CN103352466A - Pile-breaking module for assembling concrete pile-breaking equipment - Google Patents

Pile-breaking module for assembling concrete pile-breaking equipment Download PDF

Info

Publication number
CN103352466A
CN103352466A CN2013102646061A CN201310264606A CN103352466A CN 103352466 A CN103352466 A CN 103352466A CN 2013102646061 A CN2013102646061 A CN 2013102646061A CN 201310264606 A CN201310264606 A CN 201310264606A CN 103352466 A CN103352466 A CN 103352466A
Authority
CN
China
Prior art keywords
link
fixed body
broken pile
pile
breaking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102646061A
Other languages
Chinese (zh)
Inventor
吴钢梁
章骑峰
周军
徐洪潮
严传表
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG MANTOVANI MACHINERY Co Ltd
Wolong Electric Drive Group Co Ltd
Original Assignee
ZHEJIANG MANTOVANI MACHINERY Co Ltd
Wolong Electric Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG MANTOVANI MACHINERY Co Ltd, Wolong Electric Group Co Ltd filed Critical ZHEJIANG MANTOVANI MACHINERY Co Ltd
Priority to CN2013102646061A priority Critical patent/CN103352466A/en
Publication of CN103352466A publication Critical patent/CN103352466A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a pile-breaking module for assembling concrete pile-breaking equipment, and relates to the pile-breaking equipment. At present, the conventional pile-breaking equipment is integrated, inflexible to use, large in investment and difficult to place. The pile-breaking module is characterized by comprising a fixed body, an impact oil cylinder 10, cylindrical drill rods and a hanging ring 11, wherein the impact oil cylinder 10 is arranged on the fixed body; the cylindrical drill rods are connected with the impact oil cylinder 10; the handing ring 11 is arranged on the top surface of the fixed body and used for allowing the hanging ring to penetrate through; the heads of the drill rods are conical; a first connection end and a second connection end are arranged on the left side and the right side of the fixed body 1 respectively; the pile breaking module is detachably connected with a second connection end of another pile breaking module through the first connection end of the fixed body 1; and a plurality of pile-breaking modules are connected end to end, so that the annular concrete pile-breaking equipment with radially distributed drill rods is formed. According to the technical scheme, pile-breaking equipment with different inner diameters are formed through splicing, so that piles with different diameters are adapted, pile-breaking is more efficient, the equipment is low in cost and used conveniently and flexibly, and the occupied space is small after disassembly.

Description

The broken pile module that is used for assembling concrete broken pile equipment
Technical field
The present invention relates to a kind of broken pile equipment.
Background technology
The construction of any modern architecture all needs the stake of laying foundation, and foundation pile is generally the 1-2m that elevates above the soil, and for the concrete disintegrating of the part that elevates above the soil is stayed inner reinforcing bar, just needs to use special crushing appliance, if adopt all-in-one-piece broken pile equipment, just have the following disadvantages.
1, use is dumb, will adopt the broken pile equipment of different size to the stake of different sizes, and equipment investment is large.
If 2 have adopted the broken pile equipment of different size, just for to take a lot of stacking places, the difficulty that causes equipment to place.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is that the prior art scheme is improved and improved, and is provided for the broken pile module of assembling concrete broken pile equipment, to realize using flexibly the purpose of easy accessibility.For this reason, the present invention takes following technical scheme.
The broken pile module that is used for assembling concrete broken pile equipment, it is characterized in that: comprise fixed body, be located at impact oil cylinder on the fixed body, with impact the cylindricality drill steel of oil cylinder in linking to each other, be located at the fixed body end face for the suspension ring that wear rope, the head of drill steel is tapered; The described fixed body left and right sides is respectively the first link and the second link, one broken pile module removably is connected with the second link of another broken pile module by the first link of fixed body, and the end to end formation drill steel of a plurality of broken pile modules is radial ring-type concrete broken pile equipment of arranging.According to the size of stake, select the broken pile module of varying number to connect, thereby form the broken pile equipment of different inner diameters size, to adapt to the stake of different-diameter, better with the size matching of stake, broken pile is more effective, and equipment cost is low, and is easy to use, flexible.Not the time spent, detachable, shared space is few.Suspension ring can be fixed on the fixed body by welding or the mode that is spirally connected, and wear rope in the suspension ring, are suspended on above digging machine, the loop wheel machine etc. by iron chains, can automatically adjust direction if run into inner reinforcing bar when broken pile, not for reinforcing bar is caused flexural deformation.
As the further of technique scheme improved and replenish, the present invention also comprises following additional technical feature.
The first link of described fixed body is established link slot, inserts the second link of another fixed body in the link slot, and connects spacing by connector.
Described fixed body comprises upper plate, lower plate, and the upper plate soffit of the first link and the distance of lower plate upper surface are greater than the distance of the second link upper plate upper surface and lower plate soffit.
The first link, the second link are equipped with stiffener, wherein the stiffener of the first link is two, lay respectively at the upper surface of upper plate and the soffit of lower plate, offer the first pin shaft hole and the first locking lockpin hole of perforation on the upper plate of the first link, lower plate, the stiffener; The stiffener of the second link is two, lay respectively at the soffit of upper plate and the upper surface of lower plate, and be provided with reference column between two stiffeners, the upper plate of the second link, stiffener, lower plate, reference column are offered the second pin shaft hole of perforation, the upper plate of the second link, stiffener, lower plate are offered the second locking lockpin hole, and the second pin shaft hole, the second locking lockpin hole of the first pin shaft hole of a fixed body, the first locking lockpin hole and another fixed body is relative and insert bearing pin, lock pin so that two fixed bodies link to each other.
The first link, the second link are provided with a plurality of locking lockpin holes.A plurality of locking lockpin holes are convenient to the user and are come what of adjusting module quantity according to the diameter needs of broken pile.
The inner side edge of fixed body and outer side edges are curved, and the first pin shaft hole, the second pin shaft hole are established in the inner of fixed body to form ring-type broken pile equipment, and the first pin shaft hole, the second pin shaft hole are symmetrical arranged, the outer end of the fixed body pin-and-hole that uncages of setting up defences.
One end of lock pin is the not-go-end of establishing convex shoulder, places little suspension ring on the end face of not-go-end, and the lock pin other end is offered aperture radially, places R shape at aperture and sells to prevent that product from use causing lock pin to come off.Little suspension ring make things convenient for the lock pin dismounting.
Affixed a plate of an end of described bearing pin is offered a through hole on the junction plate, the through hole that screw passes junction plate is spirally connected with the screw of being located on fixed body or the stiffener, and the screw afterbody offsets with junction plate bearing pin is fixedly connected with.
The fixed body inboard establishes installation sleeve, be located in the installation sleeve and with impact the cylindricality drill steel of oil cylinder in linking to each other, described impact oil cylinder is established the first hydraulic fluid port, the second hydraulic fluid port, impact in the oil cylinder and establish piston, described piston links to each other with drill steel, and the first hydraulic fluid port, the second hydraulic fluid port are communicated with respectively the work that makes hydraulic system and drive moving forward and backward of drill steel with the rod chamber, the rodless cavity that impact oil cylinder.
Beneficial effect: the technical program makes the user according to the size of stake, select the broken pile module splicing of varying number, thereby form the broken pile equipment of different inner diameters size, to adapt to the stake of different-diameter, because better with the size matching of stake, broken pile is more effective, and the broken pile modular structure is identical, size is little, is convenient to processing, equipment cost is low, easy to use, flexible.Not the time spent, detachable, shared space is few.
Description of drawings
Fig. 1 is lateral view of the present invention.
Fig. 2 is front view of the present invention.
Among the figure: 1-fixed body, 101-upper plate; The 102-lower plate; First, second locking lockpin hole of 2-; 3-lock pin 3, first, second pin shaft hole of 4-; The 5-bearing pin; 6-R shape pin, the 7-stiffener; The 8-screw; The 9-junction plate; 10-impacts oil cylinder; The 11-suspension ring.
The specific embodiment
Below in conjunction with Figure of description technical scheme of the present invention is described in further detail.
Such as Fig. 1, shown in 2, the present invention includes fixed body 1, be located at the impact oil cylinder 10 on the fixed body 1, with impact the cylindricality drill steel of oil cylinder 10 in linking to each other, be located at the suspension ring 11 that are used for wearing rope of fixed body 1 end face, the head of drill steel is tapered, installation sleeve is established in fixed body 1 inboard, be located in the installation sleeve and with impact the cylindricality drill steel of oil cylinder 10 in linking to each other, described impact oil cylinder 10 is established the first hydraulic fluid port, the second hydraulic fluid port, impact in the oil cylinder 10 and establish piston, described piston links to each other with drill steel, the first hydraulic fluid port, the second hydraulic fluid port respectively with the rod chamber that impacts oil cylinder 10, rodless cavity is communicated with the work that makes hydraulic system and drives moving forward and backward of drill steel; Described fixed body 1 left and right sides is respectively the first link and the second link, one broken pile module removably is connected with the second link of another broken pile module by the first link of fixed body 1, and the end to end formation drill steel of a plurality of broken pile modules is radial ring-type concrete broken pile equipment of arranging.
The first link of described fixed body 1 is established link slot, inserts the second link of another fixed body 1 in the link slot, and connects spacing by connector.
Described fixed body 1 comprises that the distance of upper plate 101 soffits of upper plate 101, lower plate 102, the first links and lower plate 102 upper surfaces is greater than the distance of the second link upper plate 101 upper surfaces and lower plate 102 soffits.
The first link, the second link are equipped with stiffener 7, wherein the stiffener 7 of the first link is two, lay respectively at the upper surface of upper plate 101 and the soffit of lower plate 102, offer the first pin shaft hole 4 and the first locking lockpin hole 2 of perforation on the upper plate 101 of the first link, lower plate 102, the stiffener 7; The stiffener 7 of the second link is two, lay respectively at the soffit of upper plate 101 and the upper surface of lower plate 102, and be provided with reference column between two stiffeners 7, the upper plate 101 of the second link, stiffener 7, lower plate 102, reference column are offered the second pin shaft hole 4 of perforation, it is relative and insert bearing pin 5, lock pin 3 so that two fixed bodies 1 link to each other that the upper plate 101 of the second link, stiffener 7, lower plate 102 are offered the second pin shaft hole 4, the second locking lockpin hole 2 of first pin shaft hole 4, the first locking lockpin hole 2 of the second locking lockpin hole 2, one fixed bodies 1 and another fixed body 1.
For the broken pile module that adapts to varying number connects, the first link, the second link are provided with a plurality of locking lockpin holes 2.
Inner side edge and the outer side edges of fixed body 1 are curved, and the inner of fixed body 1 is established the first pin shaft hole 4, the second pin shaft hole 4, the first pin shaft holes 4, the second pin shaft hole 4 and is symmetrical arranged, the outer end of fixed body 1 pin-and-hole 2 that uncages of setting up defences.
One end of lock pin 3 is the not-go-end of establishing convex shoulder, places little suspension ring on the end face of not-go-end, and lock pin 3 other ends are offered aperture radially, places R shape pin 6 to prevent that product from use causing lock pin 3 to come off at aperture.
The affixed a plate 9 of one end of described bearing pin 5 is offered a through hole on the junction plate 9, the through hole that screw 8 passes junction plate 9 is spirally connected with the screw of being located on fixed body 1 or the stiffener 7, and screw 8 afterbodys offset with junction plate 9 bearing pin 5 is fixedly connected with.
Fixed body 1 inboard establishes installation sleeve, be located in the installation sleeve and with impact the cylindricality drill steel of oil cylinder 10 in linking to each other, described impact oil cylinder 10 is established the first hydraulic fluid port, the second hydraulic fluid port, impact in the oil cylinder 10 and establish piston, described piston links to each other with drill steel, and the first hydraulic fluid port, the second hydraulic fluid port are communicated with respectively the work that makes hydraulic system and drive moving forward and backward of drill steel with the rod chamber, the rodless cavity that impact oil cylinder 10.
The broken pile module that is used for assembling concrete broken pile equipment shown in above Fig. 1,2 is specific embodiments of the invention; substantive distinguishing features of the present invention and progress have been embodied; can be according to the use needs of reality; under enlightenment of the present invention; it is carried out the equivalent modifications of the aspects such as shape, structure, all at the row of the protection domain of this programme.

Claims (9)

1. the broken pile module that is used for assembling concrete broken pile equipment, it is characterized in that: comprise fixed body (1), be located at impact oil cylinder (10) on the fixed body (1), with impact the cylindricality drill steel of oil cylinder (10) in linking to each other, be located at fixed body (1) end face for the suspension ring (11) that wear rope, the head of drill steel is tapered; Described fixed body (1) left and right sides is respectively the first link and the second link, one broken pile module removably is connected with the second link of another broken pile module by the first link of fixed body (1), and the end to end formation drill steel of a plurality of broken pile modules is radial ring-type concrete broken pile equipment of arranging.
2. the broken pile module for assembling concrete broken pile equipment according to claim 1, it is characterized in that: the first link of described fixed body (1) is established link slot, insert second link of another fixed body (1) in the link slot, and connect spacing by connector.
3. the broken pile module for assembling concrete broken pile equipment according to claim 2, it is characterized in that: described fixed body (1) comprises upper plate (101), lower plate (102), and the distance of the upper plate of the first link (101) soffit and lower plate (102) upper surface is greater than the distance of the second link upper plate (101) upper surface and lower plate (102) soffit.
4. the broken pile module for assembling concrete broken pile equipment according to claim 3, it is characterized in that: the first link, the second link are equipped with stiffener (7), wherein the stiffener of the first link (7) is two, lay respectively at the upper surface of upper plate (101) and the soffit of lower plate (102), offer the first pin shaft hole (4) and the first locking lockpin hole (2) of perforation on the upper plate of the first link (101), lower plate (102), the stiffener (7); The stiffener of the second link (7) is two, lay respectively at the soffit of upper plate (101) and the upper surface of lower plate (102), and two stiffeners are provided with reference column between (7), the upper plate of the second link (101), stiffener (7), lower plate (102), reference column is offered second pin shaft hole (4) of perforation, the upper plate of the second link (101), stiffener (7), lower plate (102) is offered the second locking lockpin hole (2), first pin shaft hole (4) of a fixed body (1), second pin shaft hole (4) of the first locking lockpin hole (2) and another fixed body (1), the second locking lockpin hole (2) relatively and insert bearing pin (5), lock pin (3) is so that two fixed bodies (1) are continuous.
5. the broken pile module for assembling concrete broken pile equipment according to claim 4, it is characterized in that: the first link, the second link are provided with a plurality of locking lockpin holes (2).
6. the broken pile module for assembling concrete broken pile equipment according to claim 5, it is characterized in that: the inner side edge of fixed body (1) and outer side edges are curved to form ring-type broken pile equipment, the first pin shaft hole (4), the second pin shaft hole (4) are established in the inner of fixed body (1), the first pin shaft hole (4), the second pin shaft hole (4) are symmetrical arranged, the outer end of fixed body (1) pin-and-hole (2) that uncages of setting up defences.
7. the broken pile module for assembling concrete broken pile equipment according to claim 4, it is characterized in that: an end of lock pin (3) is the not-go-end of establishing convex shoulder, place little suspension ring on the end face of not-go-end, lock pin (3) other end is offered aperture radially, places R shape pin (6) at aperture and in use causes lock pin (3) to come off to prevent product.
8. the broken pile module for assembling concrete broken pile equipment according to claim 4, it is characterized in that: affixed a plate of an end (9) of described bearing pin (5), junction plate is offered a through hole on (9), the through hole that screw (8) passes junction plate (9) is spirally connected with the screw of being located on fixed body (1) or the stiffener (7), and screw (8) afterbody offsets with junction plate (9) bearing pin (5) is fixedly connected with.
9. the described broken pile module for assembling concrete broken pile equipment of arbitrary claim according to claim 1-8, it is characterized in that: fixed body (1) inboard establishes installation sleeve, be located in the installation sleeve and with impact the cylindricality drill steel of oil cylinder (10) in linking to each other, described impact oil cylinder (10) is established the first hydraulic fluid port, the second hydraulic fluid port, impact in the oil cylinder (10) and establish piston, described piston links to each other with drill steel, and the first hydraulic fluid port, the second hydraulic fluid port are communicated with respectively the work that makes hydraulic system and drive moving forward and backward of drill steel with the rod chamber, the rodless cavity that impact oil cylinder (10).
CN2013102646061A 2013-06-27 2013-06-27 Pile-breaking module for assembling concrete pile-breaking equipment Pending CN103352466A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102646061A CN103352466A (en) 2013-06-27 2013-06-27 Pile-breaking module for assembling concrete pile-breaking equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102646061A CN103352466A (en) 2013-06-27 2013-06-27 Pile-breaking module for assembling concrete pile-breaking equipment

Publications (1)

Publication Number Publication Date
CN103352466A true CN103352466A (en) 2013-10-16

Family

ID=49308874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102646061A Pending CN103352466A (en) 2013-06-27 2013-06-27 Pile-breaking module for assembling concrete pile-breaking equipment

Country Status (1)

Country Link
CN (1) CN103352466A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5539544A (en) * 1978-09-14 1980-03-19 Mitsubishi Heavy Ind Ltd Concrete-pile crusher
DE3541786A1 (en) * 1984-11-26 1986-08-07 TECHNOTRADE Mérnöki-Gazdasági Kisszövetkezet, Budapest Head for a breaking apparatus
EP1093898A2 (en) * 1999-10-18 2001-04-25 Mantovanibenne S.r.l. A breaker device for removing the tops of columns.
CN201610548U (en) * 2010-02-04 2010-10-20 长沙天为工程机械制造有限公司 Pile breaking mechanism for spare parts of truncated precast pile
CN201843894U (en) * 2010-10-19 2011-05-25 徐工集团工程机械股份有限公司科技分公司 Anti-loosening and anti-turning device of hinge pin
CN202000352U (en) * 2011-02-10 2011-10-05 济南皓邦基础工程有限公司 Concrete filling pile head crusher
CN202227348U (en) * 2011-08-22 2012-05-23 玉柴桩工(常州)有限公司 Concrete pile head breaking machine
CN202530458U (en) * 2012-04-01 2012-11-14 中交上海航道勘察设计研究院有限公司 Pile breaking and pile cutting device
CN202644533U (en) * 2012-04-27 2013-01-02 江苏平汉重工有限公司 Full automatic hydraulic pile cutting machine
CN202767079U (en) * 2012-07-02 2013-03-06 江苏平汉重工有限公司 Angle-fixing device of hydraulic pile-cutting machine
CN203462471U (en) * 2013-06-27 2014-03-05 卧龙电气集团股份有限公司 Pile-breaking module for assembling concrete pile-breaking equipment

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5539544A (en) * 1978-09-14 1980-03-19 Mitsubishi Heavy Ind Ltd Concrete-pile crusher
DE3541786A1 (en) * 1984-11-26 1986-08-07 TECHNOTRADE Mérnöki-Gazdasági Kisszövetkezet, Budapest Head for a breaking apparatus
EP1093898A2 (en) * 1999-10-18 2001-04-25 Mantovanibenne S.r.l. A breaker device for removing the tops of columns.
CN201610548U (en) * 2010-02-04 2010-10-20 长沙天为工程机械制造有限公司 Pile breaking mechanism for spare parts of truncated precast pile
CN201843894U (en) * 2010-10-19 2011-05-25 徐工集团工程机械股份有限公司科技分公司 Anti-loosening and anti-turning device of hinge pin
CN202000352U (en) * 2011-02-10 2011-10-05 济南皓邦基础工程有限公司 Concrete filling pile head crusher
CN202227348U (en) * 2011-08-22 2012-05-23 玉柴桩工(常州)有限公司 Concrete pile head breaking machine
CN202530458U (en) * 2012-04-01 2012-11-14 中交上海航道勘察设计研究院有限公司 Pile breaking and pile cutting device
CN202644533U (en) * 2012-04-27 2013-01-02 江苏平汉重工有限公司 Full automatic hydraulic pile cutting machine
CN202767079U (en) * 2012-07-02 2013-03-06 江苏平汉重工有限公司 Angle-fixing device of hydraulic pile-cutting machine
CN203462471U (en) * 2013-06-27 2014-03-05 卧龙电气集团股份有限公司 Pile-breaking module for assembling concrete pile-breaking equipment

Similar Documents

Publication Publication Date Title
CN103498472A (en) Concrete pile breaking device assembled by pile breaking modules
US20020112890A1 (en) Conduit pulling apparatus and method for use in horizontal drilling
EP2382368B1 (en) Method and apparatus for down-the-hole drilling
CN204691774U (en) Pin-connected panel corrugated sheet active well suspension device
CN203462470U (en) Concrete pile-breaking device assembled with pile-breaking modules
CN203462471U (en) Pile-breaking module for assembling concrete pile-breaking equipment
CN205532623U (en) Be applicable to special ground shield tunnel segment ring
CN107932419A (en) Hydraulic pressure pin pulling out device and the method pulled pin using the device
CN103352466A (en) Pile-breaking module for assembling concrete pile-breaking equipment
CN206111200U (en) Rectangular shield digs tube coupling in top
CN107178112A (en) A kind of anti-sticking breaks tine
CN206092025U (en) Quick -witted bolting with wire mesh mechanism is constructed in colliery shield in pit
CN204418153U (en) A kind of native gabion structure of construction work
CN104153367A (en) Intermediate damper of pile driver
CN208563418U (en) Auxiliary device is pulled out in rising for canal formula cutting soil cement equipment chain saw case cutting body
CN204588471U (en) Open slope shaft excavation simple gantry crane device
JP6223843B2 (en) Chain conveyor cutter
CN202500174U (en) Quick switching device for drilling, breaking, excavating and loading all-in-one machine
CN114086555B (en) Construction method for breaking pile head of bored pile foundation
CN204782728U (en) But quick maintenance's dish that drains
CN210134428U (en) Plane limiting device for inserting and punching underwater steel casing
CN109931071A (en) A kind of minor diameter compression concrete side wall machine
CN204984286U (en) Mine rig drilling rod chucking device
CN210263195U (en) Pile machine drill barrel capable of easily grabbing boulder
CN204023570U (en) The middle vibration absorber of pile driver

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131016