CN103322799B - Off-line pouring method of refractory material of burner of circular furnace - Google Patents
Off-line pouring method of refractory material of burner of circular furnace Download PDFInfo
- Publication number
- CN103322799B CN103322799B CN201210071220.4A CN201210071220A CN103322799B CN 103322799 B CN103322799 B CN 103322799B CN 201210071220 A CN201210071220 A CN 201210071220A CN 103322799 B CN103322799 B CN 103322799B
- Authority
- CN
- China
- Prior art keywords
- furnace
- burner
- refractory material
- furnace shell
- annular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
An off-line pouring method of a refractory material of a burner of a circular furnace is characterized by comprising steps as follows: a, a circular furnace casing is checked and accepted before installation; b, an anchoring brick is mounted; c, a mold and a template are erected; d, the refractory material is poured and cured; and e, a refractory material castable and the furnace casing are mounted in a furnace wall of the circular furnace jointly. The off-line pouring method of the refractory material of the burner of the circular furnace has the advantages that the manufacturing steps are reasonable in design and simple to operate, working at heights is not required, the construction quality is easy to control, safety and reliability are realized, the construction cost consumed with the off-line pouring method of the refractory material of the burner of the circular furnace is one third of that consumed with an on-line method, and the construction time of a refractory material of a single burner is one half of that of on-line construction.
Description
Technical field
The present invention relates to a kind of cold rolling industrial furnace and build construction method, specifically, is a kind of refractory material off-line pouring procedure of annular furnace burner.
Background technology
Annular furnace is the common equipment of smelting industry, and its burner is distributed on two furnace walls, and structure of refractory is shown in Fig. 1, both at home and abroad the conventional construction party genealogy of law adopt furnace shell install after carry out the construction of online burner refractory material again.But, in the construction of online burner refractory material, the degree control installed due to anchored brick, burner mould Concentricity tolerance controls, template needs load-bearing to bring when building installs difficulty, increase by a face die plate install quantities, consequently construction quality is difficult to control, and due to work high above the ground, aerial work platform set up work, construction safety hidden danger increases, in addition, because the refractory material engineering time of the long distance transportation cost of the castable that is stirred, single burner is long, construction cost increases.
The refractory material On-line construction method of therefore known annular furnace burner also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is to propose a kind of construction quality easy to control, and construction safety coefficient is large, and the engineering time is short, the refractory material off-line pouring procedure of the annular furnace burner that construction cost is low.
For achieving the above object, technical solution of the present invention is:
A refractory material off-line pouring procedure for annular furnace burner, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, check the linear dimension of monolithic furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell; C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
The refractory material off-line pouring procedure of annular furnace burner of the present invention can also be further achieved by the following technical measures.
Aforesaid method, in wherein said step b, at the asphalt caulk of its external coating 1mm thickness after anchored brick installation.
After adopting technique scheme, the refractory material off-line pouring procedure of annular furnace burner of the present invention has the following advantages:
1, making step is reasonable in design, simple to operate;
2, without work high above the ground, construction quality easily controls, safe and reliable;
3, reduce engineering cost, the construction cost of the refractory material off-line pouring procedure of annular furnace burner of the present invention is online 1/3, and engineering time of single burner refractory material is online 1/2.
Accompanying drawing explanation
Fig. 1 is the structure of refractory schematic diagram of the burner of the embodiment of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the layout drawing of burner on annular furnace furnace wall of the embodiment of the present invention;
Fig. 4 is the left view of Fig. 3.
In figure: 1 furnace shell, 2 castables, 3 anchored bricks, 4 holes, 5 burners, fibre module on 6 furnace walls, 7 chassis.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
Now refer to Fig. 1, Fig. 1 is the structure of refractory schematic diagram of the burner of the embodiment of the present invention, and Fig. 2 is the left view of Fig. 1.High-temperature ring stove burner hearth center size φ 55200mm, furnace wall height 4000mm, be divided into preheating section, the first soaking zone, the second bringing-up section, the second soaking zone, first, second, third and fourth cooling section.Total burner 162.Single burner refractory material heavily about 350kg, amounts to 56700kg.
The refractory material off-line pouring procedure of annular furnace burner of the present invention, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, checks the linear dimension of every block furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell, and at the asphalt caulk of its external coating 1mm thickness after anchored brick installation;
C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Fig. 3 is the layout drawing of burner on annular furnace furnace wall of the embodiment of the present invention, and Fig. 4 is the left view of Fig. 3.
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
The refractory material off-line pouring procedure of annular furnace burner of the present invention overcomes the drawback that existing construction method is brought, and its construction cost is 1/3 of On-line construction method, and engineering time of single burner refractory material is online 1/2.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.
Claims (2)
1. a refractory material off-line pouring procedure for annular furnace burner, is characterized in that comprising the following steps:
Annular furnace furnace shell before a, installation is inspected for acceptance
According to the installation diagram of whole annular furnace furnace shell, Unified number is carried out to every block annular furnace furnace shell, checks the linear dimension of every block furnace shell, deformation extent, the welding quality of anchoring piece; Annular furnace furnace shell inspect for acceptance qualified after every block furnace shell kept flat construct on the ground;
B, anchored brick are installed
Find out the structure of refractory of corresponding burner according to annular furnace furnace shell numbering, then install anchored brick according to burner structure of refractory figure, anchored brick will be installed firmly perpendicular to furnace shell;
C, mould, formwork erection
Burner mould installation dimension is accurate, firm, twines scratch 1mm thickness asphalt paper after installing at burner mould, is convenient to remove mould; Surrounding model sheetinstallat accurately, firmly, and in template brushing releasing agent;
D, refractory material casting and maintenance
The refractory material of burner is castable structure, and during refractory material casting construction, vibration compacting, guarantees that anchored brick is perpendicular to furnace shell, and makes surrounding template indeformable; After castable solidifies 24 hours, remove mould, template, and castable natural drying maintenance is after 48 hours, can install with furnace shell;
E, refractory material casting are fit into annular furnace furnace wall with furnace shell
Strictly carry out the installation of annular furnace furnace shell by annular furnace furnace shell erection sequence and corresponding annular furnace furnace shell numbering, during installation, furnace shell avoids concuss and shock.
2. the refractory material off-line pouring procedure of annular furnace burner as claimed in claim 1, is characterized in that, in described step b, at the asphalt caulk of its external coating 1mm thickness after anchored brick installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210071220.4A CN103322799B (en) | 2012-03-19 | 2012-03-19 | Off-line pouring method of refractory material of burner of circular furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210071220.4A CN103322799B (en) | 2012-03-19 | 2012-03-19 | Off-line pouring method of refractory material of burner of circular furnace |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103322799A CN103322799A (en) | 2013-09-25 |
CN103322799B true CN103322799B (en) | 2015-03-04 |
Family
ID=49191708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210071220.4A Active CN103322799B (en) | 2012-03-19 | 2012-03-19 | Off-line pouring method of refractory material of burner of circular furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103322799B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103727782A (en) * | 2014-01-06 | 2014-04-16 | 攀枝花钢企米易白马球团有限公司 | High-temperature square tube and manufacturing method thereof |
CN110779335B (en) * | 2019-10-26 | 2021-08-13 | 上海二十冶建设有限公司 | Integrated mounting method for prefabricated furnace top of rotary hearth furnace |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58141309A (en) * | 1982-02-18 | 1983-08-22 | Shinagawa Refract Co Ltd | Hot repairing method of lining of blast furnace |
CN101545721B (en) * | 2009-05-14 | 2012-09-19 | 中国十九冶集团有限公司 | Mounting method for thermal storage heating stove burner tile |
CN102297595A (en) * | 2010-06-25 | 2011-12-28 | 上海宝钢工业检测公司 | Method for quickly replacing burner block of annular heating furnace |
CN102288035B (en) * | 2011-07-23 | 2012-12-26 | 河北二十冶工程技术有限公司 | Integral casting-molding method for heat-storing type heating-furnace burner |
-
2012
- 2012-03-19 CN CN201210071220.4A patent/CN103322799B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103322799A (en) | 2013-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204019700U (en) | Stair prefabricated components mould | |
CN101225718B (en) | Construction method of steel reinforced concrete chimney | |
CN204174222U (en) | The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof | |
CN103322799B (en) | Off-line pouring method of refractory material of burner of circular furnace | |
CN103512360A (en) | Method for reserving large-area refractory castable construction expansion gaps | |
CN103512357B (en) | Method for positioning burner offline pouring mould of annular furnace | |
CN103788966A (en) | High-temperature resistant expansion joint for dry quenching | |
CN109762579B (en) | Dry quenching charge level indicator mount pad that prefabricated pouring piece was built by laying bricks or stones | |
CN110093469A (en) | Prefabricated iron tap channel | |
KR102287016B1 (en) | Additional columns for accommodating checker bricks, metal objects for accommodating checker bricks and methods of expanding columns | |
CN102175085A (en) | Method for pouring and constructing whole furnace wall of heating furnace with heat-accumulating-type nozzle | |
CN205119788U (en) | Assembled tunnel cave | |
JP2018145356A (en) | Method for constructing furnace top part of chamber oven type coke oven and structure of furnace top part of chamber oven type coke oven | |
CN103423999B (en) | Charging end wall for heating furnace and construction method of charging end wall | |
CN204718409U (en) | A kind of can the anode furnace of hot replacing redox mouth brick | |
CN103629925A (en) | Assembled type tunnel kiln | |
CN203866243U (en) | High-temperature-resistant expansion joint for dry quenching | |
CN204043382U (en) | Novel combined type heat preservation energy-saving tunnel cave | |
CN108996927B (en) | Double-chamber shaft kiln with cooling support upright post | |
CN202915354U (en) | Recrystallization silicon carbide boiler burner | |
JP2020070341A (en) | Dismantling and constructing method of coke oven | |
CN219390504U (en) | Assembled heating furnace | |
CN213979540U (en) | Novel assembled building block for building | |
CN202885507U (en) | Straight-through type assembling tunnel kiln | |
CN217358062U (en) | Novel repair structure for arch of kiln |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |