CN103335190B - 一种管道试压接口盲板装置 - Google Patents

一种管道试压接口盲板装置 Download PDF

Info

Publication number
CN103335190B
CN103335190B CN201310229444.8A CN201310229444A CN103335190B CN 103335190 B CN103335190 B CN 103335190B CN 201310229444 A CN201310229444 A CN 201310229444A CN 103335190 B CN103335190 B CN 103335190B
Authority
CN
China
Prior art keywords
pipeline
blind plate
interface
pin type
pressure test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310229444.8A
Other languages
English (en)
Other versions
CN103335190A (zh
Inventor
高琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310229444.8A priority Critical patent/CN103335190B/zh
Publication of CN103335190A publication Critical patent/CN103335190A/zh
Application granted granted Critical
Publication of CN103335190B publication Critical patent/CN103335190B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明涉及一种管道试压接口盲板装置,包括销轴式盲板及与待试压管道同等规格的接口管道,销轴式盲板方便加工,用水做试压介质时可在接口管道上部设置排气孔,保证在注水时管道内部气体的排出;使用时将销轴式盲板插入接口管道并焊接为一体,作为整体的试压接口装置。本发明可避免实际施工中,由于特殊工艺条件限制下管道接口位置、空间固定,无法进行微调而必须拆除端部设备等繁琐工作,如此既省时、又省力,又方便。

Description

一种管道试压接口盲板装置
技术领域
本发明属高压管道安装技术领域,特别是涉及一种管道试压接口盲板装置。
背景技术
目前在管道安装后试压的盲板选用主要有①两法兰间的嵌入式盲板②单片法兰式盲板③焊接盲板④大口径管道中应用的临时椭圆封头,但对于60MPa的高压力的、规格为φ102*25的管道试压,上述盲板形式均不合适。因此需要拆除端部的已经调试灌浆完成的高压泵设备,整个步骤较为繁复,耗费大。
发明内容
本发明所要解决的技术问题是提供一种管道试压接口盲板装置,以解决管道试压过程繁琐的问题。
本发明解决其技术问题所采用的技术方案是:提供一种管道试压接口盲板装置,包括销轴式盲板,模拟接口管道,排气孔和坡口间隙,所述的销轴式盲板一端凸出一接口,接口插入模拟接口管道的内径中,模拟接口管道的壁上开有一排气孔,且排气孔与模拟接口管道内径连通。
所述的接口与模拟接口管道的接缝处为一坡口间隙,坡口间隙为一台阶面。
所述的销轴式盲板两端皆开有坡口。
所述的模拟接口管道两端皆开有坡口。
有益效果
本发明可避免实际施工中,由于特殊工艺条件限制下管道接口位置、空间固定,无法进行微调而必须拆除端部设备的繁琐工作,如此既省时、又省力,又方便。
附图说明
图1为本发明总装配示意图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
实施例1
如图1所示,一种管道试压接口盲板装置,包括销轴式盲板1,模拟接口管道2,排气孔3和坡口间隙4,所述的销轴式盲板1一端凸出一接口,接口插入模拟接口管道2的内径中,模拟接口管道2的壁上开有一排气孔3,且排气孔3与模拟接口管道2内径连通。
所述的接口与模拟接口管道2的接缝处为一坡口间隙4,坡口间隙4为一台阶面。
所述的销轴式盲板1两端皆开有坡口。
所述的模拟接口管道2两端皆开有坡口。
销轴式盲板1(盲板采用钢柱,钢柱外径同接口管道的外径);模拟接口管道2(与待试压管道同材质、同规格);排气孔3:开孔方式,锥丝(排气后用高强螺栓封堵并焊接牢固)。销轴式盲板1、模拟接口管道2相连后,销轴式盲板1的一端与高压泵设备相连,模拟接口管道2的一端与待压管道相连,连接方式均采用焊接方式;坡口加工深度、钝边尺寸均按设计及技术要求进行加工。

Claims (4)

1.一种管道试压接口盲板装置,包括销轴式盲板(1),模拟接口管道(2),排气孔(3)和坡口间隙(4),其特征是:所述的销轴式盲板(1)一端凸出一接口,接口插入模拟接口管道(2)的内径中,模拟接口管道(2)的壁上开有一排气孔(3),且排气孔(3)与模拟接口管道(2)内径连通,所述排气孔(3)壁通过攻丝方式形成内螺纹,且排气孔(3)配有相应的高强度螺丝。
2.根据权利要求1所述的一种管道试压接口盲板装置,其特征是:所述的接口与模拟接口管道(2)的接缝处为一坡口间隙(4),坡口间隙(4)为一台阶面。
3.根据权利要求1所述的一种管道试压接口盲板装置,其特征是:所述的销轴式盲板(1)两端皆开有坡口。
4.根据权利要求1所述的一种管道试压接口盲板装置,其特征是:所述的模拟接口管道(2)两端皆开有坡口。
CN201310229444.8A 2013-06-09 2013-06-09 一种管道试压接口盲板装置 Active CN103335190B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310229444.8A CN103335190B (zh) 2013-06-09 2013-06-09 一种管道试压接口盲板装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310229444.8A CN103335190B (zh) 2013-06-09 2013-06-09 一种管道试压接口盲板装置

Publications (2)

Publication Number Publication Date
CN103335190A CN103335190A (zh) 2013-10-02
CN103335190B true CN103335190B (zh) 2016-05-18

Family

ID=49243398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310229444.8A Active CN103335190B (zh) 2013-06-09 2013-06-09 一种管道试压接口盲板装置

Country Status (1)

Country Link
CN (1) CN103335190B (zh)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101107470A (zh) * 2005-01-21 2008-01-16 J·霍恩 液压管接头用的塞子
EP2034192A2 (de) * 2007-09-10 2009-03-11 MARCO SYSTEMANALYSE UND ENTWICKLUNG GmbH Verschlussstopfen

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2623650B2 (ja) * 1988-03-09 1997-06-25 富士通株式会社 薄肉パイプの浴接方法
CN2512976Y (zh) * 2001-12-20 2002-09-25 新疆五家渠公众信息产业有限责任公司 管道封堵装置
US7946440B2 (en) * 2007-11-13 2011-05-24 Kvt Koenig, Llc Two-piece expandable sealing plug
CN202812639U (zh) * 2012-07-26 2013-03-20 马鞍山市天睿实业有限公司 一种快速接头的耐高压组件

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101107470A (zh) * 2005-01-21 2008-01-16 J·霍恩 液压管接头用的塞子
EP2034192A2 (de) * 2007-09-10 2009-03-11 MARCO SYSTEMANALYSE UND ENTWICKLUNG GmbH Verschlussstopfen

Also Published As

Publication number Publication date
CN103335190A (zh) 2013-10-02

Similar Documents

Publication Publication Date Title
CN204283384U (zh) 套管加药罐
CN103335190B (zh) 一种管道试压接口盲板装置
CN205504251U (zh) 一种高压密封接头
CN210598944U (zh) 一种可溶性金属压裂球测试装置
CN106246916A (zh) 一种管接头的水压封堵装置
CN206017716U (zh) 管接头的水压封堵装置
CN202065607U (zh) 磁力组合式管道带压堵漏器
CN201606621U (zh) 一种煤气管道堵漏装置
CN104316410A (zh) 一种压缩式封隔器胶筒实验装置
CN204387549U (zh) 一种管道连接装置
CN203823346U (zh) 一种高强钢压力钢管孔洞封堵装置
CN206831050U (zh) 一种管道堵漏装置
CN203758559U (zh) 一种超声波流量计插入式传感器
CN203258296U (zh) 管道弧形引流焊接止漏器
CN202708434U (zh) 管夹密封件
CN205826214U (zh) 一种便捷式阀门试压装置
CN206846025U (zh) 通用型取样阀
CN203201510U (zh) 防应力集中的井壁修复机构
CN204372444U (zh) 输油管道带压封堵抢修装置
CN204829004U (zh) 焊缝防腐蚀的高压管接头
CN203927174U (zh) 一种内丝接头
CN204705455U (zh) 一种用于单管试压的工装结构
CN209614016U (zh) 专用管内工件取出器
CN212203301U (zh) 一种高压喷雾泵球阀开关
CN204553216U (zh) 用于齿轮泵的直角接头

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190628

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right