whole net that brings and will be turn-offed much larger than the macro base station carrier wave, therefore when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, the preferential little base station that with this carrier wave overlapping covering relation is arranged and satisfy turn-off criterion of turn-offing can reach the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
Among the embodiment, the control node is not when arbitrary carrier wave judging the arbitrary sector of macro base station satisfies turn-off criterion, also can obtain the load information that all little base stations of overlapping covering relation are arranged with this carrier wave, and the load information of all little base stations of getting access to of traversal, judge whether each little base station satisfies turn-off criterion, if there is little base station of satisfying turn-off criterion, then control little base station execution shutoff operation that node can notify all to satisfy turn-off criterion, to reach the energy-conservation purpose of whole net.
The embodiment of the invention is on the basis of the described base station control method that can reach whole net energy-saving effect of Fig. 1 and Fig. 2, base station control method as shown in Figure 3 can further be provided, this base station control method can carry out Combined Treatment to the unlatching of macro base station carrier wave and the unlatching of little base station, to reach the energy-conservation purpose of whole net.As shown in Figure 3, this base station control method can be carried out by the control node equally, may further comprise the steps.
301, the control node judges whether the load of arbitrary carrier wave of the arbitrary sector of macro base station surpasses predetermined threshold value, and if so, then execution in step 302; If not, process ends then.
302, the control node judges whether to exist the carrier wave that belongs to same sector with this carrier wave and be in off state, and if so, then execution in step 303; If not, execution in step 304 then.
303, control node notice macro base station is carried out the open operation that belongs to same sector with this carrier wave and be in the part or all of carrier wave of off state, sharing the load of described carrier wave, and finishes process ends.
Wherein, belong to general knowledge known in those skilled in the art because macro base station is carried out the specific implementation process of carrier wave open operation, so the embodiment of the invention is not given unnecessary details yet.
304, the control node judges whether to exist the little base station that with this carrier wave overlapping covering relation is arranged and be in off state, and if so, then execution in step 305; If not, process ends then.
305, open operation is carried out in control node notice part or all of little base station of with this carrier wave overlapping covering relation being arranged and being in off state, sharing the load of described carrier wave, and finishes process ends.
In base station control method shown in Figure 3, because the macro base station carrier wave is opened the energy-conservation gain of whole net that brings and will be opened much larger than little base station, therefore when the load of arbitrary carrier wave of the arbitrary sector of macro base station is higher, the preferential part or all of carrier wave that belongs to same sector with this carrier wave and be in off state of opening can reach the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
The embodiment of the invention also provides a kind of base station control method, and the method comprises that controlling node judges whether little base station is satisfied flow process and little base station of turn-off criterion and carried out the flow process of turn-offing operate disable.Wherein, this little base station control method specifically may further comprise the steps as shown in Figure 4.
400, the control node obtains the information of little base station, and this information comprises the load information of this little base station and the turn-off function state of this little base station at least.
Wherein, step 400 is that the control node is carried out when existing arbitrary carrier wave of the arbitrary sector of macro base station of overlapping covering relation to satisfy turn-off criterion with this little base station.
The embodiment of the invention follow-up will by specific embodiment describe in detail control node how to obtain the information of little base station.
401, the control node judges according to the turn-off function state of this little base station whether the turn-off function of this little base station is opened, and if so, then execution in step 402; Otherwise, process ends.
402, the control node judges according to the load information of this little base station whether the load of this little base station is lower than predetermined threshold value, and if so, then execution in step 403; Otherwise, process ends.
403, the control node is collected in the macro base station load information of all carrier waves that all sectors of overlapping covering relation are arranged with this little base station, and execution in step 404.
The embodiment of the invention is follow-up will describe how the control node is collected in the macro base station all sectors of overlapping covering relation with this little base station the load information of all carrier waves in detail by specific embodiment.
404, the control node is according to the load information of all carrier waves that all sectors of overlapping covering relation are arranged with this little base station in the load information of little base station and the macro base station, whether the load of judging this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station, if can carry, then turn-off criterion is satisfied in this little base station, and execution in step 405; Otherwise, process ends.
The embodiment of the invention is follow-up will be described the control node in detail by specific embodiment and how judge that whether the load of this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station.
405, this little base station of control node notice is carried out and is turn-offed operation, and execution in step 406.
Wherein, little base station will enter pre-off state after receiving the notice of control node, and after the user that will access little base station migrated to macro base station in the step 403, the shutoff of carrying out little base station operated.
Wherein, after little base station enters pre-off state, also need to stop new user's access, comprise that adjacent base station is in the switching of user take this little base station as target BS of connected state etc.
Wherein, when the user that this little base station will be accessed in little base station migrates to macro base station in the step 403, the user who is in Idle state of this little base station of access and the user who is in connected state need to be migrated to the macro base station in the step 403.
406, the macro base station in control node the as a result notifying process 403 that little base station is turn-offed is so that macro base station can upgrade neighboring BS relationship about this little base station in the step 403.
In the embodiment of the invention, little base station is in carrying out the shutoff operating process, at first needing its user (for example being in the user of connection status) moved out has with it the macro base station of overlapping covering relation, and then turn-offs, and prevents the user because should the shutoff of little base station and go offline.
In the embodiment of the invention, little base station is closed and is had no progeny, the control node need to turn-off little base station the macro base station that there is overlapping covering relation result's notice and this little base station, so that have the macro base station of overlapping covering relation can upgrade neighboring BS information about this little base station with this little base station.Further, if also store the neighboring BS information of adjusting about this little base station on the control node, after turn-offed this little base station, the control node also can upgrade the neighboring BS information about this little base station of its storage so.
In the embodiment of the invention, little base station is closed and is had no progeny, the invisible mode of eating dishes without rice or wine to be in of little base station, and still, this little base station still can keep and control the communication interface between node or other base station, so that each other sending and receiving instruction.
In base station control method shown in Figure 4, when the turn-off function of little base station is opened, and when the load of this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station again, this little base station of control node notice is carried out and is turn-offed operation, to reduce whole net energy consumption.
The embodiment of the invention also provides a kind of base station control method, supposes that in the method macro base station and little base station share a RNC, and this RNC can control the execution shutoff operation of little base station as the control node.Wherein, this little base station control method specifically may further comprise the steps as shown in Figure 5.
500, RNC sends a request message to little base station, and receives the information that this little base station reports, and wherein, this information can comprise the load information of this little base station and the turn-off function state of this little base station.
Wherein, above-mentioned steps 500 is corresponding to above-mentioned step 400.
Among the embodiment, also can store the turn-off function state of little base station on the RNC, correspondingly, little base station is behind the request message that receives the RNC transmission, only need report the information of the load information that comprises this little base station to get final product to RNC, thereby can reduce the amount of information that this little base station reports, improve this little base station and report efficient.
501, RNC judges according to the turn-off function state of this little base station whether the turn-off function state of this little base station is " ON ", and namely whether the turn-off function state of this little base station is opened, and if so, determines that then this little base station allows to be turned off, and execution in step 502; Otherwise, process ends.
502, RNC judges according to the load information of this little base station whether the load L of this little base station is lower than predetermined threshold value T1, and if so, then execution in step 503; If not, process ends.
Among the embodiment, the load information of this little base station can be the number of users that is in connected state of this little base station of access, and so correspondingly, RNC can judge whether the number of users that is in connected state of this little base station is lower than predetermined threshold value T1, if so, execution in step 503 then; If not, process ends.
503, RNC send a request message to this little base station exist overlapping covering relation macro base station ENBn (n=1,2 ..., N), wherein, having all sectors of overlapping covering relation with this little base station among the macro base station ENBn is Snm (m=1,2 ..., M (n)); And receive that macro base station ENBn reports have the load information of all carrier waves of all sector Snm of overlapping covering relation and execution in step 504 with this little base station.
Wherein, above-mentioned steps 503 is corresponding to above-mentioned step 403.
504, RNC according to certain rule will this little base station load L be converted to respectively macro base station ENBn (n=1,2 ..., N) load Ln for example, multiply by macro base station ENBn (n=1 with the load L of this little base station, 2 ..., N) load commutation factor Cn (n=1 corresponding to difference, 2 ..., N) obtain macro base station ENBn (n=1,2, ..., load Ln N), i.e. Ln=L*Cn; Further, RNC can be according to the macro base station ENBn (n=1,2 that obtain after the conversion, ..., load Ln N) and macro base station ENBn (n=1,2, ..., the carrier load that N) reports is judged macro base station ENBn (n=1,2, ..., N) whether can carry the load L of this little base station, if can carry, illustrate that this little base station satisfies turn-off criterion, and execution in step 505; If can not carry process ends.
Wherein, above-mentioned steps 504 is corresponding to above-mentioned step 404.
Among the embodiment, RNC also can take following methods judge macro base station ENBn (n=1,2 ..., N) whether can carry the load L of this little base station, that is:
Method 1: the load L of this little base station is lower than predetermined threshold value T2, namely during L≤T2, think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
Method 2:RNC from macro base station ENBn (n=1,2 ..., each the sector Snm that N) reports (m=1,2 ..., M (n)) in, select the minimum carrier wave Fnm of load (selecting altogether M*N bar carrier wave), the load of carrier wave Fnm is Lnm, if the load L that all carrier wave Fnm that elect can both this little base station of independent bearing, be Ln+Lnm≤Tnm (Tnm is predetermined threshold value), then think macro base station ENBn (n=1,2, ..., N) can carry the load L of this little base station.
Method 3:RNC calculate respectively each macro base station sector Snm (n=1,2 ..., N; M=1,2, ..., M (n)) total load L ' nm (being all carrier load sums among the Snm of sector) is if the load L that all sector Snm can both this little base station of independent bearing, i.e. Ln+L ' nm≤T ' nm (T ' nm be predetermined threshold value), then think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
505, this little base station of RNC notice is carried out and is turn-offed operation, this little base station will enter pre-off state after receiving the notice of controlling node, and stop adjacent base station to be in the switching of user take this little base station as target BS of connected state, and will access little base station the user who is in idle condition and/user that is in connected state moves to macro base station ENBn (n=1,2, ..., N), be about to access little base station the user who is in idle condition and/user that is in connected state move to macro base station ENBn (n=1,2 ..., N) the sector Snm (m=1 that has overlapping covering relation in this little base station, 2 ..., M (n)) carrier wave on.
In user's transition process, for the user who is in Idle state, RNC can upgrade the residential quarter of this little base station and select parameter, make this little base station no longer satisfy the S criterion that the residential quarter is selected, like this user who is in Idle state of this little base station of access, this little base station discharge Radio Resource control (Radio Resource Control, the user who has just started shooting in the user that RRC connects and the coverage of this little base station can reside in macro base station ENBn (n=1,2, ..., N) in.
In user's transition process, correspondence is in the user of connected state, RNC requires the user who is in connected state of this little base station of access to macro base station ENBn (n=1,2, ..., N) measure, and switch to suitable macro base station based on the user who is in connected state that measurement result will access this little base station.Further, the target macro base station carrier that RNC can also specify the user who is in connected state of this little base station of access to measure can not specified yet.Wherein, this little base station can reduce transmitting power step by step in the mode of successively decreasing, and makes that the user who is in connected state is easier to be switched in the macro base station.
506, RNC upgrade macro base station ENBn (n=1,2 ..., N) neighboring BS relationship about this little base station of storage for example can be deleted this little base station from Neighboring Cell List, the flow process end.
In base station control method shown in Figure 5, when the turn-off function of little base station is opened, and when the load of this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station again, this little base station of control node notice is carried out and is turn-offed operation, to reduce whole net energy consumption.
The embodiment of the invention also provides as shown in Figure 6 a kind of to can be used for obtaining the method for the carrier load information of macro base station.Wherein, in method shown in Figure 6, suppose to exist in the macro base station of overlapping covering relation with little base station, a part of macro base station and little base station belong to RNC1, and another part macro base station belongs to RNC2, and the RNC1 under this little base station is as the control node.As shown in Figure 6, can send request load message to having overlapping covering relation with this little base station and belong to all macro base stations of RNC1 as the RNC1 of control node, and receive that this a part of macro base station reports have the load information of all carrier waves of all sectors of overlapping covering relation with this little base station.In addition, can send request load message to having overlapping covering relation with this little base station and belong to all macro base stations of RNC2 by RNC2 as the RNC1 of control node, and receive that this a part of macro base station reports have the load information of all carrier waves of all sectors of overlapping covering relation with this little base station.
Wherein, method shown in Figure 6 is corresponding to above-mentioned step 403.From shown in Figure 6 can finding out, when macro base station and little base station did not share RNC, RNC1 need to obtain via RNC2 the load information of needed macro base station carrier wave.
The embodiment of the invention also provides another kind of base station control method, suppose that in the method macro base station and little base station are all the general continental rise wireless access network of evolution (Evolved Universal Terrestrial Radio Access Network, EUTRAN) base station, and this little base station is as the control node.As shown in Figure 7, this base station control method can may further comprise the steps.
700, its load information is calculated in little base station, and the acquisition load is L.
701, little base station judges according to its turn-off function state whether its turn-off function state is " ON ", and namely whether its turn-off function state is opened, and if so, determines that then it allows to be turned off, and execution in step 702; Otherwise, process ends.
702, little base station judges according to its load information whether its load L is lower than predetermined threshold value T1, and if so, then execution in step 703; If not, process ends.
703, little base station send a request message to this little base station exist overlapping covering relation macro base station ENBn (n=1,2 ..., N), wherein, having all sectors of overlapping covering relation with this little base station among the macro base station ENBn is Snm (m=1,2 ..., M (n)); And receive that macro base station ENBn reports have the load information of all carrier waves of all sector Snm of overlapping covering relation and execution in step 704 with this little base station.
704, little base station according to certain rule will this little base station load L be converted to respectively macro base station ENBn (n=1,2 ..., N) load Ln for example, multiply by macro base station ENBn (n=1 with the load L of this little base station, 2 ..., N) load commutation factor Cn (n=1 corresponding to difference, 2 ..., N) obtain macro base station ENBn (n=1,2, ..., load Ln N), i.e. Ln=L*Cn; Further, little base station can be according to the macro base station ENBn (n=1,2 that obtain after the conversion, ..., load Ln N) and macro base station ENBn (n=1,2, ..., the carrier load that N) reports is judged macro base station ENBn (n=1,2, ..., N) whether can carry the load L of this little base station, if can carry, illustrate that this little base station satisfies turn-off criterion, and execution in step 705; If can not carry process ends.
Among the embodiment, little base station also can take following methods judge macro base station ENBn (n=1,2 ..., N) whether can carry the load L of this little base station, that is:
Method 1: the load L of this little base station is lower than predetermined threshold value T2, namely during L≤T2, little base station think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
Method 2: little base station is from macro base station ENBn (n=1,2, ..., N) each the sector Snm (m=1 that reports, 2, ..., M (n)) in, select the minimum carrier wave Fnm of load (selecting altogether M*N bar carrier wave), the load of carrier wave Fnm is Lnm, if the load L that all carrier wave Fnm that elect can both this little base station of independent bearing, be Ln+Lnm≤Tnm (Tnm is predetermined threshold value), then think macro base station ENBn (n=1,2, ..., N) can carry the load L of this little base station.
Method 3: little base station calculate respectively each macro base station sector Snm (n=1,2 ..., N; M=1,2, ..., M (n)) total load L ' nm (being all carrier load sums among the Snm of sector) is if the load L that all sector Snm can both this little base station of independent bearing, i.e. Ln+L ' nm≤T ' nm (T ' nm be predetermined threshold value), then think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
705, little base station enters pre-off state, and stop adjacent base station to be in the switching of user take this little base station as target BS of connected state, and will access little base station the user who is in idle condition and/user that is in connected state moves to macro base station ENBn (n=1,2, ..., N), be about to access little base station the user who is in idle condition and/user that is in connected state moves to macro base station ENBn (n=1,2, ..., there are sector Snm (m=1,2 of overlapping covering relation with this little base station in N), ..., M (n)) carrier wave on.
In user's transition process, for the user who is in Idle state, little base station can be upgraded the residential quarter of this little base station and select parameter, make this little base station no longer satisfy the S criterion that the residential quarter is selected, like this user who is in Idle state of this little base station of access, this little base station discharge Radio Resource control (Radio Resource Control, the user who has just started shooting in the user that RRC connects and the coverage of this little base station can reside in macro base station ENBn (n=1,2, ..., N) in.
In user's transition process, correspondence is in the user of connected state, little base station can require to access the user who is in connected state of this little base station to macro base station ENBn (n=1,2, ..., N) measure, and switch to suitable macro base station based on the user who is in connected state that measurement result will access this little base station.Further, the target macro base station carrier that little base station can also specify the user who is in connected state of this little base station of access to measure can not specified yet.Wherein, this little base station can reduce transmitting power step by step in the mode of successively decreasing, and makes that the user who is in connected state is easier to be switched in the macro base station.
706, little base station upgrade macro base station ENBn (n=1,2 ..., N) neighboring BS relationship about this little base station of storage for example can be deleted this little base station from Neighboring Cell List, the flow process end.
In base station control method shown in Figure 7, when the turn-off function of little base station is opened, and when the load of this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station again, little base station can be carried out to turn-off and be operated, to reduce whole net energy consumption.
The embodiment of the invention also provides another kind of base station control method, supposes that in the method macro base station and little base station are all the EUTRAN base station, and OSS or other core network elements are as the control node.Shown in 8, this base station control method can may further comprise the steps.
800, the control node judges according to the turn-off function state of little base station whether the turn-off function state of this little base station is " ON ", and namely whether the turn-off function state of this little base station is opened, and if so, determines that then it allows to be turned off, and execution in step 801; Otherwise, process ends.
In base station control method shown in Figure 8, the turn-off function state that the control node can pre-stored little base station.Certainly, the control node also can not stored the turn-off function state of little base station, but by send a request message to obtain the turn-off function state of this little base station to little base station, the embodiment of the invention is not construed as limiting.
801, the control node sends a request message to little base station, and receives the information that this little base station reports, and wherein, this information can comprise the load information of this little base station, and the load of supposing this little base station is L, and execution in step 802.
802, the control node judges whether the load L of this little base station is lower than predetermined threshold value T1, and if so, then execution in step 803; If not, process ends.
803, control node send a request message to this little base station exist overlapping covering relation macro base station ENBn (n=1,2 ..., N), wherein, having all sectors of overlapping covering relation with this little base station among the macro base station ENBn is Snm (m=1,2 ..., M (n)); And receive that macro base station ENBn reports have the load information of all carrier waves of all sector Snm of overlapping covering relation and execution in step 804 with this little base station.
804, the control node according to certain rule will this little base station load L be converted to respectively macro base station ENBn (n=1,2 ..., N) load Ln for example, multiply by macro base station ENBn (n=1 with the load L of this little base station, 2 ..., N) load commutation factor Cn (n=1 corresponding to difference, 2 ..., N) obtain macro base station ENBn (n=1,2, ..., load Ln N), i.e. Ln=L*Cn; Further, the control node can be according to the macro base station ENBn (n=1,2 that obtain after the conversion, ..., load Ln N) and macro base station ENBn (n=1,2, ..., the carrier load that N) reports is judged macro base station ENBn (n=1,2, ..., N) whether can carry the load L of this little base station, if can carry, illustrate that this little base station satisfies turn-off criterion, and execution in step 805; If can not carry process ends.
Among the embodiment, the control node also can take following methods judge macro base station ENBn (n=1,2 ..., N) whether can carry the load L of this little base station, that is:
Method 1: the load L of this little base station is lower than predetermined threshold value T2, namely during L≤T2, think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
Method 2:RNC from macro base station ENBn (n=1,2 ..., each the sector Snm that N) reports (m=1,2 ..., M (n)) in, select the minimum carrier wave Fnm of load (selecting altogether M*N bar carrier wave), the load of carrier wave Fnm is Lnm, if the load L that all carrier wave Fnm that elect can both this little base station of independent bearing, be Ln+Lnm≤Tnm (Tnm is predetermined threshold value), then think macro base station ENBn (n=1,2, ..., N) can carry the load L of this little base station.
Method 3:RNC calculate respectively each macro base station sector Snm (n=1,2 ..., N; M=1,2, ..., M (n)) total load L ' nm (being all carrier load sums among the Snm of sector) is if the load L that all sector Snm can both this little base station of independent bearing, i.e. Ln+L ' nm≤T ' nm (T ' nm be predetermined threshold value), then think macro base station ENBn (n=1,2 ..., N) can carry the load L of this little base station.
805, this little base station of control node notice is carried out and is turn-offed operation.
806, little base station will enter pre-off state after receiving the notice of controlling node, and stop adjacent base station to be in the switching of user take this little base station as target BS of connected state, and will access little base station the user who is in idle condition and/user that is in connected state moves to macro base station ENBn (n=1,2, ..., N), be about to access little base station the user who is in idle condition and/user that is in connected state moves to macro base station ENBn (n=1,2, ..., there are sector Snm (m=1,2 of overlapping covering relation with this little base station in N), ..., M (n)) carrier wave on.
807, the control node receives the notice that enters off state that little base station reports, and execution in step 808.
808, the control node result that will this little base station have entered off state inform macro base station ENBn (n=1,2 ..., N), macro base station ENBn (n=1,2 ..., N) upgrade neighboring BS relationship about this little base station, the flow process end.
In base station control method shown in Figure 8, when the turn-off function of little base station is opened, and when the load of this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station again, the control node can be carried out to turn-off and operate, to reduce whole net energy consumption.
The embodiment of the invention also provides another kind of base station control device, is used for carrying out the merit of above-mentioned control node.As shown in Figure 9, this base station control device can comprise the first judging unit 901, acquiring unit 902, the second judging unit 903 and notification unit 904, wherein:
The first judging unit 901 is used for judging whether arbitrary carrier wave of the arbitrary sector of macro base station satisfies the first turn-off criterion; Acquiring unit 902 is used in the judged result of the first judging unit 901 obtaining the information that each little base station of overlapping covering relation is arranged with this carrier wave when being; The information that the second judging unit 903 is used for according to each little base station judges whether this little base station satisfies the second turn-off criterion; Notification unit 904 is used in the judged result of the second judging unit 903 notify and should the execution shutoff of little base station operating when being.
Among the embodiment, notification unit 904 also is used for when the second judging unit 903 is judged each little base station and all do not satisfied the second turn-off criterion, and the notice macro base station is carried out this carrier wave and turn-offed operation.
Among the embodiment, whether the load of the first judging unit 901 concrete arbitrary carrier waves for judging the arbitrary sector of macro base station is lower than the first predetermined threshold value; When acquiring unit 902 concrete loads for judge arbitrary carrier wave of the arbitrary sector of macro base station at the first judging unit 901 are lower than the first predetermined threshold value, obtain the information that each little base station of overlapping covering relation is arranged with this carrier wave.
See also Figure 10, Figure 10 is the embodiment of the invention is optimized the another kind of base station control device that obtains on the basis of base station control device shown in Figure 9 structural representation.In base station control device shown in Figure 10, the information of each little base station that acquiring unit 902 gets access to can comprise the load information of this little base station, and so correspondingly, the second judging unit 903 can comprise the first subelement 9031, wherein:
The first subelement 9031 is used for the load information according to each little base station, and whether the load of judging this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station;
Correspondingly, notification unit 904 is concrete is used in the judged result of the first subelement 9031 notify and should the execution shutoff of little base station operating when being.
Among the embodiment, in base station control device shown in Figure 10, the second judging unit 903 can also comprise the second subelement 9032, wherein:
The second subelement 9032 is for the load information of each the little base station that gets access to according to acquiring unit 902, whether the load of judging this little base station is lower than the second predetermined threshold value, if be lower than the second predetermined threshold value, then trigger the first subelement 9031 according to the load information of each little base station, whether the load of judging this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station.
Correspondingly, the first subelement 9031 is used for the load information according to each little base station after being triggered by the second subelement 9032, and whether the load of judging this little base station can be had all carriers carry of all sectors of overlapping covering relation with this little base station in the macro base station.
Among the embodiment, in base station control device shown in Figure 10, the information of each little base station that acquiring unit 902 gets access to can comprise the turn-off function state of this little base station, so correspondingly, the second judging unit 903 can further include the 3rd subelement 9033, wherein:
The turn-off function state that the 3rd subelement 9033 is used for according to each little base station, judge whether the turn-off function of this little base station is opened, if open, then trigger the second subelement 9032 according to the load information of each little base station, judge whether the load of this little base station is lower than the second predetermined threshold value.
See also Figure 11, the structural representation of Figure 11 to be the embodiment of the invention on the basis of Fig. 9 or base station control device shown in Figure 10 be optimized another kind of base station control device that obtains.In base station control device shown in Figure 11, whether the first judging unit 901 also surpasses the 3rd predetermined threshold value for the load of arbitrary carrier wave judging the arbitrary sector of macro base station; Correspondingly, this base station control device can further include the 3rd judging unit 905, wherein:
The 3rd judging unit 905 is used for when the load that the first judging unit 901 is judged arbitrary carrier wave of the arbitrary sector of macro base station surpasses the 3rd predetermined threshold value, judges whether to exist the carrier wave that belongs to same sector with this carrier wave and be in off state.
Correspondingly, notification unit 904 also is used in the judged result of the 3rd judging unit 905 notifying the open operation that this macro base station is carried out and this carrier wave belongs to same sector and is in the part or all of carrier wave of off state, to share the load of this carrier wave when being.
Among the embodiment, in base station control device shown in Figure 11, can further include the 4th judging unit 906, wherein:
The 4th judging unit 906 is used at the 3rd judging unit 905 when the determination result is NO, judges whether to exist the little base station that with this carrier wave overlapping covering relation is arranged and be in off state.
Correspondingly, notification unit 904 also is used in the judged result of the 4th judging unit 906 when being, notice has overlapping covering relation with this carrier wave and is in part or all of little base station execution open operation of off state, to share the load of this carrier wave.
The above-mentioned base station control device that the embodiment of the invention provides can be at macro base station, or little base station, or carries out physics realization on the core network element.
In the base station control device that the embodiment of the invention provides, when arbitrary carrier wave of the arbitrary sector of macro base station satisfies turn-off criterion, the preferential little base station that overlapping covering relation is arranged and satisfy turn-off criterion with this carrier wave of turn-offing, reaching the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
More than base station control method and equipment that the embodiment of the invention is provided introduce, the embodiment of the invention considers that little base station turn-offs the energy-conservation gain of whole net that brings and will turn-off much larger than the macro base station carrier wave, therefore before the macro base station carrier wave turn-offs, preferentially turn-off the little base station that overlapping covering relation is arranged and satisfy turn-off criterion with this carrier wave; Accordingly, when macro base station carrier load is higher, before unlatching and this carrier wave had overlapping covering relation and be in little base station of off state, preferential unlatching belonged to same sector with this carrier wave and is in the macro base station carrier wave of off state, thereby reaches the purpose that maximizes whole net energy-saving effect.In addition, when judging whether little base station satisfies turn-off criterion, consider the loading condition of little base station and macro base station, when macro base station can carry the load of little base station, just allow to turn-off little base station, it is congested to cause macro base station to produce when having avoided the migration load of little base station, and then the user is switched call drop.
The embodiment of the invention also provides a kind of base control, is used for carrying out above-mentioned base station control method.As shown in figure 12, this base control can comprise base station control device 1201, macro base station 1202 and at least one little base station 1203, and wherein, there are overlapping covering relation in arbitrary carrier wave and at least one little base station 1203 of macro base station 1202 arbitrary sectors:
Base station control device 1201 is used for judging whether arbitrary carrier wave of macro base station 1201 arbitrary sectors satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station 1203 of overlapping covering relation is arranged with this carrier wave; And according to the information of each little base station 1203, judge whether this little base station 1203 satisfies the second turn-off criterion, if satisfy the second turn-off criterion, then notice little base station 1203 of satisfying the second turn-off criterion is carried out and is turn-offed operation.
When the second turn-off criterion is satisfied in little base station 1203, this little base station 1203 is used for receiving the notice of base station control device 1201 and entering pre-off state, and after the user that will access little base station 1203 migrates to macro base station 1202, carry out the shutoff operation of this little base station 1203.
Among the embodiment, base station control device 1201 also is used for judging after each little base station 1203 all do not satisfy the second turn-off criterion, and notice macro base station 1202 is carried out this carrier waves and turn-offed operation.Correspondingly, macro base station 1202 is used for receiving the notice of base station control device 1201, and carries out this carrier wave and turn-off operation.
Among the embodiment, whether base station control device 1201 also surpasses predetermined threshold value for the load of arbitrary carrier wave judging macro base station 1202 arbitrary sectors, if surpass predetermined threshold value, then judge and whether have the carrier wave that belongs to same sector with this carrier wave and be in off state on the macro base station 1202, if exist, then notify macro base station 1202 to carry out to belong to same sector with this carrier wave and be in the open operation of the part or all of carrier wave of off state.Correspondingly, macro base station 1202 also be used for to receive the notice of base station control device 1201, and carries out and this carrier wave belongs to same sector and is in the open operation of the part or all of carrier wave of off state, to share the load of this carrier wave.
Among the embodiment, base station control device 1201 also is used for not existing on judging macro base station 1202 and belongs to same sector with this carrier wave and be in after the carrier wave of off state, judges at least one little base station 1203 whether have the little base station that is in off state; If there is the little base station that is in off state, then notice is in part or all of little base station execution open operation of off state.Correspondingly, when little base station 1203 was in off state, little base station 1203 was used for receiving the notice of base station control device 1201, and carried out open operation to share the load of this carrier wave.
Wherein, the dotted line among Figure 12 represents can be wireless.
In the base control that the embodiment of the invention provides, when arbitrary carrier wave of macro base station 1202 arbitrary sectors satisfies turn-off criterion, the preferential little base station 1203 that overlapping covering relation is arranged and satisfy turn-off criterion with this carrier wave of turn-offing, reaching the purpose of maximized whole net energy-saving effect, thereby can reduce whole net energy consumption.
One of ordinary skill in the art will appreciate that all or part of step in the whole bag of tricks of above-described embodiment is to come the relevant hardware of instruction finish by program, this program can be stored in the computer-readable recording medium, storage medium can comprise: flash disk, read-only memory (Read-Only Memory, ROM), random access device (Random Access Memory, RAM), disk or CD etc.
More than base station control method that the embodiment of the invention is provided and equipment, system be described in detail, used specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.

Claims (20)

1. a base station control method is characterized in that, comprising:
Whether arbitrary carrier wave judging the arbitrary sector of macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave;
According to the information of described each little base station, judge whether described little base station satisfies the second turn-off criterion, if satisfy described the second turn-off criterion, then notify described little base station to carry out and turn-off operation.
2. method according to claim 1 is characterized in that, if described the second turn-off criterion is not all satisfied in each described little base station, then described method also comprises:
Notify described macro base station to carry out described carrier wave and turn-off operation.
3. method according to claim 1, it is characterized in that, whether described arbitrary carrier wave judging the arbitrary sector of macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtaining with described carrier wave has the information of each little base station of overlapping covering relation to comprise:
Whether the load of judging arbitrary carrier wave of the arbitrary sector of macro base station is lower than the first predetermined threshold value, if so, then obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave.
4. method according to claim 1, it is characterized in that, the information of described each little base station comprises the load information of described little base station at least, described information according to described each little base station then, judge whether described little base station satisfies the second turn-off criterion, if satisfy described the second turn-off criterion, then notify little base station of satisfying described the second turn-off criterion to carry out and turn-off to operate to comprise:
According to the load information of described each little base station, whether the load of judging described little base station can be had all carriers carry of all sectors of overlapping covering relation with described little base station in the macro base station, if so, then notifies described little base station to carry out and turn-offs operation.
5. method according to claim 4 is characterized in that, described method also comprises:
Load information according to described each little base station, whether the load of judging described little base station is lower than the second predetermined threshold value, if be lower than the second predetermined threshold value, then carry out described load information according to described each little base station, whether the load of judging described little base station can be had the step of all carriers carry of all sectors of overlapping covering relation with described little base station in the macro base station.
6. method according to claim 5 is characterized in that, the information of described each little base station also comprises the turn-off function state of described little base station, and then described method also comprises:
Turn-off function state according to described each little base station, judge whether the turn-off function of described little base station is opened, if open, then carry out described load information according to described each little base station, judge whether the load of described little base station is lower than the step of the second predetermined threshold value.
7. described method is characterized in that according to claim 1~6, and described method also comprises:
Whether the load of judging arbitrary carrier wave of the arbitrary sector of described macro base station surpasses the 3rd predetermined threshold value, if surpass the 3rd predetermined threshold value, then judge whether to exist the carrier wave that belongs to same sector with described carrier wave and be in off state, if exist, then notify described macro base station to carry out to belong to same sector with described carrier wave and be in the open operation of the part or all of carrier wave of off state, to share the load of described carrier wave.
8. method according to claim 7 is characterized in that, if there is not the carrier wave that belongs to same sector with described carrier wave and be in off state, then described method also comprises:
Judge whether to exist the little base station that with described carrier wave overlapping covering relation is arranged and be in off state, if existence has overlapping covering relation with described carrier wave and is in little base station of off state, then open operation is carried out in the notice part or all of little base station that with described carrier wave overlapping covering relation arranged and be in off state, to share the load of described carrier wave.
9. a base station control device is characterized in that, comprising:
The first judging unit is used for judging whether arbitrary carrier wave of the arbitrary sector of macro base station satisfies the first turn-off criterion;
Acquiring unit is used in the judged result of described the first judging unit obtaining the information that each little base station of overlapping covering relation is arranged with described carrier wave when being;
The second judging unit is used for the information according to described each little base station, judges whether described little base station satisfies the second turn-off criterion;
Notification unit is used in the judged result of described the second judging unit notifying described little base station to carry out to turn-off and operating when being.
10. equipment according to claim 9 is characterized in that, described notification unit also is used for notifying described macro base station to carry out described carrier wave and turn-offing operation when described the second judgment unit judges goes out each described little base station and all do not satisfy described the second turn-off criterion.
11. equipment according to claim 9 is characterized in that,
Described the first judging unit, whether the load of concrete arbitrary carrier wave for judging the arbitrary sector of macro base station is lower than the first predetermined threshold value;
Described acquiring unit when concrete load for go out arbitrary carrier wave of the arbitrary sector of described macro base station in described the first judgment unit judges is lower than described the first predetermined threshold value, obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave.
12. equipment according to claim 9 is characterized in that, the information of described each little base station comprises the load information of described little base station at least, and then described the second judging unit comprises:
The first subelement is used for the load information according to described each little base station, and whether the load of judging described little base station can be had all carriers carry of all sectors of overlapping covering relation with described little base station in the macro base station;
Described notification unit, concrete being used in the judged result of described the first subelement notified described little base station to carry out to turn-off and operates when being.
13. equipment according to claim 12 is characterized in that, described the second judging unit also comprises:
The second subelement, be used for the load information according to described each little base station, whether the load of judging described little base station is lower than the second predetermined threshold value, if be lower than the second predetermined threshold value, then trigger described the first subelement according to the load information of described each little base station, whether the load of judging described little base station can be had all carriers carry of all sectors of overlapping covering relation with described little base station in the macro base station.
14. equipment according to claim 13 is characterized in that, the information of described each little base station also comprises the turn-off function state of described little base station, and then described the second judging unit also comprises:
The 3rd subelement, be used for the turn-off function state according to described each little base station, judge whether the turn-off function of described little base station is opened, if open, then trigger described the second subelement according to the load information of described each little base station, judge whether the load of described little base station is lower than the second predetermined threshold value.
15. described equipment is characterized in that according to claim 9~14,
Described the first judging unit, also whether the load for arbitrary carrier wave judging the arbitrary sector of described macro base station surpasses the 3rd predetermined threshold value;
Described base station control device also comprises:
The 3rd judging unit is used for when the load that described the first judgment unit judges goes out arbitrary carrier wave of the arbitrary sector of described macro base station surpasses the 3rd predetermined threshold value, judges whether to exist the carrier wave that belongs to same sector with described carrier wave and be in off state;
Described notification unit also is used in the judged result of described the 3rd judging unit when being, notifies described macro base station to carry out and described carrier wave belongs to same sector and is in the open operation of the part or all of carrier wave of off state, to share the load of described carrier wave.
16. equipment according to claim 15 is characterized in that, also comprises:
The 4th judging unit is used at described the 3rd judging unit when the determination result is NO, judges whether to exist the little base station that with described carrier wave overlapping covering relation is arranged and be in off state;
Described notification unit also is used in the judged result of described the 4th judging unit when being, notice has overlapping covering relation with described carrier wave and is in part or all of little base station execution open operation of off state, to share the load of described carrier wave.
17. a base control is characterized in that, comprises base station control device, macro base station and at least one little base station, wherein, there are overlapping covering relation in arbitrary carrier wave and described at least one little base station of the arbitrary sector of described macro base station;
Described base station control device is used for judging whether arbitrary carrier wave of the arbitrary sector of described macro base station satisfies the first turn-off criterion, if satisfy the first turn-off criterion, then obtains the information that each little base station of overlapping covering relation is arranged with described carrier wave; And according to the information of described each little base station, judge whether described little base station satisfies the second turn-off criterion, if satisfy described the second turn-off criterion, then notice little base station of satisfying described the second turn-off criterion is carried out and is turn-offed operation;
When described the second turn-off criterion is satisfied in described little base station, described little base station is used for receiving the notice of described base station control device and entering pre-off state, and after the user that will access described little base station migrates to described macro base station, carry out the shutoff operation of described little base station.
18. system according to claim 17 is characterized in that,
Described base station control device also is used for notifying described macro base station to carry out described carrier wave and turn-offing operation judging after each described little base station all do not satisfy described the second turn-off criterion;
Described macro base station is used for receiving the notice of described base station control device, and carries out described carrier wave and turn-off operation.
19. according to claim 17,18 described systems, it is characterized in that,
Described base station control device, also whether the load for arbitrary carrier wave judging the arbitrary sector of described macro base station surpasses predetermined threshold value, if surpass predetermined threshold value, then judge and whether have the carrier wave that belongs to same sector with described carrier wave and be in off state on the described macro base station, if exist, then notify described macro base station to carry out to belong to same sector with described carrier wave and be in the open operation of the part or all of carrier wave of off state;
Described macro base station also is used for receiving the notice of described base station control device, and execution and described carrier wave belong to same sector and be in the open operation of the part or all of carrier wave of off state, to share the load of described carrier wave.
20. system according to claim 19 is characterized in that,
Described base station control device also is used for not existing on judging described macro base station belonging to same sector with described carrier wave and being in after the carrier wave of off state, judges in described at least one little base station whether have the little base station that is in off state; If there is the little base station that is in off state, then notice is in part or all of little base station execution open operation of off state;
When described little base station was in off state, described little base station was used for receiving the notice of described base station control device, and carried out open operation to share the load of described carrier wave.
CN2012100828963A 2012-03-26 2012-03-26 Base-station control method, device and system Pending CN103369639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100828963A CN103369639A (en) 2012-03-26 2012-03-26 Base-station control method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100828963A CN103369639A (en) 2012-03-26 2012-03-26 Base-station control method, device and system

Publications (1)

Publication Number Publication Date
CN103369639A true CN103369639A (en) 2013-10-23

Family

ID=49369921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100828963A Pending CN103369639A (en) 2012-03-26 2012-03-26 Base-station control method, device and system

Country Status (1)

Country Link
CN (1) CN103369639A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104202800A (en) * 2014-07-09 2014-12-10 京信通信系统(中国)有限公司 Energy-saving method, device and system for femtocell
CN110996377A (en) * 2019-11-25 2020-04-10 宜通世纪科技股份有限公司 Base station energy saving method, system, device and storage medium
CN111770503A (en) * 2020-07-01 2020-10-13 重庆邮电大学 System, method and storage medium for closing and opening micro base station
CN113099519A (en) * 2020-01-09 2021-07-09 华为技术有限公司 Base station control method, operation support system 0SS and distributed base station system DBS
CN114077213A (en) * 2020-08-21 2022-02-22 大唐移动通信设备有限公司 Energy-saving control method and device
CN114340050A (en) * 2022-01-10 2022-04-12 中国联合网络通信集团有限公司 System and method for shutting down network equipment of base station
CN114390646A (en) * 2020-10-19 2022-04-22 中国移动通信集团重庆有限公司 NSA base station energy saving method and device
CN114845368A (en) * 2022-06-02 2022-08-02 大连市共进科技有限公司 Energy-saving processing method and device for micro base station, micro base station and storage medium
WO2022217550A1 (en) * 2021-04-15 2022-10-20 华为技术有限公司 Carrier turn-off method, apparatus, and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010137917A2 (en) * 2009-05-29 2010-12-02 엘지전자 주식회사 Method and apparatus for transmitting signal using spatial silencing
CN102111816A (en) * 2011-03-22 2011-06-29 北京邮电大学 Energy-saving femto-network system and energy-saving method
WO2011083947A2 (en) * 2010-01-08 2011-07-14 Samsung Electronics Co., Ltd. Method for reducing power consumption of base station in wireless communication system
CN102244879A (en) * 2010-05-12 2011-11-16 电信科学技术研究院 Method and device for realizing energy-saving control among network elements
CN102342036A (en) * 2009-03-10 2012-02-01 三星电子株式会社 Communication system with femtocells and interference control method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102342036A (en) * 2009-03-10 2012-02-01 三星电子株式会社 Communication system with femtocells and interference control method therefor
WO2010137917A2 (en) * 2009-05-29 2010-12-02 엘지전자 주식회사 Method and apparatus for transmitting signal using spatial silencing
WO2011083947A2 (en) * 2010-01-08 2011-07-14 Samsung Electronics Co., Ltd. Method for reducing power consumption of base station in wireless communication system
CN102244879A (en) * 2010-05-12 2011-11-16 电信科学技术研究院 Method and device for realizing energy-saving control among network elements
CN102111816A (en) * 2011-03-22 2011-06-29 北京邮电大学 Energy-saving femto-network system and energy-saving method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104202800A (en) * 2014-07-09 2014-12-10 京信通信系统(中国)有限公司 Energy-saving method, device and system for femtocell
CN104202800B (en) * 2014-07-09 2018-03-27 京信通信系统(中国)有限公司 A kind of Home eNodeB power-economizing method, apparatus and system
CN110996377A (en) * 2019-11-25 2020-04-10 宜通世纪科技股份有限公司 Base station energy saving method, system, device and storage medium
CN113099519A (en) * 2020-01-09 2021-07-09 华为技术有限公司 Base station control method, operation support system 0SS and distributed base station system DBS
CN111770503A (en) * 2020-07-01 2020-10-13 重庆邮电大学 System, method and storage medium for closing and opening micro base station
CN111770503B (en) * 2020-07-01 2023-03-28 重庆邮电大学 System, method and storage medium for closing and opening micro base station
CN114077213A (en) * 2020-08-21 2022-02-22 大唐移动通信设备有限公司 Energy-saving control method and device
CN114077213B (en) * 2020-08-21 2023-11-03 大唐移动通信设备有限公司 Energy-saving control method and device
CN114390646A (en) * 2020-10-19 2022-04-22 中国移动通信集团重庆有限公司 NSA base station energy saving method and device
WO2022217550A1 (en) * 2021-04-15 2022-10-20 华为技术有限公司 Carrier turn-off method, apparatus, and device
CN114340050B (en) * 2022-01-10 2023-08-22 中国联合网络通信集团有限公司 Base station network equipment turn-off system and method
CN114340050A (en) * 2022-01-10 2022-04-12 中国联合网络通信集团有限公司 System and method for shutting down network equipment of base station
CN114845368A (en) * 2022-06-02 2022-08-02 大连市共进科技有限公司 Energy-saving processing method and device for micro base station, micro base station and storage medium

Similar Documents

Publication Publication Date Title
CN103369639A (en) Base-station control method, device and system
CN103477674B (en) The method and associated control device for the state for managing micro-base station by following the change of traffic demand
EP2665312B1 (en) Cell Activation and Deactivation in Heterogeneous Networks
CN102457918B (en) Determine the method and apparatus of Target cell
CN101959292B (en) Method, equipment and system for saving energy for base station
CN102396257B (en) Method, system and device of energy saving for base stations
CN100551121C (en) The method of mobile terminal skip zone autonomous switching
CN102088685B (en) Network side device and method for updating system information block (SIB)
CN105814950B (en) Heterogeneous network energy saving method and device
CN101977403B (en) Balance priority microcell energy-saving method in relay system
CN101730167A (en) Method for performing switch between a wire-band base station and a base station and communication system
US8838165B2 (en) Method and base station for managing capacity of a wireless communication network
WO2012129188A1 (en) Network scaling for network energy savings
CN101861745A (en) Cell selection method and mobile station
WO2021011131A1 (en) Proactive mobile network optimization
Koudouridis et al. A centralised approach to power on-off optimisation for heterogeneous networks
CN108370516A (en) A kind of method and user equipment of cell measurement reporting
CN108990073A (en) Overlapping control method, device and the base station of wireless area
CN105532032A (en) Energy saving functionality for small cells in E-UTRA and E-UTRAN
CN108076489A (en) A kind of method and device of cell selection
CN103118371A (en) Carrier frequency control method and device
CN101541009A (en) Method, device and system for optimizing neighbor cell list
CN103906203A (en) Base station energy saving method and system through cover compensation
CN104301974A (en) Network switching method and system and terminal
CN101466118B (en) Method for indicating neighbour zone information and network side equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131023