CN103336839A - Electric system specialized overhaul data processing method - Google Patents
Electric system specialized overhaul data processing method Download PDFInfo
- Publication number
- CN103336839A CN103336839A CN2013102986059A CN201310298605A CN103336839A CN 103336839 A CN103336839 A CN 103336839A CN 2013102986059 A CN2013102986059 A CN 2013102986059A CN 201310298605 A CN201310298605 A CN 201310298605A CN 103336839 A CN103336839 A CN 103336839A
- Authority
- CN
- China
- Prior art keywords
- overhaul
- electric system
- data
- specialized
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to an electric system specialized overhaul data processing method which comprises the following steps that (1) a data collecting module collects state information of equipment and staff in an electric system in real time; (2) a central processing module generates a current overhaul scheme according to the current state information and historical overhaul schemes stored in a database, and the current overhaul scheme is sent to an overhaul management module; (3) the overhaul management module sends a command matched with the current overhaul scheme to the equipment and staff in the electric system; (4) an overhaul process display module displays overhaul process information in real time and outputs an overhaul result report. Compared with the prior art, the method has the advantages of being high in work reliability, capable of improving specialized overhaul management level and the like.
Description
Technical field
The present invention relates to a kind of data processing method, especially relate to the specialized overhaul data disposal route of a kind of electric system.
Background technology
Development along with power domain, requirement to grid equipment status monitoring and service technique is more and more higher, the requirement of " maintenance is specialized " at present, existing infosystem can not adapt to the functional requirement that specialized maintenance brings well, is in particular in the following aspects:
1) according to the general plan of company's production information construction, finishes the exploitation of standardized work modules such as the comprehensive production schedule, repair based on condition of component (evaluation), checking experiment and the pattern of applying and to have satisfied existing requirement;
2) the production information system function can't effectively be supported the requirement that " specialization " maintenance is carried out at present.
New business model is brought new challenge, how to bring into play the advantage that specialized maintenance base human, financial, and material resources is concentrated, and for the repair based on condition of component system provides specialized support, is the current challenge that faces for the inspection of production fortune provides efficient service.
Summary of the invention
Purpose of the present invention is exactly the specialized overhaul data disposal route of electric system that provides a kind of functional reliability height for the defective that overcomes above-mentioned prior art existence, promotes specialized overhaul management level.
Purpose of the present invention can be achieved through the following technical solutions:
The specialized overhaul data disposal route of a kind of electric system, this method may further comprise the steps:
1) data acquisition module is gathered the status information of equipment and personnel in the electric system in real time;
2) central processing module generates current maintenance scheme according to stored historical maintenance scheme in current status information and the database, and current maintenance scheme is sent to overhaul management module;
3) overhaul management module equipment and personnel in the electric system send the order that is complementary with current maintenance scheme;
4) the maintenance process display module shows maintenance process information in real time, and form is as a result overhauled in output.
Described status information of equipment comprises Work tool information, standby redundancy information and material information.
The data that described maintenance process display module is showed comprise target advance data, flow data, Work tool data and personnel's data.
Compared with prior art, the present invention gathers by the maintenance information to needs, generate the maintenance scheme that is fit in real time, for focusing on of information such as specialization maintenance base human, financial, and material resources provide reliable support, realization improves equipment dependability and electric power netting safe running level to strong support, the specialized overhaul service management level of lifting of repair based on condition of component thereby reach; The present invention when improving base service work level, greatly reduces handling cost by information-based means deal with data, can directly bring considerable effectiveness of operation and economic benefit.
Description of drawings
Fig. 1 is schematic flow sheet of the present invention.
Embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.Present embodiment is that prerequisite is implemented with the technical solution of the present invention, provided detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, the specialized overhaul data disposal route of a kind of electric system, this method may further comprise the steps:
1) data acquisition module is gathered the status information of equipment and personnel in the electric system in real time, and wherein, status information of equipment comprises Work tool information, standby redundancy information and material information;
2) central processing module generates current maintenance scheme according to stored historical maintenance scheme in current status information and the database, and current maintenance scheme is sent to overhaul management module;
3) overhaul management module equipment and personnel in the electric system send the order that is complementary with current maintenance scheme;
4) the maintenance process display module shows maintenance process information in real time, and exports maintenance form as a result, and the data that the maintenance process display module is showed comprise target advance data, flow data, Work tool data and personnel's data.
Claims (3)
1. the specialized overhaul data disposal route of an electric system is characterized in that this method may further comprise the steps:
1) data acquisition module is gathered the status information of equipment and personnel in the electric system in real time;
2) central processing module generates current maintenance scheme according to stored historical maintenance scheme in current status information and the database, and current maintenance scheme is sent to overhaul management module;
3) overhaul management module equipment and personnel in the electric system send the order that is complementary with current maintenance scheme;
4) the maintenance process display module shows maintenance process information in real time, and form is as a result overhauled in output.
2. the specialized overhaul data disposal route of a kind of electric system according to claim 1 is characterized in that described status information of equipment comprises Work tool information, standby redundancy information and material information.
3. the specialized overhaul data disposal route of a kind of electric system according to claim 1 is characterized in that the data that described maintenance process display module is showed comprise target advance data, flow data, Work tool data and personnel's data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102986059A CN103336839A (en) | 2013-07-16 | 2013-07-16 | Electric system specialized overhaul data processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102986059A CN103336839A (en) | 2013-07-16 | 2013-07-16 | Electric system specialized overhaul data processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103336839A true CN103336839A (en) | 2013-10-02 |
Family
ID=49245004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102986059A Pending CN103336839A (en) | 2013-07-16 | 2013-07-16 | Electric system specialized overhaul data processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103336839A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104462745A (en) * | 2014-10-14 | 2015-03-25 | 国家电网公司 | Evaluation method for information equipment state quantity |
CN112102107A (en) * | 2020-07-30 | 2020-12-18 | 广东电网有限责任公司广州供电局 | Method, device and equipment for generating report of power supply system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102222276A (en) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | State maintenance method and device for secondary equipment of power grid |
CN102738899A (en) * | 2012-06-18 | 2012-10-17 | 南京协宏软件技术有限公司 | Power grid remote diagnosis and overhaul method based on 3G (3rd generation) network |
CN102983629A (en) * | 2012-11-07 | 2013-03-20 | 中国电力科学研究院 | Auxiliary decision-making method for on-line power system restoration |
-
2013
- 2013-07-16 CN CN2013102986059A patent/CN103336839A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102222276A (en) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | State maintenance method and device for secondary equipment of power grid |
CN102738899A (en) * | 2012-06-18 | 2012-10-17 | 南京协宏软件技术有限公司 | Power grid remote diagnosis and overhaul method based on 3G (3rd generation) network |
CN102983629A (en) * | 2012-11-07 | 2013-03-20 | 中国电力科学研究院 | Auxiliary decision-making method for on-line power system restoration |
Non-Patent Citations (1)
Title |
---|
许婧 等: "电力设备状态检修技术研究综述", 《电网技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104462745A (en) * | 2014-10-14 | 2015-03-25 | 国家电网公司 | Evaluation method for information equipment state quantity |
CN112102107A (en) * | 2020-07-30 | 2020-12-18 | 广东电网有限责任公司广州供电局 | Method, device and equipment for generating report of power supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104219315B (en) | A kind of operation monitoring system of power information acquisition system and method for supervising thereof | |
CN103427417B (en) | Based on the distribution network failure processing method of Multi-source Information Fusion | |
CN103390936B (en) | Substation secondary device remote reboot system | |
CN105577116B (en) | Exception and Fault Locating Method based on the analysis of photovoltaic power generation data | |
CN107589735A (en) | Photovoltaic O&M robot system | |
CN103337150A (en) | Long-distance intelligent monitoring system of grinding machines | |
CN104038373A (en) | Information early warning and self repairing system and method | |
CN103019207A (en) | Energy-saving emission reduction real-time monitoring system | |
CN104574004A (en) | Auxiliary distribution network state maintenance system | |
CN104237735A (en) | Modeling and fault analysis method combining fault indicator and power distribution terminal | |
CN103310389A (en) | Method for overhauling fault of overhead transmission line built on basis of fault mode and fault tree | |
CN104935007A (en) | Control method for gird-connected operation of distributed power supply | |
CN103336839A (en) | Electric system specialized overhaul data processing method | |
CN202794322U (en) | Wind power quality detection device based on FPGA processor and ARM processor | |
CN102663566A (en) | Asset management decision analysis information processing method suitable for power system | |
CN201891593U (en) | Maintenance decision system based on fault diagnosis | |
CN204103595U (en) | Based on the distributed wind-power generator system of Internet of Things | |
CN105207358A (en) | Electrical energy quality online monitoring platform | |
CN205017106U (en) | Long real -time calculation device when mobile communication basic station emergency is generated electricity | |
CN104766183A (en) | Power grid real time fault event flow management system and adopted management method thereof | |
CN110942163A (en) | Intelligent maintenance method and system based on big data | |
CN103400313A (en) | Overhaul data processing system used in specialized overhaul base for electrical equipment | |
CN203133945U (en) | Cable aging management platform in reactor containment vessel | |
CN202510279U (en) | Remote monitoring system for wind farm | |
CN202795445U (en) | Asset managing decision and analysis information processing device suitable for power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131002 |