CN107790641A - Large-scale wind electricity planet carrier cast shaping process - Google Patents

Large-scale wind electricity planet carrier cast shaping process Download PDF

Info

Publication number
CN107790641A
CN107790641A CN201711056788.8A CN201711056788A CN107790641A CN 107790641 A CN107790641 A CN 107790641A CN 201711056788 A CN201711056788 A CN 201711056788A CN 107790641 A CN107790641 A CN 107790641A
Authority
CN
China
Prior art keywords
annular plate
planet carrier
core
casting
shaping process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711056788.8A
Other languages
Chinese (zh)
Other versions
CN107790641B (en
Inventor
陈永丽
王爱江
王定军
仲向财
林军国
刘彩贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Blue Stone Casting LLC
Original Assignee
Lanzhou Blue Stone Casting LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Blue Stone Casting LLC filed Critical Lanzhou Blue Stone Casting LLC
Priority to CN201711056788.8A priority Critical patent/CN107790641B/en
Publication of CN107790641A publication Critical patent/CN107790641A/en
Application granted granted Critical
Publication of CN107790641B publication Critical patent/CN107790641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/088Feeder heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/10Cores; Manufacture or installation of cores
    • B22C9/103Multipart cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/04Influencing the temperature of the metal, e.g. by heating or cooling the mould

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The invention discloses a kind of large-scale wind electricity planet carrier cast casting moulding process, the planet carrier casting includes the upper annular plate and lower annular plate being connected with triangle uprights vertical, and the die joint of planet carrier casting is arranged on the interface of upper annular plate and three corner posts;First core and the second core are set between upper annular plate and lower annular plate, and the outside of core is provided with triangle outlet passageway, and core centre sets vertical outlet passageway;Open riser is set directly over upper annular plate and three corner post intersections;Lower annular plate sets blind riser, and the lower section of lower annular plate is provided with external chill.Running channel is returned the bottom of using to be poured into a mould with the pouring type that ladder running channel is combined.Using planet carrier casting forming produced by the invention, size qualification, casting matrix is fine and close, and three corner posts only need modified repair welding with upper annular plate, lower annular plate handing-over position flawless defect, other positions, castings production cost is reduced, there is higher economic benefit.

Description

Large-scale wind electricity planet carrier cast shaping process
Technical field
The present invention relates to plant equipment casting technology field, specifically a kind of casting forming, the matrix group formed Knit fine and close, the large-scale wind electricity planet carrier cast shaping process of flawless defect.
Background technology
Global offshore wind farm unit shows the Enlargement Tendency, and China's offshore wind farm is in the starting stage.For 5MW and High-power land and coastal waters field wind power plant above, unit is high using power, and unit requirement is not repaired for 50 years.And planet Frame product directly affects the service life of whole generating set as wind power generating set important component, its quality.OK Carrier casting integrally belongs to frame structure, and vertical direction deflation resistance is big, and amount of contraction is difficult to control, and casting dimension accuracy is difficult to protect Card;Because hindered contraction produces shrinkage stress during contraction, crackle is easily caused;Thermal center is isolated, scattered, more, obtains compact tissue difficulty, And key area does not allow soldering, Production Practice of Casting Technologies is poor, and it is big to manufacture difficulty.
The content of the invention
It is an object of the invention to provide a kind of large-scale wind electricity planet carrier cast shaping process, to solve:Planet carrier casting heat Section is isolated, scattered, more, and feeding is difficult, and hardly possible obtains compact tissue;Two layers of annular slab of planet carrier and column junction deflation resistance Greatly, amount of contraction is difficult to control, and casting dimension accuracy is difficult to ensure that;And it is easily caused when shrinking because hindered contraction produces shrinkage stress Crackle, the problem of making casting finished products can't meet the quality requirement.
It is to solve above-mentioned technical problem the technical solution used in the present invention:
A kind of large-scale wind electricity planet carrier cast shaping process, the planet carrier casting include hanging down with five equally distributed three corner posts The direct-connected upper annular plate and lower annular plate connect, upper annular plate are provided with 5 downward opening cone planetary axle blind holes, lower annular plate Intermediate region is provided with 5 equally distributed planet shaft through-holes, and planet shaft through-hole need not cast out, and the die joint of planet carrier casting is set Put the interface in upper annular plate and three corner posts;First core and the second core are set between upper annular plate and lower annular plate, The outside of first core and the second core is provided with triangle outlet passageway, and the centre of the first core is provided with to be set with runner brick row The second vertical outlet passageway, the second core centre is equipped with the first vertical outlet passageway for setting of runner brick row;Upper Open riser is respectively provided with directly over annular slab and three corner post intersections;5 are set above the planet shaft through-hole that lower annular plate does not cast out Individual blind riser, blind riser top are connected with horizontal outlet passageway, and horizontal outlet passageway is connected with the second vertical outlet passageway;
Set immediately below blind riser it is several it is low return ingate, the bottom of ingate is with setting the cross gate below planet carrier casting Be connected, cross gate converge after by setting the sprue on the outside of planet carrier casting to be drawn from casting top box, sprue passes through Ladder running channel is connected with open riser;Three corner posts are provided with several techniques with upper annular plate, lower annular plate junction and cut muscle;
The lower section of lower annular plate is provided with several piece external chill;Insulation material is laid respectively at the top of open riser after casting complete to be protected Temperature.
Preferably, the first described core with it is first that the first core and the second pasting of core is integral during the second core mould assembling Afterwards, with the height dimension of core after model control bonding, then overall lower core.
Preferably, deformability material is discharged in the middle part of first core and the second core, ensures that mold thickness exists Between 100-150 mm.
Preferably, a diameter of 80-120mm of the described first vertical outlet passageway, the size of the horizontal outlet passageway are 60mm × 60mm × 15mm, a diameter of 40-60mm of the second vertical outlet passageway.
Preferably, the open riser is circular heat insulating open riser, and insulation material is discharged after casting complete at the top of open riser For plant ash, laying weight is 12-17kg;The blind riser is circular sand mold blind riser.
Preferably, the cylindrical side of the lower annular plate is provided with several piece external chill, lower annular plate and three corner post junctions External chill is arranged right below, lower annular plate bottom is located at blind riser and is arranged right below several piece external chill.
Preferably, the thickness of the external chill is be quenched place's wall thickness or thermal center circular diameter 0.5-0.8 times, and length is quilt 1.8-2.5 times of wall thickness at Quench, width are be quenched place's wall thickness 1.5-2.0 times, and external chill contacts surface perimeter with casting The slow cooling slope gradient is 25-35 °.
Preferably, the ladder running channel shares 3, and 100-120mm highly locates above upper annular plate.
Preferably, the cast shaping process of the planet carrier casting uses resin sand hand moulding;Planet carrier is cast after shaping Part shrinkage factor is 1.5%.
Preferably, the thickness that the technique cuts muscle is 15-20mm, and adjacent process cuts spacing 40-50mm between muscle.
Beneficial effects of the present invention are:
(1)The die joint of the present invention is chosen at the interface of upper annular plate and three corner posts, and casting mold is divided into two halves up and down, made Casting major part main body is located at nowel, reduces core quantity and lower core mould assembling dimensional discrepancy;Also core is set to be entirely located in nowel, Be advantageous to lower core mould assembling operation, reduce overlap, fash that lower core is formed, improve planet carrier surface quality of continuous castings, and can be effective Ground controls the counterpart size of wall thickness dimension and 5 columns;
(2)Two cores are set between upper annular plate and lower annular plate, lower annular plate are formed with the second core, with the first core Model will be used to form the planet axis blind hole on upper annular plate and upper annular plate, during mould assembling after the first core and the second pasting of core Core overall height dimension is measured, to ensure that size meets tolerance between upper lower annular plate.Can conveniently it be made using two layers of core Type operates, it is ensured that the intensity and the degree of packing of sand mold at 5 planet axis blind holes below upper annular plate, avoids because below rising head Overheat produces scab;
(3)5 circular heat insulating open risers are arranged above what upper annular plate intersected with 5 three corner posts, solve upper annular plate And 5 root post feeding problem.5 planet shaft through-holes on lower annular plate are not cast out, 5 circular sand molds are arranged above at it Blind riser, solves the problems, such as the feeding of lower annular plate, planetocentric axis hole and planet shaft through-hole.Layering sets rising head can be to planet carrier Casting carries out abundant feeding, each position is formed compact tissue, while scattered multiple rising head collection slag significant effects.It is bright to emit 15kg insulation materials are respectively discharged at the top of mouthful after casting complete, increases riser head heat-preserving performance, riser feeding effect can be lifted;
(4)Several piece external chill is set below lower annular plate, and external chill contacts 30 ° of surface perimeter slow cooling slope with casting.External chill The setting rate of place's molten steel is about more than twice at sand mold, sets external chill to cause casting to let cool iron position and first solidify, and is formed Consecutive solidification trend is realized, riser feeding distance can be extended, so as to obtain compact tissue.External chill and the side of casting contact position Slow cooling slope is made in face, makes the interface temperature gradient gentle transition of chill and sand mold, avoids in the intersection of chill and sand mold Thermal fragmentation defect is produced on casting;
(5)The principle that opens up of resin sand technique running channel of the present invention is that low temperature, bottom are returned, opening is poured soon, sets several bottom to return Ingate be in order that the total section of ingate is maximum in running gate system, multi-point dispersion heat ensure during cast molten steel first from casting most Bottom enters, and is advantageous to pigment finish leather and floating sand in sand mold die cavity and assembles into rising head;3 ladders are set to pour above upper annular plate Road, when molten steel face is risen at 3 ladder running channels, molten steel enters from 3 ladder running channels, after so contributing to molten steel to pour into a mould Phase casting forms the trend of consecutive solidification, avoids bottom from returning overheat at ingate and shrinkage porosite and crack defect occurs;
(6)The present invention sets horizontal outlet passageway at the top of the blind riser above lower annular plate planet shaft through-hole, passes through runner brick Arrange the vertical gas off-take set and discharge gas from top box.Gas during cast in lower annular plate can only go out from the triangle of core side Gas passage and lower annular plate planet shaft through-hole(Do not cast out)Escaped at the top of the rising head of top, pass through level into the gas in rising head Outlet passageway introduces a gas into the second vertical outlet passageway and discharged from upper box top, ensures that molten steel exhaust is unimpeded inside casting mold, has The defects of effect avoids casting from producing stomata, misrun;
(7)Three corner posts of planet carrier casting intersect vertically with upper annular plate, lower annular plate, and upper annular plate, lower annular plate are main Shrink in the horizontal direction, three corner posts shrink mainly in the vertical direction, and intersection area is thick big, and radiating condition is poor, easy shape after solidification Defect is cracked into stress concentration.Decomposition can be played, discharge the work of shrinkage stress by setting multiple tracks technique to cut muscle at the position With so as to effectively reduce and Crack prevention defect;
(8)Deformability material is discharged in core middle part, and mold thickness is controlled between 100-150mm.The yielding of core can be increased Property, can reduce between upper lower annular plate and the radial contraction resistance of spindle hole, while be also beneficial to the upward of sand core internal gas Discharge;The materials such as wood chip may be selected in deformability material;
(9)The present invention elects the shrinkage factor of casting as 1.5%, can effectively solve planet carrier casting structure complexity, shrink uneven The problem of.
The planet carrier casting forming produced using the casting technique of the present invention, the matrix of formation are fine and close.By blank Carry out 100% ultrasonic examination detection and 100% magnetic powder inspection detection.Ultrasonic examination detection planet head meets with planet hole portion position The 2 grades of requirements of EN 12680-1 standards, remaining all finished surface of carrier main-body meet 3 grades of requirements of EN 1268-1 standards.Magnetic Powder carrying out flaw detection planet head meets 1 grade of requirement of EN 1369-1997 standards with planet hole portion position.Planet carrier casting intermediate cam is stood Post is with upper annular plate and lower annular plate handing-over position, planet head and planet hole portion position without any casting flaw, it is not necessary to is mended Weldering, other positions only need to carry out modified soldering.
Brief description of the drawings:
Fig. 1 is large-scale wind electricity planet carrier cast casting forming process structure schematic diagram of the present invention;
Fig. 2 is Fig. 1 schematic top plan view;
In figure:1st, planet carrier casting, 2, planet axis blind hole, 3, upper annular plate, 4, interface, the 5, first core, 6, triangle goes out Gas passage, the 7, second core, 8, lower annular plate, 9, blind riser, 10, planet shaft through-hole, 11, ingate, 12, external chill, 13, three Corner post, 14, technique cut muscle, 15, cross gate, 16, sprue, 17, ladder running channel, 18, insulation material, 19, open riser, 20, First vertical outlet passageway, the 21, second vertical outlet passageway, 22, horizontal outlet passageway,
Embodiment:
Technical scheme and beneficial effect are described in further detail below in conjunction with the accompanying drawings.
Large-scale wind electricity planet carrier cast shaping process as shown in Figure 1 and Figure 2, the planet carrier casting 1 are included with five uniformly Three corner posts 13 upper annular plate 3 and lower annular plate 8 connected vertically of distribution, upper annular plate 3 are provided with 5 downward opening cones Shape planet axis blind hole 2, the intermediate region of lower annular plate 8 are provided with 5 equally distributed planet shaft through-holes 10, and planet shaft through-hole 10 is not required to Cast out, the die joint of planet carrier casting 1 is arranged at the interface 4 of the corner post 13 of upper annular plate 3 and three;Upper annular plate 3 with First core 5 and the second core 7 be set between lower annular plate 8, and the outside of the first core 5 and the second core 7 goes out provided with triangle Gas passage 6, the centre of the first core 5 are provided with the second vertical outlet passageway 21 set with runner brick row, the center of the second core 7 Position is equipped with the first vertical outlet passageway set with runner brick row(20);First by when the first core 5 and the second 7 mould assembling of core After one core 5 and the second core 7 are bonded into one, with the height dimension of core after model control bonding, then overall lower core.
Open riser 19 is respectively provided with directly over the intersection of 3 and three corner post of upper annular plate 13;The row that lower annular plate 8 does not cast out The top of star shaft through-hole 10 sets 5 blind risers 9, and the top of blind riser 9 is connected with horizontal outlet passageway 22, horizontal outlet passageway 22 It is connected with the second vertical outlet passageway 21;A diameter of 80-120mm of first vertical outlet passageway 20, horizontal outlet passageway 22 Size be 60mm × 60mm × 15mm, a diameter of 40-60mm of the second vertical outlet passageway 21.First core 5 and the second sand Deformability material is discharged in the middle part of core 7, ensures mold thickness between 100-150 mm.
Set immediately below blind riser 9 it is several it is low return ingate 11, the bottom of ingate 11 is with setting under planet carrier casting 1 The cross gate 15 of side is connected, cross gate 15 converge after by setting the sprue 16 in the outside of planet carrier casting 1 from casting Case is drawn, and sprue 16 is connected by ladder running channel 17 with open riser 19;Three corner posts 13 are handed over upper annular plate 3, lower annular plate 8 The place of connecing is provided with several techniques and cuts muscle 14;
The cylindrical side of lower annular plate 8 is provided with several piece external chill 12, and lower annular plate 8 is arranged right below with the junction of three corner post 13 External chill 12, the bottom of lower annular plate 8 are located at blind riser 9 and are arranged right below several piece external chill 12.
Open riser 19 is circular heat insulating open riser, and it is vegetation that insulation material 18 is discharged at the top of open riser 19 after casting complete Ash, laying weight are 15kg;Blind riser 9 is circular sand mold blind riser.
Ladder running channel 17 shares 3, and 100-120mm highly locates above upper annular plate 3.
The cast shaping process of planet carrier casting 1 uses resin sand hand moulding;The shrinkage factor of planet carrier casting 1 is after shaping 1.5%。
The thickness that technique cuts muscle 14 is 15-20mm, and spacing is 40-50mm between adjacent process cuts muscle 14.
Planet carrier product type is in the present embodiment:WF5000BIA;Material therefor is:ZG35CrMo;Appearance and size: 2000mm×1210mm;Using wooden mold furane resins sand molding, casting gross weight:8400kg, feeder modulus are cast for the position 1.5-1.1 times of part modulus, with reference to riser feeding distance calculating method set external chill, according to casting gross weight and pour, emit it is salty Calculating casting yield rate is:50%.
Manufacture experimently 2 planet carrier casting of production altogether with technical scheme of the present invention.To produced planet carrier cast product without It is as follows to damage testing result:
1st, ultrasonic examination testing result:
2nd, magnetic powder inspection testing result:
(1)Non-linear stomata, burning into sand and slag inclusion, the testing result due to shrink defects caused by nitrogen:
(2)Linear and aligning defect testing result:
3rd, the corner post of planet carrier casting three and upper annular plate and lower annular plate handing-over position and planet head and planet hole portion position without times What crack defect, it is not necessary to carry out repair welding.There is a small amount of micro-crack defect in other positions, it is only necessary to carry out modified repair welding.

Claims (10)

1. a kind of large-scale wind electricity planet carrier cast shaping process, the planet carrier casting(1)Including with five equally distributed triangles Column(13)Upper annular plate connected vertically(3)And lower annular plate(8), upper annular plate(3)It is provided with 5 downward opening tapers Planet axis blind hole(2), lower annular plate(8)Intermediate region is provided with 5 equally distributed planet shaft through-holes(10), planet shaft through-hole (10)It need not cast out, it is characterised in that:The planet carrier casting(1)Die joint be arranged on upper annular plate(3)Stood with triangle Post(13)Interface(4);Upper annular plate(3)With lower annular plate(8)Between the first core is set(5)With the second core(7), the One core(5)With the second core(7)Outside be provided with triangle outlet passageway(6), the first core(5)Centre be provided with use The second vertical outlet passageway that runner brick row sets(21), the second core(7)Centre is equipped with first set with runner brick row Vertical outlet passageway(20);In upper annular plate(3)With three corner posts(13)Open riser is respectively provided with directly over intersection(19);Lower ring Shape plate(8)The planet shaft through-hole not cast out(10)Top sets 5 blind risers(9), blind riser(9)Top and horizontal outlet passageway (22)It is connected, horizontal outlet passageway(22)With the second vertical outlet passageway(21)It is connected;
Blind riser(9)Underface, which is set, several low returns ingate(11), ingate(11)Bottom with set planet carrier casting (1)The cross gate of lower section(15)It is connected, cross gate(15)By setting planet carrier casting after converging(1)The sprue in outside (16)Drawn from casting top box, sprue(16)Pass through ladder running channel(17)With open riser(19)It is connected;Three corner posts(13)With Upper annular plate(3), lower annular plate(8)Junction is provided with several techniques and cuts muscle(14);
Lower annular plate(8)Lower section be provided with several piece external chill(12);Open riser(19)Laying is protected respectively after casting complete at top Adiabator(18)It is incubated.
2. large-scale wind electricity planet carrier cast shaping process according to claim 1, it is characterised in that:The first described core (5)With the second core(7)First by the first core during mould assembling(5)With the second core(7)After being bonded into one, controlled and bonded with model The height dimension of core afterwards, then overall lower core.
3. large-scale wind electricity planet carrier cast shaping process according to claim 1 or 2, it is characterised in that:First sand Core(5)With the second core(7)Middle part discharge deformability material, ensure mold thickness between 100-150 mm.
4. large-scale wind electricity planet carrier cast shaping process according to claim 3, it is characterised in that:Described first goes out vertically Gas passage(20)A diameter of 80-120mm, the horizontal outlet passageway(22)Size be 60mm × 60mm × 15mm, it is described Second vertical outlet passageway(21)A diameter of 40-60mm.
5. large-scale wind electricity planet carrier cast shaping process according to claim 3, it is characterised in that:The open riser(19) For circular heat insulating open riser, open riser(19)Insulation material is discharged after casting complete in top(18)For plant ash, weight is laid For 12-17kg;The blind riser(9)For circular sand mold blind riser.
6. large-scale wind electricity planet carrier cast shaping process according to claim 5, it is characterised in that:The lower annular plate (8)Cylindrical side be provided with several piece external chill(12), lower annular plate(8)With three corner posts(13)Junction is arranged right below outer cold Iron(12), lower annular plate(8)Bottom is located at blind riser(9)It is arranged right below several piece external chill(12).
7. large-scale wind electricity planet carrier cast shaping process according to claim 6, it is characterised in that:The external chill(12) Thickness be to be quenched place's wall thickness or 0.5-0.8 times of thermal center circular diameter, length is to be quenched 1.8-2.5 times that locates wall thickness, wide Spend to be quenched 1.5-2.0 times of place's wall thickness, external chill(12)The surface perimeter slow cooling slope gradient is contacted with casting as 25-35 °.
8. large-scale wind electricity planet carrier cast shaping process according to claim 7, it is characterised in that:The ladder running channel (17)3 are shared, positioned at upper annular plate(3)Top 100-120mm highly locates.
9. large-scale wind electricity planet carrier cast shaping process according to claim 8, it is characterised in that:The planet carrier casting (1)Cast shaping process use resin sand hand moulding;Planet carrier casting after shaping(1)Shrinkage factor is 1.5%.
10. large-scale wind electricity planet carrier cast shaping process according to claim 9, it is characterised in that:The technique cuts muscle (14)Thickness be 15-20mm, adjacent process cuts muscle(14)Between spacing be 40-50mm.
CN201711056788.8A 2017-11-01 2017-11-01 Large-scale wind electricity planet carrier cast shaping process Active CN107790641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711056788.8A CN107790641B (en) 2017-11-01 2017-11-01 Large-scale wind electricity planet carrier cast shaping process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711056788.8A CN107790641B (en) 2017-11-01 2017-11-01 Large-scale wind electricity planet carrier cast shaping process

Publications (2)

Publication Number Publication Date
CN107790641A true CN107790641A (en) 2018-03-13
CN107790641B CN107790641B (en) 2019-06-25

Family

ID=61548839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711056788.8A Active CN107790641B (en) 2017-11-01 2017-11-01 Large-scale wind electricity planet carrier cast shaping process

Country Status (1)

Country Link
CN (1) CN107790641B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109909451A (en) * 2019-04-09 2019-06-21 安徽应流集团霍山铸造有限公司 A kind of steel-casting casting model and its pouring procedure
CN110216240A (en) * 2019-07-08 2019-09-10 常熟市虹桥铸钢有限公司 A kind of petroleum preventer double disc Shell Manufacture
CN110369678A (en) * 2019-06-17 2019-10-25 江苏吉鑫风能科技股份有限公司 A kind of wind power principal axis metal mold and casting system
CN111036853A (en) * 2019-12-05 2020-04-21 江苏吉鑫风能科技股份有限公司 Size control method for 8MW fan base casting
CN112170785A (en) * 2020-08-25 2021-01-05 常熟市虹桥铸钢有限公司 Casting method of hub reduction gear frame
CN112846080A (en) * 2021-01-05 2021-05-28 中国第一重型机械股份公司 Integral casting control method for rudder blade casting for large ship
CN112872297A (en) * 2020-12-25 2021-06-01 兰州高压阀门有限公司 Stepped feeding casting process for large-scale profile section casting
CN113118389A (en) * 2021-05-25 2021-07-16 江苏力源金河铸造有限公司 Sand core for casting shell casting and casting process thereof
CN115121766A (en) * 2021-03-29 2022-09-30 常熟市虹桥铸钢有限公司 Gearbox resin sand casting process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103363083A (en) * 2013-08-07 2013-10-23 重庆望江工业有限公司 Planetary frame for large wind power gear box
CN203725706U (en) * 2014-03-28 2014-07-23 日月重工股份有限公司 Structure for planet carrier casting and pouring system of wind turbine generator set
CN104174819A (en) * 2014-08-22 2014-12-03 常熟市虹桥铸钢有限公司 Casting technology for three-stage planetary frame of ocean platform climbing machine
CN205660111U (en) * 2016-06-08 2016-10-26 浙江点铁科技有限公司 Planet carrier rising head structure
CN106399812A (en) * 2016-09-22 2017-02-15 浙江点铁科技有限公司 Alloy material of planet carrier and manufacturing process of planet carrier

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103363083A (en) * 2013-08-07 2013-10-23 重庆望江工业有限公司 Planetary frame for large wind power gear box
CN203725706U (en) * 2014-03-28 2014-07-23 日月重工股份有限公司 Structure for planet carrier casting and pouring system of wind turbine generator set
CN104174819A (en) * 2014-08-22 2014-12-03 常熟市虹桥铸钢有限公司 Casting technology for three-stage planetary frame of ocean platform climbing machine
CN205660111U (en) * 2016-06-08 2016-10-26 浙江点铁科技有限公司 Planet carrier rising head structure
CN106399812A (en) * 2016-09-22 2017-02-15 浙江点铁科技有限公司 Alloy material of planet carrier and manufacturing process of planet carrier

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭显平: "2000MW级风电行星架大型铸钢件的", 《铸造技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109909451A (en) * 2019-04-09 2019-06-21 安徽应流集团霍山铸造有限公司 A kind of steel-casting casting model and its pouring procedure
CN110369678A (en) * 2019-06-17 2019-10-25 江苏吉鑫风能科技股份有限公司 A kind of wind power principal axis metal mold and casting system
CN110216240A (en) * 2019-07-08 2019-09-10 常熟市虹桥铸钢有限公司 A kind of petroleum preventer double disc Shell Manufacture
CN111036853A (en) * 2019-12-05 2020-04-21 江苏吉鑫风能科技股份有限公司 Size control method for 8MW fan base casting
CN111036853B (en) * 2019-12-05 2021-02-26 江苏吉鑫风能科技股份有限公司 Size control method for 8MW fan base casting
CN112170785A (en) * 2020-08-25 2021-01-05 常熟市虹桥铸钢有限公司 Casting method of hub reduction gear frame
CN112872297A (en) * 2020-12-25 2021-06-01 兰州高压阀门有限公司 Stepped feeding casting process for large-scale profile section casting
CN112872297B (en) * 2020-12-25 2023-04-25 兰州高压阀门有限公司 Stepped feeding casting process for large-sized profile section casting
CN112846080A (en) * 2021-01-05 2021-05-28 中国第一重型机械股份公司 Integral casting control method for rudder blade casting for large ship
CN112846080B (en) * 2021-01-05 2022-12-02 中国第一重型机械股份公司 Integral casting control method for rudder blade casting for large ship
CN115121766A (en) * 2021-03-29 2022-09-30 常熟市虹桥铸钢有限公司 Gearbox resin sand casting process
CN113118389A (en) * 2021-05-25 2021-07-16 江苏力源金河铸造有限公司 Sand core for casting shell casting and casting process thereof

Also Published As

Publication number Publication date
CN107790641B (en) 2019-06-25

Similar Documents

Publication Publication Date Title
CN107790641B (en) Large-scale wind electricity planet carrier cast shaping process
CN101716655B (en) Casting method of large water turbine blade
CN100491019C (en) A Casting Method of Large Main Bearing Seat
CN101618426B (en) Method for casting main shaft casts of stators in aerogenerators
CN101444838B (en) Method for casting large jigger wheel with counterbalance
CN103624218A (en) Casting method of hollow crankshaft of slurry pump
CN208178377U (en) The process unit of Iron Mould Coated Sand vertical-parting cast bearing lid casting
CN101837432B (en) Tyre casting method and casting die
CN104190874B (en) Super-low sulfur phosphorus HTHP valve body cast shaping process
CN103212674A (en) Steel plate ingot casting device and method for producing ultra-thick steel plate cast ingot with same
CN103100669B (en) A kind of with flange casting bolt hole gate valve body composite pouring technique
CN104226915B (en) Casting method of hollow shaft and casting mold
CN104827000B (en) A kind of casting method of gear ring
CN106392013A (en) Riser and pouring system for producing gray pig iron hub castings on DISA line and design method of riser and pouring system
CN111168005A (en) Casting device and casting method for balance shaft casting
CN103170580B (en) A kind of casting technique of gas turbine blower bearing block and running gate system thereof
CN201921988U (en) Diesel engine body casting mold
CN105458225B (en) A kind of bimetallic alloy hammers casting method into shape
CN110153377A (en) A gating system for controlling the synchronous filling of large molded shells and its application
CN204413064U (en) A kind of oil drilling pump crosshead die
CN106583646A (en) Pouring system and casting process method for railway locomotive large-size motor shell
CN206229978U (en) DISA on-line production of gray cast iron wheel castings casting riser system
CN102091762A (en) Differential-height casting method for horizontal roll frame blank of rough mill
CN103600035A (en) Manufacturing technology of walking machinery bracket casting
CN206474641U (en) The inexpensive gate valve casting without rising head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant