CN103331587B - Bilateral scissors upper tool post speedy erection system - Google Patents

Bilateral scissors upper tool post speedy erection system Download PDF

Info

Publication number
CN103331587B
CN103331587B CN201310153228.XA CN201310153228A CN103331587B CN 103331587 B CN103331587 B CN 103331587B CN 201310153228 A CN201310153228 A CN 201310153228A CN 103331587 B CN103331587 B CN 103331587B
Authority
CN
China
Prior art keywords
connecting rod
tool post
upper tool
knife rest
hang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310153228.XA
Other languages
Chinese (zh)
Other versions
CN103331587A (en
Inventor
邓顺文
向鑫
芦涛
秦保仁
潘新梁
董清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201310153228.XA priority Critical patent/CN103331587B/en
Publication of CN103331587A publication Critical patent/CN103331587A/en
Application granted granted Critical
Publication of CN103331587B publication Critical patent/CN103331587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to bilateral scissors assembly method.A kind of bilateral scissors upper tool post speedy erection system, it comprises: exit cutting edge; Remove bilateral scissors panel connecting bolt and relevant oil pipe thereof; Remove balancing cylinder and base; Hang panel, utilize the big nut of F shape to revolve and get bar dismounting upper tool post big nut; Remove connecting rod both sides gland; With bearing rib, two connecting rods are positioned welding; Hold with two 3T cucurbits and hang connecting rod, driving hangs 2 5T cucurbits, connect knife rest and bear its weight, the good connecting rod working plate of frame, be screwed into bolt, load onto top at knife rest lead to the hole site and get device, directly over carriage saddle, set up a 50T hydraulic jack, start simultaneously operating, knife rest and connecting rod are spun off in the lump and hang; Upper tool post is overhauled; Returning of upper tool post fills; Return load bar side pressure lid, oil pipe, panel and big nut; Restore balance oil cylinder fasten panels bolt, returns dress cutting edge.The present invention shortens construction period, and security also improves greatly.

Description

Bilateral scissors upper tool post speedy erection system
Technical field
The present invention relates to bilateral scissors, particularly relate to the knife rest assembly method of bilateral scissors.
Background technology
When current smelter Wide and Thick Slab bilateral scissors upper tool post assembles, conventional method adopts removes bilateral scissors panel and upper tool post connecting rod two ends gland, then 2 10T screw jack (also needing 1 for subsequent use to adjust position at any time) are set up at two connecting rod places, above in knife rest and 2 draw rod positions set up the hydraulic jack (also needing 1 use adjusting and change top for subsequent use) of 1 50T respectively, then jacking disengaging is carried out to upper tool post simultaneously.And when installing, by the bilateral scissors of opposite side as support, upper tool post carries out heading into recovery by erection hydraulic top.Mainly there is four problems: 1, working space is narrow and small, the erection of the jack of rest position is very difficult, and only enough a people leans to one side frame top; 2, in knife rest detach procedure, because the stroke of top is limited, needs to set up cushion block frequently, construct very inconvenient; 3, construction needs institute's jack quantity more, and required manpower is also more; When 4, installing, because by the bilateral scissors of opposite side as support, easily cause damage to equipment.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and provides a kind of bilateral scissors upper tool post speedy erection system.The present invention shortens construction period, and save manpower, guarantee construction quality, security also improves greatly.
For solving the problem, a kind of bilateral scissors upper tool post of the present invention speedy erection system, it comprises:
Step one, exit cutting edge;
Step 2, tripartite confirm, have a power failure, stop pressure, list;
Step 3, dismounting bilateral scissors panel connecting bolt and relevant oil pipe thereof;
Step 4, dismounting balancing cylinder and base, note carrying out dust prevention to each oil pipe;
Step 5, hang panel, utilize the big nut of F shape to revolve to get bar and remove upper tool post big nut;
Step 6, dismounting connecting rod both sides gland, note carrying out mark, to return dress;
Step 7, with bearing rib, two connecting rods are positioned welding, to go back to the correct location that dress imports;
Step 8, to hold with two 3T cucurbits and hang connecting rod, driving hangs 2 5T cucurbits, connect knife rest and bear its weight, the good connecting rod working plate of frame, be screwed into bolt, load onto top at knife rest lead to the hole site and get device, directly over carriage saddle, set up a 50T hydraulic jack, start simultaneously operating, knife rest and connecting rod are spun off in the lump and hang; It is that a upper side edge band is fluted that device is got on described top, and center is provided with the screw being screwed into nut;
Step 9, upper tool post to be overhauled;
The dress that returns of step 10, upper tool post recovers, when connecting rod and the correct contraposition of carriage saddle and after importing 10mm, at the added good special tooling plate of connecting rod, carriage saddle pull bar is screwed into the sleeve lead screw device of one end with screwed hole of centre plate, then utilize screw mandrel by its synchronous evenly press-in, note keeping measuring in the work progress moment, prevent uneven stuck of process; Described sleeve lead screw device is the sleeve pipe of one end cover closure, and cover plate central has screwed hole;
Step 11, time load bar side pressure lid, oil pipe, panel and big nut, time dress of end cap must coat flat sealant, and each oil connection must be cleaned out and check whether sealing is intact, adopts the tight method in diagonal angle to carry out during tight screw;
Step 12, restore balance oil cylinder fasten panels bolt, returns dress cutting edge;
Step 13, tripartite confirm, delisted, power transmission, send pressure, test run.
General thought of the present invention is design connecting rod special tooling plate, the screw on connecting rod and main eccentric shaft is utilized to pull, replace the use of screw jack, make top at knife rest lead to the hole site and get device, to replace 2 hydraulic jack near draw rod positions, during the dismounting of upper tool post, only need to utilize long jackscrew to carry out pushing up just can completing from operation simultaneously; And when returning dress, then design and produce a sleeve jackscrew, utilize the tension screw mandrel screw of knife rest to load onto sleeve screw mandrel and carry out frock operation.The dismounting operation of traditional handicraft only upper tool post at least needs 32 hours, and adopts the method only to need to complete for 16 hours; Traditional handicraft needs frequent adjustment jacking stroke, and set up cushion block, the labour intensity of workmen is larger; In the assembling process of traditional handicraft upper tool post, easily cause that to pull top dress speed irregular and produce inclination screens and to do over again event, and after adopting the method, the process of pulling can control more intuitively.Construction period shortens greatly compared with conventional method, and save a large amount of manpowers, ensure that construction quality, security also improves greatly.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is described special connecting rod working plate schematic diagram;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is that device schematic diagram is got on described top;
Fig. 4 is the left view of described Fig. 3;
Fig. 5 is described sleeve screw mandrel schematic diagram;
Fig. 6 is that described big nut revolves and gets bar.
Detailed description of the invention
Refer to Fig. 1-Fig. 6, a kind of bilateral scissors upper tool post speedy erection system, comprises the steps:
Step one, exit cutting edge.
Step 2, tripartite confirm, have a power failure, stop pressure, list.
Step 3, dismounting bilateral scissors panel connecting bolt and relevant oil pipe thereof.
Step 4, dismounting balancing cylinder and base, note carrying out dust prevention to each oil pipe.
Step 5, hang panel, utilize homemade big nut to revolve and get bar 4(as Fig. 6) remove upper tool post big nut.
Step 6, dismounting connecting rod both sides gland, note carrying out mark, to return dress.
Step 7, with bearing rib, two connecting rods are positioned welding, to go back to the correct location that dress imports.
Step 8, to hold with two 3T cucurbits and hang connecting rod, driving hangs 2 5T cucurbits, connect knife rest and bear its weight, frame good connecting rod special tooling plate 1(is as Fig. 1 and Fig. 2), be screwed into bolt, load onto top at knife rest lead to the hole site and get device 2(as Fig. 3 and Fig. 4), directly over carriage saddle, set up a 50T hydraulic jack, start simultaneously operating, knife rest and connecting rod are spun off in the lump and hang.
Step 9, upper tool post to be overhauled.
The dress that returns of step 10, upper tool post recovers, when connecting rod and the correct contraposition of carriage saddle and after importing 10mm, at the added good special connecting rod working plate of connecting rod, carriage saddle pull bar is screwed into sleeve lead screw device 3(as Fig. 5), then utilize screw mandrel by its synchronous evenly press-in, note keeping measuring in the work progress moment, prevent uneven stuck of process.
Step 11, time load bar side pressure lid (noting checking whether sealing is intact), oil pipe, panel and big nut, time dress of end cap must coat flat sealant, and each oil connection must be cleaned out and check whether sealing is intact, adopts the tight method in diagonal angle to carry out during tight screw.
Step 12, restore balance oil cylinder fasten panels bolt, returns dress cutting edge.
Step 13, tripartite confirm, delisted, power transmission, send pressure, test run.

Claims (1)

1. a bilateral scissors upper tool post speedy erection system, is characterized in that; It comprises:
Step one, exit cutting edge;
Step 2, tripartite confirm, have a power failure, stop pressure, list;
Step 3, dismounting bilateral scissors panel connecting bolt and relevant oil pipe thereof;
Step 4, dismounting balancing cylinder and base, note carrying out dust prevention to each oil pipe;
Step 5, hang panel, utilize the big nut of F shape to revolve to get bar and remove upper tool post big nut;
Step 6, dismounting connecting rod both sides gland, note carrying out mark, to return dress;
Step 7, with bearing rib, two connecting rods are positioned welding, to go back to the correct location that dress imports;
Step 8, to hold with two 3T cucurbits and hang connecting rod, driving hangs 2 5T cucurbits, connect knife rest and bear its weight, the good special connecting rod working plate of frame, be screwed into bolt, load onto top at knife rest lead to the hole site and get device, directly over carriage saddle, set up a 50T hydraulic jack, start simultaneously operating, knife rest and connecting rod are spun off in the lump and hang; It is that a upper side edge band is fluted that device is got on described top, and center is provided with the rectangular slab of the screw being screwed into nut;
Step 9, upper tool post to be overhauled;
Returning of step 10, upper tool post fills, when connecting rod and the correct contraposition of carriage saddle and after importing 10mm, at the added good special tooling plate of connecting rod, carriage saddle pull bar is screwed into the sleeve lead screw device of one end with screwed hole of centre plate, then utilize screw mandrel by its synchronous evenly press-in, note keeping measuring in the work progress moment, prevent uneven stuck of process; Described sleeve lead screw device is the sleeve pipe of one end cover closure, and cover plate central has screwed hole;
Step 11, time load bar side pressure lid, oil pipe, panel and big nut, time dress of end cap must coat flat sealant, and each oil connection must be cleaned out and check whether sealing is intact, adopts the tight method in diagonal angle to carry out during tight screw;
Step 12, restore balance oil cylinder fasten panels bolt, returns dress cutting edge;
Step 13, tripartite confirm, delisted, power transmission, send pressure, test run.
CN201310153228.XA 2013-04-28 2013-04-28 Bilateral scissors upper tool post speedy erection system Active CN103331587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310153228.XA CN103331587B (en) 2013-04-28 2013-04-28 Bilateral scissors upper tool post speedy erection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310153228.XA CN103331587B (en) 2013-04-28 2013-04-28 Bilateral scissors upper tool post speedy erection system

Publications (2)

Publication Number Publication Date
CN103331587A CN103331587A (en) 2013-10-02
CN103331587B true CN103331587B (en) 2016-01-20

Family

ID=49239827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310153228.XA Active CN103331587B (en) 2013-04-28 2013-04-28 Bilateral scissors upper tool post speedy erection system

Country Status (1)

Country Link
CN (1) CN103331587B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111036979B (en) * 2018-10-12 2021-04-27 中冶宝钢技术服务有限公司 Bilateral scissors front plate and knife rest mounting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2126938A (en) * 1982-09-13 1984-04-04 Labounty Roy E Metal demolition shear
CN2372083Y (en) * 1999-05-07 2000-04-05 中国第二重型机械集团公司 Three-axle transmission generating cutting type double side shearing machine
CN1683729A (en) * 2004-11-16 2005-10-19 兰州理工大学 Sleeve type lifting device for stage
CN201046512Y (en) * 2007-05-10 2008-04-16 西峡龙成特种材料有限公司 Hydraulic type double-side shears
CN101708605A (en) * 2009-11-16 2010-05-19 中南大学 Platform for disassembling and assembling disc hob

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2126938A (en) * 1982-09-13 1984-04-04 Labounty Roy E Metal demolition shear
CN2372083Y (en) * 1999-05-07 2000-04-05 中国第二重型机械集团公司 Three-axle transmission generating cutting type double side shearing machine
CN1683729A (en) * 2004-11-16 2005-10-19 兰州理工大学 Sleeve type lifting device for stage
CN201046512Y (en) * 2007-05-10 2008-04-16 西峡龙成特种材料有限公司 Hydraulic type double-side shears
CN101708605A (en) * 2009-11-16 2010-05-19 中南大学 Platform for disassembling and assembling disc hob

Also Published As

Publication number Publication date
CN103331587A (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN109202411B (en) Hydraulic cylinder copper bush replacing process of quick forging equipment
CN103331587B (en) Bilateral scissors upper tool post speedy erection system
CN103521527B (en) A kind of balance cylinder of back-up roller of heavy plate mill changes device and method
CN202318280U (en) Rotating device for container maintenance tools
CN202780427U (en) Flywheel detaching device
CN206516986U (en) A kind of adjustable electric power overhaul frame based on lever principle
CN202622316U (en) Disassembling and assembling platform for cylinder pistons
CN205996881U (en) Coal mining machine roller seat extracting tool
CN205151660U (en) Automatic jacking device of quick -witted maintenance of conical rollers down of ring of passing through many hands or places
CN205420794U (en) Simple and easy stamp dyeing compaction device
CN101776033B (en) Hydraulic dismounting device for vertical-shaft pelton turbine rotating wheel
CN202278539U (en) Piston disassembling device
CN102678140B (en) Rotation device of hydraulic support retraction machine
CN202864797U (en) Portable assembly and disassembly frame
CN202045485U (en) Special detaching tool for reinflation cylinder supports inside rotor center parts
CN206536430U (en) Fit up material bearing device
CN205869919U (en) A device for dismantling or installation aluminium foil mill injection crossbeam
CN203259548U (en) Special bracket for online monitoring instrument of 110kV arrester
CN104511876A (en) Dismounting device for parts on shaft
CN203639049U (en) Concrete T beam hydraulic demoulding device
CN203879520U (en) Device used for disassembling or assembling hydraulic support stand column guide sleeve underground
CN203409716U (en) Roller bearing fast dismounting and mounting tool for mine
CN203097797U (en) Oil field down-hole tool test well-head equipment
CN103551796A (en) Roller bed bearing fast replacement method
CN210414391U (en) Hydroelectric set guide bearing oil groove bottom plate dismouting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant