CN103368962A - Visual frame implementation method based on power distribution network - Google Patents

Visual frame implementation method based on power distribution network Download PDF

Info

Publication number
CN103368962A
CN103368962A CN2013102880586A CN201310288058A CN103368962A CN 103368962 A CN103368962 A CN 103368962A CN 2013102880586 A CN2013102880586 A CN 2013102880586A CN 201310288058 A CN201310288058 A CN 201310288058A CN 103368962 A CN103368962 A CN 103368962A
Authority
CN
China
Prior art keywords
visual
client
distribution network
power distribution
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102880586A
Other languages
Chinese (zh)
Other versions
CN103368962B (en
Inventor
张渭澎
刘歆
李聪利
陈学民
翟储臣
吴�琳
杜红卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310288058.6A priority Critical patent/CN103368962B/en
Publication of CN103368962A publication Critical patent/CN103368962A/en
Application granted granted Critical
Publication of CN103368962B publication Critical patent/CN103368962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a visual frame implementation method based on a power distribution network. The visual frame implementation method is technically characterized by comprising the following steps that a client acquires a visual scene of a current picture and an ID (identifier) corresponding to the visual scene; the client judges whether the visual scene is changed or not; if the visual scene is changed, the client submits a visual scene request to a server; the server receives the visual scene request of the client and arranges data needing to respond to the client; the server sends the corresponding arranged data to the client; and the client receives response data sent by the server, and colors a visual frame according to the data. By carrying out visual representation through different colors for different visual application scenes, the characteristics of the power distribution network can be intuitively and effectively displayed on a daily user monitoring picture and can be vividly and conveniently expressed, and power network operation and maintenance staff can intuitively check the operation characteristics of the power distribution network.

Description

Visualization Framework implementation method based on power distribution network
Technical field
The invention belongs to the distribution network technical field, especially a kind of Visualization Framework implementation method based on power distribution network.
Background technology
At present, further raising along with distribution management system (DMS) data acquisition ability, and various online application software application level constantly promote, real-time and the analysis data volume of power distribution network management and running and the required grasp of analyst is increasing, it is deficient that traditional display data means more seem, make the operating analysis personnel not have the overall situation to data and see, thereby affect dispatching of power netwoks operation and control decision.Under such background, will more and more urgent to the automation system for the power network dispatching visual analyzing with the intelligent research that represents.Visual analyzing and an intelligent key technology that represents as intelligent dispatch are power sciences and the intersecting and extension of the subjects such as computer technology, Geomatics, human efficiency subject, also are the power system dispatching automation technique development trends.
Existing data visualization processing method is usually in the following ways: (1) will gather or finished data with formal representations such as form, pie chart, curve, block diagrams out, the problem that this mode exists: adopt static mode to process, live effect is poor, can not reflect intuitively the running status of present electrical network; (2) form that adopts animation is expressed electric network swim such as the arrow of running etc., and the problem that this mode exists is: can only local display go out the running status of electrical network, can not fully go out whole operation characteristics of power distribution network.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of Visualization Framework implementation method based on power distribution network of reasonable in design, real-time and visual pattern is provided.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of Visualization Framework implementation method based on power distribution network may further comprise the steps:
Step 1, client are obtained the affiliated Visual Scene of current picture and ID corresponding to this Visual Scene;
Step 2, client judge whether current Visual Scene changes;
If variation has occured Visual Scene in step 3 step 2, client is submitted corresponding Visual Scene request by the CORBA bus to service end;
Step 4, service end receive the Visual Scene request of client, and arrangement needs the data of customer in response end;
Corresponding data after step 5, service end will be put in order sends to client;
Step 6, client are received the response data that service end sends, and carry out the painted processing of Visualization Framework according to data.
And described step 4 arrangement needs the method for customer in response end data to be: service end constantly receives three distant data, calculates the power distribution network operation characteristic, thus the data of the client that meets with a response.
And described power distribution network operation characteristic comprises distribution topology, charging zone, pilot zone, electric pressure and line load rate.
And the method for the painted processing of described step 6 Visualization Framework is:
⑴ distribution topology is visual: according to distribution model real-time topology information, carry out painted according to the concept on electric island to the figure of "current" model;
⑵ charging zone is visual: according to the real-time electriferous state of distribution model, carry out painted according to charged and power failure two states to the figure of "current" model;
⑶ pilot area visualization: whether carry out the automation pilot according to the distribution model, carry out painted according to pilot zone and non-pilot zone to the figure of "current" model;
⑷ electric pressure is visual: according to the concrete electric pressure of distribution model, carry out painted according to different electric pressure colors to the figure of "current" model;
⑸ line load rate is visual: according to the realization load factor of distribution model, carry out visual according to the percentage of load to the figure of "current" model.
Advantage of the present invention and good effect are:
1, the present invention is according to the electric power system model characteristics and in conjunction with various application and the operational efficiency of DMS system, carry out visable representation for the visual application scenarios of difference by different colours, adopt different colours to express the different running status of electrical network, can intuitively effectively show the power distribution network feature at the picture of the daily supervision of user, express very vivid and convenience, operation of power networks and attendant can check the power distribution network operation characteristic intuitively.
2, the present invention can divide for following five class scenes and carries out visualization processing: the distribution topology is visual, charging zone is visual, the pilot area visualization, electric pressure is visual and the line load rate is visual, can react intuitively all sidedly the operation characteristic of power distribution network, carry out dispatch deal to the dispatcher and offer convenience.
3, the present invention partly separates Visualization part and visualization processing by the CORBA bus, service end is responsible for real-time calculating index of correlation, and client then is responsible for adopting different colours to express various indexs, and the two is asynchronous, need not to have guaranteed efficient and extensibility synchronously.
Description of drawings
Fig. 1 is handling process schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing the present invention is further described.
A kind of Visualization Framework implementation method based on power distribution network as shown in Figure 1, comprises client and service end two parts processing procedure, and client and service end communicate by the CORBA bus.Client is by given current Visual Scene ID, need not in the situation of any manual intervention, judge whether the current application scene switches, according to the scene characteristics, data and package request message bag that the corresponding scene of client-requested need to be expressed send to the CORBA bus, service end is calculated in real time various electrical network indexs and is processed the request of client, and the encapsulation response message sends to client.
A kind of Visualization Framework implementation method based on power distribution network may further comprise the steps:
Step 1, client are obtained the affiliated Visual Scene of current picture and ID corresponding to this Visual Scene;
Step 2, client judge whether current Visual Scene changes;
If variation has occured Visual Scene in step 3 step 2, client is submitted corresponding Visual Scene request by the CORBA bus to service end;
Step 4, service end receive the Visual Scene request of client, and service end constantly receives three distant data simultaneously, calculates the power distribution network operation characteristic, and puts out the data that need the customer in response end in order;
Described power distribution network operation characteristic comprises five aspects such as distribution topology, charging zone, pilot zone, electric pressure and line load rate;
Corresponding data after step 5, service end will be put in order sends to client;
Step 6, client are received the response data that service end sends, and carry out the painted processing of Visualization Framework according to data, specifically comprise the visualization processing of the power distribution network operation characteristic of following five aspects:
⑴ distribution topology is visual: according to distribution model real-time topology information, carry out painted according to the concept on electric island to the figure of "current" model;
⑵ charging zone is visual: according to the real-time electriferous state of distribution model, carry out painted according to charged and power failure two states to the figure of "current" model;
⑶ pilot area visualization: whether carry out the automation pilot according to the distribution model, carry out painted according to pilot zone and non-pilot zone to the figure of "current" model;
⑷ electric pressure is visual: according to the concrete electric pressure of distribution model, carry out painted according to different electric pressure colors to the figure of "current" model;
⑸ line load rate is visual: according to the realization load factor of distribution model, carry out visual according to the percentage of load to the figure of "current" model.
The present invention is when using, in conjunction with on-the-spot distribution scale and model data, based on the soft ware platform that has made up, each Visual Scene is classified, define respectively communication information bag at the client and server end, and set up internal communication protocol using, switch Visual Scene after, the scene ID that provides is calculated in real time and embodies scene by color.
It is emphasized that; embodiment of the present invention is illustrative; rather than determinate; therefore the present invention includes and be not limited to the embodiment described in the embodiment; every other execution modes that drawn by those skilled in the art's technical scheme according to the present invention belong to the scope of protection of the invention equally.

Claims (4)

1. Visualization Framework implementation method based on power distribution network is characterized in that: may further comprise the steps:
Step 1, client are obtained the affiliated Visual Scene of current picture and ID corresponding to this Visual Scene;
Step 2, client judge whether current Visual Scene changes;
If variation has occured Visual Scene in step 3 step 2, client is submitted corresponding Visual Scene request by the CORBA bus to service end;
Step 4, service end receive the Visual Scene request of client, and arrangement needs the data of customer in response end;
Corresponding data after step 5, service end will be put in order sends to client;
Step 6, client are received the response data that service end sends, and carry out the painted processing of Visualization Framework according to data.
2. the Visualization Framework implementation method based on power distribution network according to claim 1, it is characterized in that: described step 4 arrangement needs the method for customer in response end data to be: service end constantly receives three distant data, calculate the power distribution network operation characteristic, thus the data of the client that meets with a response.
3. the Visualization Framework implementation method based on power distribution network according to claim 2 is characterized in that: described power distribution network operation characteristic comprises distribution topology, charging zone, pilot zone, electric pressure and line load rate.
4. the Visualization Framework implementation method based on power distribution network according to claim 1, it is characterized in that: the method for the painted processing of described step 6 Visualization Framework is:
⑴ distribution topology is visual: according to distribution model real-time topology information, carry out painted according to the concept on electric island to the figure of "current" model;
⑵ charging zone is visual: according to the real-time electriferous state of distribution model, carry out painted according to charged and power failure two states to the figure of "current" model;
⑶ pilot area visualization: whether carry out the automation pilot according to the distribution model, carry out painted according to pilot zone and non-pilot zone to the figure of "current" model;
⑷ electric pressure is visual: according to the concrete electric pressure of distribution model, carry out painted according to different electric pressure colors to the figure of "current" model;
⑸ line load rate is visual: according to the realization load factor of distribution model, carry out visual according to the percentage of load to the figure of "current" model.
CN201310288058.6A 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network Active CN103368962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310288058.6A CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310288058.6A CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Publications (2)

Publication Number Publication Date
CN103368962A true CN103368962A (en) 2013-10-23
CN103368962B CN103368962B (en) 2016-06-08

Family

ID=49369499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310288058.6A Active CN103368962B (en) 2013-07-10 2013-07-10 Based on the visual frame implementation method of distribution network

Country Status (1)

Country Link
CN (1) CN103368962B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617318A (en) * 2013-11-27 2014-03-05 国家电网公司 Method for modeling distribution automation power grid
CN110994788A (en) * 2019-11-25 2020-04-10 北京科东电力控制系统有限责任公司 Method, system and storage medium for dynamically switching scenes according to power grid characteristic events

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496881A (en) * 2011-12-09 2012-06-13 北京科东电力控制系统有限责任公司 Visualized implementation method oriented to operation load state monitoring of distribution network
CN103078407A (en) * 2013-01-12 2013-05-01 华南理工大学 Intelligent control system for microgrid
WO2013089782A2 (en) * 2011-12-16 2013-06-20 Schneider Electric USA, Inc. Co-location electrical architecture
CN103338359A (en) * 2013-07-03 2013-10-02 国家电网公司 Visual display method for power distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496881A (en) * 2011-12-09 2012-06-13 北京科东电力控制系统有限责任公司 Visualized implementation method oriented to operation load state monitoring of distribution network
WO2013089782A2 (en) * 2011-12-16 2013-06-20 Schneider Electric USA, Inc. Co-location electrical architecture
CN103078407A (en) * 2013-01-12 2013-05-01 华南理工大学 Intelligent control system for microgrid
CN103338359A (en) * 2013-07-03 2013-10-02 国家电网公司 Visual display method for power distribution network

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617318A (en) * 2013-11-27 2014-03-05 国家电网公司 Method for modeling distribution automation power grid
CN110994788A (en) * 2019-11-25 2020-04-10 北京科东电力控制系统有限责任公司 Method, system and storage medium for dynamically switching scenes according to power grid characteristic events
CN110994788B (en) * 2019-11-25 2021-08-20 北京科东电力控制系统有限责任公司 Method, system and storage medium for dynamically switching scenes according to power grid characteristic events

Also Published As

Publication number Publication date
CN103368962B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN102510127B (en) Method for unifying models of on-line monitored first and secondary equipment of power grid
CN102931725B (en) Power scheduling main station type comprehensive intelligent anti-error system automated topology colorize method
CN109547538A (en) Controller switching equipment condition monitoring system and implementation method based on technology of Internet of things
CN105225566B (en) A kind of electric network emergency drills visual simulating deduction system
CN104239998A (en) Implementation method of smart power grid resource real-time operating state three-dimensional visualization display system
CN105186353B (en) A kind of dynamic equipment live state display method of the substation based on threedimensional model
CN105137231A (en) Power quality monitoring method and system
CN103218753B (en) A kind of modeling method of extra-high voltage grid information model and information interacting method
CN104300604B (en) A kind of electric automobile electric charging station monitoring system
CN103023147B (en) Electric power main website based on CIM data model and transformer station's remote viewing interlock method
CN106597862A (en) Building energy consumption control device and building energy consumption control method based on association rule mining
CN103338359B (en) Method towards the visual presentation of power distribution network
CN109409732A (en) A kind of energy consumption management system and management method
CN103955865A (en) Scheduled and faulted power outage range visualization method based on information interaction
CN104077934A (en) Integrated training platform for intelligent substation secondary system
CN104881022A (en) Monitoring system based on substation digital model
CN111210364A (en) Intelligent building comprehensive monitoring management platform system
CN103368962A (en) Visual frame implementation method based on power distribution network
CN104504168A (en) Method and system thereof for dynamically displaying power grid simulating calculation result through sand table
CN104484831A (en) Graph dispatching operation order system and generation method for distribution network operation order graphs in graph dispatching operation order system
CN209002010U (en) A kind of monitoring management system for distribution net gridding
CN103545805A (en) Modeling-based railway power supply arm monitoring method
CN204390008U (en) Based on the power transmission and transforming equipment intelligent monitoring device of technology of Internet of things
CN203455377U (en) Power consumption monitoring device
CN103530815B (en) A kind of scene type electrical network methods of exhibiting and its displaying application system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant