CN103322827A - 机力通风空气冷却凝汽器 - Google Patents

机力通风空气冷却凝汽器 Download PDF

Info

Publication number
CN103322827A
CN103322827A CN2013102572551A CN201310257255A CN103322827A CN 103322827 A CN103322827 A CN 103322827A CN 2013102572551 A CN2013102572551 A CN 2013102572551A CN 201310257255 A CN201310257255 A CN 201310257255A CN 103322827 A CN103322827 A CN 103322827A
Authority
CN
China
Prior art keywords
tube bank
air cooling
cooling condenser
tube
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102572551A
Other languages
English (en)
Inventor
薛海君
江瀚
汪建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuangliang Eco Energy Systems Co Ltd
Original Assignee
Shuangliang Eco Energy Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuangliang Eco Energy Systems Co Ltd filed Critical Shuangliang Eco Energy Systems Co Ltd
Priority to CN2013102572551A priority Critical patent/CN103322827A/zh
Publication of CN103322827A publication Critical patent/CN103322827A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Details Of Heat-Exchange And Heat-Transfer (AREA)

Abstract

本发明涉及一种机力通风空气冷却凝汽器,用于冷凝汽轮机所排出的低压蒸汽。它包括蒸汽分配管(3)、管束(2)、凝水联箱(1)、风机(4)、框架(5)和密封墙(6),管束(2)以垂直形式布置,管束(2)内蒸汽和水的流动方向为铅垂方向,多片管束(2)以“一”字形排列在框架(5)的侧面,框架(5)为矩形或近似矩形,密封墙(6)位于框架(5)未布置管束(2)的侧面,在管束(2)顶部水平方向布置蒸汽分配管(3),管束(2)底部连接凝水联箱(1),风机(4)安装在框架(5)的上方,风机(4)以吸风方式使空气通过管束(2)形成强制对流。该发明的优点是:管束的支撑结构简单,可节省支撑结构的成本;风机由鼓风式改为吸风式后,通过管束的空气流速更均匀,换热效率较高。

Description

机力通风空气冷却凝汽器
技术领域
本发明涉及一种空气冷却凝汽器,主要与火力发电或其它行业的汽轮机配套使用,用于冷凝汽轮机所排出的低压蒸汽。
背景技术
凝汽器的作用是将在汽轮机内部做功后排出的低压蒸汽冷凝成水,以实现将蒸汽冷凝成水返回锅炉循环使用的目的。空气冷却凝汽器管束内走蒸汽和凝结水,管束外走用于冷却的空气,由空气与蒸汽进行热交换把热量带走。与传统的水冷却凝汽器相比,空气冷却凝汽器节水效果显著,近几年在国内火力发电和煤化工行业得到了越来越广泛地应用。目前常见的机力通风空气冷却凝汽器的结构形式是这样的:管束以“屋顶”形(或称为“A”形)布置在十几米甚至数十米高的平台上,管束倾斜安装,与水平方向形成近60°的夹角,管束下面布置轴流风机,通过风机鼓风进行强制对流换热。
这种空气冷却凝汽器的不足是:
1)由于支撑平台高,平台上设备荷载、风荷载和地震荷载都很大,支撑结构复杂而且成本较高;
2)凝汽器管束外用于换热的空气流动属于鼓风的形式,空气通过管束的流动速度不均匀,换热效率较低。
发明内容
本发明的目的在于克服上述机力通风空气冷却凝汽器的不足,提供一种成本低、换热效率高的机力通风空气冷却凝汽器。
本发明的目的是这样实现的:一种机力通风空气冷却凝汽器,包括蒸汽分配管、管束、凝水联箱、风机、框架和密封墙,其特征在于:管束以垂直形式布置,管束内蒸汽和水的流动方向为铅垂方向,多片管束以“一”字形排列在框架的侧面,框架为矩形或近似矩形,密封墙位于框架未布置管束的侧面,在管束顶部水平方向布置蒸汽分配管,管束底部连接凝水联箱,风机安装在框架的上方,风机以吸风方式使空气通过管束形成强制对流。
本发明机力通风空气冷却凝汽器,有一个或者更多的风机组合在一起。
本发明机力通风空气冷却凝汽器,在框架四个侧面中的一个侧面布置管束,或者在其中两个侧面布置管束。
本发明取得的主要有益效果是:
1)管束可以直接支撑在地面或基础上,降低了安装高度,支撑结构简单,节省了支撑结构的成本;
2)吸风式的空气强制对流方式,使通过管束的空气流动速度更均匀,换热效率有所提高。
附图说明
图1为本发明机力通风空气冷却凝汽器实施例1的立向视图。
图2为本发明实施例1的管束布置俯向视图(去除蒸汽分配管和凝水联箱)。
图3 为本发明实施例2的管束布置示意图。
图4为本发明实施例3的管束布置示意图。
图中附图标记:
凝水联箱1、管束2、蒸汽分配管3、风机4、框架5、密封墙6。
具体实施方式
实施例1:
参见图1和图2,图1是实施例1立向视图,图2为本发明实施例1的管束布置俯向视图(去除蒸汽分配管3和凝水联箱1)。实施例1一种机力通风空气冷却凝汽器,由蒸汽分配管3、管束2、凝水联箱1、风机4、框架5和密封墙6组成,管束2以“一”字形垂直布置在矩形框架5的两个侧面,蒸汽分配管3设置在管束2的顶部,凝水联箱1设置在管束2的底部,风机4设置在框架5的上方。图2表示的是管束2在框架5两个侧面布置的形式,其中每个侧面布置三片管束2、一根蒸汽分配管3和一根凝水联箱1;框架5的另两个未布置管束的侧面设置密封墙6。本实施例1仅包括了一台风机4,六片管束2。
工作时,蒸汽分配管3将低压蒸汽导入管束2内,管束2内蒸汽和水的流动方向为铅垂方向(向下或向上),风机4以吸风的形式使空气通过管束2形成对流换热,蒸汽在管束2内冷凝为水后流入凝水联箱1。
实施例2:
参见图3(管束2布置的俯向视图)。实施例2共有三台风机,框架5两侧面外部布置管束2。多台风机与各台风机所对应的管束2和框架5组合成一列,联接为一体,形成了多台风机组合的一种形式。实施例2除风机、框架和管束的数量外,其它与实施例1相同。
实施例3:
图4为实施例3的管束2布置图。本实施例3与实施例1和实施例2不同之处是,共有六台风机,框架5仅有一个侧面布置管束2,其余侧面布置密封墙6。实施例3是多台风机的另一种组合形式。

Claims (3)

1.一种机力通风空气冷却凝汽器,包括蒸汽分配管(3)、管束(2)、凝水联箱(1)、风机(4)、框架(5)和密封墙(6),其特征在于:管束(2)以垂直形式布置,管束(2)内蒸汽和水的流动方向为铅垂方向,多片管束(2)以“一”字形排列在框架(5)的侧面,框架(5)为矩形或近似矩形,密封墙(6)位于框架(5)未布置管束(2)的侧面,在管束(2)顶部水平方向布置蒸汽分配管(3),管束(2)底部连接凝水联箱(1),风机(4)安装在框架(5)的上方,风机(4)以吸风方式使空气通过管束(2)形成强制对流。
2.根据权利要求1所述的一种机力通风空气冷却凝汽器,其特征在于:有一个或者更多的风机(4)组合在一起。
3.根据权利要求1所述的一种机力通风空气冷却凝汽器,其特征在于:在框架(5)四个侧面中的一个侧面布置管束(2),或者在其中两个侧面布置管束(2)。
CN2013102572551A 2013-06-26 2013-06-26 机力通风空气冷却凝汽器 Pending CN103322827A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102572551A CN103322827A (zh) 2013-06-26 2013-06-26 机力通风空气冷却凝汽器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102572551A CN103322827A (zh) 2013-06-26 2013-06-26 机力通风空气冷却凝汽器

Publications (1)

Publication Number Publication Date
CN103322827A true CN103322827A (zh) 2013-09-25

Family

ID=49191736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102572551A Pending CN103322827A (zh) 2013-06-26 2013-06-26 机力通风空气冷却凝汽器

Country Status (1)

Country Link
CN (1) CN103322827A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104841238A (zh) * 2015-05-06 2015-08-19 双良节能系统股份有限公司 含湿废气消雾排放装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1847765A (zh) * 2005-04-04 2006-10-18 Spx冷却技术有限公司 气冷式冷凝器
CN201348447Y (zh) * 2009-01-08 2009-11-18 江苏双良空调设备股份有限公司 防止冻结的直接空冷凝汽器
WO2010005882A1 (en) * 2008-07-10 2010-01-14 Spx Cooling Technologies, Inc. Modular air-cooled condenser apparatus and method
CN203454834U (zh) * 2013-06-26 2014-02-26 双良节能系统股份有限公司 机力通风空气冷却凝汽器

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1847765A (zh) * 2005-04-04 2006-10-18 Spx冷却技术有限公司 气冷式冷凝器
WO2010005882A1 (en) * 2008-07-10 2010-01-14 Spx Cooling Technologies, Inc. Modular air-cooled condenser apparatus and method
CN201348447Y (zh) * 2009-01-08 2009-11-18 江苏双良空调设备股份有限公司 防止冻结的直接空冷凝汽器
CN203454834U (zh) * 2013-06-26 2014-02-26 双良节能系统股份有限公司 机力通风空气冷却凝汽器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104841238A (zh) * 2015-05-06 2015-08-19 双良节能系统股份有限公司 含湿废气消雾排放装置
CN104841238B (zh) * 2015-05-06 2017-05-24 双良节能系统股份有限公司 含湿废气消雾排放装置

Similar Documents

Publication Publication Date Title
CN106716036B (zh) 用于冷凝蒸汽的设备
US9395127B2 (en) Indirect dry cooling tower apparatus and method
CN103217025B (zh) 一种包含水平轴轴流风机群的空冷凝汽器结构
CN102980417B (zh) 塔式直接空冷凝汽器及其塔式直接干冷系统
CN101551201A (zh) 火力发电厂联合通风直接空冷系统
CN107560038A (zh) 基于地道风和立式板管换热器的蒸发冷却空调机组
CN203454834U (zh) 机力通风空气冷却凝汽器
CN203011179U (zh) 塔式直接空冷凝汽器及其塔式直接干冷系统
CN207113644U (zh) 一种翅片倾斜布置的自然通风直接空冷系统
CN107421348A (zh) 一种翅片倾斜布置的自然通风直接空冷系统
CN102619550A (zh) 一种新型矿用空调系统换热设备
CN103322827A (zh) 机力通风空气冷却凝汽器
CN201497387U (zh) 火力发电厂联合通风直接空冷系统
CN202531210U (zh) 一种新型矿用空调系统换热设备
CN105403065A (zh) 采用自然通风的直接空冷系统
CN101403572B (zh) 空冷平台支撑与环境风场诱导一体化装置
CN106052413B (zh) 塔式直接空冷凝汽器
CN203586856U (zh) 连铸机排蒸汽系统用自然冷却器
CN202709779U (zh) 电站直接空冷系统可动挡风装置
CN203163522U (zh) 机力通风空气冷却凝汽器
CN202532664U (zh) 一种高效空气-空气换热器
CN201377863Y (zh) 两排管大焓差风机盘管机组
CN103615911B (zh) 连铸机排蒸汽系统用自然冷却器
CN105114139B (zh) 一种带有立式三角形式干式空冷凝汽器的直接空冷系统
CN101586919B (zh) 一种消除换热死角的方法及空气冷凝器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925