CN103368962B - Based on the visual frame implementation method of distribution network - Google Patents

Based on the visual frame implementation method of distribution network Download PDF

Info

Publication number
CN103368962B
CN103368962B CN201310288058.6A CN201310288058A CN103368962B CN 103368962 B CN103368962 B CN 103368962B CN 201310288058 A CN201310288058 A CN 201310288058A CN 103368962 B CN103368962 B CN 103368962B
Authority
CN
China
Prior art keywords
visual
distribution network
client terminal
data
service end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310288058.6A
Other languages
Chinese (zh)
Other versions
CN103368962A (en
Inventor
张渭澎
刘歆
李聪利
陈学民
翟储臣
吴�琳
杜红卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310288058.6A priority Critical patent/CN103368962B/en
Publication of CN103368962A publication Critical patent/CN103368962A/en
Application granted granted Critical
Publication of CN103368962B publication Critical patent/CN103368962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of visual frame implementation method based on distribution network, its main technology feature is: comprise the following steps: client terminal obtains visual scene belonging to current picture and ID corresponding to this visual scene; Client terminal judges whether current visual scene changes; If visual scene there occurs change, client terminal submits visual scene request to service end; Service end receives the visual scene request of client terminal, and arranges out the data needing customer in response end; Corresponding data after arrangement is sent by service end to client terminal; Client terminal receives the response data that service end sends, and carries out visual framework coloring treatment according to data. The present invention is directed to different visual application scene and carry out visable representation by different colours, intuitively effectively can illustrate distribution network feature on the picture of the daily supervision of user, it is very vivid and convenient to express, and operation of power networks and maintenance personnel can check distribution network operation characteristic intuitively.

Description

Based on the visual frame implementation method of distribution network
Technical field
The invention belongs to distribution network technical field, especially a kind of visual frame implementation method based on distribution network.
Background technology
At present, along with the further raising of distribution management system (DMS) data acquisition ability, and various application on site software application level constantly promotes, distribution network management and running are increasing with the required real-time and analytical data amount grasped of the personnel of analysis, traditional displaying data means more seem deficient, make operating analysis personnel that data not have overall situation sight, thus affect dispatching of power netwoks operation and control decision. In this context, research power network schedule automation system visual analyzing and intellectuality represented will be more and more urgent. Visual analyzing represents as intelligent dispatch gordian technique with intelligent, is power science and the intersecting and extension of the subject such as computer technology, geography information, human efficiency subject, is also power system dispatching automation technique development trend.
Existing data visualization treatment process is usual in the following ways: collection or processed data are expressed by (1) with forms such as form, cake figure, curve, histograms, which Problems existing: adopt static mode to process, live effect is poor, can not reflect the running status of current electrical network intuitively; (2) adopting form such as the arrow etc. of running of animation to express electric network swim, which Problems existing is: local display can only go out the running status of electrical network, can not fully go out whole operation characteristics of distribution network.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that the visual frame implementation method based on distribution network of a kind of reasonable in design, real-time and visual pattern.
The present invention solves its technical problem and takes following technical scheme to realize:
Based on a visual frame implementation method for distribution network, comprise the following steps:
Step 1, client terminal obtain visual scene belonging to current picture and ID corresponding to this visual scene;
Step 2, client terminal judge whether current visual scene changes;
If visual scene there occurs change in step 3 step 2, client terminal submits corresponding visual scene request by CORBA bus to service end;
Step 4, service end receive the visual scene request of client terminal, arrange the data needing customer in response end;
Corresponding data after arrangement is sent by step 5, service end to client terminal;
Step 6, client terminal receive the response data that service end sends, and carry out visual framework coloring treatment according to data.
And, described step 4 arranges needs the method for customer in response end data to be: service end constantly receives three distant data, calculates distribution network operation characteristic, thus obtains the data of customer in response end.
And, described distribution network operation characteristic comprises distribution topology, charging zone, pilot region, voltage range and circuit load factor.
And, the method for the visual framework coloring treatment of described step 6 is:
(1) distribution topology visualization: according to distribution network model real-time topology information, carries out painted according to the concept of electrical island to the figure of "current" model;
(2) charging zone is visual: according to the real-time electriferous state of distribution network model, carries out painted according to charged and power failure two states to the figure of "current" model;
(3) pilot area visualization: according to whether distribution network model carries out automatization pilot, carries out painted according to pilot region and non-pilot region to the figure of "current" model;
(4) voltage range is visual: according to the concrete voltage range of distribution network model, carries out painted according to the figure of different voltage range Color pair "current" model;
(5) circuit load factor is visual: realize load factor according to distribution network model, carries out visual according to the per-cent of load to the figure of "current" model.
Advantage and the positively effect of the present invention be:
1, the present invention is according to electric power system model feature and in conjunction with the various application of DMS system and operational efficiency, visable representation is carried out by different colours for the visual application scene of difference, different colours is adopted to express the different running status of electrical network, intuitively effectively can illustrate distribution network feature on the picture of the daily supervision of user, it is very vivid and convenient to express, and operation of power networks and maintenance personnel can check distribution network operation characteristic intuitively.
2, the present invention can divide for following five class scenes and carries out visualization processing: distribution topology visualization, charging zone are visual, pilot area visualization, voltage range are visual and circuit load factor is visual, the operation characteristic of distribution network can be reacted comprehensively intuitively, carry out dispatch deal to dispatcher and offer convenience.
3, visual expression part is separated by CORBA bus by the present invention with visualization processing part, service end is responsible for real-time calculating index of correlation, and client terminal is then responsible for adopting different colours to express various index, and the two is asynchronous, without the need to synchronously, ensure that efficiency and extensibility.
Accompanying drawing explanation
Fig. 1 is the treatment scheme schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further described.
Based on a visual frame implementation method for distribution network, as shown in Figure 1, comprising client terminal and service end two portions treating processes, client terminal is communicated by CORBA bus with service end. Client terminal is by given current visual scene ID, when without the need to any manual intervention, judge whether current application scene switches, according to scene feature, the corresponding scene of client-requested needs the data of expression and package request message bag is sent to CORBA bus, service end calculates various electrical network index in real time and processes the request of client terminal, and encapsulation response message is sent to client terminal.
Based on a visual frame implementation method for distribution network, comprise the following steps:
Step 1, client terminal obtain visual scene belonging to current picture and ID corresponding to this visual scene;
Step 2, client terminal judge whether current visual scene changes;
If visual scene there occurs change in step 3 step 2, client terminal submits corresponding visual scene request by CORBA bus to service end;
Step 4, service end receive the visual scene request of client terminal, and service end constantly receives three distant data simultaneously, calculate distribution network operation characteristic, and arrange out the data needing customer in response end;
Described distribution network operation characteristic comprises five aspects such as distribution topology, charging zone, pilot region, voltage range and circuit load factor;
Corresponding data after arrangement is sent by step 5, service end to client terminal;
Step 6, client terminal receive the response data that service end sends, and carry out visual framework coloring treatment according to data, specifically comprise the visualization processing of the distribution network operation characteristic of following five aspects:
(1) distribution topology visualization: according to distribution network model real-time topology information, carries out painted according to the concept of electrical island to the figure of "current" model;
(2) charging zone is visual: according to the real-time electriferous state of distribution network model, carries out painted according to charged and power failure two states to the figure of "current" model;
(3) pilot area visualization: according to whether distribution network model carries out automatization pilot, carries out painted according to pilot region and non-pilot region to the figure of "current" model;
(4) voltage range is visual: according to the concrete voltage range of distribution network model, carries out painted according to the figure of different voltage range Color pair "current" model;
(5) circuit load factor is visual: realize load factor according to distribution network model, carries out visual according to the per-cent of load to the figure of "current" model.
The present invention is when applying, in conjunction with on-the-spot distribution scale and model data, based on the soft ware platform built, each visual scene is classified, communication information bag is defined respectively in client terminal and server end, and set up internal communication protocol, after switching visual scene, carry out the scene ID provided calculating in real time and by the on-the-spot scape of colour bodies.
It is emphasized that; embodiment of the present invention is explanation property; instead of it is limited; therefore the present invention comprises the embodiment being not limited to described in embodiment; every other enforcement modes drawn according to the technical scheme of the present invention by those skilled in the art, belong to the scope of protection of the invention equally.

Claims (1)

1. the visual frame implementation method based on distribution network, it is characterised in that: comprise the following steps:
Step 1, client terminal obtain visual scene belonging to current picture and ID corresponding to this visual scene;
Step 2, client terminal judge whether current visual scene changes;
If visual scene there occurs change in step 3 step 2, client terminal submits corresponding visual scene request by CORBA bus to service end;
Step 4, service end receive the visual scene request of client terminal, arrange the data needing customer in response end;
Corresponding data after arrangement is sent by step 5, service end to client terminal;
Step 6, client terminal receive the response data that service end sends, and carry out visual framework coloring treatment according to data;
Described step 4 arranges needs the method for customer in response end data to be: service end constantly receives three distant data, calculates distribution network operation characteristic, thus obtains the data of customer in response end; Described distribution network operation characteristic comprises distribution topology, charging zone, pilot region, voltage range and circuit load factor;
The method of the visual framework coloring treatment of described step 6 is:
(1) distribution topology visualization: according to distribution network model real-time topology information, carries out painted according to the concept of electrical island to the figure of "current" model;
(2) charging zone is visual: according to the real-time electriferous state of distribution network model, carries out painted according to charged and power failure two states to the figure of "current" model;
(3) pilot area visualization: according to whether distribution network model carries out automatization pilot, carries out painted according to pilot region and non-pilot region to the figure of "current" model;
(4) voltage range is visual: according to the concrete voltage range of distribution network model, carries out painted according to the figure of different voltage range Color pair "current" model;
(5) circuit load factor is visual: realize load factor according to distribution network model, carries out visual according to the per-cent of load to the figure of "current" model.
CN201310288058.6A 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network Active CN103368962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310288058.6A CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310288058.6A CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Publications (2)

Publication Number Publication Date
CN103368962A CN103368962A (en) 2013-10-23
CN103368962B true CN103368962B (en) 2016-06-08

Family

ID=49369499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310288058.6A Active CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Country Status (1)

Country Link
CN (1) CN103368962B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617318A (en) * 2013-11-27 2014-03-05 国家电网公司 Method for modeling distribution automation power grid
CN110994788B (en) * 2019-11-25 2021-08-20 北京科东电力控制系统有限责任公司 Method, system and storage medium for dynamically switching scenes according to power grid characteristic events

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496881B (en) * 2011-12-09 2015-02-04 北京科东电力控制系统有限责任公司 Visualized implementation method oriented to operation load state monitoring of distribution network
US10025337B2 (en) * 2011-12-16 2018-07-17 Schneider Electric USA, Inc. Method and system for managing an electrical distribution system in a facility
CN103078407B (en) * 2013-01-12 2015-03-11 华南理工大学 Intelligent control system for microgrid
CN103338359B (en) * 2013-07-03 2017-03-15 国家电网公司 Method towards the visual presentation of power distribution network

Also Published As

Publication number Publication date
CN103368962A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN102931725B (en) Power scheduling main station type comprehensive intelligent anti-error system automated topology colorize method
CN106208394B (en) Intelligent power saving power supply system and method based on cloud computing technology
CN102510127B (en) Method for unifying models of on-line monitored first and secondary equipment of power grid
CN105023414A (en) Mobile terminal-electric energy meter interconnection system and intelligent electric energy meter
CN104836336A (en) Intelligent distribution box based on master-slave monitoring
CN105388768A (en) Remote circuit control system and method based on cloud platform
CN103338359B (en) Method towards the visual presentation of power distribution network
CN205265349U (en) Little electric wire netting intelligence measurement and control device
CN103955865A (en) Scheduled and faulted power outage range visualization method based on information interaction
CN103200280A (en) Process level interface device of intelligent substation
CN105023415A (en) Electric energy meter system utilizing mobile terminal communication and multi-communication channel electric energy meter system
CN103368962B (en) Based on the visual frame implementation method of distribution network
CN105048456A (en) Loss-reducing and energy-saving management method and system applied to intelligent metering platform
CN104484831A (en) Graph dispatching operation order system and generation method for distribution network operation order graphs in graph dispatching operation order system
CN103530815B (en) A kind of scene type electrical network methods of exhibiting and its displaying application system
CN207216352U (en) A kind of die heater controller based on equipment networking system
CN204706955U (en) Smart incoming line monitoring module and intelligent distribution box
CN209248007U (en) Metering fault simulator and system
CN205622315U (en) Low pressure generalized type intelligent power distribution system
CN103489059A (en) Object-oriented method and system for comprehensively displaying power grid monitoring information
CN106972498A (en) Electricity needs response control system and its duty control method
CN207249454U (en) A kind of household electricity comprehensive monitoring management system
CN203289496U (en) Intelligent substationprocess layer interface device
CN106300651A (en) A kind of intelligent low voltage power distribution cabinet system
CN204578216U (en) A kind of intelligent low voltage power distribution cabinet system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant