CN103334402A - 针对非开挖港池航道的泥沙淤积预报方法 - Google Patents

针对非开挖港池航道的泥沙淤积预报方法 Download PDF

Info

Publication number
CN103334402A
CN103334402A CN2013102924033A CN201310292403A CN103334402A CN 103334402 A CN103334402 A CN 103334402A CN 2013102924033 A CN2013102924033 A CN 2013102924033A CN 201310292403 A CN201310292403 A CN 201310292403A CN 103334402 A CN103334402 A CN 103334402A
Authority
CN
China
Prior art keywords
silt
alluvial
unit
basin
water body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102924033A
Other languages
English (en)
Inventor
张磊
徐啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN2013102924033A priority Critical patent/CN103334402A/zh
Publication of CN103334402A publication Critical patent/CN103334402A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及一种针对非开挖港池航道的泥沙淤积预报方法,包括:采集目标非开挖港池航道的环境参数,环境参数包括水体含沙量S、泥沙中值粒径d50、港池航道建设前水体平均流速V1、港池航道建设后水体平均流速V2;根据泥沙中值粒径d50计算淤积体的干容重γ0、泥沙沉速ω;计算淤积量PB;所得PB值即为在预定淤积时间t内的预报结果。本发明可更好地适用于非开挖港池航道的泥沙淤积预报,预报结果合理可靠,可对港口场地选择、航道选线及港口航道持续运行成本测算起到指导作用。

Description

针对非开挖港池航道的泥沙淤积预报方法
技术领域
本发明涉及一种泥沙淤积预报方法,尤其是一种针对非开挖港池航道的泥沙淤积预报方法,属于港口航道泥沙工程领域。
背景技术
据申请人所知,近十年来我国港口建设发展正值高峰期,而港口航道泥沙问题是关系到港口场地选择、航道选线及港口航道持续运行成本的关键问题,这就对港口、航道泥沙工程研究提出了新的挑战。
针对泥沙淤积程度进行预报可以对泥沙淤积的严重性进行衡量,但是目前的预报方法均是针对开挖的港池航道,尚未出现专门针对非开挖港池航道的泥沙淤积预报方法。
针对开挖港池航道的预报方法有多种,如刘家驹[1]、罗肇森[2]、李旺生[3]、曹祖德[4]、乐培九[5]的研究文献,徐啸[6]把这类预报方法归入p=kaf(h1/h2)ωC1的形式,即其回淤率为相对开挖水深的函数。这类预报方法比较简单,各参数容易确定,已得到实践检验。然而,这类预报方法对非开挖港池航道情况适用性不强,亟需研发出适宜的预报方法。
发明内容
本发明所要解决的技术问题是:克服现有技术存在的问题,提供一种针对非开挖港池航道的泥沙淤积预报方法,构思巧妙,步骤简单,能有效实现预报。
本发明的主要技术构思如下:申请人经深入实践研究,充分利用泥沙沉积的力学机理,以流速变化为引起泥沙淤积的核心指标,再结合对大量案例的分析,终于得出适用于非开挖港池航道的泥沙淤积预报方法。
本发明解决其技术问题的技术方案如下:
一种针对非开挖港池航道的泥沙淤积预报方法,其特征是,包括以下步骤:
第一步、采集目标非开挖港池航道的环境参数,所述环境参数包括水体含沙量S、泥沙中值粒径d50、港池航道建设前水体平均流速V1、港池航道建设后水体平均流速V2
第二步、根据泥沙中值粒径d50计算淤积体的干容重γ0、泥沙沉速ω;
第三步、按下式计算淤积量PB
P B = K Sωt γ 0 ( V 1 V 2 - 1 ) ,
K为常数,t为预定淤积时间;
所得PB值即为在预定淤积时间t内的预报结果。
本发明进一步完善的技术方案如下:
优选地,第二步中,按下式计算淤积体的干容重γ0、泥沙沉速ω:
γ0=1750d50 0.183
Figure BDA00003502772500022
其中,γs为泥沙的容重,γ为水的容重,g为重力加速度,υ为水的运动粘性系数。
优选地,第一步中,水体含沙量S的单位为千克/立方米,泥沙中值粒径d50的单位为毫米,港池航道建设前水体平均流速V1和港池航道建设后水体平均流速V2单位相同;
第二步中,淤积体的干容重γ0单位为千克/立方米,泥沙沉速ω单位为米/秒,泥沙的容重γs和水的容重γ单位相同,重力加速度g单位为米/平方秒,水的运动粘性系数υ单位为平方毫米/秒;
第三步中,预定淤积时间t单位为秒;淤积量PB的单位为米。
优选地,第二步中,
Figure BDA00003502772500023
重力加速度g=9.8,水的运动粘性系数υ=1.003。
优选地,第三步中,常数K=0.086,预定淤积时间t=31536000。
与现有技术相比,本发明可更好地适用于非开挖港池航道的泥沙淤积预报,预报结果合理可靠,可对港口场地选择、航道选线及港口航道持续运行成本测算起到指导作用。
附图说明
图1为本发明实施例1码头附近泥沙淤积剖面图。
图2为图1实施例二期码头建成后,码头附近全潮平均流速(m/s)分布。
具体实施方式
下面参照附图并结合实施例对本发明作进一步详细描述。但是本发明不限于所给出的例子。
实施例1
本实施例针对非开挖港池航道的泥沙淤积预报方法,包括以下步骤:
第一步、采集目标非开挖港池航道的环境参数,环境参数包括水体含沙量S、泥沙中值粒径d50、港池航道建设前水体平均流速V1、港池航道建设后水体平均流速V2
水体含沙量S的单位为千克/立方米,泥沙中值粒径d50的单位为毫米,港池航道建设前水体平均流速V1和港池航道建设后水体平均流速V2单位相同。
其中,水体含沙量S、泥沙中值粒径d50是通过水文测验分析获得的;港池航道建设前水体平均流速V1、港池航道建设后水体平均流速V2是根据现有模型进行计算或试验获得的。
第二步、根据泥沙中值粒径d50计算淤积体的干容重γ0、泥沙沉速ω;按下式计算淤积体的干容重γ0、泥沙沉速ω:
γ0=1750d50 0.183
Figure BDA00003502772500031
其中,γs为泥沙的容重,γ为水的容重,g为重力加速度,υ为水的运动粘性系数。
淤积体的干容重γ0单位为千克/立方米,泥沙沉速ω单位为米/秒,泥沙的容重γs和水的容重γ单位相同,重力加速度g单位为米/平方秒,水的运动粘性系数υ单位为平方毫米/秒。
Figure BDA00003502772500041
重力加速度g=9.8,水的运动粘性系数υ=1.003。
第三步、按下式计算淤积量PB
P B = K Sωt γ 0 ( V 1 V 2 - 1 ) ,
K为常数,t为预定淤积时间;
所得PB值即为在预定淤积时间t内的预报结果。
预定淤积时间t单位为秒;淤积量PB的单位为米。
常数K=0.086,预定淤积时间t=31536000。
具体实验案例:
华能福州电厂煤码头位于福建省福州市长乐市筹东村的东北侧,闽江南岸青洲大桥下游。该河段为感潮河段,潮汐调和常数为0.24,规则半日潮,每日两涨两落,平均潮差3.80m。水文测验表明该河段水流强劲,潮流作用占优势。
一期煤码头1988年建成使用,二期煤码头是1997年开始建设,1999年建成使用。煤码头建成后附近水域为淤积状态,码头某断面淤积情况见图1,码头建设后全潮平均流速见图2。
经水文测验悬沙和底质资料对比表明煤码头附近水域主要为悬沙淤积物。
首先,通过水文测验分析获得环境参数:水体含沙量S为0.130kg/m3,泥沙中值粒径d50为0.063mm。通过模型计算得,码头建设前水体平均流速V1为0.55m/s,码头建设后水体平均流速V2为0.25m/s。
其次,根据泥沙中值粒径d50计算淤积体的干容重γ0、泥沙沉速ω:
γ0=1750d50 0.183=1750×(0.063)0.183
ω = 1 24 γ s - γ γ g d 50 2 v = 1 24 × 1.65 × 9.8 × 0.063 2 1.003 ;
最后,计算PB
P B = K Sωt γ 0 ( V 1 V 2 - 1 ) = 0.086 × 0.130 × ω × 31536000 γ 0 ( 0.55 0.25 - 1 ) = 1.069 m .
即预报结果为:在1年内该码头的淤积量为1.069m。
验证:经水文测验,该码头正常使用期间,年淤厚为1.00m。
本实施例预报方法所得预报值与实际值非常接近,相对误差为6.9%(小于10%),预报准确度很高。
除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。
参考文献
[1]刘家驹,连云港外航道的回淤计算及预报[M],连云港回淤研究论文集,1990。
[2]罗肇森,河口航道开挖后的回淤计算,南京水利科学研究院。
[3]李旺生,航道开挖后的泥沙回淤预报计算方法,天津水利工程科学研究院。
[4]曹祖德,泥质海港防沙堤全理长度的确定[M],第七届全国海岸工程学术讨论论文集。
[5]乐培九,河口海湾地区航道挖槽回淤的估算方法[J],水道港口,1993(3)。
[6]徐啸,近海航道回淤预报[J],水利水运科学研究,1991,(1)。

Claims (5)

1.一种针对非开挖港池航道的泥沙淤积预报方法,其特征是,包括以下步骤:
第一步、采集目标非开挖港池航道的环境参数,所述环境参数包括水体含沙量S、泥沙中值粒径d50、港池航道建设前水体平均流速V1、港池航道建设后水体平均流速V2
第二步、根据泥沙中值粒径d50计算淤积体的干容重γ0、泥沙沉速ω;
第三步、按下式计算淤积量PB
P B = K Sωt γ 0 ( V 1 V 2 - 1 ) ,
K为常数,t为预定淤积时间;
所得PB值即为在预定淤积时间t内的预报结果。
2.根据权利要求1所述针对非开挖港池航道的泥沙淤积预报方法,其特征是,第二步中,按下式计算淤积体的干容重γ0、泥沙沉速ω:
γ0=1750d50 0.183
其中,γs为泥沙的容重,γ为水的容重,g为重力加速度,υ为水的运动粘性系数。
3.根据权利要求2所述的针对非开挖港池航道的泥沙淤积预报方法,其特征是,第一步中,水体含沙量S的单位为千克/立方米,泥沙中值粒径d50的单位为毫米,港池航道建设前水体平均流速V1和港池航道建设后水体平均流速V2单位相同;
第二步中,淤积体的干容重γ0单位为千克/立方米,泥沙沉速ω单位为米/秒,泥沙的容重γs和水的容重γ单位相同,重力加速度g单位为米/平方秒,水的运动粘性系数υ单位为平方毫米/秒;
第三步中,预定淤积时间t单位为秒;淤积量PB的单位为米。
4.根据权利要求3所述的针对非开挖港池航道的泥沙淤积预报方法,其特征是,第二步中,
Figure FDA00003502772400021
重力加速度g=9.8,水的运动粘性系数υ=1.003。
5.根据权利要求4所述的针对非开挖港池航道的泥沙淤积预报方法,其特征是,第三步中,常数K=0.086,预定淤积时间t=31536000。
CN2013102924033A 2013-07-12 2013-07-12 针对非开挖港池航道的泥沙淤积预报方法 Pending CN103334402A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102924033A CN103334402A (zh) 2013-07-12 2013-07-12 针对非开挖港池航道的泥沙淤积预报方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102924033A CN103334402A (zh) 2013-07-12 2013-07-12 针对非开挖港池航道的泥沙淤积预报方法

Publications (1)

Publication Number Publication Date
CN103334402A true CN103334402A (zh) 2013-10-02

Family

ID=49242601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102924033A Pending CN103334402A (zh) 2013-07-12 2013-07-12 针对非开挖港池航道的泥沙淤积预报方法

Country Status (1)

Country Link
CN (1) CN103334402A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774605A (zh) * 2014-01-10 2014-05-07 河海大学 一种提高环抱式港池水体交换能力的设计方法
CN106709153A (zh) * 2016-11-29 2017-05-24 中国农业大学 一种泵站前池扬沙率的确定方法
CN107145688A (zh) * 2017-06-09 2017-09-08 中交第四航务工程勘察设计院有限公司 一种海上大型沉管基床回淤多因素复合型预警预报方法
CN108629055A (zh) * 2017-03-16 2018-10-09 中交上海航道勘察设计研究院有限公司 一种基于饱和输沙原理的沙质内河航道回淤量预报方法
CN108898256A (zh) * 2018-07-04 2018-11-27 上海市水利工程设计研究院有限公司 淤泥质潮汐河口促淤工程淤积效果预报方法
CN113887033A (zh) * 2021-09-27 2022-01-04 浙江科技学院 一种感潮河段泥沙淤积预测方法
CN114674526A (zh) * 2022-03-11 2022-06-28 水利部交通运输部国家能源局南京水利科学研究院 波浪作用下细粉沙层移运动临界条件确定方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4866146B2 (ja) * 2006-05-17 2012-02-01 五洋建設株式会社 サンドリサイクルにおける粒子移動のシミュレーション方法
CN102359862A (zh) * 2011-08-12 2012-02-22 河海大学 粉沙质和淤泥质海岸泥沙运动数值模拟方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4866146B2 (ja) * 2006-05-17 2012-02-01 五洋建設株式会社 サンドリサイクルにおける粒子移動のシミュレーション方法
CN102359862A (zh) * 2011-08-12 2012-02-22 河海大学 粉沙质和淤泥质海岸泥沙运动数值模拟方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴华林等: "泥沙群体沉速计算及其应用", 《长江科学院院报》, vol. 15, no. 03, 30 June 1998 (1998-06-30), pages 24 - 27 *
张磊: "近海顺岸桩基码头水流变化及泥沙淤积计算研究", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》, no. 04, 15 April 2006 (2006-04-15), pages 53 - 54 *
高树华等: "塑料沙的起动流速与沉速的试验研究", 《泥沙研究》, no. 02, 30 June 1992 (1992-06-30), pages 69 - 75 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774605A (zh) * 2014-01-10 2014-05-07 河海大学 一种提高环抱式港池水体交换能力的设计方法
CN106709153A (zh) * 2016-11-29 2017-05-24 中国农业大学 一种泵站前池扬沙率的确定方法
CN106709153B (zh) * 2016-11-29 2019-08-09 中国农业大学 一种泵站前池扬沙率的确定方法
CN108629055A (zh) * 2017-03-16 2018-10-09 中交上海航道勘察设计研究院有限公司 一种基于饱和输沙原理的沙质内河航道回淤量预报方法
CN108629055B (zh) * 2017-03-16 2021-11-09 中交上海航道勘察设计研究院有限公司 一种基于饱和输沙原理的沙质内河航道回淤量预报方法
CN107145688A (zh) * 2017-06-09 2017-09-08 中交第四航务工程勘察设计院有限公司 一种海上大型沉管基床回淤多因素复合型预警预报方法
CN107145688B (zh) * 2017-06-09 2020-07-28 中交第四航务工程勘察设计院有限公司 一种海上大型沉管基床回淤多因素复合型预警预报方法
CN108898256A (zh) * 2018-07-04 2018-11-27 上海市水利工程设计研究院有限公司 淤泥质潮汐河口促淤工程淤积效果预报方法
CN113887033A (zh) * 2021-09-27 2022-01-04 浙江科技学院 一种感潮河段泥沙淤积预测方法
CN113887033B (zh) * 2021-09-27 2024-03-26 浙江科技学院 一种感潮河段泥沙淤积预测方法
CN114674526A (zh) * 2022-03-11 2022-06-28 水利部交通运输部国家能源局南京水利科学研究院 波浪作用下细粉沙层移运动临界条件确定方法
CN114674526B (zh) * 2022-03-11 2023-06-23 水利部交通运输部国家能源局南京水利科学研究院 波浪作用下细粉沙层移运动临界条件确定方法

Similar Documents

Publication Publication Date Title
CN103334402A (zh) 针对非开挖港池航道的泥沙淤积预报方法
Bajracharya et al. Sand erosion of Pelton turbine nozzles and buckets: A case study of Chilime Hydropower Plant
Sindelar et al. Effects of weir height and reservoir widening on sediment continuity at run-of-river hydropower plants in gravel bed rivers
Huang et al. Unexpected sedimentation patterns upstream and downstream of the Three Gorges Reservoir: Future risks
Ahmed et al. A study of the factors and processes involved in the sedimentation of Tarbela reservoir, Pakistan
MLADENOVIC et al. Sediment regime of the Danube River in Serbia
Chen et al. Dynamic hydrology and geomorphology of the Yangtze River
Zhang et al. Large-scale 3D numerical modelling of flood propagation and sediment transport and operational strategy in the Three Gorges Reservoir, China
Zhang et al. Advances in Water Resources & Hydraulic Engineering: Proceedings of 16th IAHR-APD Congress and 3rd Symposium of IAHR-ISHS
CN107816031A (zh) 利用高含沙洪水的沉积物固定流动沙丘的方法
Fukuoka et al. Advances in river sediment research
Gong et al. Sediment transport following water transfer from Yangtze River to Taihu Basin
Ma et al. Physical Modeling of Tailings Dams in China: A Review
Xie et al. Formation and evolution of the Jiuduansha Shoal over the past 50 years
Chen et al. Application of mathematical model on deposition study of pumped-storage power reservoir
Tagavifar et al. Evaluation of sedimentation and flushing by mathematical model in reservoirs of the successive Dez stream dams in Iran
Wang et al. Sediment studies and management strategies in China
Singal et al. Small Hydropower: Design and Analysis
Kos et al. Hydro-Energy suitability of rivers regarding their hydrological and hydrogeological characteristics. Water 2021, 13, 1777
Su et al. Using two‐dimensional modeling to evaluate strategies of sediment reduction and evacuation for Nanshi river under Guishan dam operations
Dou et al. Numerical simulation study on deposition downstream estuarine sluice
Tran et al. Application of Numerical Modeling for the Dyke Erosion in Trieu Do Commune on Thach Han River Basin in Vietnam
Liu et al. Numerical Study on Influence of Water Exchange for Artificial Island Group
Xiong et al. Morphological evolutions and dynamic mechanisms of Hangwei Sandspit in Pingtan, China
Zhang et al. Qingkou complex: an engineering masterpiece of the Grand Canal of China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131002