CN103321191A - Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam - Google Patents

Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam Download PDF

Info

Publication number
CN103321191A
CN103321191A CN2013102504408A CN201310250440A CN103321191A CN 103321191 A CN103321191 A CN 103321191A CN 2013102504408 A CN2013102504408 A CN 2013102504408A CN 201310250440 A CN201310250440 A CN 201310250440A CN 103321191 A CN103321191 A CN 103321191A
Authority
CN
China
Prior art keywords
dam
concrete
width
weir
overflow weir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102504408A
Other languages
Chinese (zh)
Inventor
王惠芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN2013102504408A priority Critical patent/CN103321191A/en
Publication of CN103321191A publication Critical patent/CN103321191A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a dam body flood discharging and energy dissipating arranging method for a concrete-faced rockfill dam. The method includes that 1 a spillway is arranged along the downstream dam face in the direction from the dam top of the concrete-faced rockfill dam to a river bed at the dam bottom, the spillway is composed of an overflow weir arranged at the dam top, a discharging groove formed in the downstream dam face and a stilling pool arranged at the position of the river bed at the dam bottom, the weir top width of the overflow weir is 1-3 times as large as the seam width of a concrete face, the seam width of the overflow weir is consistent with that of the concrete face, the width of a weir head of the overflow weir is smaller than or equal to 4m, and the single-width discharging quantity is smaller than or equal to 15m<3>/s*m; 2 a base plate of the discharging groove is arranged to be of a step structure and formed by pouring concrete or laying squared stones, the step height is 0.8m-1.2m, and pull steel bars are arranged in steps and embedded in a dam body rockfill body. The method has the advantages of optimizing junction layout, solving the problem that the spillway on the bank side is difficult to arrange, omitting excavation of spillways in bank slopes and reduces project investment.

Description

The flood discharge of Concrete Face Rockfill Dam dam body and energy dissipating method for arranging
Technical field
The present invention relates to the medium and small project Concrete Face Rockfill Dam, especially relate to the flood discharge of Concrete Face Rockfill Dam dam body and energy dissipating method for arranging.
Background technology
Concrete Face Rockfill Dam outlet structure escape works arrangement form, should be comprehensively more definite according to the hinge condition, at the favourable dam site of orographic condition, be main outlet structure escape works with open spillway generally, when arranging that open spillway truly has at need, also can adopt flood-discharge tunnel, but should adopt the open type import, connect flood discharging tunnel down.For the medium and small engineering Concrete Face Rockfill Dam of height of dam less than 70m, little when flood discharge, when the riverbed basement rock is better, for saving construction investment, can the arrangement form that flood spillway combines with the step energy dissipating be set at dam body, but yet there are no all relevant reports.
Summary of the invention
The object of the invention is to provide the few Concrete Face Rockfill Dam dam body flood discharge of a kind of construction investment and energy dissipating method for arranging.
For achieving the above object, the present invention takes following technical proposals:
Concrete Face Rockfill Dam dam body of the present invention flood discharge and energy dissipating method for arranging, carry out according to following step:
The first step, the riverbed direction arranges flood spillway at the bottom of the Concrete Face Rockfill Dam dam crest is along the downstream dam facing to the dam; Described flood spillway is made up of absorption basin three parts of position, riverbed of letting out at the bottom of groove and the dam of the overflow weir that is arranged in dam crest, downstream dam facing; The weir crest width of described overflow weir is 1-3 times of concrete slab parting width; The parting width of overflow weir is consistent with the parting width of concrete slab; Weir head≤the 4m of overflow weir, single wide discharge≤15m 3/ sm;
Second step, let out trough floor and be set to ledge structure, adopt concreting or work stone to build by laying bricks or stones, shoulder height 0.8m-1.2m is provided with lacing wire and is embedded in the dam body rockfill in the step.
The invention has the advantages that the technical scheme of taking face dam spillway on dam body, step energy dissipating, disspation through hydraudic jimp, be embodied as:
1, flood spillway is arranged in the rock dam body, has optimized the hinge layout, has solved the problem that the bank flood spillway is difficult to arrange, has saved the excavation of bank slope flood spillway;
2, the weir crest current have alleviated the burden of downstream energy-dissipating installation greatly along letting out groove step aeration, deceleration, energy dissipating step by step; By letting out the step energy dissipating of groove, the following sluicing stream energy of flood spillway can be eliminated 50%-70%;
3, flood spillway is terminal adopts the absorption basin energy dissipating, has guaranteed to flow out that the current of absorption basin are can be smooth-going stable enters downstream river course, has improved energy dissipating efficient, has reduced washing away downstream river course;
4, hinge is arranged compactness, has reduced construction investment.
Description of drawings
Fig. 1 is Concrete Face Rockfill Dam spillway on dam body layout schematic diagram of the present invention.
Fig. 2 is Concrete Face Rockfill Dam spillway on dam body cross-sectional view of the present invention.
The specific embodiment
As shown in Figure 1, 2, Concrete Face Rockfill Dam dam body of the present invention flood discharge and energy dissipating method for arranging, carry out according to following step:
The first step, the riverbed direction arranges flood spillway at the bottom of Concrete Face Rockfill Dam dam crest 1 is along downstream dam facing 2 to the dam; Described flood spillway is made up of absorption basin 5 three parts of position, riverbed of letting out at the bottom of groove 4 and the dam of the overflow weir 3 that is arranged in dam crest 1, downstream dam facing 2; The weir crest width of described overflow weir 3 is 3 times of concrete slab parting width; The parting width of overflow weir 3 is consistent with the parting width of concrete slab; Weir head≤the 4m of overflow weir 3, single wide discharge≤15m 3/ sm;
Second step, let out groove 4 base plates and be set to step 6 structures, adopt concreting or work stone to build by laying bricks or stones, described step 6 height 0.8m-1.2m are provided with lacing wire 7 and are embedded in the dam body rockfill in the step 6.

Claims (1)

1. Concrete Face Rockfill Dam dam body flood discharge and energy dissipating method for arranging is characterized in that: carry out according to following step:
The first step, the riverbed direction arranges flood spillway at the bottom of Concrete Face Rockfill Dam dam crest (1) is along downstream dam facing (2) to the dam; Described flood spillway is made up of absorption basin (5) three parts of position, riverbed of letting out at the bottom of groove (4) and the dam of the overflow weir that is arranged in dam crest (1) (3), downstream dam facing (2); The weir crest width of described overflow weir (3) is 1-3 times of concrete slab parting width; The parting width of overflow weir (3) is consistent with the parting width of concrete slab; Weir head≤the 4m of overflow weir (3), single wide discharge≤15m 3/ sm;
Second step, let out groove (4) base plate and be set to step (6) structure, adopt concreting or work stone to build by laying bricks or stones, step (6) height 0.8m-1.2m is provided with lacing wire (7) and is embedded in the dam body rockfill in the step (6).
CN2013102504408A 2013-06-24 2013-06-24 Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam Pending CN103321191A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102504408A CN103321191A (en) 2013-06-24 2013-06-24 Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102504408A CN103321191A (en) 2013-06-24 2013-06-24 Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam

Publications (1)

Publication Number Publication Date
CN103321191A true CN103321191A (en) 2013-09-25

Family

ID=49190215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102504408A Pending CN103321191A (en) 2013-06-24 2013-06-24 Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam

Country Status (1)

Country Link
CN (1) CN103321191A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264639A (en) * 2014-09-11 2015-01-07 四川大学 Underflow type stair stilling pool energy consumption system
CN105442499A (en) * 2015-12-29 2016-03-30 云南华电金沙江中游水电开发有限公司 Self-supporting type panel structural system for 300m-level concrete faced rockfill dam and mounting method for self-supporting type panel structural system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2818548Y (en) * 2005-09-06 2006-09-20 中国水电顾问集团华东勘测设计研究院 Spillway of stone dam body with reinforced concrete panel
JP2009228315A (en) * 2008-03-24 2009-10-08 National Agriculture & Food Research Organization Damping structure for falling water sound-falling water flow in water zone

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2818548Y (en) * 2005-09-06 2006-09-20 中国水电顾问集团华东勘测设计研究院 Spillway of stone dam body with reinforced concrete panel
JP2009228315A (en) * 2008-03-24 2009-10-08 National Agriculture & Food Research Organization Damping structure for falling water sound-falling water flow in water zone

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曹骏: "台阶状混凝土垫层在面板堆石坝坝顶溢洪道中的运用研究", 《水力发电》 *
田嘉宁: "台阶式泄水建筑物水力特性试验研究", 《博士论文电子期刊》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264639A (en) * 2014-09-11 2015-01-07 四川大学 Underflow type stair stilling pool energy consumption system
CN104264639B (en) * 2014-09-11 2016-04-20 四川大学 Underflow type step absorption basin energy-dissipating system
CN105442499A (en) * 2015-12-29 2016-03-30 云南华电金沙江中游水电开发有限公司 Self-supporting type panel structural system for 300m-level concrete faced rockfill dam and mounting method for self-supporting type panel structural system
CN105442499B (en) * 2015-12-29 2017-07-18 云南华电金沙江中游水电开发有限公司 300m grades of rock self-bearing type panel construction systems and installation method

Similar Documents

Publication Publication Date Title
CN103410130B (en) Multi-purpose tunnel arrangement structure
CN102900054A (en) River bank-like flood spillway
CN202500122U (en) Energy dissipator of high-fall sluice
CN104863098A (en) Danger-elimination refitting method for stilling pool downstream energy dissipater
CN210002360U (en) kinds of mountain gorge damming flood discharge structure
CN202913400U (en) River bank spillway
CN103938592B (en) Sediment trapping bank is offered tap hole and carries out the method shunted of damming
CN201933472U (en) Dam structure utilizing flaring piers and dam face small flip buckets to jointly discharge flood and dissipate energy
CN206800348U (en) A kind of apron structure of improvement
CN103321191A (en) Dam body flood discharging and energy dissipating arranging method for concrete-faced rockfill dam
CN210636383U (en) Debris flow blocking dam with slag removal and drainage channel
CN111424620A (en) Hydraulic energy dissipation structure and method
CN106013009A (en) Multi-reverse-slope type stilling pool
CN205000309U (en) Cross fish device suitable for low water head overfall dam
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN101851910A (en) Water guide board arranged on outlet of pressure drainage channel
CN203808025U (en) Intercepting ditch structure for steeper terrain
CN210086181U (en) Sediment dam structure is blocked to formula of permeating water
CN211228408U (en) Landscape type spillway structure
CN204000796U (en) Power station in river channel&#39;s structure
CN202989885U (en) Double-wing wedge-shaped cover plate of novel oblique slot flood discharge system
CN111058422A (en) Water blocking and draining structure
CN208762979U (en) Band blocks water the stilling pond or cushion pool of pier
CN102704451B (en) Double-wing wedge-shaped cover plate of novel chute flood drainage system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925