CN103307698B - Air conditioning system and control method and device thereof - Google Patents

Air conditioning system and control method and device thereof Download PDF

Info

Publication number
CN103307698B
CN103307698B CN201210071827.2A CN201210071827A CN103307698B CN 103307698 B CN103307698 B CN 103307698B CN 201210071827 A CN201210071827 A CN 201210071827A CN 103307698 B CN103307698 B CN 103307698B
Authority
CN
China
Prior art keywords
compressor
premises station
priority level
running priority
running
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210071827.2A
Other languages
Chinese (zh)
Other versions
CN103307698A (en
Inventor
黄强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201210071827.2A priority Critical patent/CN103307698B/en
Publication of CN103307698A publication Critical patent/CN103307698A/en
Application granted granted Critical
Publication of CN103307698B publication Critical patent/CN103307698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention provides an air conditioning system and a control method and device thereof, which are used for solving the problem of unbalanced use of each compressor of the air conditioning system in the prior art. The method comprises the following steps: controlling each compressor to start according to the preset operation priority of the compressor; monitoring the operation condition of each compressor; when the running condition of the compressor reaches a preset compressor rotation condition, resetting the running priority of the compressor; and controlling the compressor to operate according to the reset operation priority of the compressor. By adopting the technical scheme of the invention, each compressor of the air conditioner can be fully utilized, the overall service life of the air conditioner is prolonged, the cost of daily maintenance is reduced, and the working efficiency of an air conditioning system is improved.

Description

Air conditioning system and control method thereof and device
Technical field
The present invention relates to air-conditioner field, particularly relate to a kind of air conditioning system and control method thereof and device.
Background technology
Currently for comprising the air conditioning system of multiple compressors, existing air conditioning system is mainly according to each compressor rated power Size, sets certain priority to each compressor, and according to the height of each compressor priority, control system is compressor Distribution load, to reach refrigeration or heating effect.
According to the scheme of prior art, when air conditioning system is run the most under low loading conditions, the low compressor of priority without Method is run, and the compressor long-play that priority is high, cause each compressor of air conditioning system to use unbalanced, cause dimension Protect difficulty.And for the air conditioning system of many off-premises stations, be allocated owing to payload is directed to compressor, cause greatly When running under loading condiction, compressor operating load fluctuation is bigger.
Additionally, there is also a kind of air conditioning system, including multiple off-premises stations, each off-premises station includes one or more compressor, right When this air conditioning system is controlled, according to the priority of off-premises station, first start the off-premises station that priority is the highest, this off-premises station During startup, start the compressor of this off-premises station successively, then start the off-premises station that priority is taken second place, start the compression of this off-premises station Machine, by that analogy, until the requirement of load.This air conditioning system, for off-premises station distribution load, can avoid respective compressive machine The problem that operating load fluctuation is big.
But in this manner, when air conditioning system is run under low loading conditions, the low off-premises station of priority and this off-premises station Compressor still cannot run, cause the off-premises station of air conditioning system and compressor thereof to use unbalanced.
Use unbalanced problem for each compressor of air conditioning system present in prior art, the most not yet propose effective Solution.
Summary of the invention
The main object of the present invention is to provide a kind of air conditioning system and control method thereof and device, to solve air-conditioning system in prior art Each compressor of system uses unbalanced problem.
In order to realize object above, according to an aspect of the invention, it is provided the control method of a kind of air conditioning system, the method Including: control each compressor start according to the running priority level of default compressor;Monitor the ruuning situation of each compressor; When the ruuning situation of compressor reaches default compressor rotation condition, reset the running priority level of compressor;Control pressure Contracting machine runs according to the running priority level of the compressor reset.
Further, air conditioning system includes that multiple off-premises station, each off-premises station include multiple compressor, according to default compressor Running priority level control each compressor start and include: control each off-premises station according to the running priority level of default off-premises station and open Dynamic;Running priority level according to each compressor in same off-premises station controls the compressor start in this off-premises station.
Further, the control method that the present invention provides also includes: monitor the ruuning situation of each off-premises station;When each off-premises station Ruuning situation when reaching default off-premises station rotation condition, reset the running priority level of off-premises station;Control off-premises station according to The running priority level of the off-premises station reset is run.
Further, the off-premises station of air conditioning system includes a frequency-changeable compressor and multiple invariable frequency compressor, according to default compression The running priority level of machine controls each compressor start and includes: first starts frequency-changeable compressor, then determines frequency compression according to preset The running priority level of machine controls each invariable frequency compressor and starts;The ruuning situation monitoring each compressor includes: monitor each fixed frequency The ruuning situation of compressor;When the ruuning situation of compressor reaches default compressor rotation condition, reset compressor Running priority level includes: when the ruuning situation of invariable frequency compressor reaches default compressor rotation condition, resets and determines frequency pressure The running priority level of contracting machine;Control compressor to include according to the running priority level operation of the compressor reset: first start change Frequently compressor, then controls invariable frequency compressor and runs according to the running priority level of the invariable frequency compressor reset.
Further, the ruuning situation of compressor reaches default compressor rotation condition and includes following any one or more condition: The actual run time of the compressor that the operation time is the longest exceedes the time of default compressor operating;One or more compressors go out Existing operation troubles;The time of the running priority level of the compressor reset away from last time exceedes default time interval;User sends Reset the control command of compressor operating priority.
Further, reset the running priority level of compressor and use following any one or various ways: to all compressions The operation time of machine sorts, and resets the running priority level of compressor according to this sequence;By this running priority level The running priority level of high compressor is set as minimum, and the running priority level of remaining compressor is constant;Duty is occurred abnormal The priority of compressor be set to minimum, the running priority level of remaining compressor is constant;Control instruction according to user sets pressure The running priority level of contracting machine.
Further, the ruuning situation of each off-premises station reaches default off-premises station rotation condition and includes following any one or more Condition: the actual run time of the off-premises station that the operation time is the longest exceedes the time that default off-premises station runs;One or more rooms There is operation troubles in outer machine;The time of the running priority level of the off-premises station reset away from last time exceedes default time interval;With Family sends the control command resetting off-premises station running priority level.
Further, reset the running priority level of off-premises station and use following any one or various ways: to all outdoors The operation time of machine sorts, and resets the running priority level of off-premises station according to this sequence;By this running priority level The running priority level of high off-premises station is set as minimum, and the running priority level of remaining off-premises station is constant;Duty is occurred abnormal The priority of off-premises station be set to minimum, the running priority level of remaining off-premises station is constant;Control instruction according to user sets room The running priority level of outer machine.
According to an aspect of the invention, it is provided the control method of another kind of air conditioning system, the method includes: according to default The running priority level of off-premises station controls each off-premises station and starts;Monitor the ruuning situation of each off-premises station;Fortune when each off-premises station When market condition reaches default off-premises station rotation condition, reset the running priority level of off-premises station;Control each off-premises station according to The running priority level of the off-premises station reset is run.
Further, each off-premises station includes one or more compressor.
According to another aspect of the present invention, it is provided that the control device of a kind of air conditioning system, this device includes: compressor start Control unit, for controlling each compressor start according to the running priority level of the compressor preset;Compressor monitoring means, uses In the ruuning situation monitoring each compressor;Compressor priority level initializing unit, for reaching default when the ruuning situation of compressor Compressor rotation condition time, reset the running priority level of compressor;Compressor operating control unit, is used for controlling air-conditioning The compressor of system runs according to the running priority level of the compressor reset.
According to another aspect of the present invention, it is provided that the control device of another kind of air conditioning system, this device includes: off-premises station opens Dynamic control unit, controls each described off-premises station according to the running priority level of default off-premises station and starts;Off-premises station monitoring means, For monitoring the ruuning situation of each off-premises station;Off-premises station priority level initializing unit, for reaching when the ruuning situation of each off-premises station During to the off-premises station rotation condition preset, reset the running priority level of off-premises station;Off-premises station runs control unit, is used for controlling Off-premises station processed runs according to the running priority level of the off-premises station reset.
According to another aspect of the present invention, it is provided that a kind of air conditioning system, it is characterised in that this air conditioning system includes above-mentioned Control device.
According to technical scheme, control each compressor start according to the running priority level of default compressor;Monitoring is each The ruuning situation of individual compressor;When the ruuning situation of compressor reaches default compressor rotation condition, reset compressor Running priority level;Control compressor to run according to the running priority level of the compressor reset.Make each pressure of air conditioning system Contracting machine can be fully utilized, and improves the overall work life-span of air conditioning system, reduces the cost of regular maintenance, improve sky The work efficiency of adjusting system.
Accompanying drawing explanation
Figure of description is used for providing a further understanding of the present invention, constitutes the part of the application, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the control method of air conditioning system according to embodiments of the present invention;
Fig. 2 is the schematic diagram controlling device of air conditioning system according to embodiments of the present invention;
Fig. 3 is the schematic diagram controlling device of the air conditioning system of according to embodiments of the present invention two;
Fig. 4 is the particular flow sheet of the off-premises station startup of air conditioner system control method according to embodiments of the present invention;
Fig. 5 is the particular flow sheet of the compressor start of air conditioner system control method according to embodiments of the present invention.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutually combined. Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1 is the schematic diagram of the control method of air conditioning system according to embodiments of the present invention, as it is shown in figure 1, the method is mainly wrapped Include following steps:
Step S11: control each compressor start according to the running priority level of default compressor;
Step S13: monitor the ruuning situation of each compressor;
Step S15: when the ruuning situation of compressor reaches default compressor rotation condition, the operation resetting compressor is excellent First level;
Step S17: control compressor and run according to the running priority level of the compressor reset.
According to the difference of the condition of use, when air-conditioning is operated, the power requirement of output is different, this just require air conditioning system according to The output being actually needed opens the compressor of corresponding power, and described step S11 controls pressure according to the running priority level of compressor The boot sequence of contracting machine, the compressor that priority is the highest more early starts, when the compressor horsepower started reaches demanded power output, It is not then turned on priority compressor rearward.
Above-mentioned steps S13, after compressor start brings into operation, the ruuning situation of monitoring compressor, this ruuning situation can include The operation time of compressor, duty, output etc..
Above-mentioned steps S15, the compressor operating situation obtained according to step S13, judge with the rotation condition of compressor, when When the ruuning situation of compressor reaches compressor rotation condition, reset the running priority level of compressor.
The mode resetting compressor operating priority has multiple:
Priority level initializing mode one: sort the operation time of all compressors, the compressor running shortest time is preferential Level is the highest, and the operation time, the priority of next was taken second place, and by that analogy, runs time the longest compressor priority minimum, so Rotation ensures that all of compressor can be used, and the time of operation is average.
Priority level initializing mode two: according to the height of priority, compressor is arranged to operation queue, during each rotation, by this The compressor that running priority level is the highest is placed on the last of queue, and remaining compressor order priority promotes, and so operation avoids certain The service life reduction that compressor causes because running time overlength.
Priority level initializing mode three: during rotation, duty is occurred that the priority of abnormal compressor is set to minimum, it is ensured that empty Adjusting system, in the case of can normally using, is safeguarded.
Priority level initializing mode four: user sends the control command resetting compressor operating priority, according to the instruction of user Reset the running priority level of compressor, improve the motility that user is actually used.
The rotation condition of compressor can be configured according to practical operation situation, and concrete rotation condition can also be by multiple:
Rotation condition one: the actual run time of the compressor that the operation time is the longest exceedes the time of default compressor operating, root According to compressor operating time rotation, when the compressor operating time that priority is the highest reaches default limit value, excellent to compressor First level resets, and this mode can ensure that the operation time average of compressor.
Rotation condition two: operation troubles occur in one or more compressors, according to compressor operating operating mode rotation, works as Partial shrinkage When operation irregularity occurs in machine, the priority of compressor is reset, it is ensured that the overall work of air conditioning system is steady.
Rotation condition three: the time of the running priority level of the compressor reset away from last time exceedes default time interval, the most just Being set time rotation, every such as one month set time, reset the priority of compressor, this mode is For simplicity, but underaction.
Rotation condition four: user sends the control command resetting compressor operating priority, sets again according to the instruction of user Determine the running priority level of compressor, improve the motility that user is actually used.
Above rotation condition can configure according to actual needs, may be used alone, can also be combi use.
For comprising multiple off-premises station, off-premises station includes the air conditioning system of one or more compressor, it is possible to use off-premises station rotation Method, it is possible to use off-premises station and the method for the common rotation of compressor.
The method of off-premises station rotation is included: control each off-premises station according to the running priority level of default off-premises station and start;Monitoring The ruuning situation of each off-premises station;When the ruuning situation of each off-premises station reaches default off-premises station rotation condition, reset The running priority level of off-premises station;Control each off-premises station to run according to the running priority level of the off-premises station reset.This method The situation of a compressor can be included, it is also possible to include the situation of multiple compressor for each off-premises station for each off-premises station. The compressor of each off-premises station can start in a fixed order, it is also possible to carries out rotation startup.
Include the situation of multiple compressor for each off-premises station, above-mentioned steps S11 just may include that first according to off-premises station Running priority level controls off-premises station and starts;Compressor in the most each off-premises station controls this room according to the running priority level of compressor Compressor start in outer machine.The compressor of each off-premises station can start according to fixing running priority level, it is also possible to compression The running priority level of machine carries out rotation according to the operation shift process of compressor above.
The rotation condition of off-premises station and priority level initializing mode are referred to the rotation condition of compressor and enter with priority level initializing mode OK, it is however generally that the rotation time of compressor should be less than the rotation time of off-premises station.The off-premises station being equivalent to air-conditioning carries out big Priority rotation circulates, and the compressor of each off-premises station carries out little priority rotation circulation.Such as:
The ruuning situation of each off-premises station reaches default off-premises station rotation condition and includes following any one or more condition: run The actual run time of the off-premises station that the time is the longest exceedes the time that default off-premises station runs;There is fortune in one or more off-premises stations Row fault;The time of the running priority level of the off-premises station reset away from last time exceedes default time interval;User sends again Set the control command of off-premises station running priority level.
Reset the running priority level of off-premises station and use following any one or various ways: during to the operation of all off-premises stations Between sort, reset the running priority level of off-premises station according to this sequence;By off-premises station the highest for this running priority level Running priority level be set as minimum, the running priority level of remaining off-premises station is constant;There is abnormal off-premises station in duty Priority is set to minimum, and the running priority level of remaining off-premises station is constant;Control instruction according to user sets the operation of off-premises station Priority.
The kind of the compressor of air conditioning system is probably different, as each off-premises station includes a frequency-changeable compressor and some fixed Frequently compressor.This air conditioning system is for coping with external load change, the advantage better profiting from frequency-changeable compressor, it is necessary to Preferentially use frequency-changeable compressor.For this situation, the control method that the embodiment of the present invention provides can also include: first starts Frequency-changeable compressor, then controls each invariable frequency compressor according to the running priority level of the invariable frequency compressor preset and starts;Monitor each The ruuning situation of invariable frequency compressor;When the ruuning situation of invariable frequency compressor reaches default compressor rotation condition, reset The running priority level of invariable frequency compressor;First start frequency-changeable compressor, then control invariable frequency compressor and determine frequency according to reset The running priority level of compressor is run.Namely the priority of frequency-changeable compressor is the highest, is in the state run at first all the time, no Participating in the rotation of invariable frequency compressor running priority level, invariable frequency compressor carries out rotation according to above-mentioned method.
Preferably, off-premises station is not limited to use a frequency-changeable compressor, can individually set a kind of priority, control multiple change Frequently compressor uses, when using multiple compressor for an air conditioner, it is also possible to set multiple priorities as required Mode.
Above-mentioned steps S17 controls compressor run according to the running priority level of the compressor reset, specifically can use many The mode of kind: after resetting running priority level, restart this air conditioning system, starts compressor according to new running priority level;Will weight Priority after new settings compares with the compressor of operation, out of service in the compressor of low priority, start off-duty The compressor of high priority.
After the running priority level of off-premises station resets, it would however also be possible to employ various ways controls off-premises station according to the outdoor reset The running priority level of machine is run: restart air conditioning system, starts off-premises station according to new running priority level;Low excellent in out of service The off-premises station of first level, starts the off-premises station of off-duty high priority.
Fig. 2 is the schematic diagram controlling device of air conditioning system according to embodiments of the present invention, as in figure 2 it is shown, this control device 20 Specifically include that compressor start control unit 21, open for controlling each compressor according to the running priority level of the compressor preset Dynamic;Compressor monitoring means 23, for monitoring the ruuning situation of each compressor;Compressor priority level initializing unit 25, is used for When the ruuning situation of compressor reaches default compressor rotation condition, reset the running priority level of compressor;Compressor Run control unit 27, run according to the running priority level of the compressor reset for controlling the compressor of air conditioning system.
Each off-premises station is included a frequency-changeable compressor and the air conditioning system of some invariable frequency compressors, compressor start control unit 21, may be used for first starting frequency-changeable compressor, then control each fixed frequency according to the running priority level of the invariable frequency compressor preset Compressor;Compressor monitoring means 23, may be used for monitoring the ruuning situation of each invariable frequency compressor;Compressor priority level initializing Unit 25, may be used for, when the ruuning situation of invariable frequency compressor reaches default compressor rotation condition, resetting and determining frequency pressure The running priority level of contracting machine;Compressor operating control unit 27, may be used for controlling invariable frequency compressor and determines frequency according to reset The running priority level of compressor is run.
In compressor priority level initializing unit 25, the ruuning situation of compressor reaches default compressor rotation condition and can include following Any one or more conditions: the actual run time of the compressor that the operation time is the longest exceedes the time of default compressor operating; There is operation troubles in one or more compressors;The time of the running priority level of the compressor reset away from last time exceedes default Time interval;User sends the control command resetting compressor operating priority.
Compressor priority level initializing unit 25 resets the running priority level of compressor can use following any one or many The mode of kind: the operation time of all compressors is sorted, resets the running priority level of compressor according to this sequence; Being set as minimum by the running priority level of compressor the highest for this running priority level, the running priority level of remaining compressor is constant; Being set to minimum by the priority that abnormal compressor occurs in duty, the running priority level of remaining compressor is constant;According to The control instruction at family sets the running priority level of compressor.
The embodiment of the present invention two provides and comprises multiple off-premises station, and each off-premises station includes the air conditioning system of one or more compressor. Fig. 3 is the schematic diagram controlling device of the air conditioning system of according to embodiments of the present invention two, as it is shown on figure 3, the embodiment of the present invention The control device 30 of two air conditioning systems provided can also include: off-premises station starts control unit 31, according to default off-premises station Running priority level controls each off-premises station and starts;Off-premises station monitoring means 33, for monitoring the ruuning situation of each off-premises station;Room Outer machine priority level initializing unit 35, is used for when the ruuning situation of each off-premises station reaches default off-premises station rotation condition, again Set the running priority level of off-premises station;Off-premises station runs control unit 37, for controlling off-premises station according to the off-premises station reset Running priority level run.
Off-premises station starts control unit 31, it is also possible to open for controlling each off-premises station according to the running priority level of the off-premises station preset Dynamic;Running priority level according to each compressor in same off-premises station controls the compressor start in this off-premises station.
In off-premises station monitoring means 33, the ruuning situation of each off-premises station reaches default off-premises station rotation condition and can include following Anticipate one or more condition: the actual run time of the off-premises station that the operation time is the longest exceedes the time that default off-premises station runs; There is operation troubles in one or more off-premises stations;The time of the running priority level of the off-premises station reset away from last time exceedes default Time interval;User sends the control command resetting off-premises station running priority level.
Off-premises station priority level initializing unit 35 resets the running priority level of off-premises station can use following any one or many The mode of kind: the operation time of all off-premises stations is sorted, resets the running priority level of off-premises station according to this sequence; Being set as minimum by the running priority level of off-premises station the highest for this running priority level, the running priority level of remaining off-premises station is constant; Being set to minimum by the priority that abnormal off-premises station occurs in duty, the running priority level of remaining off-premises station is constant;According to The control instruction at family sets the running priority level of off-premises station.
The specific embodiment of the present invention additionally provides a kind of air conditioning system, including the control device of above-mentioned air conditioning system, uses The control method stating air conditioning system is controlled.
Hereinafter the control method of a certain concrete air-conditioning being described: the multiple off-premises station of this compressor, every off-premises station includes individual one Frequency-changeable compressor and multiple invariable frequency compressor.During work, frequency-changeable compressor is always opened at first, and rotation compressor order refers to The priority of rotation invariable frequency compressor.
First, setting off-premises station and the priority orders of each compressor, prepreerence off-premises station or compressor, according to load Increase, increase the off-premises station or compressor run according to priority orders.
After running a period of time, the running priority level of off-premises station and compressor is resequenced, by conduct before by air conditioning system The most front off-premises station or compressor are transferred to finally, and this air conditioning system is run according to new priority orders.
First off-premises station is controlled by this control method, then is controlled the multi-compressor under off-premises station.
After air conditioning system is started working, off-premises station rotation and compressor rotation carrying out practically mode are as follows:
First each off-premises station is carried out priority arrangement after powering on;
The compressor comprised in each off-premises station carries out priority arrangement;
User requires, when air conditioning system unlatching heats or freezes, according to each off-premises station priority orders, to distribute each off-premises station Corresponding power output;
Invariable frequency compressor distribution power is exported by the off-premises station being assigned power output according to the priority of its invariable frequency compressor;
After compressor load is assigned, air conditioning system normally works, and has off-premises station to produce fault, to off-premises station after X hour Running priority level is resequenced, and distribution principle is that the off-premises station that will appear from fault is transferred to finally, redistribute according to new priority The load of off-premises station;
After compressor operating Y hour, compressor is had to produce fault, the weight of compressor new sort to this off-premises station, frequency-changeable compressor All the time it is in override position, the compressor that override in invariable frequency compressor is opened is adjusted to priority last, according to new preferential Level redistributes the load of compressor;
It is circulated control according to above-mentioned method.Compressor rotation time is generally less than the rotation time of off-premises station.Fig. 4 and Fig. 5 It it is the flow chart of above-mentioned air conditioner system control method.Fig. 4 is the outdoor of air-conditioner system control method according to embodiments of the present invention The particular flow sheet that machine starts, as shown in Figure 4, this control method comprises the following steps:
S401, is ranked up off-premises station according to the running priority level of off-premises station,
S402, starts the off-premises station that remaining priority is the highest;
S403, the ruuning situation that monitoring is outdoor, if reach the rotation condition of off-premises station priority;If it does not, enter step S404, If it is, enter step S405;
S404, whether the off-premises station of startup meets the requirement of actual loading, if terminating this to start control, if it does not, return Return S402.;
S405, according to priority level initializing mode, resets the running priority level of off-premises station.
Wherein step S402 includes the control of compressor of this off-premises station.Fig. 5 is air-conditioner system according to embodiments of the present invention The particular flow sheet of the compressor start of control method, as it is shown in figure 5, the control method of compressor comprises the following steps:
S501, is ranked up compressor module according to the running priority level of compressor;
S502, starts the compressor that remaining priority is the highest;
S503, the ruuning situation of monitoring compressor, if reach the rotation condition of compressor;If it does not, enter step S504, If it is, enter step S505;
S504, whether the compressor of startup reaches the requirement of the load of this module, enters the control process of next off-premises station, if No, return S502.;
S505, according to priority level initializing mode, resets the running priority level of compressor.
Wherein, the sequencer procedure of step S501, frequency-changeable compressor is come the position started at first, then invariable frequency compressor is entered Row sequence.
According to technical scheme, control each compressor start according to the running priority level of default compressor;Monitoring is each The ruuning situation of individual compressor;When the ruuning situation of compressor reaches default compressor rotation condition, reset compressor Running priority level;Control compressor to run according to the running priority level of the compressor reset.Make each pressure of air conditioning system Contracting machine can be fully utilized, and improves the overall work life-span of air conditioning system, reduces the cost of regular maintenance, improve sky The work efficiency of adjusting system.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general calculating Device realizes, and they can concentrate on single calculating device, or is distributed on the network that multiple calculating device is formed, Alternatively, they can realize with calculating the executable program code of device, it is thus possible to be stored in storing device In perform by calculating device, or they are fabricated to respectively each integrated circuit modules, or by the multiple modules in them Or step is fabricated to single integrated circuit module and realizes.So, the present invention is not restricted to the combination of any specific hardware and software.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art For, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of being made, etc. With replacement, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the control method of an air conditioning system, it is characterised in that including:
Running priority level according to default compressor controls each compressor start;
Monitor the ruuning situation of each described compressor;
When the ruuning situation of described compressor reaches default compressor rotation condition, reset the fortune of described compressor Row major level;
Control each described compressor to run according to the running priority level of the described compressor reset;
Wherein, described air conditioning system includes that multiple off-premises station, each off-premises station include multiple described compressor, described basis The running priority level of the compressor preset controls each described compressor start and includes:
Running priority level according to default off-premises station controls each described off-premises station and starts;
Monitor the ruuning situation of each described off-premises station;
When the ruuning situation of off-premises station reaches default off-premises station rotation condition each described, reset described off-premises station Running priority level;
Control each described off-premises station to run according to the running priority level of the described off-premises station reset;
Running priority level according to the described compressor of each in same off-premises station controls the compressor start in this off-premises station.
Method the most according to claim 1, it is characterised in that the off-premises station of described air conditioning system includes a frequency-changeable compressor With multiple invariable frequency compressors,
The running priority level of the compressor that described basis is preset controls each described compressor start and includes: first start frequency conversion Compressor, then controls each described invariable frequency compressor according to the running priority level of the invariable frequency compressor preset and starts;
The ruuning situation monitoring each described compressor includes: monitor the ruuning situation of each invariable frequency compressor;
Described when reaching default compressor rotation condition when the ruuning situation of described compressor, reset described compressor Running priority level include: when the ruuning situation of described invariable frequency compressor reaches default compressor rotation condition, again Set the running priority level of described invariable frequency compressor;
Each described compressor of described control runs according to the running priority level of the described compressor reset and includes: first Start frequency-changeable compressor, then control the operation according to the described invariable frequency compressor reset of each described invariable frequency compressor Priority is run.
Method the most according to any one of claim 1 to 2, it is characterised in that
The ruuning situation of described compressor reaches default compressor rotation condition and includes following any one or more condition:
The actual run time of the described compressor that the operation time is the longest exceedes the time of default compressor operating;
There is operation troubles in one or more described compressors;
The time of the running priority level of the described compressor reset away from last time exceedes default time interval;
User sends the control command resetting compressor operating priority.
Method the most according to any one of claim 1 to 2, it is characterised in that
The described running priority level resetting described compressor uses following any one or various ways:
The operation time of all described compressors is sorted, resets the operation of described compressor according to this sequence Priority;
The running priority level of described compressor the highest for this running priority level is set as minimum, remaining described compressor Running priority level is constant;
Being set to minimum by the priority that abnormal described compressor occurs in duty, the operation of remaining described compressor is excellent First level is constant;
Control instruction according to user sets the running priority level of described compressor.
Method the most according to claim 1, it is characterised in that
The ruuning situation of each described off-premises station described reach default off-premises station rotation condition include following any one or many Individual condition:
The actual run time of the described off-premises station that the operation time is the longest exceedes the time that default off-premises station runs;
There is operation troubles in one or more described off-premises stations;
The time of the running priority level of the described off-premises station reset away from last time exceedes default time interval;
User sends the control command resetting off-premises station running priority level.
Method the most according to claim 1, it is characterised in that
The described running priority level resetting described off-premises station uses following any one or various ways:
The operation time of all described off-premises stations is sorted, resets the operation of described off-premises station according to this sequence Priority;
The running priority level of described off-premises station the highest for this running priority level is set as minimum, remaining described off-premises station Running priority level is constant;
Being set to minimum by the priority that abnormal described off-premises station occurs in duty, the operation of remaining described off-premises station is excellent First level is constant;
Control instruction according to user sets the running priority level of described off-premises station.
7. the control method of an air conditioning system, it is characterised in that including:
Running priority level according to default off-premises station controls each off-premises station and starts;
Monitor the ruuning situation of each described off-premises station;
When the ruuning situation of off-premises station reaches default off-premises station rotation condition each described, reset described off-premises station Running priority level;
Control each described off-premises station to run according to the running priority level of the described off-premises station reset;
Running priority level according to each compressor in same off-premises station controls the compressor start in this off-premises station, wherein, Each described off-premises station includes multiple compressor.
8. the control device of an air conditioning system, it is characterised in that including:
Compressor start control unit, opens for controlling each described compressor according to the running priority level of the compressor preset Dynamic;
Compressor monitoring means, for monitoring the ruuning situation of each described compressor;
Compressor priority level initializing unit, for reaching default compressor rotation condition when the ruuning situation of described compressor Time, reset the running priority level of described compressor;
Compressor operating control unit, for controlling the operation according to the described compressor reset of each described compressor Priority is run;
Wherein, described air conditioning system includes that multiple off-premises station, each off-premises station include multiple described compressor, described compression Machine starts control unit and includes:
Running priority level according to default off-premises station controls each described off-premises station and starts;
Monitor the ruuning situation of each described off-premises station;
When the ruuning situation of off-premises station reaches default off-premises station rotation condition each described, reset described off-premises station Running priority level;
Control each described off-premises station to run according to the running priority level of the described off-premises station reset;
Running priority level according to the described compressor of each in same off-premises station controls the compressor start in this off-premises station.
9. the control device of an air conditioning system, it is characterised in that also include:
Off-premises station starts control unit, controls each described off-premises station according to the running priority level of default off-premises station and starts;
Off-premises station monitoring means, for monitoring the ruuning situation of each described off-premises station;
Off-premises station priority level initializing unit, is used for when each described, the ruuning situation of off-premises station reaches default off-premises station rotation During condition, reset the running priority level of described off-premises station;
Off-premises station runs control unit, for controlling the operation according to the described off-premises station reset of each described off-premises station Priority is run;
Running priority level according to each compressor in same off-premises station controls the compressor start in this off-premises station, wherein, Each described off-premises station includes multiple compressor.
10. an air conditioning system, it is characterised in that include the control device described in claim 8 or 9.
CN201210071827.2A 2012-03-16 2012-03-16 Air conditioning system and control method and device thereof Active CN103307698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210071827.2A CN103307698B (en) 2012-03-16 2012-03-16 Air conditioning system and control method and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210071827.2A CN103307698B (en) 2012-03-16 2012-03-16 Air conditioning system and control method and device thereof

Publications (2)

Publication Number Publication Date
CN103307698A CN103307698A (en) 2013-09-18
CN103307698B true CN103307698B (en) 2016-12-14

Family

ID=49133205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210071827.2A Active CN103307698B (en) 2012-03-16 2012-03-16 Air conditioning system and control method and device thereof

Country Status (1)

Country Link
CN (1) CN103307698B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104515249A (en) * 2013-09-27 2015-04-15 珠海格力电器股份有限公司 Air conditioning system operation control method and device and air conditioning system
CN104833047B (en) * 2015-04-22 2017-11-24 四川长虹电器股份有限公司 A kind of control method and humidity control system
US10642258B2 (en) * 2015-07-01 2020-05-05 Panasonic Intellectual Property Management Co., Ltd. Maintenance work support system
CN106403484B (en) * 2015-12-04 2019-11-26 苏州新亚科技有限公司 A kind of intelligent object networked control systems and its control method
CN106352637A (en) * 2016-11-28 2017-01-25 重庆美的通用制冷设备有限公司 Air conditioner, and control method and control device thereof
CN108613327B (en) 2018-03-30 2019-10-08 珠海格力电器股份有限公司 Combined alternate operation method and device of outdoor unit and multi-split system
CN108844267A (en) * 2018-06-19 2018-11-20 珠海格力电器股份有限公司 Multi-press fault monitoring method and device and multi-press system
CN110131845B (en) * 2019-05-22 2021-03-30 广东美的暖通设备有限公司 Air conditioner, control method thereof and computer readable storage medium
CN110131844B (en) * 2019-05-22 2021-07-23 广东美的暖通设备有限公司 Air conditioner, control method thereof, and computer-readable storage medium
CN110108002B (en) * 2019-05-31 2021-02-26 珠海格力电器股份有限公司 Outdoor unit operation control method and device for improving operation energy efficiency and stability
CN110319540A (en) * 2019-06-28 2019-10-11 广东志高暖通设备股份有限公司 A kind of Modular multi-connection control method of dynamic adjustment
CN110319539A (en) * 2019-06-28 2019-10-11 广东志高暖通设备股份有限公司 A kind of Modular multi-connection control method
CN110542188A (en) * 2019-09-12 2019-12-06 广东美的暖通设备有限公司 group control method and system of air conditioners and computer readable storage medium
CN111174367A (en) * 2019-09-17 2020-05-19 同方泰德国际科技(北京)有限公司 Control method suitable for parallel equipment rotation
WO2022059154A1 (en) * 2020-09-17 2022-03-24 東芝キヤリア株式会社 Air conditioner
CN113899051B (en) * 2021-10-28 2023-12-01 宁波奥克斯电气股份有限公司 Multi-split control method, control device and multi-split
CN114923266B (en) * 2022-07-20 2022-09-30 蘑菇物联技术(深圳)有限公司 Method, apparatus and medium for controlling chiller of central air conditioning system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1432765A (en) * 2002-01-11 2003-07-30 广东科龙电器股份有限公司 Control method of one-driving-several air conditioner
CN1760597A (en) * 2004-10-15 2006-04-19 三星电子株式会社 Be used to control the equipment and the method for the compressor of multi-chamber type air conditioner
CN101718460A (en) * 2009-11-10 2010-06-02 广东美的电器股份有限公司 Control method of inverter air conditioner

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020017465A (en) * 2000-08-30 2002-03-07 구자홍 The remote control air-conditioner system and the control method
JP4316933B2 (en) * 2003-06-03 2009-08-19 東芝キヤリア株式会社 Air conditioner
JP2005282896A (en) * 2004-03-29 2005-10-13 Sanyo Electric Co Ltd Refrigerating machine
KR101253231B1 (en) * 2005-10-21 2013-04-16 삼성전자주식회사 Control method of multi type air conditioner
KR100844324B1 (en) * 2007-01-26 2008-07-07 엘지전자 주식회사 Demand control system and demand control method for multi-air conditioner
CN102147143B (en) * 2011-04-06 2013-06-12 深圳达实智能股份有限公司 On-off optimization control method and device of central air-conditioning system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1432765A (en) * 2002-01-11 2003-07-30 广东科龙电器股份有限公司 Control method of one-driving-several air conditioner
CN1760597A (en) * 2004-10-15 2006-04-19 三星电子株式会社 Be used to control the equipment and the method for the compressor of multi-chamber type air conditioner
CN101718460A (en) * 2009-11-10 2010-06-02 广东美的电器股份有限公司 Control method of inverter air conditioner

Also Published As

Publication number Publication date
CN103307698A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN103307698B (en) Air conditioning system and control method and device thereof
EP3730853B1 (en) Combined alternating operation method, device and multi-split system for outdoor units
CN1291191C (en) Central control system of air conditioners and method for operating the same
CN1825014A (en) Power load control system and control method for multi-unit air conditioners
CN111059713A (en) Control method of air conditioner, air conditioner and computer storage medium
CN106196431A (en) Air conditioner air duct control system, method and device
CN109974224B (en) Air conditioner adaptive to use requirements of places and method and device for controlling air conditioner
CN108562019B (en) Control method and control system of air conditioning system and air conditioning system
JPWO2009119150A1 (en) Air conditioning management apparatus, air conditioning management method, air conditioning system, program, and recording medium
CN109780689B (en) Control method of air conditioner, air conditioner and computer readable storage medium
CN110542188A (en) group control method and system of air conditioners and computer readable storage medium
EP2584277B1 (en) Network system equipped with air conditioner and control method thereof
CN113959069B (en) Air conditioning system
US10655879B2 (en) Air-conditioning system, air-conditioning control method, and non-transitory computer readable medium storing program
CN110173807A (en) Control method, device and the multi-online air-conditioning system of multi-online air-conditioning system
CN109780687B (en) Air conditioner starting-up pre-blowing control method and system and air conditioner
CN203413766U (en) Indoor unit load capacity control system
CN103398447B (en) Indoor set load capacity control system and indoor set load capacity control method
CN111706962B (en) Control device and method of multi-air-conditioning system and multi-air-conditioning system
CN215951704U (en) Converter and air conditioning unit
CN114484758A (en) Control method of multi-split air conditioner, air conditioner and computer readable storage medium
CN110260498B (en) Compressor frequency adjusting method and device and air conditioning system
CN107525219B (en) Control method, control system and wire controller
CN103423843B (en) The method of wind pipe type indoor set and control wind pipe type indoor set capacity
CN113266923B (en) Control method and control device of compressor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant