CN103364641B - A kind of transformer station's transient state electromagnetic environment test method - Google Patents

A kind of transformer station's transient state electromagnetic environment test method Download PDF

Info

Publication number
CN103364641B
CN103364641B CN201210094056.9A CN201210094056A CN103364641B CN 103364641 B CN103364641 B CN 103364641B CN 201210094056 A CN201210094056 A CN 201210094056A CN 103364641 B CN103364641 B CN 103364641B
Authority
CN
China
Prior art keywords
mrow
transformer station
test
magnetic field
transient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210094056.9A
Other languages
Chinese (zh)
Other versions
CN103364641A (en
Inventor
蔡耀红
童凯
池伟
黄晓明
王松
吴俊�
黄军浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210094056.9A priority Critical patent/CN103364641B/en
Publication of CN103364641A publication Critical patent/CN103364641A/en
Application granted granted Critical
Publication of CN103364641B publication Critical patent/CN103364641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The present invention relates to a kind of method of testing of substation field transient state electromagnetic environment.Current steady-state method of test is not suitable for the test and evaluation of electromagnetic field intensity in transient state process of electric power system.The present invention uses non-frequency-selecting type broadband radiation measuring instrument in testing, and the background data of one stable state of test, transformer station's power frequency and radio frequency electrical, magnetic field background value are obtained using steady-state method of test before transformer station's transient process occurs;When transformer station transient process occurs, by record power frequency, radio frequency electrical, maximum field strength method obtain Temporal Data so that can analyze the interference free performance for the electronic equipment for being placed on the position meet requirement.The present invention can effectively measure power frequency, radio frequency electromagnetic field change in transient process in transformer station, assess of practical meaning to the electromagnetic environment that smart machine site in transformer station is installed.

Description

A kind of transformer station's transient state electromagnetic environment test method
Technical field
The present invention relates to the test of transient process Electro Magnetic Compatibility in the transformer station related to power system, specifically A kind of method of testing of substation field transient state electromagnetic environment.
Background technology
Source is harassed as one compared with strong electromagnetic radiation by transformer station, can operationally produce all kinds of electromagnetic interferences.With microelectronics With the secondary device based on computer technology, such as relay protection, telemechanical, communication equipment are the sensitive subjects of interference, easily by There are the abnormal operating states such as malfunction, program operation exception to interference effect, or even cause component or device damage. For this transformer station secondary device be required to the experiment by all kinds of electromagnetism interferences after can come into operation, and equipment install It is being electromagnetically shielded the preferable small interior of electronics.With power network intelligent substation all-round construction, transformer on-line checking terminal, protection with Control intelligent terminal, the intelligent electronic device site such as electronic mutual inductor to install, these equipment from transformer station harassing and wrecking source more Closely, running environment is worse.To that will face bigger using the interference free performance of smart machine on the spot of high-frequency low-voltage microprocessor Challenge.
The heavier anti-interference test (EMC tests) regarding electronic product in current EMC test, and to power system The test of transient state electromagnetic disturbance (EMI tests) is less, and most common harassing and wrecking source test (such as electric tool, household electrical appliance) is also Carried out under experiment room environmental.The measuring method of Power System Electromagnetic Environment (harassing and wrecking), is also only limitted to power system and normally runs Carried out under operating mode.Such as standard GB/T 998-2005《High-voltage alternating aerial power transmission line, transformer station's power frequency electric field and magnetic-field measurement Method》, it is proposed that a kind of test for stable state power frequency electromagnet field intensity.This test is generally using the reading one per 1min Number, take the survey measurements method of 5min average value normally run there is provided power system under electromagnetic environment evaluation.It is not suitable for The test and evaluation of electromagnetic field intensity in the transient process such as short-circuit fault of power system and switch tool operation.In power system In transient process except power frequency electromagnet outside the venue, mainly with the electromagnetic field in radio-frequency region.
The content of the invention
The technical problems to be solved by the invention be the defect for overcoming above-mentioned prior art to exist there is provided one kind in transformer station The method of live Validity Test transient process electromagnetic field environment (harassing and wrecking degree).
Therefore, the present invention is adopted the following technical scheme that:A kind of transformer station's transient state electromagnetic environment test method, its test step It is rapid as follows:
1) tester is selected:Selection meets the tester of international IEC61000-4 electromagnetic compatibility standards requirement, uses Non- frequency-selecting type broadband radiation measuring instrument, measurement frequency be 24~2000Hz power frequency electric, magnetic field intensity, frequency be 100k~ 30GHz radio frequency electrical, magnetic field intensity;
2) test point is selected:Select physical features flat, centered on the point for occurring transient interference source, from smart machine on the spot On the circumference that distance delimited for radius, unobstructed position is taken as tester riding position;
3) test probe is installed:Hidden between the test probe requirement of tester and the point for producing transient interference source without object Gear, test probe is placed on wooden pillar, from the ground 1~2m;
4) before transformer station transient process occurs one stable state of test background data, using read within every 1 minute a data, The steady-state method of test of the average value of 3~5 data is taken to obtain transformer station's power frequency and radio frequency electrical, magnetic field background value;Transformer station Transient process occur when, by record power frequency, radio frequency electrical, maximum field strength method obtain Temporal Data;Measuring instrument The unit of the electric-field strength instantaneous value of reading is V/m, and unit of magnetic field strength is μ T, in air dielectric, and 1 μ T-phase is worked as in 0.8A/m, Calculated by following equation:
Background value is calculated:
Changing value is calculated:Δ E1=E1max-Ep1, Δ B1=B1max-Bp1;
Δ E2=E2max-Ep2, Δ B2=B2max-Bp2;
In formula, Ep1/Bp1:Power frequency electric/magnetic field average;Ep2/Bp2:Radio frequency electrical/magnetic field average;n:Average value is read Number of times, 3-5 times;E1max/B1max:Power frequency electric/maximum value of magnetic field;E2max/B2max:Radio frequency electrical/maximum value of magnetic field;ΔE1/ ΔB1:Transient state power frequency electric/changes of magnetic field value;ΔE2/ΔB2:Transient state radio frequency electrical/changes of magnetic field value;
5) data analysis:Can the interference free performance for the electronic equipment for being placed on the position be analyzed meet requirement.
Electromagnetic field feature is produced in research and analysis transient state process of electric power system of the present invention, and combines related electromagnetic compatibility state Family's standard and actual condition, it is determined that electromagnetic field intensity frequency range and harassing and wrecking type in test transient state process of electric power system.According to transient state electricity The characteristics of magnetic field, in the transient processes such as transformer station's isolation switch operation, arc short-circuit, ground short circuit produce electromagnetic field frequency domain compared with Width, in testing using non-frequency-selecting type broadband radiation measuring instrument.It is that 24~2000HZ power frequency electric, magnetic field are strong to determine measurement frequency Degree, frequency is 100k~30GHz radio frequency electrical, the big type of magnetic field intensity two.
Field measurement power frequency, radio frequency electrical, magnetic field value maximum should be less than highest ranking value in following standard:《Limit time-varying The directive/guide (below 300GHz) that electric field, magnetic field and electromagnetic field expose to the open air》Professional exposure limit;GB/T 17626.8-1998 electromagnetism Compatibility experiment and e measurement technology/power frequency magnetic field noise immunity experiment;GB/T 17626.3-1998 EMC tests and measurement skill Art/radio frequency electromagnetic field radiation immunity experiment.
During test, test probe of the testing crew away from measuring instrument at least wants 2.5m;The ambient humidity of test site exists Less than 80%;All need to read the background data before testing before each testing experiment.
The present invention can effectively measure power frequency, radio frequency electromagnetic field change in transient process in transformer station, to intelligence in transformer station The electromagnetic environment that equipment site is installed is assessed of practical meaning.
With reference to embodiment, the invention will be further described.
Embodiment
The step of present invention measures transient electromagnetic field interference source in certain transformer station artificial earthing's short-circuit test is as follows:
1. tester is selected:8053A electromagnetic radiations analyzer and EHP-50C power frequencies probe from PMM companies, measurement Frequency is 24~2000HZ power frequency electromagnetic field, and NBM550 electromagnetic radiation analyzer and EF0391 probes, and measurement frequency is 100k~30GHz rf electric field.
2. test point selection:Select physical features flat, centered on the point for occurring transient interference source, from smart machine on the spot On the circumference that distance delimited for radius, unobstructed position is taken as test equipment riding position.
3. test probe is installed:At selected test position, test probe requirement (connects with producing the point in transient interference source The short dot or switch, the disconnecting link to be operated of ground short circuit experiment) between blocked without object.Test probe is placed on wooden pillar Above, 1~2m positions from the ground, to avoid passing through the support leakage current of measuring instrumentss;In order to measure safety, it is desirable to live ring Border humidity should be below 80%;When testing electric-field intensity, tester should be remote enough from the probe of measuring instrumentss, generally At least want 2.5m, it is to avoid larger electric field distortion is produced at instrument.
4. in order to test electricity, changes of magnetic field in transient state process of electric power system, it is necessary to before transient state process of electric power system generation The background data of a stable state is tested, obtaining steady state data using the method for steady state test (reads average electricity, the magnetic in 1 minute Field value), read 3~5 data and calculate power frequency and radio frequency electrical, magnetic field background value.
5. when measuring transient state electricity, magnetic field intensity, from the probe for meeting transient characteristic frequency, meter reading is reset, and is surveyed Examination instrument is arranged under the pattern of record maximum, electricity, maximum field strength in record change procedure.
During test, testing crew should the probe away from measuring instrumentss it is remote enough, generally at least want 2.5m, experiment knot Shu Hou, reads data from instrument.
6. the reading of electricity, magnetic field intensity measuring instrument table is reset, tested next time, degree should read examination before experiment every time Background data before testing.
7. test data analyzer:According to the power frequency, the maximum of radio-frequency electromagnetic field intensity that test measurement is arrived several times, analysis Can the interference free performance of the electronic equipment of the position is placed on meet requirement.
8. the evaluation criterion used:Each alarm of smart machine on the spot, abnormal information are detected in process of the test, detection is set on the spot The standby sampled value and action behavior correctness uploaded.Electricity, magnetic field measured value should be less than such as following table electromagnetic environment evaluation criterion value:

Claims (4)

1. a kind of transformer station's transient state electromagnetic environment test method, its testing procedure is as follows:
1) tester is selected:Selection meets the tester of international IEC61000-4 electromagnetic compatibility standards requirement, using non-choosing Frequency formula broadband radiation measuring instrument, measurement frequency is 24~2000Hz power frequency electric, magnetic field intensity, and frequency is 100k~30GHz's Radio frequency electrical, magnetic field intensity;
2) test point is selected:Select physical features it is flat, centered on the point for occurring transient interference source, from smart machine on the spot with a distance from On the circumference delimited for radius, unobstructed position is taken as tester riding position;
3) test probe is installed:Blocked between the test probe requirement of tester and the point for producing transient interference source without object, Test probe is placed on wooden pillar, from the ground 1~2m;
4) background data of a stable state is tested before transformer station's transient process occurs, a data was read using every 1 minute, takes 3 The steady-state method of test of the average value of~5 data obtains transformer station's power frequency and radio frequency electrical, magnetic field background value;Transformer station's transient state Process occur when, by record power frequency, radio frequency electrical, maximum field strength method obtain Temporal Data;Measuring instrument is read The unit of electric-field strength instantaneous value be V/m, unit of magnetic field strength is μ T, in air dielectric, and 1 μ T-phase is pressed when in 0.8A/m Row formula is calculated:
Background value is calculated: <mrow> <mi>Ep</mi> <mn>1</mn> <mo>=</mo> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mrow> <mi>E</mi> <mn>1</mn> </mrow> <mi>i</mi> </msub> <mo>,</mo> </mrow> <mrow> <mi>Bp</mi> <mn>1</mn> <mo>=</mo> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mrow> <mi>B</mi> <mn>1</mn> </mrow> <mi>i</mi> </msub> <mo>;</mo> </mrow>
<mrow> <mi>Ep</mi> <mn>2</mn> <mo>=</mo> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mrow> <mi>E</mi> <mn>2</mn> </mrow> <mi>i</mi> </msub> <mo>,</mo> </mrow> <mrow> <mi>Bp</mi> <mn>2</mn> <mo>=</mo> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mrow> <mi>B</mi> <mn>2</mn> </mrow> <mi>i</mi> </msub> <mo>;</mo> </mrow>
Changing value is calculated:Δ E1=E1max-Ep1, Δ B1=B1max-Bp1;
Δ E2=E2max-Ep2, Δ B2=B2max-Bp2;
In formula, Ep1/Bp1:Power frequency electric/magnetic field average;Ep2/Bp2:Radio frequency electrical/magnetic field average;n:Average value reads secondary Number, 3-5 times;E1max/B1max:Power frequency electric/maximum value of magnetic field;E2max/B2max:Radio frequency electrical/maximum value of magnetic field;ΔE1/Δ B1:Transient state power frequency electric/changes of magnetic field value;ΔE2/ΔB2:Transient state radio frequency electrical/changes of magnetic field value;
5) data analysis:Can the interference free performance for the electronic equipment for being placed on the position be analyzed meet requirement.
2. transformer station's transient state electromagnetic environment test method according to claim 1, it is characterised in that during test, testing crew Test probe away from measuring instrument at least wants 2.5m.
3. transformer station's transient state electromagnetic environment test method according to claim 1, it is characterised in that the environment of test site Humidity is below 80%.
4. transformer station's transient state electromagnetic environment test method according to claim 1, it is characterised in that before each testing experiment All need to read the background data before testing.
CN201210094056.9A 2012-03-31 2012-03-31 A kind of transformer station's transient state electromagnetic environment test method Active CN103364641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210094056.9A CN103364641B (en) 2012-03-31 2012-03-31 A kind of transformer station's transient state electromagnetic environment test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210094056.9A CN103364641B (en) 2012-03-31 2012-03-31 A kind of transformer station's transient state electromagnetic environment test method

Publications (2)

Publication Number Publication Date
CN103364641A CN103364641A (en) 2013-10-23
CN103364641B true CN103364641B (en) 2017-09-01

Family

ID=49366435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210094056.9A Active CN103364641B (en) 2012-03-31 2012-03-31 A kind of transformer station's transient state electromagnetic environment test method

Country Status (1)

Country Link
CN (1) CN103364641B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103678808B (en) * 2013-12-12 2017-04-05 中国能源建设集团广东省电力设计研究院有限公司 Transformer station's electromagnetic field analogy method based on component library
CN103760427A (en) * 2014-01-15 2014-04-30 国家电网公司 Statistical method of power frequency electromagnetic field distribution rules in transformer substation
CN106448099B (en) * 2016-08-31 2019-09-06 国网山东省电力公司菏泽供电公司 A kind of ring network cabinet running environment remote supervision system
CN106324435B (en) * 2016-08-31 2019-02-19 国网山东省电力公司菏泽供电公司 A kind of controller switching equipment running environment monitoring method
CN106332108B (en) * 2016-09-30 2019-11-12 深圳市吉祥腾达科技有限公司 A kind of building method of the anti-interference test environment of household radio product
CN109039832B (en) * 2018-09-29 2022-04-15 安徽众家云物联网科技有限公司 Intelligent household electrical appliance communication reliability testing method
CN113945766B (en) * 2021-09-23 2022-07-12 西安交通大学 Electromagnetic compatibility testing method for transformer embedded sensor
CN115099180B (en) * 2022-07-25 2022-11-15 广州地铁设计研究院股份有限公司 Subway high-voltage direct-current power supply system EMI radiation source loop model and modeling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2102972A (en) * 1981-07-22 1983-02-09 Gen Electric Co Plc Capacitor voltage transformers
CN101504432A (en) * 2009-01-24 2009-08-12 国网电力科学研究院 Transient electromagnetic field measuring method for transforming plant
CN101571563A (en) * 2009-06-04 2009-11-04 东方博沃(北京)科技有限公司 Integrative electric energy quality monitoring terminal
JP2010025849A (en) * 2008-07-23 2010-02-04 Olympus Corp Inspection apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2102972A (en) * 1981-07-22 1983-02-09 Gen Electric Co Plc Capacitor voltage transformers
JP2010025849A (en) * 2008-07-23 2010-02-04 Olympus Corp Inspection apparatus
CN101504432A (en) * 2009-01-24 2009-08-12 国网电力科学研究院 Transient electromagnetic field measuring method for transforming plant
CN101571563A (en) * 2009-06-04 2009-11-04 东方博沃(北京)科技有限公司 Integrative electric energy quality monitoring terminal

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
变电站二次设备电磁兼容性能的评估;冯子韬;《河北工业大学硕士论文》;20090131;第25-39页 *
高压输电线、变电站电磁环境测量方法研究;刘华麟;《重庆大学硕士论文》;20060131;第6-13页 *

Also Published As

Publication number Publication date
CN103364641A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN103364641B (en) A kind of transformer station&#39;s transient state electromagnetic environment test method
CN103576059B (en) A kind of transformer turn-to-turn electric discharge resultant fault diagnostic method and system
CN103197212B (en) GIS partial discharge on-line monitoring tester and configuration verification method thereof
CN103913679B (en) High-tension switch cabinet partial discharge monitoring system
CN204256093U (en) The On-line Fault monitoring device of cable splice in a kind of 10 ~ 35kV power distribution network
CN104407270A (en) Online fault monitoring device for cable connector in 10-35kV power distribution network and method for evaluating system state
CN112345889B (en) Transient voltage and transient current fused overvoltage fault diagnosis method and system
CN103217658A (en) Calibration evaluating system and method of partial discharge ultrahigh-frequency detecting device based on GTEM
CN103487679B (en) A kind of AIS electric mutual inductor test macro and method thereof
CN204064509U (en) A kind of temperature of high-tension switch cabinet on-line monitoring system
Coenen Measurement of partial discharges in power transformers using electromagnetic signals
CN109307815A (en) The power equipment test method simulated based on substation&#39;s electromagnetic interference and temperature and humidity
CN107462853A (en) A kind of scaling method of superfrequency partial discharge detecting system
CN116184265A (en) Lightning arrester leakage current detection method and system based on multi-classification SVM
CN103884953A (en) Damping loop fault diagnosis system of capacitor voltage transformer
CN110673075A (en) Method for evaluating electromagnetic interference resistance of ultrahigh frequency partial discharge detector
Qiang et al. Field test and analysis of partial discharge on GIS under impulse voltage
CN105353332A (en) Electronic transformer long-term charged performance test method and system
CN203519062U (en) Switch cabinet partial discharge intelligent on-line monitoring system
CN203502581U (en) AIS electronic transformer test system based on disconnecting switch switching-on and switching-off capacitive small current
CN109239547A (en) A kind of method and device measuring high-tension cable operating status
CN207232368U (en) A kind of inspection circuit of the extra-high video sensor effective height of partial discharge of transformer
CN207408505U (en) A kind of arrester early defect live testing system based on total current harmonic wave vector
CN106371044A (en) Magnetic flux leakage based case inside iron core working state monitoring method
CN213457262U (en) Circuit breaker divide-shut brake coil repetitive pulse method detection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant