CN103309723A - 虚拟机资源整合系统及方法 - Google Patents

虚拟机资源整合系统及方法 Download PDF

Info

Publication number
CN103309723A
CN103309723A CN2012100693044A CN201210069304A CN103309723A CN 103309723 A CN103309723 A CN 103309723A CN 2012100693044 A CN2012100693044 A CN 2012100693044A CN 201210069304 A CN201210069304 A CN 201210069304A CN 103309723 A CN103309723 A CN 103309723A
Authority
CN
China
Prior art keywords
virtual machine
server
resource
new virtual
resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100693044A
Other languages
English (en)
Other versions
CN103309723B (zh
Inventor
李忠一
叶建发
彭冠桥
林彦宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guangyun Communication Technology Co ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CN201210069304.4A priority Critical patent/CN103309723B/zh
Publication of CN103309723A publication Critical patent/CN103309723A/zh
Application granted granted Critical
Publication of CN103309723B publication Critical patent/CN103309723B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stored Programmes (AREA)
  • Multi Processors (AREA)

Abstract

一种虚拟机资源整合系统,该系统包括:接收模块,用于接收虚拟机安装请求及新的虚拟机需要的硬件资源;计算模块,用于判断所有服务器的总剩余资源是否大于等于新的虚拟机需要的硬件资源;设定模块,用于当所有服务器的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略;配置模块,用于根据用户设定的资源整合策略收集各台服务器的剩余资源,从收集的服务器中选定一台服务器并将该选定的服务器中原有的虚拟机迁移至其他的服务器,使得该选定的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器中。本发明还提供一种虚拟机资源整合方法。本发明能够提高服务器的资源利用率。

Description

虚拟机资源整合系统及方法
技术领域
本发明涉及一种云计算系统及方法,特别是关于一种虚拟机资源整合系统及方法。
背景技术
云端运算的到来让用户可以通过网络按照需求弹性、方便地使用虚拟技术资源。面对用户提出的虚拟机安装请求,如何提高实体机(例如服务器)的资源利用率成为云端管理者面临的新的难题。
发明内容
鉴于以上内容,有必要提供一种虚拟机资源整合系统,能够整合服务器的剩余资源,提高服务器的资源利用率。
此外,还有必要提供一种虚拟机资源整合方法,能够整合服务器的剩余资源,降低服务器的资源闲置率。
一种虚拟机资源整合系统,运行于主控设备中,该主控设备与多台服务器通信连接,该系统包括:接收模块,用于接收用户的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源;计算模块,用于在单台服务器的剩余资源不能满足新的虚拟机的需要时,计算所有服务器的总剩余资源,判断所有服务器的总剩余资源是否大于等于新的虚拟机需要的硬件资源;设定模块,用于当所有服务器的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略;配置模块,用于根据用户设定的资源整合策略按照一定的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,从收集的服务器中选定一台服务器并将该选定的服务器中原有的虚拟机迁移至其他的服务器,使得该选定的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器中。
一种虚拟机资源整合方法,应用于主控设备中,该主控设备与多台服务器通信连接,该方法包括:接收步骤,接收用户的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源;计算步骤,在单台服务器的剩余资源不能满足新的虚拟机的需要时,计算所有服务器的总剩余资源,判断所有服务器的总剩余资源是否大于等于新的虚拟机需要的硬件资源;设定步骤,当所有服务器的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略;配置步骤,根据用户设定的资源整合策略按照一定的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,从收集的服务器中选定一台服务器并将该选定的服务器中原有的虚拟机迁移至其他的服务器,使得该选定的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器中。
本发明能够整合分散在不同服务器上的剩余资源,将这些剩余资源用于创建新的虚拟机,从而提高各台服务器的资源利用率。
附图说明
图1为本发明虚拟机资源整合系统较佳实施例的应用环境示意图。
图2为图1中虚拟机资源整合系统的功能模块图。
图3为本发明虚拟机资源整合方法较佳实施例的流程图。
主要元件符号说明
虚拟机资源整合系统 10
主控设备 11
数据中心 12
服务器 13
网络 14
客户端 15
存储设备 16
处理器 17
接收模块 200
计算模块 210
设定模块 220
配置模块 230
如下具体实施方式将结合上述附图进一步说明本发明。
具体实施方式
参阅图1所示,是本发明虚拟机资源整合系统较佳实施例的应用环境示意图。所述虚拟机资源整合系统10安装并运行于主控设备11中。该主控设备11与数据中心12中的多台服务器13通过网络14相连接。每台服务器13中安装有一台或多台虚拟机。多个客户端15连接至网络14。所述主控设备11还包括存储设备16及处理器17。所述存储设备16存储虚拟机资源整合系统10的计算机化程序代码及运行中所需的数据。所述处理器17执行所述虚拟机资源整合系统10的计算机化程序代码,在单台服务器13剩余资源不足时,整合各台服务器13的剩余资源用以创建新的虚拟机。所述网络14可以是内部网(Intranet),也可以是互联网(Internet)或其它类型的通讯网络,如GPRS、Wi-Fi/WLAN、3G/WCDMA、3.5G/HSDPA等。
参阅图2所示,是图1中虚拟机资源整合系统10的功能模块图。该虚拟机资源整合系统10包括接收模块200、计算模块210、设定模块220及配置模块230。
所述接收模块200用于接收用户通过客户端15提出的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源。所述硬件资源包括,但不限于CPU、内存和硬盘。例如,用户请求安装新的虚拟机VM1,并设定为该新的虚拟机VM1分配2个CPU。
所述计算模块210用于在单台服务器13的剩余资源不能满足新的虚拟机的需要时,计算所有服务器13的总剩余资源。例如,数据中心12包括三台服务器13分别记为Server1、Server2与Server3,其中,Server1无剩余CPU,Server2剩余1个CPU,Server3剩余2个CPU。服务器Server1、Server2与Server3共剩余3个CPU。
所述计算模块210还用于将所有服务器13的总剩余资源与新的虚拟机需要的硬件资源相比较,判断是否有足够的剩余资源。若所有服务器13的总剩余资源大于等于新的虚拟机需要的硬件资源,则有足够的剩余资源。例如,若用户请求为新的虚拟机VM1分配2个CPU,服务器Server1、Server2与Server3共剩余3个CPU,则有足够的剩余资源。
所述设定模块220用于当所有服务器13的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略。所述资源整合策略包括循序收集策略及最大剩余优先策略。其中,循序收集策略是按照预先设定的顺序(例如按照各台服务器13编号由小到大的顺序)收集各台服务器13的剩余资源。所述预先设定的顺序是与剩余资源大小无关的顺序。最大剩余优先策略是根据各台服务器13剩余资源的大小,对剩余资源最大的服务器13优先收集。
所述配置模块230用于根据用户设定的资源整合策略按照一定的顺序收集各台服务器13的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,从收集的服务器13中选定一台服务器13并将该选定的服务器13中原有的虚拟机迁移至其他的服务器13,使得该选定的服务器13的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器13中。
当用户设定的资源整合策略为循序收集策略时,配置模块230按照预先设定的顺序收集各台服务器13的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集。配置模块230将最先收集的服务器13中原有的虚拟机迁移至其他的服务器13,使得该最先收集的服务器13的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该最先收集的服务器13中。在本实施例中,配置模块230优先将最先收集的服务器13中原有的虚拟机迁移至收集的其他的(指最先收集的服务器13之外的)服务器13。
当用户设定的资源整合策略为最大剩余优先策略时,配置模块230从具有最大剩余资源的服务器13开始,按照剩余资源从大到小的顺序收集各个服务器13的剩余资源,当收集的剩余资源之和满足新的虚拟机需要时停止收集,将具有最大剩余资源的服务器13中原有的虚拟机迁移至其他的服务器13,使得该具有最大剩余资源的服务器13的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该具有最大剩余资源的服务器13中。在本实施例中,配置模块230优先将具有最大剩余资源的服务器13中原有的虚拟机迁移至收集的其他的(指具有最大剩余资源的服务器13之外的)服务器13。
参阅图3所示,是本发明虚拟机资源整合方法较佳实施例的流程图。
步骤S301,接收模块200接收用户通过客户端15提出的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源。所述硬件资源包括,但不限于CPU、内存和硬盘。例如,用户请求安装新的虚拟机VM1,并设定为该新的虚拟机VM1分配2个CPU。
当单台服务器13的剩余资源不能满足新的虚拟机的需要时,步骤S302,计算模块210计算所有服务器13的总剩余资源。例如,数据中心12包括三台服务器13分别记为Server1、Server2与Server3,其中,Server1无剩余CPU,Server2剩余1个CPU,Server3剩余2个CPU。服务器Server1、Server2与Server3共剩余3个CPU。
步骤S303,计算模块210将所有服务器13的总剩余资源与新的虚拟机需要的硬件资源相比较,判断是否有足够的剩余资源。若所有服务器13的总剩余资源大于等于新的虚拟机需要的硬件资源,则有足够的剩余资源。例如,若用户请求为新的虚拟机VM1分配2个CPU,服务器Server1、Server2与Server3共剩余3个CPU,则有足够的剩余资源。若没有足够的剩余资源,则流程结束。
若有足够的剩余资源,步骤S304,设定模块220接收用户设定的资源整合策略。所述资源整合策略包括循序收集策略及最大剩余优先策略。其中,循序收集策略是按照预先设定的顺序(例如按照各台服务器13编号由小到大的顺序)收集各台服务器13的剩余资源。最大剩余优先策略是根据各台服务器13剩余资源的大小,对剩余资源最大的服务器13优先收集。
若用户设定的资源整合策略为循序收集策略,步骤S305,配置模块230按照预先设定的顺序收集各台服务器13的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集。
步骤S306,配置模块230将最先收集的服务器13中原有的虚拟机迁移至其他的服务器13,使得该最先收集的服务器13的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该最先收集的服务器13中。
若用户设定的资源整合策略为最大剩余优先策略,步骤S307,配置模块230从具有最大剩余资源的服务器13开始,按照剩余资源从大到小的顺序收集各个服务器13的剩余资源,当收集的剩余资源之和满足新的虚拟机需要时停止收集。
步骤S308,配置模块230将具有最大剩余资源的服务器13中原有的虚拟机迁移至其他的服务器13,使得该具有最大剩余资源的服务器13的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该具有最大剩余资源的服务器13中。

Claims (10)

1.一种虚拟机资源整合系统,运行于主控设备中,该主控设备与多台服务器通信连接,其特征在于,该系统包括:
接收模块,用于接收用户的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源;
计算模块,用于在单台服务器的剩余资源不能满足新的虚拟机的需要时,计算所有服务器的总剩余资源,判断所有服务器的总剩余资源是否大于等于新的虚拟机需要的硬件资源;
设定模块,用于当所有服务器的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略;
配置模块,用于根据用户设定的资源整合策略按照一定的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,从收集的服务器中选定一台服务器并将该选定的服务器中原有的虚拟机迁移至其他的服务器,使得该选定的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器中。
2.如权利要求1所述的虚拟机资源整合系统,其特征在于,所述资源整合策略包括循序收集策略及最大剩余优先策略。
3.如权利要求2所述的虚拟机资源整合系统,其特征在于,当用户设定的资源整合策略为循序收集策略时,所述配置模块按照与剩余资源大小无关的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,将最先收集的服务器中原有的虚拟机迁移至其他的服务器,使得该最先收集的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该最先收集的服务器中。
4.如权利要求2所述的虚拟机资源整合系统,其特征在于,当用户设定的资源整合策略为最大剩余优先策略时,所述配置模块从具有最大剩余资源的服务器开始,按照剩余资源从大到小的顺序收集各个服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机需要时停止收集,将具有最大剩余资源的服务器中原有的虚拟机迁移至其他的服务器,使得该具有最大剩余资源的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该具有最大剩余资源的服务器中。
5.如权利要求1所述的虚拟机资源整合系统,其特征在于,所述新的虚拟机需要的硬件资源包括CPU、内存和硬盘。
6.一种虚拟机资源整合方法,应用于主控设备中,该主控设备与多台服务器通信连接,其特征在于,该方法包括:
接收步骤,接收用户的虚拟机安装请求及用户设定的新的虚拟机需要的硬件资源;
计算步骤,在单台服务器的剩余资源不能满足新的虚拟机的需要时,计算所有服务器的总剩余资源,判断所有服务器的总剩余资源是否大于等于新的虚拟机需要的硬件资源;
设定步骤,当所有服务器的总剩余资源大于等于新的虚拟机需要的硬件资源时,接收用户设定的资源整合策略;
配置步骤,根据用户设定的资源整合策略按照一定的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,从收集的服务器中选定一台服务器并将该选定的服务器中原有的虚拟机迁移至其他的服务器,使得该选定的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该选定的服务器中。
7.如权利要求6所述的虚拟机资源整合方法,其特征在于,所述资源整合策略包括循序收集策略及最大剩余优先策略。
8.如权利要求7所述的虚拟机资源整合方法,其特征在于,当用户设定的资源整合策略为循序收集策略时,所述配置步骤按照与剩余资源大小无关的顺序收集各台服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机的需要时停止收集,将最先收集的服务器中原有的虚拟机迁移至其他的服务器,使得该最先收集的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该最先收集的服务器中。
9.如权利要求7所述的虚拟机资源整合方法,其特征在于,当用户设定的资源整合策略为最大剩余优先策略时,所述配置步骤从具有最大剩余资源的服务器开始,按照剩余资源从大到小的顺序收集各个服务器的剩余资源,当收集的剩余资源之和满足新的虚拟机需要时停止收集,将具有最大剩余资源的服务器中原有的虚拟机迁移至其他的服务器,使得该具有最大剩余资源的服务器的剩余资源满足新的虚拟机的需要,并将新的虚拟机配置在该具有最大剩余资源的服务器中。
10.如权利要求6所述的虚拟机资源整合方法,其特征在于,所述新的虚拟机需要的硬件资源包括CPU、内存和硬盘。
CN201210069304.4A 2012-03-16 2012-03-16 虚拟机资源整合系统及方法 Expired - Fee Related CN103309723B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210069304.4A CN103309723B (zh) 2012-03-16 2012-03-16 虚拟机资源整合系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210069304.4A CN103309723B (zh) 2012-03-16 2012-03-16 虚拟机资源整合系统及方法

Publications (2)

Publication Number Publication Date
CN103309723A true CN103309723A (zh) 2013-09-18
CN103309723B CN103309723B (zh) 2016-08-10

Family

ID=49134982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210069304.4A Expired - Fee Related CN103309723B (zh) 2012-03-16 2012-03-16 虚拟机资源整合系统及方法

Country Status (1)

Country Link
CN (1) CN103309723B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103593249A (zh) * 2013-11-13 2014-02-19 华为技术有限公司 一种ha预警方法及虚拟资源管理器
CN103685542A (zh) * 2013-12-23 2014-03-26 重庆广播电视大学 云虚拟机迁移方法、装置和系统
CN105224389A (zh) * 2015-09-23 2016-01-06 电子科技大学 基于线性相关性及分段性装箱理论的虚拟机资源整合方法
WO2016058415A1 (zh) * 2014-10-17 2016-04-21 华为技术有限公司 一种应用伸缩管理方法及装置
CN106959886A (zh) * 2017-05-15 2017-07-18 河南科技学院 一种基于云计算的虚拟机部署管控平台及使用方法
CN108810170A (zh) * 2018-07-19 2018-11-13 中国联合网络通信集团有限公司 资源配置方法及系统
WO2021013185A1 (zh) * 2019-07-22 2021-01-28 中兴通讯股份有限公司 虚机迁移处理及策略生成方法、装置、设备及存储介质
TWI779321B (zh) * 2020-07-22 2022-10-01 宏碁股份有限公司 資源整合系統及資源整合方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070006218A1 (en) * 2005-06-29 2007-01-04 Microsoft Corporation Model-based virtual system provisioning
CN101449258A (zh) * 2006-05-18 2009-06-03 微软公司 基于工作负载表征将虚拟机部署到主机
CN102170474A (zh) * 2011-04-22 2011-08-31 广州杰赛科技股份有限公司 一种云计算网络中虚拟资源动态调度方法及系统
CN102279771A (zh) * 2011-09-02 2011-12-14 北京航空航天大学 一种虚拟化环境中自适应按需资源分配的方法及系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070006218A1 (en) * 2005-06-29 2007-01-04 Microsoft Corporation Model-based virtual system provisioning
CN101449258A (zh) * 2006-05-18 2009-06-03 微软公司 基于工作负载表征将虚拟机部署到主机
CN102170474A (zh) * 2011-04-22 2011-08-31 广州杰赛科技股份有限公司 一种云计算网络中虚拟资源动态调度方法及系统
CN102279771A (zh) * 2011-09-02 2011-12-14 北京航空航天大学 一种虚拟化环境中自适应按需资源分配的方法及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨子夜等: "利用虚拟机动态迁移技术整合虚拟和模拟环境", 《小型微型计算机系统》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103593249A (zh) * 2013-11-13 2014-02-19 华为技术有限公司 一种ha预警方法及虚拟资源管理器
CN103593249B (zh) * 2013-11-13 2016-02-03 华为技术有限公司 一种ha预警方法及虚拟资源管理器
CN103685542A (zh) * 2013-12-23 2014-03-26 重庆广播电视大学 云虚拟机迁移方法、装置和系统
CN103685542B (zh) * 2013-12-23 2016-06-29 重庆广播电视大学 云虚拟机迁移方法、装置和系统
WO2016058415A1 (zh) * 2014-10-17 2016-04-21 华为技术有限公司 一种应用伸缩管理方法及装置
US10133606B2 (en) 2014-10-17 2018-11-20 Huawei Technologies Co., Ltd. Application scaling management method and apparatus that uses distances between data centers and network resources of data centers to select a data center for expansion
CN105224389A (zh) * 2015-09-23 2016-01-06 电子科技大学 基于线性相关性及分段性装箱理论的虚拟机资源整合方法
CN105224389B (zh) * 2015-09-23 2018-07-13 电子科技大学 基于线性相关性及分段性装箱理论的虚拟机资源整合方法
CN106959886A (zh) * 2017-05-15 2017-07-18 河南科技学院 一种基于云计算的虚拟机部署管控平台及使用方法
CN108810170A (zh) * 2018-07-19 2018-11-13 中国联合网络通信集团有限公司 资源配置方法及系统
WO2021013185A1 (zh) * 2019-07-22 2021-01-28 中兴通讯股份有限公司 虚机迁移处理及策略生成方法、装置、设备及存储介质
TWI779321B (zh) * 2020-07-22 2022-10-01 宏碁股份有限公司 資源整合系統及資源整合方法

Also Published As

Publication number Publication date
CN103309723B (zh) 2016-08-10

Similar Documents

Publication Publication Date Title
CN103309723A (zh) 虚拟机资源整合系统及方法
EP3335120B1 (en) Method and system for resource scheduling
CN103164253A (zh) 虚拟机部署系统及方法
US20050262505A1 (en) Method and apparatus for dynamic memory resource management
US20140040895A1 (en) Electronic device and method for allocating resources for virtual machines
JP5596716B2 (ja) リソース管理装置、リソース管理システム、リソース管理方法およびリソース管理プログラム
JP2012079242A (ja) 複合イベント分散装置、複合イベント分散方法および複合イベント分散プログラム
CN103530185A (zh) 资源优化方法及装置
CN107967164B (zh) 一种虚拟机热迁移的方法及系统
US20120233313A1 (en) Shared scaling server system
CN104077188A (zh) 一种用于任务调度的方法和装置
CN104468737A (zh) 一种基于业务类别特征的存储分级调度方法及系统
Varma et al. Performance analysis of cloud computing using queuing models
CN114780244A (zh) 容器云资源弹性分配方法、装置、计算机设备及介质
CN106789421B (zh) 协同设计的方法和装置
CN113608869A (zh) 任务调度方法、装置、电子设备和计算机存储介质
Yeh et al. Fog computing task scheduling optimization based on multi-objective simplified swarm optimization
KR20150007698A (ko) 가상 데스크탑 서비스를 위한 부하 분산 시스템
CN113568756B (zh) 一种密码资源协同动态调度方法和系统
CN109800085B (zh) 资源配置的检测方法、装置、存储介质和电子设备
JP2005501335A (ja) コンピュータ・リソースの負荷をコンピュータの間で分散する方法及びシステム
CN109347982A (zh) 一种数据中心的调度方法及装置
US20150079966A1 (en) Methods for facilitating telecommunication network administration and devices thereof
JP2013196695A (ja) 仮想マシン割り当てシステム及びその方法
JP5388134B2 (ja) 計算機システム、及び、移動データ決定方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160318

Address after: 518109 Guangdong province Shenzhen city Longhua District Dragon Road No. 83 wing group building 11 floor

Applicant after: SCIENBIZIP CONSULTING (SHEN ZHEN) Co.,Ltd.

Address before: 518109 Guangdong city of Shenzhen province Baoan District Longhua Town Industrial Zone tabulaeformis tenth East Ring Road No. 2 two

Applicant before: HONG FU JIN PRECISION INDUSTRY (SHENZHEN) Co.,Ltd.

Applicant before: HON HAI PRECISION INDUSTRY Co.,Ltd.

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160603

Address after: 518000 Guangdong Province, Shenzhen New District of Longhua City, Dalang street, Hua Sheng Lu Yong Jingxuan commercial building 1608

Applicant after: Jinyang Shenzhen sea Network Intelligent Technology Co.,Ltd.

Address before: 518109 Guangdong province Shenzhen city Longhua District Dragon Road No. 83 wing group building 11 floor

Applicant before: SCIENBIZIP CONSULTING (SHEN ZHEN) Co.,Ltd.

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Youlei

Inventor after: Wang Mei

Inventor after: Cao Xu

Inventor before: Li Zhongyi

Inventor before: Ye Jianfa

Inventor before: Peng Guanqiao

Inventor before: Lin Yanhong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160701

Address after: Laishan Mingda road 264000 Shandong city of Yantai province No. 11

Applicant after: Shandong Smart Life Data System Co.,Ltd.

Address before: 518000 Guangdong Province, Shenzhen New District of Longhua City, Dalang street, Hua Sheng Lu Yong Jingxuan commercial building 1608

Applicant before: Jinyang Shenzhen sea Network Intelligent Technology Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190228

Address after: 264000 B Hall, Second Floor, Tourist World, 128 Dama Road, Zhifu District, Yantai City, Shandong Province

Patentee after: SHANDONG GUANGYUN COMMUNICATION TECHNOLOGY CO.,LTD.

Address before: 264000 Mingda West Road, Laishan District, Yantai, Shandong Province, No. 11

Patentee before: Shandong Smart Life Data System Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810