CN103338245A - Wireless supervision method on high-pressure testing site - Google Patents
Wireless supervision method on high-pressure testing site Download PDFInfo
- Publication number
- CN103338245A CN103338245A CN2013102541375A CN201310254137A CN103338245A CN 103338245 A CN103338245 A CN 103338245A CN 2013102541375 A CN2013102541375 A CN 2013102541375A CN 201310254137 A CN201310254137 A CN 201310254137A CN 103338245 A CN103338245 A CN 103338245A
- Authority
- CN
- China
- Prior art keywords
- personnel
- wireless
- instrument
- wiring
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a wireless supervision method on a high-pressure testing site. The existing supervision method always brings about potential safety hazards, even personal injury and death to testing wiring staff. According to the invention, after determining a test program, an instrument operator informs the testing wiring staff in a wireless communication manner; after completing initialization of the instrument, the instrument operator sends out a boosting preparation command; after receiving the boosting preparation command, the testing wiring staff assess the wiring and state of the entire testing device, and sends out a boosting allowing command through a wireless monitoring module after correct confirmation; a control instrument allows the instrument operator to perform the boosting operation only when the boosting allowing command sent by the wireless monitoring module is received. According to the invention, various potential safety hazards caused by untimely communication or malfunction during the high-pressure testing process can be avoided, and the safety guarantee of the testing wiring staff can be greatly improved.
Description
Technical field
The present invention relates to the method that a kind of high voltage test on-site wireless is managed.
Background technology
At present at the high voltage test scene; test connection personnel and exchanging of instrumentation personnel be basically propaganda directed to communicate exchange or intercom to exchange be main; the instrumentation personnel often can't be directly acquainted with the wiring situation of experimental rig and the ruuning situation of experimental rig; the test connection personnel also can't be directly acquainted with instrument for the situation that arranges of experimental rig; and the situation of boosting of experimental rig in test; and the test connection personnel can't make intervening measure timely and effectively at the emergency of experimental rig; and the instrumentation personnel generally can only come experimental rig is made intervening measure for the visual situation of testing equipment by protection warning measure or the test connection personnel of instrument for experimental rig, do not have good promptness.If the instrumentation personnel since misoperation or in time link up when knowing with the test connection personnel tend to bring no small potential safety hazard to the test connection personnel, even the test connection personnel caused personal injury so that dead.
Summary of the invention
At above situation, the present invention is to adopt instrumentation personnel instrument monitoring to be controlled to be the master in the Monitoring and Controlling to testing equipment, management method that the test connection personnel are wireless is the monitoring method of assisting, the test connection personnel can be in entire test play the Monitoring and Controlling effect by the wireless monitor module for the situation of boosting of experimental rig, and when emergency takes place, but the judgement of test connection personnel very first time basis oneself is made intervening measure for experimental rig.
The present invention is specifically:
After instrumentation personnel confirmed test project, personnel carry out wiring to experimental rig by wireless communication mode notice test connection, and control instrument is carried out initialization operation; Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction; After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction; Control instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
Beneficial effect of the present invention: by the method for this wireless management, can avoid in the high voltage test process because the various potential safety hazards that communication is untimely or mistake such as misoperation is brought can greatly improve test connection personnel's safety guarantee.
Description of drawings
Fig. 1 is interactive flow process basic between instrumentation personnel and the test connection personnel.
Fig. 2 is the relation structure diagram between instrument control instrument and wireless monitor module and the experimental rig.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
In Fig. 1, after the instrumentation personnel had determined pilot project, personnel carried out wiring to experimental rig by wireless communication mode notice test connection, and self carries out initialization operation to control instrument.Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction.After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction.Instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
In Fig. 2, the instrumentation personnel carry out main Monitoring and Controlling by control instrument to experimental rig, and the test connection personnel can carry out Monitoring and Controlling to testing equipment by the wireless monitor module is auxiliary, also adopt the method for wireless telecommunications to carry out communication between control instrument and the wireless monitor module.Therefore, in whole high voltage test process, the test connection personnel can be by the operation that the wireless monitor module the is understood the monitoring test device in real time situation of boosting, when testing equipment generation emergency, the test connection personnel also can make urgent intervention measures such as suddenly stopping step-down to experimental rig by the wireless monitor module.
Claims (1)
1. the high voltage test on-site wireless method of managing, the instrumentation personnel carry out main Monitoring and Controlling by control instrument to experimental rig, the test connection personnel carry out Monitoring and Controlling by the wireless monitor module is auxiliary to testing equipment, adopt the method for wireless telecommunications to carry out communication between control instrument and the wireless monitor module, it is characterized in that this method specifically:
After instrumentation personnel confirmed test project, personnel carry out wiring to experimental rig by wireless communication mode notice test connection, and control instrument is carried out initialization operation; Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction; After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction; Control instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102541375A CN103338245A (en) | 2013-06-24 | 2013-06-24 | Wireless supervision method on high-pressure testing site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102541375A CN103338245A (en) | 2013-06-24 | 2013-06-24 | Wireless supervision method on high-pressure testing site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103338245A true CN103338245A (en) | 2013-10-02 |
Family
ID=49246339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102541375A Pending CN103338245A (en) | 2013-06-24 | 2013-06-24 | Wireless supervision method on high-pressure testing site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103338245A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6333880B1 (en) * | 2000-07-14 | 2001-12-25 | Mitsubishi Denki Kabushiki Kaisha | Semiconductor memory device capable of detecting high-voltage test command signal |
CN102196005A (en) * | 2010-03-16 | 2011-09-21 | 武汉特试特科技有限公司 | Electric test vehicle communication network structure |
CN102622834A (en) * | 2012-03-30 | 2012-08-01 | 华北电网有限公司唐山供电公司 | Electronic safety protection method and private network guardrail for high-voltage tests of electric power system |
-
2013
- 2013-06-24 CN CN2013102541375A patent/CN103338245A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6333880B1 (en) * | 2000-07-14 | 2001-12-25 | Mitsubishi Denki Kabushiki Kaisha | Semiconductor memory device capable of detecting high-voltage test command signal |
CN102196005A (en) * | 2010-03-16 | 2011-09-21 | 武汉特试特科技有限公司 | Electric test vehicle communication network structure |
CN102622834A (en) * | 2012-03-30 | 2012-08-01 | 华北电网有限公司唐山供电公司 | Electronic safety protection method and private network guardrail for high-voltage tests of electric power system |
Non-Patent Citations (2)
Title |
---|
刘强强等: "高压试验电源远程可视快速切断装置的研制", 《浙江电力》 * |
杨帆: "高压试验中的呼唱制度", 《电力安全技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203154692U (en) | Intelligent firefighting patrol inspection equipment | |
CN103487766B (en) | Method and system for monitoring the power supply of fire-fighting pump motor in fire-fighting system | |
CN205007474U (en) | Subway fire detection reports to police and fire extinguishing systems | |
CN106204829B (en) | Lockset wireless control system and method | |
CN206626413U (en) | A kind of gas leakage alarm cuts off monitoring system | |
CN101655407A (en) | Automatic pressure test device and pressure test control method of oil extraction well mouth equipment | |
CN102903291B (en) | Simulation platform of cooling system of high-voltage direct-current transmission converter valve | |
CN103995924A (en) | Switch online monitoring equipment communication simulating device based on IEC61850 and method thereof | |
CN206239946U (en) | Safety management system is monitored based on Internet of Things fire water-supply | |
CN105405334A (en) | Power distribution automation system and simulation method | |
CN103338245A (en) | Wireless supervision method on high-pressure testing site | |
CN105974852A (en) | Method and apparatus for remote controlling hydraulic gate | |
CN206617131U (en) | A kind of well head emergency flight control system | |
CN109752616A (en) | For the adjustment method under EMU cell level maintenance model | |
CN207380882U (en) | Dewaterer halt alarm device | |
CN207503028U (en) | Tele-control system and fully-mechanized mining working equipment train | |
CN202506037U (en) | Fire protection maintenance remote monitoring management device | |
CN204121655U (en) | There is the fire-fighting water supply network intelligent inspection system of combat exercise | |
CN108635720B (en) | Intelligent circuit board digital inspection control cabinet and method | |
CN207798339U (en) | Remote control atrial pressure power is remotely checked and warning device | |
CN205986321U (en) | Haul oneself willingly into protection logic and verify device | |
CN205787787U (en) | The device that a kind of water conservancy gate remotely controls | |
CN205960620U (en) | Plug -and -play's overload protection device | |
CN205809659U (en) | Transformer station's fire extinguisher canvas hose leakage early warning system | |
CN109555892A (en) | Pipeline cutting device long-distance monitoring and alarming control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131002 |