Summary of the invention
The technical problem that the present invention solved is: the installation method that a kind of installation rate is fast, the good thermal storage heating stove burner tile of rear furnace body tightness is installed is provided.
The technical scheme that solves the problems of the technologies described above is: the installation method of thermal storage heating stove burner tile; Earlier with the burner block location and installation on burner; And then the pours body of wall carried out moulding by casting; Burner block and burner are being positioned when installing, burner block is connected with burner and is being strained and fixed through the drawknot screw arbor assembly, material feeding body of wall to be poured is removed the drawknot screw arbor assembly after meeting the requirements of intensity again; Said drawknot screw arbor assembly comprises screw rod, and an end of screw rod passes burner and is fixedly connected channel-section steel, and the spout that the other end of screw rod passes on the burner block is connected with nut.
Burner block is connected with burner through the drawknot screw rod for convenient; Burner block and burner are being positioned when installing; Earlier on the furnace wall steel plate, weld gripper shoe, burner block is hung and is supported on the gripper shoe, and then burner block is connected with burner and is strained and fixed through the drawknot screw arbor assembly.
The invention has the beneficial effects as follows: the installation rate of burner block is faster, pours into a mould number of times simultaneously and reduces, and construction joint reduces, and whole body of heater tightness is better.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
The installation method of the application's thermal storage heating stove burner tile, earlier with burner block 4 location and installation on burner 6, and then the pours body of wall carried out moulding by casting.This installation method and the difference of existing installation method are that the application is earlier with burner block 4 and the cast of carrying out the pours body of wall after burner 6 is connected again; Therefore can each be arranged and carry out the integrated poured of pours body of wall after burner block 4 is installed on the burner 6 respectively; Therefore the installation rate of burner block 4 is faster; Pour into a mould number of times simultaneously and reduce, construction joint reduces, and whole body of heater tightness is better.
Because existing installation method is only drawn close burner block and burner, does not carry out pretension, so the gap between burner block and the burner is big, leakiness.For overcoming this problem, as shown in Figure 1, burner block 4 and burner 6 are being positioned when installing, burner block 4 is connected with burner 6 and is strained and fixed through drawknot screw arbor assembly 12, material feeding body of wall to be poured meets the requirements of after the intensity again with 12 dismountings of drawknot screw arbor assembly.Drawknot screw arbor assembly 12 has makes burner block 4 be connected the also effect of axial pretightening with burner 6, and after the pours body of wall met the requirements of intensity, burner block 4 closely was connected with burner 6 like this, can improve the installation accuracy and the installation quality of burner block 4.
Wherein, as shown in Figure 1, said drawknot screw arbor assembly 12 comprises screw rod 9, and an end of screw rod 9 passes burner 6 and is fixedly connected channel-section steel 7, and the spout 13 that the other end of screw rod 9 passes on the burner block 4 is connected with nut 11.When making drawknot screw arbor assembly 12, on channel-section steel 7, open two holes earlier, pitch-row is spout 13 centre-to-centre spacing on the burner block 4; Boring ratio screw rod 9 somewhat larger in diameter, screw rod 9 penetrate in the hole and with screw rod 9 and channel-section steel 7 and weld, and let screw rod 9 keep vertical with channel-section steel 7.Channel-section steel 7 length are wideer than burner.Screw rod 9 can be made with steel scrap muscle one greatest service silk.When using drawknot screw arbor assembly 12 to connect burner blocks 4 with burner 6, screw rod 9 is attacked a threaded end and is passed from the spout 13 of burner block 4, makes channel-section steel 7 flat leaning against on the burner 6, and coupling nut 11 then, and burner block 4 and burner 6 are strained and fixed.For the ease of passing through screw rod 9, channel-section steel 8 is being installed between burner block 4 and nut 11 on the screw rod 9 to burner block 4 application of forces.Back channel-section steel 8 is installed to be abutted against on the burner block 4.
Through the drawknot screw rod burner block is connected with burner for ease; When burner block 4 and burner 6 are positioned installation; On furnace wall steel plate 2, weld gripper shoe 1 earlier; Burner block 4 is hung and is supported on the gripper shoe 1, and then burner block 4 is connected with burner 6 and is strained and fixed through drawknot screw arbor assembly 12.
In addition, on the faying face of burner block 4 and burner 6, alumina silicate fiber felt 5 is set, so that being connected of burner block 4 and burner 6.
Embodiment
The installation of thermal storage heating stove burner tile comprises the steps:
1), the preparation of drawknot screw arbor assembly 12: as shown in Figure 1, on channel-section steel 7, open two holes, pitch-row is spout 13 centre-to-centre spacing of burner block 4; Boring ratio screw rod 9 somewhat larger in diameter, screw rod 9 penetrate in the hole screw rod 9 and channel-section steel 7 are welded, and let screw rod 9 keep vertical with channel-section steel 7.Channel-section steel 7 length are than burner 6 wide 300mm.Screw rod 9 can be made with steel scrap muscle one greatest service silk.
2), like Fig. 2, shown in 3, on furnace wall steel plate 2, emit unified burner block 4 bottom absolute altitude lines.In the absolute altitude line position gripper shoe 1 of burn-oning, gripper shoe 1 upper surface is concordant with the absolute altitude line;
3), as shown in Figure 2, with soft suspender belt 3 burner block 4 being sling is placed on the gripper shoe 1, after burner block 4 sticks the thick alumina silicate fiber felt 5 of 20mm with burner 6 binding sites; Let both abut against together, with channel-section steel 7 flat the leaning against on the burner 6 of drawknot screw rod, screw rod 9 passes from burner block 4 middle part spouts 13; Put channel-section steel 8 and pad 10 well; Adjust the plan-position of burner block 4, cover upper cap nut 11 tension burner blocks 4, finally being compressed into 10mm with 20mm alumina silicate fiber felt 5 is standard.The length of channel-section steel 8 is than the short 300mm of burner block 4 width.
4), install burner block 4 after, take off soft suspender belt 3, installed the cast that template is carried out the pours body of wall.Pours reaches form removal after the intensity, takes out screw rod 9 and channel-section steel 8.