CN103345713B - A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method - Google Patents

A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method Download PDF

Info

Publication number
CN103345713B
CN103345713B CN201310253529.XA CN201310253529A CN103345713B CN 103345713 B CN103345713 B CN 103345713B CN 201310253529 A CN201310253529 A CN 201310253529A CN 103345713 B CN103345713 B CN 103345713B
Authority
CN
China
Prior art keywords
data
power
check
plan
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310253529.XA
Other languages
Chinese (zh)
Other versions
CN103345713A (en
Inventor
董炜
蔡帜
门德月
戴赛
张传成
闫翠会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310253529.XA priority Critical patent/CN103345713B/en
Publication of CN103345713A publication Critical patent/CN103345713A/en
Application granted granted Critical
Publication of CN103345713B publication Critical patent/CN103345713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of ultra-large electric power networks synchronous safety nucleus correcting system design methods, which comprises (1) collects data;(2) it is verified;(3) it generates bulk power grid synchronous safety calculation and check data check and handles log;(4) calculation and check data are verified and is corrected in advance;(5) it quickly calculates.The present invention is based on conventional securities to check constraint blocking algorithm, sufficiently consideration mass data receive send and pretreatment, multi-stage user participate in, the decoupling of information local sharing mode, data adaptive the technical requirements such as calculates and proposes thoughtful system scheme comprehensively, design can assurance function finally realize and stable and high effective operation.

Description

A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method
Technical field
The invention belongs to dispatching automation of electric power systems, in particular to a kind of ultra-large electric power networks synchronous safety school Core design method.
Background technique
The power Transmission pattern based on extra-high voltage, high voltage ac/dc power grid has been gradually formed at present, has thoroughly been broken The isolated power network structure of hair transmission & distribution one in traditional area.Completely new electric system is able to solve state's interior power, power load distributing area The serious situation uneven, efficiency of energy utilization is low in domain, but the new method of operation also works out completely electric system planning business Sufficient Safety guide requires power grid ground state and open-ended line to stablize directive/guide and proposes new challenge.
Check constraint blocking algorithm based on conventional security, be unable to fully consideration mass data receive send and be intended to handle, The technical requirements such as multi-stage user participates in, information local sharing mode decouples, and data adaptive calculates.It is badly in need of a kind of comprehensively thoughtful System design scheme can guarantee that system function is finally realized and stable and high effective operation.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of solve in the extensive electric power networks progress multilayer of labyrinth Grade user participates in synchronous security analysis system (hereinafter referred to as bulk power grid synchronous safety is checked) design method.Bulk power grid is synchronous Security Checking needs to have the following conditions: 1, stronger synchronization process magnanimity planning data ability;2, it quickly generates and checks day whole day Calculate section;3, calculating process is accurately quick;4, result shows full apparent, retrieves information fast and easy;5, whole consideration is more Level user collaborative participates in feature.
Based on above-mentioned technical requirements, should be included at least to guarantee to reach practical level requirement, when system designs in Hold:
1, database table design and specification, business data synchronous exchange scheme;
2, the pre- verifying function of check data;
3, it checks parameter setting and calculates control function;
4, result warning information concentrates analytic function;
5, full-time check section tidal current Integrated query function;
6, locally, under sharing mode information decouples function to total system.
The design of this external system also needs whole to consider that magnanimity calculates and be likely to occur local data's deterioration and more in source data The problems such as ground multi-layer network communication stability.
The purpose of the present invention is adopt the following technical solutions realization:
A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method, which is characterized in that the described method includes:
(1) data are collected;
(2) it is verified;
(3) it generates bulk power grid synchronous safety calculation and check data check and handles log;
(4) calculation and check data are verified and is corrected in advance;
(5) it quickly calculates.
Preferably, the step (1) includes collecting number needed for the bulk power grid synchronous safety that higher level control centre issues is checked According to.
Preferably, the data include that transmission cross-section limit, transmission cross-section constituent element, equipment power failure plan, system are negative Lotus prediction, extension set group operation plan, bus load prediction He Fen save total seven major class data of exchange plan.
Preferably, the step (2) the following steps are included:
A, basic verification rule-based knowledge base is established;
B, complex data verification rule-based knowledge base is established;
C, for the data prediction of shaped form load.
Further, the step a includes whether verification seven kinds of data has reported with whether the content of Various types of data is neat Entirely.
Further, the step b includes the data check rule of shaped form and the data check rule of non-shaped form;
Shaped form data include system loading prediction, bus load prediction, tie line plan and machine unit scheduling plan;
The data of non-shaped form include transmission cross-section Quota List, transmission cross-section constituent element table and equipment power failure planning chart.
Further, the step c includes carrying out data prediction to class of a curve shortage of data and data mutation.
Preferably, the step (5) includes:
I, AC power flow calculates;
II, the uneven active power of calculated equilibrium node;
III, each regional imbalance active power is calculated.
Further, the imbalance power absolute value is less than convergence, then that corrects adjustable unit and load has Function power, return step II, otherwise trend restrains, and carries out N-1 using power flow solutions and fault set calculates.
Compared with the prior art, the invention has the benefit that
Constraint blocking algorithm is checked the present invention is based on conventional security, and abundant consideration mass data, which receives, to be sent and pre- place The technical requirements such as reason, multi-stage user participate in, information local sharing mode decouples, and data adaptive calculates propose comprehensively thoughtful System scheme, design can assurance function finally realize and stable and high effective operation.
1, towards the ultra-large electric power networks of labyrinth, based on basic data and section hair is calculated by the pre- school of electric equilibrium The Day-ahead static security correction for the adaptive contact line coordination section power tested, which calculates, controls synchronous security analysis function.This Invention proposes a whole set of and is able to solve domestic large-scale complex electric power networks plans trend methods of risk assessment a few days ago, examines simultaneously Consider in the case where the planning data of acquisition is of low quality, it is adaptively damp that system according to pre- check results is able to carry out interconnection Stream calculation, the calculated result accuracy for planning trend after adjustment were significantly improved more in the past, and the system functionization of can satisfy is wanted It asks;
2, pacified towards the ultra-large electric power networks of labyrinth based on the superior and the subordinate's Integral synchronous static state of expert knowledge library The Data preprocess function that counts is assessed by whole school.The bulk power grid synchronous safety nucleus correcting system power grid that orients towards the whole country is verified, and is collected into All kinds of project basis data bulks are big, and transmission link is more, there is the quality fluctuation being difficult to avoid that, the design method considers plan The data that data are likely to occur are failed to report, and are fallen a little and the problems such as wrong point, can be carried out according to the expert knowledge library strategy specially established Automatic identification intelligence amendment, and the verification journal file that subsequent computing system can recognize is produced, realize whole process data school Closed-loop control is tested, the problems such as calculating mistake caused by because of data quality problem is effectively prevented.
Detailed description of the invention
Fig. 1 is bulk power grid synchronous safety nucleus correcting system design function flow chart provided by the invention.
Fig. 2 is complex data synchronization check flow chart provided by the invention.
Fig. 3 is provided by the invention based on expert knowledge library Security Checking data verification method.
Fig. 4 is Interval Power Flow tie--line control method provided by the invention.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
The mentioned bulk power grid synchronous safety nucleus correcting system design function process of the present invention is as shown in Fig. 1, mainly includes logarithm According to database design and specification, business data synchronous exchange scheme, the pre- verifying function of check data, check parameter setting and calculating Control function, result warning information concentrate analytic function, full-time check section tidal current Integrated query function and total system local, total The design for enjoying information decoupling function under mode is realized.Wherein magnanimity planning data verifying function is designed as shown in Fig. 2.
1 system design mentioned to this programme is described further with reference to the accompanying drawing:
Firstly, adapting to the requirement run simultaneously in different regions, multi-user for guarantee system, Uniting system is needed to run Required database table, related data specification and data synchronous exchange scheme.
Secondly, need to design magnanimity can be calculated needed for data processing and carry out the check of checking treatment and verified in advance with data Function.
Data volume needed for checking in view of bulk power grid synchronous safety is huge, and ingredient multiplicity, source is complicated, directly using easily Computational solution precision difference is caused to even result in the phenomenon that calculating process does not restrain trivial solution generation, therefore need to be before calculating to being collected into Source data verified, while generating the data check warning information that later period calculation procedure is capable of discrimination.
The Functional Design mainly includes:
1. collecting data needed for the bulk power grid synchronous safety that higher level control centre issues is checked;
2. requiring to verify according to data standard to different classes of data respectively;
3. generating the report of associated check result warning information, reads and use for later period calculation procedure;
4. the influence that shows data check result using dedicated picture user oriented and may be generated to calculated result.
To realize above-mentioned design requirement, introduce based on the superior and the subordinate's Integral synchronous security analysis of expert knowledge library Count Data preprocess Functional Design.Specific step is as follows:
Step 1: establishing and regular expert knowledge library is verified based on planning data substantially.Including
(1) whether seven kinds of data has reported.Each net, which saves, to be adjusted and should report seven kinds of data by regulation.
(2) whether the content of every class data is complete.
First is that whether the device name of reported data is consistent with D5000 basic model device name;
Second is that whether reported data covers the armamentarium in compass of competency;State's tune can count each net and save the seven class numbers reported According to time and upper tape number.The minimax that the upper tape number of every one kind data cannot be reported beyond Various types of data in experts database Range.
Step 2: establishing complex data and verify regular expert knowledge library substantially.Including:
1) the data check rule of shaped form.Shaped form data include system loading prediction, bus load prediction, interconnection Plan, machine unit scheduling plan, need to verify in have:
(1) data of shaped form whether there is disadvantage situation.
(2) system loading prediction is maximum, no more than limit value, (net adjusts the system loading prediction reported maximum to the minimum and rate of change Value is no more than 300,000,000 kilowatts, and minimum value is not less than 20,000,000 kilowatts, and the rate of change absolute value between adjacent two o'clock is no more than 30,000,000 Kilowatt).(3) unit plan power generating value must not be higher than unit maximum technology and contribute.
2) non-shaped form data check rule, need to verify in have: the data of non-shaped form are divided into transmission cross-section Quota List, transmission cross-section constituent element table, equipment power failure planning chart mainly include
(1) maintenance unit is planned out that power is non-zero, and equipment has a power failure is in the unit of power failure, the meter for the period that has a power failure in the works It draws value and is necessary for 0.
(2) cross-section limitation must have corresponding member definition.Section title in " transmission cross-section Quota List " all must be Corresponding member definition is found in " transmission cross-section constituent element table ".
Consider grid power equilibrium response, addition overall calibration rule refers mainly to hair and checked by coulomb balance.Due to safety Check and be directed to 220 kilovolts or more of voltage class, it is therefore desirable to verify 220 kilovolts and above power generation, Whether balanced by electricity and electricity consumption.
Step 3: for the data prediction of shaped form load.
Since the quality of data directly affects the accuracy of Security Checking calculated result, only data check is not No more.For shaped form load, shortage of data and data mutation are very big on the influence of the result of Security Checking.Herein in order to improve number According to quality, class of a curve data are verified based on above-mentioned rule, and data have been carried out to the shaped form data verified out Pretreatment, realizes the repairing of missing data and the smoothing processing of bad data.
Step 4: forming bulk power grid synchronous safety calculation and check data check and handle log.
The call format of log can be parsed by subsequent calculation procedure.Log domestic demand, which is recorded in detail in Various types of data, to be implemented Verification rule result situation, can be with quick positioning question by log information.Log information can also pass through remote service Mode by junior scheduling check, to understand the quality condition of reported data in time and to right the wrong.
After completing data collection and pre- verification, need to design includes to check parameter setting and calculate answering for control function The miscellaneous quick computing function of structure electric power networks security analysis.In view of China " three China " (East China, North China, Central China) backbone electricity Web frame is complicated, and electrical node is various, and the planning datas order of accuarcy such as prediction of bus load needed for Security Checking cannot still expire Needed for foot calculates, therefore needs to introduce the adaptive interconnection verified in advance based on basic data and calculating section hair by electric equilibrium and assist Adjust the Day-ahead static security correction calculation control method of section power.As shown in figure 4, its specific steps is described as follows:
Step 5: start before calculation and check to each net save the data that report and interregional interconnection section power planned value into The pre- verification of row and amendment;
Step 6: carrying out AC power flow calculating, then the uneven active power of calculated equilibrium node, calculates each region not Balance active power;
Step 7: if imbalance power absolute value is less than convergence, correcting the wattful power of adjustable unit and load Rate, return step 6, otherwise trend restrains, and carries out N-1 using power flow solutions and fault set calculates.
According in step 5, if bulk power grid is divided into N number of region, all interconnection wattful powers in each region and other regions The sum of rate is the interconnection section in its region, and the interconnection section power for being located at ith zone is pi, interconnection section power meter Drawing initial value isThe sum of the interconnection section power of all areas is zero known to then:
To the pre- method of calibration of interregional interconnection section power planned value:
Calculate plan initial value summation Δ p:
If Δ p is equal to 0, each interconnection section power plan initial value by verifying in advance:
In formulaThe interconnection section power planned value used for Load flow calculation.
If Δ p is not equal to 0, region interconnection section power plan initially needs to correct, modification method are as follows:
It is found that
According in step 6, basic Load flow calculation is carried out using following generation schedule and the bus load prediction first, always not Balance power concentrates in balance nodes, if its value is Δ ps
Each regional imbalance active power are as follows:
In formula, PjkFor the active power of branch jk, jk ∈ LiFor member Tributary's set in the interconnection section of region i.
According in step 7, if balance nodes region is a, when meeting the following conditions:
In formula, ε is convergence, and G is regional ensemble.
Basis at this timeIt is found thatIt is believed that the interconnection section power of region a Also comply with convergence.
It completes to need full-time check section tidal current Integrated query and full-time check section tidal current Integrated query after user side calculates Function facilitates participation to calculate each side and checks that alarm and power flow solutions information are checked in comparison.Estimated ginseng when in view of system operation It is more with user, therefore local and synchronous two kinds of data modes need to be considered in above-mentioned Functional Design, that is, use multiple technologies means The clear data currently shown of intuitively distinguishing are local computing result or other participation unit calculated results, convenient for users to Work is analyzed in the comparison for carrying out result.
After collectivity Scheme Design is based on the synchronous acquisition full electric network planning data of local logical data too much, through Security Checking point The raw result of division is synchronized to remaining using data and participates in realizing multi-user at combined calculation user, and at many levels, strange land is synchronous Carry out the synchronous security analysis system function of labyrinth bulk power grid.
Large-scale complex electric power networks proposed by the present invention plan trend methods of risk assessment a few days ago, while in view of obtaining In the case that the planning data obtained is of low quality, system is able to carry out the adaptive Load flow calculation of interconnection according to pre- check results, The calculated result accuracy for planning trend after adjustment was significantly improved more in the past, can satisfy system functionization requirement.
The bulk power grid synchronous safety nucleus correcting system power grid that orients towards the whole country is verified, all kinds of project basis data numbers being collected into Amount is big, and transmission link is more, there is the quality fluctuation being difficult to avoid that, the design method considers the data that planning data is likely to occur It fails to report, falls a little and the problems such as wrong point, automatic identification intelligence amendment can be carried out according to the expert knowledge library strategy specially established, and The verification journal file that subsequent computing system can recognize is produced, the closed-loop control of whole process data check is realized, effectively avoids The problems such as because calculating mistake caused by data quality problem.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, are intended to be within the scope of the claims of the invention.

Claims (2)

1. a kind of ultra-large electric power networks synchronous safety nucleus correcting system design method, which is characterized in that the described method includes:
(1) data are collected;
(2) it is verified;
(3) it generates bulk power grid synchronous safety calculation and check data check and handles log;
(4) calculation and check data are verified and is corrected in advance;
(5) it quickly calculates;
The step (5) includes:
I, AC power flow calculates;
II, the uneven active power of calculated equilibrium node;
III, each regional imbalance active power is calculated;
Each regional imbalance active power absolute value is less than convergence, then corrects the active power of adjustable unit and load, Return step II, otherwise trend restrains, and carries out N-1 using power flow solutions and fault set calculates;
If bulk power grid is divided into N number of region, the sum of each region and all interconnection active power in other regions are its region Interconnection section, the interconnection section power for being located at ith zone is Pi, interconnection section power plan initial value isThen The sum of the interconnection section power for knowing all areas is zero:
To the pre- method of calibration of interregional interconnection section power planned value:
Calculate plan initial value summation Δ p:
If Δ p is equal to O, each interconnection section power plan initial value by verifying in advance:
In formulaThe interconnection section power planned value used for Load flow calculation;
If Δ p is not equal to O, region interconnection section power plan initially needs to correct, modification method are as follows:
It is found that
The step (1) includes collecting data needed for the bulk power grid synchronous safety that higher level control centre issues is checked;
The data include transmission cross-section limit, transmission cross-section constituent element, equipment power failure plan, system loading prediction, extension set Group scheduling plan, bus load prediction He Fen save total seven major class data of exchange plan;
Basic Load flow calculation is carried out using following generation schedule and the bus load prediction first, total imbalance power concentrates on putting down It weighs on node, if its value is Δ ps
Each regional imbalance active power are as follows:
In formula, PjkFor the active power of branch jk, jk ∈ LiFor member Tributary's set in the interconnection section of region i;
The step (2) the following steps are included:
A, basic verification rule-based knowledge base is established;
B, complex data verification rule-based knowledge base is established;
C, for the data prediction of shaped form load;
The step a includes whether verification seven kinds of data has reported with whether the content of Various types of data is complete;
The step b includes the data check rule of shaped form and the data check rule of non-shaped form;
Shaped form data include system loading prediction, bus load prediction, tie line plan and machine unit scheduling plan;
The data of non-shaped form include transmission cross-section Quota List, transmission cross-section constituent element table and equipment power failure planning chart;
If balance nodes region is a, when meeting the following conditions:
In formula, ε is convergence, and G is regional ensemble;
Basis at this timeIt is found thatIt is believed that the interconnection section power of region a also accords with Close convergence.
2. such as a kind of ultra-large electric power networks synchronous safety nucleus correcting system design method that claim 1 is told, feature exists In told step c includes carrying out data prediction to class of a curve shortage of data and data mutation.
CN201310253529.XA 2013-06-24 2013-06-24 A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method Active CN103345713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310253529.XA CN103345713B (en) 2013-06-24 2013-06-24 A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310253529.XA CN103345713B (en) 2013-06-24 2013-06-24 A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method

Publications (2)

Publication Number Publication Date
CN103345713A CN103345713A (en) 2013-10-09
CN103345713B true CN103345713B (en) 2019-07-26

Family

ID=49280506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310253529.XA Active CN103345713B (en) 2013-06-24 2013-06-24 A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method

Country Status (1)

Country Link
CN (1) CN103345713B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104218569B (en) * 2014-08-15 2016-02-24 国家电网公司 A kind of evaluation analysis method of large scale electric network security analysis
CN104217014A (en) * 2014-09-22 2014-12-17 国家电网公司 Data verification method used for national, regional and provincial integration security check
CN107424077B (en) * 2015-08-27 2024-03-26 中国电力科学研究院有限公司 Multi-stage daily power generation plan and synchronous safety check design method for complex power grid
CN107834536A (en) * 2017-09-29 2018-03-23 广东电力交易中心有限责任公司 A kind of electric network security and the energy market emulation mode of market economy
CN110570020B (en) * 2019-08-15 2023-04-07 中国南方电网有限责任公司 Medium-and-long-term transaction electric quantity safety checking method suitable for regional alternating current-direct current hybrid power grid
CN113659579B (en) * 2021-08-11 2022-10-04 国网福建省电力有限公司 N-1 safety constraint considered regional power grid tie line power transmission capability calculation method
CN115513952B (en) * 2022-11-23 2023-02-28 中国电力科学研究院有限公司 Safety check method, system, equipment and medium for power generation and utilization of regional power grid

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008061334A (en) * 2006-08-30 2008-03-13 Meidensha Corp Power supply method of power distribution automation system
CN103020853A (en) * 2012-11-29 2013-04-03 中国电力科学研究院 Method for checking short-term trade plan safety

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008061334A (en) * 2006-08-30 2008-03-13 Meidensha Corp Power supply method of power distribution automation system
CN103020853A (en) * 2012-11-29 2013-04-03 中国电力科学研究院 Method for checking short-term trade plan safety

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
华东网调日计划安全校核系统及其扩展;葛朝强;《电力系统自动化》;20080525;第32卷(第10期);第45-48页
基于规则的电力调度计划数据校验机制;昌力 等;《电力系统自动化》;20121110;第36卷(第21期);第98-101页
安全校核及计划修正系统在电网调度中的实用化研究;李敏科 等;《现代电子技术》;20111001;第34卷(第19期);第147-149页
日前计划安全校核中计划潮流自动生成技术;林毅 等;《电力系统自动化》;20121025;第36卷(第20期);第68-73页
短期电力负荷预报中几种异常数据的处理;陈亚红 等;《东北电力学院学报》;20020630;第22卷(第2期);第1-5页

Also Published As

Publication number Publication date
CN103345713A (en) 2013-10-09

Similar Documents

Publication Publication Date Title
CN103345713B (en) A kind of ultra-large electric power networks synchronous safety nucleus correcting system design method
Zhou et al. Distributed power management for networked AC–DC microgrids with unbalanced microgrids
Zhou et al. Distributed secondary control for islanded microgrids with mobile emergency resources
Brandao et al. Optimal multiobjective control of low-voltage AC microgrids: Power flow regulation and compensation of reactive power and unbalance
CN106655267A (en) Energy local area network considering multi-micro-grid interaction and control method
CN102938106B (en) Major network N-1 methods of risk assessment based on grid power blackout plan and system
Gupta et al. Grid-aware distributed model predictive control of heterogeneous resources in a distribution network: Theory and experimental validation
CN103384068A (en) Online strategy optimization calculating method for electric system transient state safety and stability emergency control
CN109327323B (en) New energy grid-connected power communication network planning and optimizing method and system
CN103746368A (en) Method of optimizing static safe and stable operation limit of electric power system
Totz et al. Control of synchronization in two-layer power grids
CN112907051B (en) Intelligent maintenance plan generation method based on allocation cooperation
CN109149549A (en) A kind of Bipolar DC power system layered structure and control method using multivoltage balanced device parallel connection
CN107147146A (en) A kind of distributed energy management solutions optimization method and device based on many microgrids of joint
CN105186496B (en) A kind of microgrid group running status appraisal procedure and system
CN110046790A (en) A kind of low-voltage platform area receiving distributed photovoltaic power generation merit rating method
CN105226649B (en) One kind predicting improved provincial power network power generation dispatching optimization method based on bus load
CN104809543B (en) Power system operating mode generation method based on monthly power transmission and transforming equipment repair schedule
Bento An optimization approach for the wide-area damping control design
CN105375505B (en) It is a kind of to exchange profile recognition method with direct current transient stability strong correlation
Chen et al. Scheduled power tracking control of the virtual power plant for its internal contingency considering the communication delay and the unit capacity limitation
CN204761035U (en) Automatic voltage control system of distributing type photovoltaic power plant
CN104319779B (en) Regional power grid reactive voltage control method
Guo et al. Distributed secondary voltage control of islanded microgrids with event-triggered scheme
Hu et al. Research on AC/DC Distribution Network Planning Method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160520

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China Electric Power Research Institute

Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

GR01 Patent grant
GR01 Patent grant