CN103321217A - Composite foundation pile for lava regions - Google Patents

Composite foundation pile for lava regions Download PDF

Info

Publication number
CN103321217A
CN103321217A CN2013102681972A CN201310268197A CN103321217A CN 103321217 A CN103321217 A CN 103321217A CN 2013102681972 A CN2013102681972 A CN 2013102681972A CN 201310268197 A CN201310268197 A CN 201310268197A CN 103321217 A CN103321217 A CN 103321217A
Authority
CN
China
Prior art keywords
pile
lava
cfg
composite foundation
regions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102681972A
Other languages
Chinese (zh)
Inventor
潘建杰
蒋科化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013102681972A priority Critical patent/CN103321217A/en
Publication of CN103321217A publication Critical patent/CN103321217A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a composite foundation pile for lava regions, and belongs to the technical field of pile foundation construction for large-tonnage roads, bridges and houses in the building industry. The composite foundation pile for the lava regions comprises a CFG (cement fly-ash gravel) pile and two or more precast end-bearing piles, and is characterized in that the precast end-bearing piles are arranged in the CFG pile, one type of filling sand, fine stone particles, slag, concrete and the like or one or a plurality of mixtures of the filling sand, the fine stone particles, the slag, the concrete and the like is mixed to form the CFG pile, and the precast end-bearing piles are positioned in the CFG pile. The composite foundation pile has the advantages that the composite foundation pile is simple in structure, easy to implement and wide in applicable geological environments, the quality of the pile and the construction speed can be guaranteed, the cost further can be reduced, and the problem of difficulty in applying static-pressure high-tonnage precast end-bearing piles to the lava geological regions can be solved.

Description

A kind of ground composite pile for the lava area
Technical field
The invention belongs to the pile foundation construction technical field in builing industry large-tonnage road, bridge, house, be specifically related to a kind of ground composite pile for the lava area.
Background technology
Existing patented technology such as application number are 200510040317.9 patent of invention " construction process for composite pile of foundation and pile tip displacement regulating device thereof ", this invention provides a kind of construction process for composite pile of foundation that inhomogeneous granite residual soil uses that is suitable for, in the lava geological environment, have slightly thick but when failing to reach the dirt band of design load bearing requirements, can't use when running into.
In the prior art, the pile foundation construction in builing industry large-tonnage road, bridge, house mainly adopts four kinds of punching (brill) hole cast-in-place concrete piles, Static Pressure Precast Piles, driven precast pile, the high tonnage preformed pile of static pressure end bearing pile.Punching (brill) hole cast-in-place concrete pile: be mainly used in the high tonnage foundation construction of heavy caliber, be characterized in that pile body is long, diameter is large, can be deep to the rock stratum, but its cost is high, easily occurs running pulp during construction, destroys the geological hydrology environment; And long construction period, easily produce serious mass defect during construction.Be difficult for clearly totally constriction occuring easily such as residue at the bottom of the hole, pile shaft concrete strength is difficult to control, and concrete piles forms broken pile, and two, three class stakes occur more during detection.Static Pressure Precast Piles: be mainly used in city house foundation construction on the middle and senior level, be characterized in: pile body is long, and cost is high, and cushion cap is large, by force preformed pile is pressed in the soil with external force during construction, and pile body is subjected to external force excessive, cracky, and during detection, two, three class stakes occur more.More crucial is to be difficult to use at karst area and lava geological environment.Driven precast pile: be mainly used in away from the city, the area of geology low bearing capacity is characterized in that noise is large, because use oil hammer, so serious environment pollution belongs to filtering technique and job practices.
Summary of the invention
Above-mentioned deficiency for prior art, the technical problem to be solved in the present invention provides a kind of ground composite pile for the lava area, its easy construction, and whole work progress noise is low, emission-free discharging, speed of application is fast, and is little to the geology Hydrological Effects, belongs to the environment-friendly type construction, the construction investment controllability is strong, pile quality is good, and applicable geological environment is wide, can solve the difficult problem that the existing high tonnage preformed pile of static pressure end bearing pile technology is difficult to use in lava geology area.
Technical scheme: a kind of ground composite pile for the lava area, made by CFG stake and prefabricated end bearing pile, it is characterized in that: comprise prefabricated end bearing pile more than two or two in the described ground composite pile, described CFG stake is made with one or more mixture mixs wherein such as inserts sand, microlith powder, slag, tabias; Described prefabricated end bearing pile is arranged in the CFG stake.
A kind of job practices of the ground composite pile for the lava area:
(1) pore-forming: with punching or drilling machine, in the position of setting, be pressed into prefabricated end bearing pile quantity and take up an area dimensional requirement punching or boring by the plan regulation, until then the bearing stratum of design code is cleaned out residue in the hole;
(2) perfusion inserts: punching or boring are finished and through after the assay was approved, are inserted conduit, and the form of construction work of pressing pouring concrete pile is poured into inserts in the hole, make it form the CFG stake; Described inserts is one or more mixtures in sand, microlith powder, slag, the tabia etc.;
(3) piling: be pressed into prefabricated end bearing pile in the CFG stake with the high tonnage stake of static pressure machine in the hole, until the bearing stratum of design setting is pressed into prefabricated end bearing pile more than two or two by designing requirement, a kind of ground composite pile construction for the lava area is finished.
Method of the present invention is simple to operate, implements easily, and applicable geological environment is wide, can guarantee quality of pile, can guarantee speed of application again, can also reduce cost, can solve the high tonnage preformed pile of static pressure end bearing pile in the difficult problem that lava geology area uses, be a kind of job practices that is worthy to be popularized and uses.
Advantage of the present invention:
1, convenient construction is only used the high tonnage pile machine equipment of punching or drilling machine and static pressure.
2, the work progress noise is low, and emission-free discharging is little to the geology Hydrological Effects.
3, speed of application is fast, pore-forming is up to the standards and can pours into immediately inserts formation CFG stake, the CFG stake that inserts forms, do not bear the function of carrying, only play the effect of the bearing stratum of setting when soil removal and replacement makes preformed pile can be depressed into smoothly design and the construction of punching (brill) hole, need not to wait its formation intensity and carry out trace routine, as long as the CFG pile driving construction is finished, construct followed by just being pressed into precast reinforced concrete piles.
4, quality is good, is pressed into preformed pile in the CFG stake with the high tonnage stake of static pressure machine in the hole, during construction because precast pile is not subjected to the horizontal external effect, so precast pile can not be subject to breakage in installation.Because be preformed pile, so can not occur that constriction, pile shaft concrete strength are difficult to control, concrete piles forms broken pile yet, the phenomenon that Driven Piles pile body hammer splits, the pile crown hammer breaks can not occur yet, greatly improved seismic performance of building, especially use in lava geology area, bearing stratum is to reach the complete rock that design specifications requires, and bearing capacity is uniform and stable, settling amount is very little, and the house can not produce because sedimentation is uneven the crack.
5, environmental protection.The ground composite pile is comprised of one or more mixture inserts in preformed pile and sand, microlith powder, slag, the tabia etc., can not pollute surrounding enviroment and destroy the on-site geological hydrology environment of building project.
6, the investment controllability is strong, particularly in lava geology area, Static Pressure Precast Piles, driven precast pile, these the three kinds of stakes of the high tonnage preformed pile of static pressure end bearing pile can't directly be used basically, normally used is punching (brill) hole cast-in-place concrete pile, in lava geology area, its geological condition is more complicated all usually, generally there is Soft Soil Layer, rock crevice, the burning into sand layer, underground underground river, one or more phenomenons of fusion hole etc., when the Concrete Grouting Pale of punching (brill) hole, pressure is larger when constructing because of filling concrete, the stream slurry often appears, running pulp, the super filling problem of concrete is caused in swell aperture etc. of compressing, according to statistics, the super filling amount of concrete is minimum all reaches three times of design theory value, and many is more than ten times of design theory value, causes investment clearly to control.A kind of for the prefabricated end bearing pile in lava area, when the perfusion inserts makes it form the CFG pile driving construction in the hole, do not need intensified pressure, reduced stream slurry, running pulp, the compressing aperture problem that swells, preformed pile is can not change its shape and volume when construction, thereby reaches the investment controllability of building project.
Description of drawings
Fig. 1 is the structural representation of ground composite pile of the present invention.
Among the figure: CFG stake 1, prefabricated end bearing pile 2, prefabricated end bearing pile 3.
The specific embodiment
Below in conjunction with the description of drawings the invention process.A kind of ground composite pile for the lava area, made by CFG stake 1 and reinforced concrete prefabricated end bearing pile 2, reinforced concrete prefabricated end bearing pile 3, it is characterized in that: the mixture mixs such as described CFG stake 1 usefulness inserts sand, microlith powder, slag, tabia are made; Described reinforced concrete prefabricated end bearing pile 2 and reinforced concrete prefabricated end bearing pile 3 are arranged in CFG stake 1.
A kind of job practices of the ground composite pile for the lava area:
(1) pore-forming: with punching or drilling machine, in the position of setting, be pressed into reinforced concrete prefabricated end bearing pile quantity and take up an area dimensional requirement punching or boring by the plan regulation, until then the bearing stratum of design code is cleaned out residue in the hole;
(2) perfusion inserts: punching or boring are finished and through after the assay was approved, are inserted conduit, and the form of construction work of pressing pouring concrete pile is poured into inserts in the hole, make it form the CFG stake; Described inserts is one or more mixtures in sand, microlith powder, slag, the tabia etc.;
(3) piling: in the hole, be pressed into reinforced concrete prefabricated end bearing pile in the CFG stake with the high tonnage stake of static pressure machine, until the bearing stratum of design setting, be pressed into reinforced concrete prefabricated end bearing pile more than two or two by designing requirement, a kind of ground composite pile construction for the lava area is finished.
The present invention is not only applicable in the lava area, and all can use at various geological environments.

Claims (1)

1. ground composite pile that is used for the lava area, made by CFG stake and prefabricated end bearing pile, it is characterized in that: comprise prefabricated end bearing pile more than two or two in the described ground composite pile, described CFG stake is made with one or more mixture mixs wherein such as inserts sand, microlith powder, slag, tabias; Described prefabricated end bearing pile is arranged in the CFG stake.
CN2013102681972A 2013-06-19 2013-06-19 Composite foundation pile for lava regions Pending CN103321217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102681972A CN103321217A (en) 2013-06-19 2013-06-19 Composite foundation pile for lava regions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102681972A CN103321217A (en) 2013-06-19 2013-06-19 Composite foundation pile for lava regions

Publications (1)

Publication Number Publication Date
CN103321217A true CN103321217A (en) 2013-09-25

Family

ID=49190241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102681972A Pending CN103321217A (en) 2013-06-19 2013-06-19 Composite foundation pile for lava regions

Country Status (1)

Country Link
CN (1) CN103321217A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917402A (en) * 2017-03-20 2017-07-04 陈甫 A kind of CFG pile precast piles head and CFG pile construction methods

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0552366B2 (en) * 1986-05-07 1993-08-05 Tokyu Kensetsu Kk
CN201190278Y (en) * 2008-05-15 2009-02-04 浙江中富建筑集团股份有限公司 Concrete long-corn cement soil composite pile
CN201943069U (en) * 2010-12-01 2011-08-24 张继红 Precast compacting-enlarging pile
CN202730791U (en) * 2012-08-10 2013-02-13 福建省华荣建设集团有限公司 Composite pile foundation of building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0552366B2 (en) * 1986-05-07 1993-08-05 Tokyu Kensetsu Kk
CN201190278Y (en) * 2008-05-15 2009-02-04 浙江中富建筑集团股份有限公司 Concrete long-corn cement soil composite pile
CN201943069U (en) * 2010-12-01 2011-08-24 张继红 Precast compacting-enlarging pile
CN202730791U (en) * 2012-08-10 2013-02-13 福建省华荣建设集团有限公司 Composite pile foundation of building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917402A (en) * 2017-03-20 2017-07-04 陈甫 A kind of CFG pile precast piles head and CFG pile construction methods
CN106917402B (en) * 2017-03-20 2019-03-05 陈甫 A kind of CFG pile precast pile head and CFG pile construction method

Similar Documents

Publication Publication Date Title
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN102021906A (en) Method for reinforcing soft soil foundation at deep mixing pile
CN1487150A (en) Combined grouting construction process of reinforcing foundation
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN105525605A (en) Basement backfill area reinforcing method
CN103979880B (en) A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method
CN103938651B (en) The stake of Large stone porous concrete and treatment process of composite foundation thereof under water
CN102839683A (en) Discrete pile-water permeability concrete pile novel binary composite foundation and treatment method of composite foundation
CN101899827B (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation
CN101451356B (en) Five in one pre-expansion ecological pile body processing foundation method
CN201330403Y (en) Composite foundation with lateral confinement structure
CN103321217A (en) Composite foundation pile for lava regions
CN203346875U (en) Foundation composite pile for lava area
CN102677671B (en) Construction method of precast pile in thick-slag-stone-layer field
CN103306275A (en) Construction method for preformed end bearing pile in lava region
CN204530685U (en) A kind of cement-soil stiff composite pile
CN206736895U (en) A kind of joint bar repairing type CFG stakes
CN112195909A (en) Method for reinforcing soft foundation of road and parking lot
CN204530683U (en) A kind of pile making device ramming expansion CFG stake for spiral pore-forming
CN104278660A (en) Method for constructing earth-rock dam directly consolidated and reinforced by horizontal buried pipe layered injected slurry
CN207419448U (en) A kind of NEW TYPE OF COMPOSITE foundation pile based on static pressure construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925