CN103322799B - Off-line pouring method of refractory material of burner of circular furnace - Google Patents

Off-line pouring method of refractory material of burner of circular furnace Download PDF

Info

Publication number
CN103322799B
CN103322799B CN201210071220.4A CN201210071220A CN103322799B CN 103322799 B CN103322799 B CN 103322799B CN 201210071220 A CN201210071220 A CN 201210071220A CN 103322799 B CN103322799 B CN 103322799B
Authority
CN
China
Prior art keywords
furnace
burner
refractory material
furnace shell
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210071220.4A
Other languages
Chinese (zh)
Other versions
CN103322799A (en
Inventor
谭春华
程爱民
谢明洪
徐铁权
任社安
杨志福
周亚丽
王志宏
吴恒
袁杰平
何建军
郑召忠
郭晓宇
王莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201210071220.4A priority Critical patent/CN103322799B/en
Publication of CN103322799A publication Critical patent/CN103322799A/en
Application granted granted Critical
Publication of CN103322799B publication Critical patent/CN103322799B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

An off-line pouring method of a refractory material of a burner of a circular furnace is characterized by comprising steps as follows: a, a circular furnace casing is checked and accepted before installation; b, an anchoring brick is mounted; c, a mold and a template are erected; d, the refractory material is poured and cured; and e, a refractory material castable and the furnace casing are mounted in a furnace wall of the circular furnace jointly. The off-line pouring method of the refractory material of the burner of the circular furnace has the advantages that the manufacturing steps are reasonable in design and simple to operate, working at heights is not required, the construction quality is easy to control, safety and reliability are realized, the construction cost consumed with the off-line pouring method of the refractory material of the burner of the circular furnace is one third of that consumed with an on-line method, and the construction time of a refractory material of a single burner is one half of that of on-line construction.

Description

The refractory material off-line pouring procedure of annular furnace burner
Technical field
The present invention relates to a kind of cold rolling industrial furnace and build construction method, specifically, is a kind of refractory material off-line pouring procedure of annular furnace burner.
Background technology
Annular furnace is the common equipment of smelting industry, and its burner is distributed on two furnace walls, and structure of refractory is shown in Fig. 1, both at home and abroad the conventional construction party genealogy of law adopt furnace shell install after carry out the construction of online burner refractory material again.But, in the construction of online burner refractory material, the degree control installed due to anchored brick, burner mould Concentricity tolerance controls, template needs load-bearing to bring when building installs difficulty, increase by a face die plate install quantities, consequently construction quality is difficult to control, and due to work high above the ground, aerial work platform set up work, construction safety hidden danger increases, in addition, because the refractory material engineering time of the long distance transportation cost of the castable that is stirred, single burner is long, construction cost increases.
The refractory material On-line construction method of therefore known annular furnace burner also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is to propose a kind of construction quality easy to control, and construction safety coefficient is large, and the engineering time is short, the refractory material off-line pouring procedure of the annular furnace burner that construction cost is low.
For achieving the above object, technical solution of the present invention is:
A refractory material off-line pouring procedure for annular furnace burner, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, check the linear dimension of monolithic furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell; C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
The refractory material off-line pouring procedure of annular furnace burner of the present invention can also be further achieved by the following technical measures.
Aforesaid method, in wherein said step b, at the asphalt caulk of its external coating 1mm thickness after anchored brick installation.
After adopting technique scheme, the refractory material off-line pouring procedure of annular furnace burner of the present invention has the following advantages:
1, making step is reasonable in design, simple to operate;
2, without work high above the ground, construction quality easily controls, safe and reliable;
3, reduce engineering cost, the construction cost of the refractory material off-line pouring procedure of annular furnace burner of the present invention is online 1/3, and engineering time of single burner refractory material is online 1/2.
Accompanying drawing explanation
Fig. 1 is the structure of refractory schematic diagram of the burner of the embodiment of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the layout drawing of burner on annular furnace furnace wall of the embodiment of the present invention;
Fig. 4 is the left view of Fig. 3.
In figure: 1 furnace shell, 2 castables, 3 anchored bricks, 4 holes, 5 burners, fibre module on 6 furnace walls, 7 chassis.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
Now refer to Fig. 1, Fig. 1 is the structure of refractory schematic diagram of the burner of the embodiment of the present invention, and Fig. 2 is the left view of Fig. 1.High-temperature ring stove burner hearth center size φ 55200mm, furnace wall height 4000mm, be divided into preheating section, the first soaking zone, the second bringing-up section, the second soaking zone, first, second, third and fourth cooling section.Total burner 162.Single burner refractory material heavily about 350kg, amounts to 56700kg.
The refractory material off-line pouring procedure of annular furnace burner of the present invention, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, checks the linear dimension of every block furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell, and at the asphalt caulk of its external coating 1mm thickness after anchored brick installation;
C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Fig. 3 is the layout drawing of burner on annular furnace furnace wall of the embodiment of the present invention, and Fig. 4 is the left view of Fig. 3.
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
The refractory material off-line pouring procedure of annular furnace burner of the present invention overcomes the drawback that existing construction method is brought, and its construction cost is 1/3 of On-line construction method, and engineering time of single burner refractory material is online 1/2.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.

Claims (2)

1. a refractory material off-line pouring procedure for annular furnace burner, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, checks the linear dimension of every block furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell;
C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
2. the refractory material off-line pouring procedure of annular furnace burner as claimed in claim 1, is characterized in that, in described step b, at the asphalt caulk of its external coating 1mm thickness after anchored brick installation.
CN201210071220.4A 2012-03-19 2012-03-19 Off-line pouring method of refractory material of burner of circular furnace Active CN103322799B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210071220.4A CN103322799B (en) 2012-03-19 2012-03-19 Off-line pouring method of refractory material of burner of circular furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210071220.4A CN103322799B (en) 2012-03-19 2012-03-19 Off-line pouring method of refractory material of burner of circular furnace

Publications (2)

Publication Number Publication Date
CN103322799A CN103322799A (en) 2013-09-25
CN103322799B true CN103322799B (en) 2015-03-04

Family

ID=49191708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210071220.4A Active CN103322799B (en) 2012-03-19 2012-03-19 Off-line pouring method of refractory material of burner of circular furnace

Country Status (1)

Country Link
CN (1) CN103322799B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103727782A (en) * 2014-01-06 2014-04-16 攀枝花钢企米易白马球团有限公司 High-temperature square tube and manufacturing method thereof
CN110779335B (en) * 2019-10-26 2021-08-13 上海二十冶建设有限公司 Integrated mounting method for prefabricated furnace top of rotary hearth furnace

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58141309A (en) * 1982-02-18 1983-08-22 Shinagawa Refract Co Ltd Hot repairing method of lining of blast furnace
CN101545721B (en) * 2009-05-14 2012-09-19 中国十九冶集团有限公司 Mounting method for thermal storage heating stove burner tile
CN102297595A (en) * 2010-06-25 2011-12-28 上海宝钢工业检测公司 Method for quickly replacing burner block of annular heating furnace
CN102288035B (en) * 2011-07-23 2012-12-26 河北二十冶工程技术有限公司 Integral casting-molding method for heat-storing type heating-furnace burner

Also Published As

Publication number Publication date
CN103322799A (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN204019700U (en) Stair prefabricated components mould
CN101225718B (en) Construction method of steel reinforced concrete chimney
CN204174222U (en) The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof
CN103322799B (en) Off-line pouring method of refractory material of burner of circular furnace
CN103512360A (en) Method for reserving large-area refractory castable construction expansion gaps
CN103512357B (en) Method for positioning burner offline pouring mould of annular furnace
CN103788966A (en) High-temperature resistant expansion joint for dry quenching
CN109762579B (en) Dry quenching charge level indicator mount pad that prefabricated pouring piece was built by laying bricks or stones
CN110093469A (en) Prefabricated iron tap channel
KR102287016B1 (en) Additional columns for accommodating checker bricks, metal objects for accommodating checker bricks and methods of expanding columns
CN102175085A (en) Method for pouring and constructing whole furnace wall of heating furnace with heat-accumulating-type nozzle
CN205119788U (en) Assembled tunnel cave
JP2018145356A (en) Method for constructing furnace top part of chamber oven type coke oven and structure of furnace top part of chamber oven type coke oven
CN103423999B (en) Charging end wall for heating furnace and construction method of charging end wall
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN103629925A (en) Assembled type tunnel kiln
CN203866243U (en) High-temperature-resistant expansion joint for dry quenching
CN204043382U (en) Novel combined type heat preservation energy-saving tunnel cave
CN108996927B (en) Double-chamber shaft kiln with cooling support upright post
CN202915354U (en) Recrystallization silicon carbide boiler burner
JP2020070341A (en) Dismantling and constructing method of coke oven
CN219390504U (en) Assembled heating furnace
CN213979540U (en) Novel assembled building block for building
CN202885507U (en) Straight-through type assembling tunnel kiln
CN217358062U (en) Novel repair structure for arch of kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant