CN103363083A - Planetary frame for large wind power gear box - Google Patents

Planetary frame for large wind power gear box Download PDF

Info

Publication number
CN103363083A
CN103363083A CN201310340357XA CN201310340357A CN103363083A CN 103363083 A CN103363083 A CN 103363083A CN 201310340357X A CN201310340357X A CN 201310340357XA CN 201310340357 A CN201310340357 A CN 201310340357A CN 103363083 A CN103363083 A CN 103363083A
Authority
CN
China
Prior art keywords
land
adpting flange
bolt
mounting hole
carrier main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310340357XA
Other languages
Chinese (zh)
Other versions
CN103363083B (en
Inventor
向革
戴先武
马朝玲
罗明轩
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Wangjiang Industry Co Ltd
Original Assignee
Chongqing Wangjiang Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Wangjiang Industry Co Ltd filed Critical Chongqing Wangjiang Industry Co Ltd
Priority to CN201310340357.XA priority Critical patent/CN103363083B/en
Publication of CN103363083A publication Critical patent/CN103363083A/en
Application granted granted Critical
Publication of CN103363083B publication Critical patent/CN103363083B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a planetary frame for a large wind power gear box. The planetary frame comprises a connecting flange (1) and a planetary frame main body (2), and is characterized in that the connecting flange (1) and the planetary frame main body (2) are of a split structure, one end of the connecting flange (1) is a connecting plate (1-1) extruding outward in the radial direction, one end of the planetary frame main body (2) is a connecting table (2-1) extruding outward in the axial direction, and the connecting flange (1) and the planetary frame main body (2) are fixedly connected through the connecting plate (1-1) and the connecting table (2-1). By means of the split structure, the planetary frame has the advantages of being simple in structure, easy to process, and safe and reliable.

Description

A kind of large-scale wind electricity gear-box planet carrier
Technical field
The present invention relates to wind turbine gearbox, be specifically related to a kind of large-scale wind electricity gear-box planet carrier.
Background technique
The first order adopts the planetary gear train transmission usually in the wind turbine gearbox, and this grade planet carrier will be subject to the low-speed heave-load effect usually, and is therefore very high to the requirement of strength of structure.Existing large-scale wind electricity gear-box is made of adpting flange and carrier main-body with planet carrier, is generally the overall structure of integrally casting moulding.Because its global shape, complex structure, enormous size, thereby design, make, process all very difficult.Especially the planet carrier of 3MW and above large-scale wind electricity gear-box because the safety coefficient requirement is very high, must use cast steel could satisfy performance requirement; Thereby so that the casting technique difficulty of integral cast steel planet carrier is very large, yield rate is not high.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of simple in structure, easy processing, safe and reliable large-scale wind electricity gear-box planet carrier.
For solving the problems of the technologies described above, the present invention takes following technological scheme;
The split type planet carrier of large-scale wind electricity gear-box of the present invention comprises adpting flange and carrier main-body, it is characterized in that; Described adpting flange and carrier main-body are Split type structure, described adpting flange one end is the outwardly land of radius vector, described carrier main-body one end is to the outwardly connected unit of axle, and described adpting flange is fixedly connected with connected unit by land with carrier main-body;
Described land is provided with attachment hole, and described connected unit is provided with mounting hole, and described adpting flange and carrier main-body are with bolts by the attachment hole on the land and the mounting hole on the connected unit;
Described land is provided with attachment hole, and described connected unit is provided with mounting hole, and described adpting flange is connected the mounting hole employing link connection that the attachment hole on the land is connected with connected unit with carrier main-body;
Described link is comprised of bolt and locating stud, and described locating stud is hollow pin, is set on the described bolt, and the bolt two ends are connected with the mounting hole that the attachment hole on the land is connected with connected unit;
Described land is provided with attachment hole, and described connected unit is provided with mounting hole, and described adpting flange is connected the mounting hole that the attachment hole on the land is connected with connected unit and adopts bolt to be connected with link with carrier main-body; The quantity of described bolt and link is identical or not identical;
Described adpting flange material is cast iron;
Described carrier main-body material is cast steel.
The present invention has following beneficial effect with respect to prior art;
1, because large-scale wind electricity gear-box integral body of the present invention is Split type structure, adpting flange and carrier main-body are independent structure, thereby relatively adpting flange and carrier main-body be the structure of the large-scale wind electricity gear-box of integral body, relatively simple for structure, adpting flange and carrier main-body can be cast separately, therefore significantly reduce the parts of Casting technology difficulty, improve product percent of pass, reduce manufacture cost.
2, adpting flange is connected bolt or link and connects the moment of torsion can indirectly guarantee planet carrier integral body and transmit safe and reliable with carrier main-body.
3, adpting flange adopts cast iron materials, satisfies under the condition of safety coefficient requirement, saves cost.
4, carrier main-body adopts cast steel material, compares cast iron and has better reliability and Security.
Description of drawings
Fig. 1 is the decomposing schematic representation of the planet carrier structure used of wind turbine gearbox of the present invention.
Among the figure, adpting flange 1, land 1-1, attachment hole 1-1-1, carrier main-body 2, connected unit 2-1, mounting hole 2-1-1, bolt 3, locating stud 4.
Embodiment
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail;
Embodiment 1, and referring to shown in Figure 1, large-scale wind electricity gear-box planet carrier of the present invention comprises adpting flange 1 and carrier main-body 2, it is characterized in that; Described adpting flange 1 and carrier main-body 2 are Split type structure, described adpting flange 1 one ends are the outwardly land 1-1 of radius vector, described carrier main-body 2 one ends are to the outwardly connected unit 2-1 of axle, and described adpting flange 1 and carrier main-body 2 are by land 1-) be fixedly connected with connected unit 2-1.Large-scale wind electricity gear-box of the present invention can make separately adpting flange 1 and carrier main-body 2 with this structure of planet carrier, again assembling.Thereby easy to manufacture, the assembling easy.
Described land 1-1 is provided with attachment hole 1-1-1, and described connected unit 2-1 is provided with mounting hole 2-1-1, and described adpting flange 1 is connected the mounting hole 2-1-1 that is connected with connected unit 2-1 by the attachment hole 1-1-1 on the land 1-1 and is adopted bolt 3 to connect with carrier main-body.Adopt bolt 3 to connect, can prevent the axial motion between adpting flange 1 and the carrier main-body 2, connect safe and reliable.
Embodiment 2, and referring to shown in Figure 1, the present embodiment difference from Example 1 is, described adpting flange 1 is connected the mounting hole 2-1-1 that is connected with connected unit 2-1 by the attachment hole 1-1-1 on the land 1-1 and is adopted link to connect with carrier main-body.This link is an assembly parts, can be bolt collar (not shown in FIG.), also can be pin and the assembly parts (not shown in FIG.) that is set in the sleeve on the pin.Preferred described link is comprised of bolt 3 and locating stud 4, described locating stud 4 is hollow pin, be set on the described bolt 3, locating stud 4 and bolt 3 are interference fit, and bolt 3 two ends are connected with the mounting hole 2-1-1 that attachment hole 1-1-1 on the land 1-1 is connected with connected unit 2-1.The large-scale wind electricity gear-box of the present invention this structure of planet carrier, bolt 3 can prevent the axial motion between adpting flange 1 and the carrier main-body 2, connects safe and reliable; Be set in locating stud 4 on the described bolt 3 and can resist warping force between adpting flange 1 and the carrier main-body 2, make the connection between adpting flange 1 and the carrier main-body 2 more safe and reliable.
Embodiment 3, and the present embodiment and embodiment 1 and embodiment's 2 differences are, described adpting flange 1 is connected the mounting hole 2-1-1 that is connected with connected unit 2-1 by the attachment hole 1-1-1 on the land 1-1 and is adopted bolt 3 to be connected with link with carrier main-body; The quantity of described bolt 3 and link is identical or not identical.Large-scale wind electricity gear-box of the present invention is with this structure of planet carrier, comprehensive above-described embodiment 1 and embodiment's 2 advantage, whole raising safety, reliability.
Described adpting flange 1 material of the various embodiments described above is cast iron, and this is so that its casting technique is relatively easily simple.
Described carrier main-body 2 materials of the various embodiments described above are cast steel, so that carrier main-body 2 has intensity to be guaranteed.

Claims (8)

1. a large-scale wind electricity gear-box planet carrier comprises adpting flange (1) and carrier main-body (2), it is characterized in that; Described adpting flange (1) and carrier main-body (2) are Split type structure, described adpting flange (1) one end is the outwardly land of radius vector (1-1), described carrier main-body (2) one ends are to the outwardly connected unit of axle (2-1), and described adpting flange (1) is fixedly connected with connected unit (2-1) by land (1-1) with carrier main-body (2).
2. large-scale wind electricity gear-box planet carrier according to claim 1 is characterized in that; Described land (1-1) is provided with attachment hole (1-1-1), described connected unit (2-1) is provided with mounting hole (2-1-1), and described adpting flange (1) is connected 2 with carrier main-body) be connected 2-1 with connected unit by the attachment hole (1-1-1) on the land (1-1)) on mounting hole (2-1-1) adopt bolt (3) connection.
3. large-scale wind electricity gear-box planet carrier according to claim 1 is characterized in that; Described land (1-1) is provided with attachment hole (1-1-1), described connected unit (2-1) is provided with mounting hole (2-1-1), and described adpting flange (1) is connected 2 with carrier main-body) be connected 2-1 with connected unit by the attachment hole (1-1-1) on the land (1-1)) on mounting hole (2-1-1) adopt the link connection.
4. large-scale wind electricity gear-box planet carrier according to claim 3 is characterized in that; Described link is comprised of bolt (3) and locating stud (4), described locating stud (4) is hollow pin, be set on the described bolt (3), bolt (3) two ends and the attachment hole (1-1-1) on the land (1-1) are connected 2-1 with connected unit) on mounting hole (2-1-1) be connected.
5. large-scale wind electricity gear-box planet carrier according to claim 1 is characterized in that; Described land (1-1) is provided with attachment hole (1-1-1), described connected unit (2-1) is provided with mounting hole (2-1-1), and described adpting flange (1) is connected 2 with carrier main-body) be connected 2-1 with connected unit by the attachment hole (1-1-1) on the land (1-1)) on mounting hole (2-1-1) employing bolt (3) be connected with link; The quantity of described bolt (3) and link is identical or not identical.
6. large-scale wind electricity gear-box planet carrier according to claim 5 is characterized in that; Described link is comprised of bolt (3) and locating stud (4), described locating stud (4) is hollow pin, be set on the described bolt (3), bolt (3) two ends and the attachment hole (1-1-1) on the land (1-1) are connected 2-1 with connected unit) on mounting hole (2-1-1) be connected.
7. 1 to 6 each described large-scale wind electricity gear-box planet carrier as requested, it is characterized in that: described adpting flange material is cast iron.
8. 7 described large-scale wind electricity gear-box planet carriers as requested, it is characterized in that: described carrier main-body material is cast steel.
CN201310340357.XA 2013-08-07 2013-08-07 A kind of large-scale wind electricity gear-box planet carrier Expired - Fee Related CN103363083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310340357.XA CN103363083B (en) 2013-08-07 2013-08-07 A kind of large-scale wind electricity gear-box planet carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310340357.XA CN103363083B (en) 2013-08-07 2013-08-07 A kind of large-scale wind electricity gear-box planet carrier

Publications (2)

Publication Number Publication Date
CN103363083A true CN103363083A (en) 2013-10-23
CN103363083B CN103363083B (en) 2016-08-24

Family

ID=49365087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310340357.XA Expired - Fee Related CN103363083B (en) 2013-08-07 2013-08-07 A kind of large-scale wind electricity gear-box planet carrier

Country Status (1)

Country Link
CN (1) CN103363083B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104668882A (en) * 2015-01-26 2015-06-03 上汽通用五菱汽车股份有限公司 Torsional damper and mounting method thereof
CN105422825A (en) * 2015-12-28 2016-03-23 南京高速齿轮制造有限公司 Input end structure of large-power wind driven generator gearbox
CN107790641A (en) * 2017-11-01 2018-03-13 兰州兰石铸锻有限责任公司 Large-scale wind electricity planet carrier cast shaping process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08270739A (en) * 1995-03-28 1996-10-15 Nissan Motor Co Ltd Carrier structure for planetary gear in automatic transmission
CN1829872A (en) * 2003-07-25 2006-09-06 依纳-谢夫勒两合公司 Planet carrier for a gearbox
KR20090051534A (en) * 2007-11-19 2009-05-22 세일공업 주식회사 Decelerator for driving shaft
CN201714592U (en) * 2010-03-31 2011-01-19 南京高速齿轮制造有限公司 Speed-increasing gear box for high-power wind power generator
CN102322511A (en) * 2011-09-09 2012-01-18 重庆齿轮箱有限责任公司 Input connecting structure of wind power generation gear box
CN202158146U (en) * 2011-07-20 2012-03-07 合肥顺通机械制造有限公司 Walking driving mechanism with special walking speed reducer of amphibious excavator
CN103148169A (en) * 2013-03-18 2013-06-12 大连新氏传动科技有限公司 Step-up gear box for wind power generator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08270739A (en) * 1995-03-28 1996-10-15 Nissan Motor Co Ltd Carrier structure for planetary gear in automatic transmission
CN1829872A (en) * 2003-07-25 2006-09-06 依纳-谢夫勒两合公司 Planet carrier for a gearbox
KR20090051534A (en) * 2007-11-19 2009-05-22 세일공업 주식회사 Decelerator for driving shaft
CN201714592U (en) * 2010-03-31 2011-01-19 南京高速齿轮制造有限公司 Speed-increasing gear box for high-power wind power generator
CN202158146U (en) * 2011-07-20 2012-03-07 合肥顺通机械制造有限公司 Walking driving mechanism with special walking speed reducer of amphibious excavator
CN102322511A (en) * 2011-09-09 2012-01-18 重庆齿轮箱有限责任公司 Input connecting structure of wind power generation gear box
CN103148169A (en) * 2013-03-18 2013-06-12 大连新氏传动科技有限公司 Step-up gear box for wind power generator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104668882A (en) * 2015-01-26 2015-06-03 上汽通用五菱汽车股份有限公司 Torsional damper and mounting method thereof
CN104668882B (en) * 2015-01-26 2018-05-01 上汽通用五菱汽车股份有限公司 The installation method and its device of a kind of torsional vibration damper
CN105422825A (en) * 2015-12-28 2016-03-23 南京高速齿轮制造有限公司 Input end structure of large-power wind driven generator gearbox
CN107790641A (en) * 2017-11-01 2018-03-13 兰州兰石铸锻有限责任公司 Large-scale wind electricity planet carrier cast shaping process
CN107790641B (en) * 2017-11-01 2019-06-25 兰州兰石铸锻有限责任公司 Large-scale wind electricity planet carrier cast shaping process

Also Published As

Publication number Publication date
CN103363083B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104085531B (en) The force transferring structure of Helicopter Main Reducer and helicopter
CN103363083A (en) Planetary frame for large wind power gear box
CN202628727U (en) Split crankshaft gear of high-power diesel engine
CN202900611U (en) Novel connection structure of hydraulic pump and power takeoff
CN102691784B (en) Input planet carrierin gearbox of high-power wind driven generator
CN202767685U (en) Lift-pull type blocking lock
CN103523041A (en) Pull rod device for locomotive traction
CN204283755U (en) A kind of wind-driven generator and blower fan main shaft thereof
CN203272625U (en) Step-up gear box of wind driven generator
CN204961605U (en) Connection structure of integral key shaft and bead
CN203230796U (en) Novel planetary mechanism of wind power gear box
CN203717687U (en) Coupling structure of calender
CN203544005U (en) Locomotive traction pull rod device
CN201714591U (en) Planetary gear train in wind motor gear case
CN203868285U (en) Belt pulley connected through expansion sleeve
CN202914689U (en) Gearbox body convenient to dismount and install
CN202670571U (en) Simple adjustable machine set transshipment device
CN202176629U (en) Coupling
CN103277499A (en) Planet carrier for wind power gear box
CN201648923U (en) Detachable type lug wheel mechanism of vibroll
CN206468682U (en) Crane pin shaft component
CN103762769A (en) Stator-deformation-resistant horizontal-axis large-sized wind turbine
CN204688121U (en) A kind of axlebox rod rubber arthrosis
CN202579970U (en) Input planet carrier in gear case of high-power wind driven generator
CN203836088U (en) Planetary reducer of traction box of coal mining machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20190807

CF01 Termination of patent right due to non-payment of annual fee