CN103338245A - Wireless supervision method on high-pressure testing site - Google Patents

Wireless supervision method on high-pressure testing site Download PDF

Info

Publication number
CN103338245A
CN103338245A CN2013102541375A CN201310254137A CN103338245A CN 103338245 A CN103338245 A CN 103338245A CN 2013102541375 A CN2013102541375 A CN 2013102541375A CN 201310254137 A CN201310254137 A CN 201310254137A CN 103338245 A CN103338245 A CN 103338245A
Authority
CN
China
Prior art keywords
personnel
wireless
instrument
wiring
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102541375A
Other languages
Chinese (zh)
Inventor
胡维兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU XIHU INSTITUTE OF ELECTRONIC RESEARCH
Original Assignee
HANGZHOU XIHU INSTITUTE OF ELECTRONIC RESEARCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU XIHU INSTITUTE OF ELECTRONIC RESEARCH filed Critical HANGZHOU XIHU INSTITUTE OF ELECTRONIC RESEARCH
Priority to CN2013102541375A priority Critical patent/CN103338245A/en
Publication of CN103338245A publication Critical patent/CN103338245A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a wireless supervision method on a high-pressure testing site. The existing supervision method always brings about potential safety hazards, even personal injury and death to testing wiring staff. According to the invention, after determining a test program, an instrument operator informs the testing wiring staff in a wireless communication manner; after completing initialization of the instrument, the instrument operator sends out a boosting preparation command; after receiving the boosting preparation command, the testing wiring staff assess the wiring and state of the entire testing device, and sends out a boosting allowing command through a wireless monitoring module after correct confirmation; a control instrument allows the instrument operator to perform the boosting operation only when the boosting allowing command sent by the wireless monitoring module is received. According to the invention, various potential safety hazards caused by untimely communication or malfunction during the high-pressure testing process can be avoided, and the safety guarantee of the testing wiring staff can be greatly improved.

Description

The method that a kind of high voltage test on-site wireless is managed
Technical field
The present invention relates to the method that a kind of high voltage test on-site wireless is managed.
Background technology
At present at the high voltage test scene; test connection personnel and exchanging of instrumentation personnel be basically propaganda directed to communicate exchange or intercom to exchange be main; the instrumentation personnel often can't be directly acquainted with the wiring situation of experimental rig and the ruuning situation of experimental rig; the test connection personnel also can't be directly acquainted with instrument for the situation that arranges of experimental rig; and the situation of boosting of experimental rig in test; and the test connection personnel can't make intervening measure timely and effectively at the emergency of experimental rig; and the instrumentation personnel generally can only come experimental rig is made intervening measure for the visual situation of testing equipment by protection warning measure or the test connection personnel of instrument for experimental rig, do not have good promptness.If the instrumentation personnel since misoperation or in time link up when knowing with the test connection personnel tend to bring no small potential safety hazard to the test connection personnel, even the test connection personnel caused personal injury so that dead.
Summary of the invention
At above situation, the present invention is to adopt instrumentation personnel instrument monitoring to be controlled to be the master in the Monitoring and Controlling to testing equipment, management method that the test connection personnel are wireless is the monitoring method of assisting, the test connection personnel can be in entire test play the Monitoring and Controlling effect by the wireless monitor module for the situation of boosting of experimental rig, and when emergency takes place, but the judgement of test connection personnel very first time basis oneself is made intervening measure for experimental rig.
The present invention is specifically:
After instrumentation personnel confirmed test project, personnel carry out wiring to experimental rig by wireless communication mode notice test connection, and control instrument is carried out initialization operation; Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction; After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction; Control instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
Beneficial effect of the present invention: by the method for this wireless management, can avoid in the high voltage test process because the various potential safety hazards that communication is untimely or mistake such as misoperation is brought can greatly improve test connection personnel's safety guarantee.
Description of drawings
Fig. 1 is interactive flow process basic between instrumentation personnel and the test connection personnel.
Fig. 2 is the relation structure diagram between instrument control instrument and wireless monitor module and the experimental rig.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
In Fig. 1, after the instrumentation personnel had determined pilot project, personnel carried out wiring to experimental rig by wireless communication mode notice test connection, and self carries out initialization operation to control instrument.Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction.After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction.Instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
In Fig. 2, the instrumentation personnel carry out main Monitoring and Controlling by control instrument to experimental rig, and the test connection personnel can carry out Monitoring and Controlling to testing equipment by the wireless monitor module is auxiliary, also adopt the method for wireless telecommunications to carry out communication between control instrument and the wireless monitor module.Therefore, in whole high voltage test process, the test connection personnel can be by the operation that the wireless monitor module the is understood the monitoring test device in real time situation of boosting, when testing equipment generation emergency, the test connection personnel also can make urgent intervention measures such as suddenly stopping step-down to experimental rig by the wireless monitor module.

Claims (1)

1. the high voltage test on-site wireless method of managing, the instrumentation personnel carry out main Monitoring and Controlling by control instrument to experimental rig, the test connection personnel carry out Monitoring and Controlling by the wireless monitor module is auxiliary to testing equipment, adopt the method for wireless telecommunications to carry out communication between control instrument and the wireless monitor module, it is characterized in that this method specifically:
After instrumentation personnel confirmed test project, personnel carry out wiring to experimental rig by wireless communication mode notice test connection, and control instrument is carried out initialization operation; Finish after the instruction when the instrumentation personnel finish the initialization of instrument and receive wiring that the test connection personnel send by the wireless monitor module, the instrumentation personnel send and prepare to boost instruction; After this moment, the test connection personnel received the instruction of preparing to boost, wiring and the state of whole test device are made assessment, confirm that errorless sending by the wireless monitor module later on allows to boost instruction; Control instrument could allow the instrumentation personnel to carry out boost operations, otherwise control instrument will permit no. any boost action after allowing of only receiving that the wireless monitor module sends boosted instruction.
CN2013102541375A 2013-06-24 2013-06-24 Wireless supervision method on high-pressure testing site Pending CN103338245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102541375A CN103338245A (en) 2013-06-24 2013-06-24 Wireless supervision method on high-pressure testing site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102541375A CN103338245A (en) 2013-06-24 2013-06-24 Wireless supervision method on high-pressure testing site

Publications (1)

Publication Number Publication Date
CN103338245A true CN103338245A (en) 2013-10-02

Family

ID=49246339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102541375A Pending CN103338245A (en) 2013-06-24 2013-06-24 Wireless supervision method on high-pressure testing site

Country Status (1)

Country Link
CN (1) CN103338245A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6333880B1 (en) * 2000-07-14 2001-12-25 Mitsubishi Denki Kabushiki Kaisha Semiconductor memory device capable of detecting high-voltage test command signal
CN102196005A (en) * 2010-03-16 2011-09-21 武汉特试特科技有限公司 Electric test vehicle communication network structure
CN102622834A (en) * 2012-03-30 2012-08-01 华北电网有限公司唐山供电公司 Electronic safety protection method and private network guardrail for high-voltage tests of electric power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6333880B1 (en) * 2000-07-14 2001-12-25 Mitsubishi Denki Kabushiki Kaisha Semiconductor memory device capable of detecting high-voltage test command signal
CN102196005A (en) * 2010-03-16 2011-09-21 武汉特试特科技有限公司 Electric test vehicle communication network structure
CN102622834A (en) * 2012-03-30 2012-08-01 华北电网有限公司唐山供电公司 Electronic safety protection method and private network guardrail for high-voltage tests of electric power system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘强强等: "高压试验电源远程可视快速切断装置的研制", 《浙江电力》 *
杨帆: "高压试验中的呼唱制度", 《电力安全技术》 *

Similar Documents

Publication Publication Date Title
CN203154692U (en) Intelligent firefighting patrol inspection equipment
CN103487766B (en) Method and system for monitoring the power supply of fire-fighting pump motor in fire-fighting system
CN205007474U (en) Subway fire detection reports to police and fire extinguishing systems
CN106204829B (en) Lockset wireless control system and method
CN206626413U (en) A kind of gas leakage alarm cuts off monitoring system
CN101655407A (en) Automatic pressure test device and pressure test control method of oil extraction well mouth equipment
CN102903291B (en) Simulation platform of cooling system of high-voltage direct-current transmission converter valve
CN103995924A (en) Switch online monitoring equipment communication simulating device based on IEC61850 and method thereof
CN206239946U (en) Safety management system is monitored based on Internet of Things fire water-supply
CN105405334A (en) Power distribution automation system and simulation method
CN103338245A (en) Wireless supervision method on high-pressure testing site
CN105974852A (en) Method and apparatus for remote controlling hydraulic gate
CN206617131U (en) A kind of well head emergency flight control system
CN109752616A (en) For the adjustment method under EMU cell level maintenance model
CN207380882U (en) Dewaterer halt alarm device
CN207503028U (en) Tele-control system and fully-mechanized mining working equipment train
CN202506037U (en) Fire protection maintenance remote monitoring management device
CN204121655U (en) There is the fire-fighting water supply network intelligent inspection system of combat exercise
CN108635720B (en) Intelligent circuit board digital inspection control cabinet and method
CN207798339U (en) Remote control atrial pressure power is remotely checked and warning device
CN205986321U (en) Haul oneself willingly into protection logic and verify device
CN205787787U (en) The device that a kind of water conservancy gate remotely controls
CN205960620U (en) Plug -and -play's overload protection device
CN205809659U (en) Transformer station's fire extinguisher canvas hose leakage early warning system
CN109555892A (en) Pipeline cutting device long-distance monitoring and alarming control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131002