CN103334501A CN2013102614643A CN201310261464A CN103334501A CN 103334501 A CN103334501 A CN 103334501A CN 2013102614643 A CN2013102614643 A CN 2013102614643A CN 201310261464 A CN201310261464 A CN 201310261464A CN 103334501 A CN103334501 A CN 103334501A
Authority
CN
China
Prior art keywords
bolt hole
orifices
bolt holes
antiseepage
job practices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102614643A
Other languages
English (en)
Other versions
CN103334501B (zh
Inventor
李兆龙
陈超
贾杨
葛守峰
尹大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen intercontinental architectural decoration Group Co., Ltd.
Original Assignee
QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd, Qingdao Jianan Construction Group Co Ltd filed Critical QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd
Priority to CN201310261464.3A priority Critical patent/CN103334501B/zh
Publication of CN103334501A publication Critical patent/CN103334501A/zh
Application granted granted Critical
Publication of CN103334501B publication Critical patent/CN103334501B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种建筑外墙螺栓孔防渗施工方法,包括如下步骤:(1)对剪力墙螺栓孔的内、外侧孔口进行剔凿,使之形成“V”型口,清理后冲水润湿,孔口表面无明水时,用聚合物水泥防水砂浆对外侧孔口进行封堵,压实抹平;(2)外侧孔口的聚合物水泥防水砂浆达到三天强度后,对螺栓孔进行精细清;(3)螺栓孔植筋完成48小时后,检查封堵螺栓孔外侧孔口的聚合物水泥防水砂浆是否有松动,如有松动及时修补,完成后将内侧孔口用聚合物水泥防水砂浆封堵、抹平;(4)采用热熔铺贴法,使SBS卷材底面的沥青熔化,与基层处理剂粘结牢固。本发明所公开的建筑外墙螺栓孔防渗施工方法,操作简单,通过四层防水阻断处理措施,有效避免建筑外墙螺栓孔渗水。

Description

一种建筑外墙螺栓孔防渗施工方法
技术领域
本发明涉及一种建筑孔洞防渗漏施工方法,尤其涉及建筑外墙剪力墙模板螺栓孔防水封堵施工技术。
背景技术
在框剪结构建筑施工中,在剪力墙模板支设过程中为保证模板强度和刚度,防止浇筑混凝土过程中出现涨模、漏浆、模板变形等质量事故的发生,采用对拉螺栓加固是必须的手段和措施。同时为了加快施工进度和施工便捷,目前施工单位普遍采用加套管可重复使用的对拉螺栓。从而造成剪力墙对拉螺栓部位产生人为孔洞。若采用常规砂浆封堵方法,极易发生外墙渗漏现象,影响使用功能和美观。
发明内容
本发明所要解决的技术问题就是提供一种有效防止建筑外墙螺栓孔渗水的施工方法
本发明采用如下技术方案:
一种建筑外墙螺栓孔防渗施工方法,包括如下步骤:
(1)对剪力墙螺栓孔的内、外侧孔口进行剔凿,使之形成“V”型口,清理后冲水润湿,孔口表面无明水时,用聚合物水泥防水砂浆对外侧孔口进行封堵,压实抹平;
(2)外侧孔口的聚合物水泥防水砂浆达到三天强度后,对螺栓孔进行精细清理,清除孔内垃圾及浮灰;清洗后将微膨胀型化学胶粘剂注入孔内,然后将预先制作的直段钢筋植入孔内,使孔内饱满;
(3)螺栓孔植筋完成48小时后,检查封堵螺栓孔外侧孔口的聚合物水泥防水砂浆是否有松动,如有松动及时修补,完成后将螺栓孔内侧孔口外溢的胶粘剂清理干净,并用清水湿润内侧孔口,完成后将内侧孔口用聚合物水泥防水砂浆封堵、抹平;
(4)将螺栓孔外侧孔口周围的基层浮浆、杂物清理干净,并且外侧孔口周围200mm范围内剪力墙表面平整无凸凹、干燥、含水量不大于9%,完成后在外侧孔口均匀涂刷基层处理剂,待基层处理剂干燥后,将SBS卷材进行定位,采用热熔铺贴法,使SBS卷材底面的沥青熔化,与基层处理剂粘结牢固。
进一步的,在步骤(1)中,利用外脚手架作为施工操作平台。
进一步的,在步骤(1)中,用棕毛刷清理“V”型口。
进一步的,在步骤(2)中,对螺栓孔进行精细清理包括采用压缩空气进行反复3—5次清理,清除孔内垃圾;然后用棉布或毛刷将孔壁浮灰擦净。
进一步的,在步骤(2)中,采用手动注浆机将微膨胀型化学胶粘剂注入孔内。
进一步的,在步骤(2)中,注胶量为孔体积的50%。
进一步的,在步骤(2)中,植入钢筋长度等于剪力墙厚度减60mm,钢筋表面浮锈应清理干净,露出金属光泽。
进一步的,在步骤(4)中,SBS卷材为150mm×150mm的小块。
进一步的,在步骤(4)中,点燃火焰喷枪或喷灯烘烤SBS卷材底面与基层处理剂的交接处,使SBS卷材底面的沥青熔化。
进一步的,在步骤(4)中,块型SBS卷材周边应采取碾压措施。
本发明的有益效果是:
本发明所公开的建筑外墙螺栓孔防渗施工方法,操作简单,通过四层防水阻断处理措施,有效避免建筑外墙螺栓孔渗水。
附图说明
图1是使用本发明实施例1所公开的施工方法处理后的建筑外墙螺栓孔的剖面图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图和实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
实施例1,请参照图1,本实施例公开了一种建筑外墙螺栓孔防渗施工方法,包括如下步骤:
(1)对剪力墙1螺栓孔的内、外侧孔口进行剔凿,使之形成“V”型口,清理后冲水润湿,孔口表面无明水时,用聚合物水泥防水砂浆2对外侧孔口进行封堵,压实抹平;
在步骤(1)中,利用外脚手架作为施工操作平台。
在步骤(1)中,用棕毛刷清理“V”型口。
在步骤(1)中,“V”型口可以加大聚合物水泥防水砂浆与剪力墙的接触面积,提高封堵强度及效果。
(2)外侧孔口的聚合物水泥防水砂浆达到三天强度后,对螺栓孔进行精细清理,清除孔内垃圾及浮灰;清洗后将微膨胀型化学胶粘剂3注入孔内,然后将预先制作的直段钢筋4植入孔内,使孔内饱满;
在步骤(2)中,对螺栓孔进行精细清理包括采用压缩空气进行反复3—5次清理,清除孔内垃圾;然后用棉布或毛刷将孔壁浮灰擦净。
在步骤(2)中,采用手动注浆机将微膨胀型化学胶粘剂注入孔内。
在步骤(2)中,注胶量为孔体积的50%。
在步骤(2)中,植入钢筋长度等于剪力墙厚度减60mm,钢筋表面浮锈应清理干净,露出金属光泽。
(3)螺栓孔植筋完成48小时后,检查封堵螺栓孔外侧孔口的聚合物水泥防水砂浆是否有松动,如有松动及时修补,完成后将螺栓孔内侧孔口外溢的胶粘剂清理干净,并用清水湿润内侧孔口,完成后将内侧孔口用聚合物水泥防水砂浆2封堵、抹平;
(4)将螺栓孔外侧孔口周围的基层浮浆、杂物清理干净,并且外侧孔口周围200mm范围内剪力墙表面平整无凸凹、干燥、含水量不大于9%,完成后在外侧孔口均匀涂刷基层处理剂,待基层处理剂干燥后,将SBS卷材5进行定位,采用热熔铺贴法,使SBS卷材底面的沥青熔化,与基层处理剂粘结牢固。
在步骤(4)中,SBS卷材为150mm×150mm的小块。
在步骤(4)中,点燃火焰喷枪或喷灯烘烤SBS卷材底面与基层处理剂的交接处,使SBS卷材底面的沥青熔化。
在步骤(4)中,块型SBS卷材周边应采取碾压措施。

Claims (10)

1.一种建筑外墙螺栓孔防渗施工方法,其特征在于,包括如下步骤:
(1)对剪力墙螺栓孔的内、外侧孔口进行剔凿,使之形成“V”型口,清理后冲水润湿,孔口表面无明水时,用聚合物水泥防水砂浆对外侧孔口进行封堵,压实抹平;
(2)外侧孔口的聚合物水泥防水砂浆达到三天强度后,对螺栓孔进行精细清理,清除孔内垃圾及浮灰;清洗后将微膨胀型化学胶粘剂注入孔内,然后将预先制作的直段钢筋植入孔内,使孔内饱满;
(3)螺栓孔植筋完成48小时后,检查封堵螺栓孔外侧孔口的聚合物水泥防水砂浆是否有松动,如有松动及时修补,完成后将螺栓孔内侧孔口外溢的胶粘剂清理干净,并用清水湿润内侧孔口,完成后将内侧孔口用聚合物水泥防水砂浆封堵、抹平;
(4)将螺栓孔外侧孔口周围的基层浮浆、杂物清理干净,并且外侧孔口周围200mm范围内剪力墙表面平整无凸凹、干燥、含水量不大于9%,完成后在外侧孔口均匀涂刷基层处理剂,待基层处理剂干燥后,将SBS卷材进行定位,采用热熔铺贴法,使SBS卷材底面的沥青熔化,与基层处理剂粘结牢固。
2.根据权利要求1所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(1)中,利用外脚手架作为施工操作平台。
3.根据权利要求2所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(1)中,用棕毛刷清理“V”型口。
4.根据权利要求1所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(2)中,对螺栓孔进行精细清理包括采用压缩空气进行反复3—5次清理,清除孔内垃圾;然后用棉布或毛刷将孔壁浮灰擦净。
5.根据权利要求4所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(2)中,采用手动注浆机将微膨胀型化学胶粘剂注入孔内。
6.根据权利要求5所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(2)中,注胶量为孔体积的50%。
7.根据权利要求6所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(2)中,植入钢筋长度等于剪力墙厚度减60mm,钢筋表面浮锈应清理干净,露出金属光泽。
8.根据权利要求1所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(4)中,SBS卷材为150mm×150mm的小块。
9.根据权利要求8所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(4)中,点燃火焰喷枪或喷灯烘烤SBS卷材底面与基层处理剂的交接处,使SBS卷材底面的沥青熔化。
10.根据权利要求9所述的建筑外墙螺栓孔防渗施工方法,其特征在于:在步骤(4)中,块型SBS卷材周边应采取碾压措施。
CN201310261464.3A 2013-06-26 2013-06-26 一种建筑外墙螺栓孔防渗施工方法 Active CN103334501B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310261464.3A CN103334501B (zh) 2013-06-26 2013-06-26 一种建筑外墙螺栓孔防渗施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310261464.3A CN103334501B (zh) 2013-06-26 2013-06-26 一种建筑外墙螺栓孔防渗施工方法

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201410436639.4A Division CN104264797B (zh) 2013-06-26 2013-06-26 建筑外墙采用微膨胀型化学胶粘剂的螺栓孔防渗施工方法
CN201410438126.7A Division CN104179258B (zh) 2013-06-26 2013-06-26 建筑外墙剪力墙螺栓孔防渗施工方法

Publications (2)

Publication Number Publication Date
CN103334501A true CN103334501A (zh) 2013-10-02
CN103334501B CN103334501B (zh) 2014-10-08

Family

ID=49242702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310261464.3A Active CN103334501B (zh) 2013-06-26 2013-06-26 一种建筑外墙螺栓孔防渗施工方法

Country Status (1)

Country Link
CN (1) CN103334501B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541439A (zh) * 2013-09-24 2014-01-29 宝鸡市第一建筑工程有限责任公司 一种混凝土剪力墙对拉螺栓孔的填塞方法
CN103711205A (zh) * 2014-01-13 2014-04-09 任斌向 一种墙体对拉螺栓孔洞防水封堵构造及施工方法
CN104179258A (zh) * 2013-06-26 2014-12-03 青岛建安建设集团有限公司 螺栓孔防渗施工方法
CN106639313A (zh) * 2017-02-21 2017-05-10 潍坊市宏源防水材料有限公司 一种橡胶止水塞及地下外墙模板对拉螺栓孔封堵止水施工方法
CN107795021A (zh) * 2016-08-30 2018-03-13 盛世安泰建筑工程(北京)有限公司 微创堵漏系统及其施工工艺
CN111535591A (zh) * 2020-05-28 2020-08-14 四川省建筑科学研究院有限公司 钻通孔植筋锚固灌胶方法
CN113737969A (zh) * 2021-09-02 2021-12-03 三维建设工程咨询有限公司 墙体对拉螺栓孔封堵方法
CN113802698A (zh) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 一种剪力墙对拉螺栓孔封堵施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264797B (zh) * 2013-06-26 2016-06-29 青岛建安建设集团有限公司 建筑外墙采用微膨胀型化学胶粘剂的螺栓孔防渗施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993023640A1 (de) * 1992-05-13 1993-11-25 Rascor Spezialbau Gmbh Verfahren zum errichten von betonwänden unter verwendung von verspannten verschalungen sowie vorrichtung zur durchführung des verfahrens
CN102267809A (zh) * 2010-06-02 2011-12-07 中冶建筑研究总院有限公司 一种钢筋连接用高强水泥砂浆及其制备方法
CN202559540U (zh) * 2012-05-08 2012-11-28 中建六局建设发展有限公司 用于外墙对拉螺栓孔的防水封堵结构
CN202730973U (zh) * 2012-09-05 2013-02-13 中建七局第二建筑有限公司 混凝土外墙螺栓孔防渗漏结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993023640A1 (de) * 1992-05-13 1993-11-25 Rascor Spezialbau Gmbh Verfahren zum errichten von betonwänden unter verwendung von verspannten verschalungen sowie vorrichtung zur durchführung des verfahrens
CN102267809A (zh) * 2010-06-02 2011-12-07 中冶建筑研究总院有限公司 一种钢筋连接用高强水泥砂浆及其制备方法
CN202559540U (zh) * 2012-05-08 2012-11-28 中建六局建设发展有限公司 用于外墙对拉螺栓孔的防水封堵结构
CN202730973U (zh) * 2012-09-05 2013-02-13 中建七局第二建筑有限公司 混凝土外墙螺栓孔防渗漏结构

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179258A (zh) * 2013-06-26 2014-12-03 青岛建安建设集团有限公司 螺栓孔防渗施工方法
CN103541439A (zh) * 2013-09-24 2014-01-29 宝鸡市第一建筑工程有限责任公司 一种混凝土剪力墙对拉螺栓孔的填塞方法
CN103711205A (zh) * 2014-01-13 2014-04-09 任斌向 一种墙体对拉螺栓孔洞防水封堵构造及施工方法
CN107795021A (zh) * 2016-08-30 2018-03-13 盛世安泰建筑工程(北京)有限公司 微创堵漏系统及其施工工艺
CN106639313A (zh) * 2017-02-21 2017-05-10 潍坊市宏源防水材料有限公司 一种橡胶止水塞及地下外墙模板对拉螺栓孔封堵止水施工方法
CN106639313B (zh) * 2017-02-21 2019-08-27 宏源防水科技集团有限公司 一种橡胶止水塞及地下外墙模板对拉螺栓孔封堵止水施工方法
CN111535591A (zh) * 2020-05-28 2020-08-14 四川省建筑科学研究院有限公司 钻通孔植筋锚固灌胶方法
CN113802698A (zh) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 一种剪力墙对拉螺栓孔封堵施工方法
CN113737969A (zh) * 2021-09-02 2021-12-03 三维建设工程咨询有限公司 墙体对拉螺栓孔封堵方法

Also Published As

Publication number Publication date
CN103334501B (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
CN103334501B (zh) 一种建筑外墙螺栓孔防渗施工方法
CN109838065B (zh) 一种地砖地面铺贴施工方法
CN103266767A (zh) 混凝土结构与填充墙间裂缝防治施工工法
CN103470067B (zh) 一种用于既有建筑外墙的清水混凝土饰面改造施工方法
CN106150001B (zh) 一种预制装配整体式楼梯施工方法
CN105464396B (zh) 一种历史保护建筑外墙加固方法
CN107724704A (zh) 地坪空鼓开裂的修复施工方法
CN202559540U (zh) 用于外墙对拉螺栓孔的防水封堵结构
CN105064579B (zh) 一种保证卫生间止水坎台浇筑成型的施工方法
CN103938758A (zh) 一种清水混凝土凹凸木纹装饰墙体的制作方法
CN109056843A (zh) 一种fs101、fs102地下刚性复合防水施工方法
CN102400525A (zh) 蒸压加气砼砌块墙体薄层抹灰方法
CN104179258B (zh) 建筑外墙剪力墙螺栓孔防渗施工方法
CN109488037A (zh) 一种民宅快速翻建的环保施工方法
CN104264797B (zh) 建筑外墙采用微膨胀型化学胶粘剂的螺栓孔防渗施工方法
CN110735493B (zh) 一种平屋面防渗漏的复合防水方法
CN204826468U (zh) 一种环保型室外台阶
CN106337566A (zh) 水泥预制构件孔洞高强度修补方法
CN103741651A (zh) 一种混凝土齿槽消力池及其施工方法
CN106677550A (zh) 外墙裂缝维修方法
CN103243801A (zh) 一种检查井修复方法
CN104452813B (zh) 一种地下厂房闸门井防浸水方法
CN209211892U (zh) 一种可用于悬挑工字钢结构洞口成型的简易工具
CN102322146A (zh) 剪力墙结构连梁施工缝的处理方法
CN104211440B (zh) 一种露骨料混凝土的制备方法及其使用的露骨料水洗剂

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: QINGDAO EAST ASIA BUILDING DECORATION CO., LTD.

Effective date: 20140326

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140326

Address after: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant after: Qingdao Jianan Construction Group Co., Ltd.

Address before: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant before: Qingdao Jianan Construction Group Co., Ltd.

Applicant before: Qingdao Dongya Construction Decoration Co., Ltd.

ASS Succession or assignment of patent right

Owner name: QINGDAO DONGYA DECORATION CO., LTD.

Free format text: FORMER OWNER: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Effective date: 20140416

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266071 QINGDAO, SHANDONG PROVINCE TO: 266012 QINGDAO, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140416

Address after: 266012 Shandong province Qingdao City, Liaoning Road No. 228

Applicant after: QINGDAO DONGYA DECORATION CO., LTD.

Address before: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant before: Qingdao Jianan Construction Group Co., Ltd.

ASS Succession or assignment of patent right

Owner name: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: QINGDAO DONGYA DECORATION CO., LTD.

Effective date: 20140901

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266012 QINGDAO, SHANDONG PROVINCE TO: 266000 QINGDAO, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140901

Address after: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant after: Qingdao Jianan Construction Group Co., Ltd.

Address before: 266012 Shandong province Qingdao City, Liaoning Road No. 228

Applicant before: QINGDAO DONGYA DECORATION CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QINGDAO DONGYA DECORATION CO., LTD.

Free format text: FORMER OWNER: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Effective date: 20141103

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266000 QINGDAO, SHANDONG PROVINCE TO: 266071 QINGDAO, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141103

Address after: 266071 Shandong province Qingdao City, Liaoning Road No. 228

Patentee after: QINGDAO DONGYA DECORATION CO., LTD.

Address before: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Patentee before: Qingdao Jianan Construction Group Co., Ltd.

ASS Succession or assignment of patent right

Owner name: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: QINGDAO DONGYA DECORATION CO., LTD.

Effective date: 20150717

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150717

Address after: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building 26

Patentee after: Qingdao Jianan Construction Group Co., Ltd.

Address before: 266071 Shandong province Qingdao City, Liaoning Road No. 228

Patentee before: QINGDAO DONGYA DECORATION CO., LTD.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Peng Renya

Inventor after: Jiang Wei

Inventor before: Li Zhaolong

Inventor before: Chen Chao

Inventor before: Jia Yang

Inventor before: Ge Shoufeng

Inventor before: Yin Dapeng

TR01 Transfer of patent right

Effective date of registration: 20170502

Address after: Futian District Binhe Road in Shenzhen city of Guangdong province 518026 No. 3099 Hong Kong Ming district a three storey

Patentee after: Shenzhen intercontinental architectural decoration Group Co., Ltd.

Address before: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building 26

Patentee before: Qingdao Jianan Construction Group Co., Ltd.

TR01 Transfer of patent right