CN103306312A - Underground diaphragm wall plate-type rigid joint and construction method thereof - Google Patents

Underground diaphragm wall plate-type rigid joint and construction method thereof Download PDF

Info

Publication number
CN103306312A
CN103306312A CN201310246594XA CN201310246594A CN103306312A CN 103306312 A CN103306312 A CN 103306312A CN 201310246594X A CN201310246594X A CN 201310246594XA CN 201310246594 A CN201310246594 A CN 201310246594A CN 103306312 A CN103306312 A CN 103306312A
Authority
CN
China
Prior art keywords
rigid
rigid baffle
joint
diaphragm wall
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310246594XA
Other languages
Chinese (zh)
Other versions
CN103306312B (en
Inventor
侯新宇
嵇小雷
隋宛轩
薛必芳
火映霞
侯天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITY VOCATIONAL COLLEGE OF JIANGSU
Original Assignee
CITY VOCATIONAL COLLEGE OF JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITY VOCATIONAL COLLEGE OF JIANGSU filed Critical CITY VOCATIONAL COLLEGE OF JIANGSU
Priority to CN201310246594.XA priority Critical patent/CN103306312B/en
Publication of CN103306312A publication Critical patent/CN103306312A/en
Application granted granted Critical
Publication of CN103306312B publication Critical patent/CN103306312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses an underground diaphragm wall rigid baffle joint and a construction method thereof, and relates to a rigid baffle joint mode and a construction method thereof. The rigid baffle joint (8) consists of two rigid baffles (1) and a rigid bottom plate (3), wherein a latch pipe (5) is arranged between the two rigid baffles (1); second connecting piece clamping grooves (7) are formed in the side surface of the latch pipe (5); first connecting piece clamping grooves (2) are formed in the side surfaces of the rigid baffles (1); the two rigid baffles (1) are connected with the latch pipe (5) by the first connecting piece clamping grooves (2) and the second connecting piece clamping grooves (7); steel bar end sockets (6) are arranged on the bottom surface of the latch pipe (5); steel bar clamping grooves (4) are formed in the rigid bottom plate (3); and the steel bar ends are fitted with the steel bar clamping grooves (4) to connect the latch pipe (5) with the rigid bottom plate (3). The rigid baffle joint is simple to design and manufacture; accurate contraposition of steel bar cages of adjacent walls is realized; the wall integrity is improved; the lateral bending resistance of the joint is improved; and a percolation path is increased.

Description

The board-like rigid joint of a kind of diaphragm wall and job practices thereof
Technical field
The present invention relates to the board-like rigid joint of a kind of diaphragm wall and job practices thereof, belong to geotechnical engineering Base hole supporting technology field.Be applicable to groundwater table and bury the base pit engineering shallow, that cutting depth is large and go along with sb. to guard him construction, especially more aobvious advantage under weak soil, flour sand silt geological conditions.
Background technology
Underground continuous wall connector refers to the construction joint between underground continuous wall groove segment and the groove section.Can be divided into flexible joint and rigid joint, flexible joint commonly used has: circular locking notch pipe joint, waveform (double wave, three ripples) joint, preparation joint and rubber water-proof belt lacing etc., shearing resistance, the bending resistance of flexible joint are poor, easily be subject to influence on groundwater in the foundation pit construction process and the quality problems such as seepage occur, generally only use as outer wall of basement, usually do not bear the vertical load of superstructure or only share the part vertical load.
Compare with flexible joint, rigid joint for underground continuous wall can be born larger vertical and horizontal loading, and the body of wall integral rigidity is large.Common rigid joint has: cross steel plate joint, I-shaped steel joint and bar splicing joint etc.When underground diaphragm wall during as the main body outer wall of underground structure, for reaching the body of wall globality, bearing the requirements such as vertical load ability, barrier performance, should adopt rigid joint.
The cross steel plate joint can be born larger vertical load, coordinates the differential settlement of groove section, has increased percolation path, possesses preferably water resistance, but the making of cross steel plate and construction process relative complex.
I-shaped steel joint increases the joint lateral rigidity, make it to bear larger side to load, reduced lateral deformation, but easily form flow-disturbing at the i iron rear side in the concreting process, tend to affect the construction of lower a slice body of wall, the groove segment length is shorter more effective in the situation that ground load is large for this joint.
The bar splicing joint adopts the way of reserving the joint reinforcing bar in the reinforcing cage end, by working measure, two width of cloth wall steel bars are partly overlapped build, improved joint stiffness, strengthen deformability and seepage capability, this kind overlapping mode requires higher to fabrication of reinforcing cage precision and construction quality.
Summary of the invention
Technical problem: the object of the present invention is to provide a kind of simple in structurely, job practices is simple and efficient, is applicable to the board-like rigid joint of a kind of diaphragm wall and the job practices thereof that are subjected to influence on groundwater large.
Technical scheme: diaphragm wall rigid baffle joint of the present invention consists of the rigid baffle joint jointly by two rigid baffles and stiff baseplate, between two rigid baffles, be provided with the snap close pipe, be provided with the second connector draw-in groove in the side of snap close pipe, the side of rigid baffle is provided with the first connector draw-in groove, and two rigid baffles are connected with the second connector draw-in groove by the first connector draw-in groove with the snap close pipe; Bottom surface at the snap close pipe is provided with steel bar end, is provided with the reinforcing bar draw-in groove at stiff baseplate, steel bar end and reinforcing bar draw-in groove match with, snap close pipe and stiff baseplate link together.
The job practices of diaphragm wall rigid baffle joint of the present invention comprises the steps:
The first step: according to diaphragm wall width and the degree of depth, design rigid baffle and stiff baseplate, comprise rigid baffle size (length and the reinforcing cage of rigid baffle is isometric, width is got the diaphragm wall width 1.5~2.0 times, position and the size of thickness 10~20mm), connector draw-in groove, position and the size of stiff baseplate size (stiff baseplate length is that rigid baffle width, width are that the diaphragm wall width subtracts 30~50mm, thickness and rigid baffle uniform thickness), reinforcing bar draw-in groove, snap close pipe bottom reinforcement bars tip position and size;
Second step: according to designing and producing rigid baffle, stiff baseplate, snap close pipe;
The 3rd step: rigid baffle and the stiff baseplate made are welded to connect, and form the rigid baffle joint;
The 4th step: diaphragm wall milling slot;
The 5th step: assembly unit rigid baffle joint and snap close pipe, rigid baffle joint and snap close pipe are installed in above-mentioned groove simultaneously;
The 6th step: the first reinforcing cage is installed, again the first diaphragm wall of forming of concreting in the groove of a side of rigid baffle joint;
The 7th step: extract the snap close pipe, the part of rigid baffle joint is cast in the body of wall of established the first diaphragm wall, and part is exposed in the adjacent slot section;
The 8th step: continue the construction of adjacent slot section, the rigid baffle joint that previous step is exposed is cast in the concrete, and the construction of rigid baffle joint is complete, forms the first complete diaphragm wall and the second diaphragm wall.
Beneficial effect: the present invention adopts above technical scheme and corresponding job practices, possess compared with prior art following advantage: rigid baffle, stiff baseplate that joint needs design and produce simply, the reinforcing cage contraposition that the final rigid baffle joint that forms can make neighboring walls accurately, improve body of wall globality, enhancing joint side to bending resistance, increased percolation path.The present invention finishes the construction of rigid joint by the ripe snap close pipe flexible joint job practices of tradition, technological process is simple and efficient, is easy to realize.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing and case study on implementation.
Fig. 1: the rigid baffle elevational schematic view,
Fig. 2: the rigid baffle schematic top plan view,
Fig. 3: the stiff baseplate elevational schematic view,
Fig. 4: the stiff baseplate schematic top plan view,
Fig. 5: snap close pipe elevational schematic view,
Fig. 6: snap close pipe schematic top plan view,
Fig. 7: rigid baffle joint elevational schematic view,
Fig. 8: rigid baffle joint schematic top plan view,
Fig. 9: the rigid baffle joint is implemented schematic diagram 1,
Figure 10: the rigid baffle joint is implemented plan view 2,
Have among the above figure: rigid baffle 1; Connector draw-in groove 2; Stiff baseplate 3; Reinforcing bar draw-in groove 4; Snap close pipe 5; Steel bar end 6; Connector draw-in groove 7; Rigid baffle joint 8; The first reinforcing cage 9; The first diaphragm wall 10; The second reinforcing cage 11; The second diaphragm wall 12; Foundation ditch inboard 13; The foundation ditch outside 14.
The specific embodiment
Below in conjunction with accompanying drawing technical scheme of the present invention is elaborated:
The job practices of diaphragm wall rigid baffle joint of the present invention, the implementation operating procedure is as follows:
The first step: according to diaphragm wall width and the degree of depth, design corresponding rigid baffle 1 and stiff baseplate 3, the position and the size that comprise rigid baffle 1 size, connector draw-in groove 2, position and the size of stiff baseplate 3 sizes, reinforcing bar draw-in groove 4, snap close pipe 6 positions, 5 bottom reinforcement bars terminations and size;
Second step: according to designing and producing rigid baffle 1, stiff baseplate 3, snap close pipe 5;
The 3rd step: rigid baffle 1 and the stiff baseplate 3 made are welded to connect, and form rigid baffle joint 8;
The 4th step: diaphragm wall milling slot;
The 5th step: assembly unit rigid baffle joint 8 and snap close pipe 5, rigid baffle joint 8 and snap close pipe 5 are installed simultaneously;
The 6th step: reinforcing cage 1 is installed, concreting;
The 7th step: extract snap close pipe 5, the part of rigid baffle joint 8 is cast in the body of wall of established diaphragm wall 1, and part is exposed in the adjacent slot section;
The 8th step: continue the construction of adjacent slot section, the rigid baffle joint 8 that previous step is exposed is cast in the concrete, and 8 constructions of rigid baffle joint are complete, form complete diaphragm wall 1 and diaphragm wall 2 12.
Length and the reinforcing cage of described rigid baffle is isometric, width is got the diaphragm wall width 1.5~2.0 times, thickness 10~20mm; Described stiff baseplate length is that rigid baffle width, width are that the diaphragm wall width subtracts 30~50mm, thickness and rigid baffle uniform thickness.

Claims (3)

1. diaphragm wall rigid baffle joint, it is characterized in that: this rigid baffle joint consists of rigid baffle joint (8) jointly by two rigid baffles (1) and stiff baseplate (3), between two rigid baffles (1), be provided with snap close pipe (5), be provided with the second connector draw-in groove (7) in the side of snap close pipe (5), the side of rigid baffle (1) is provided with the first connector draw-in groove (2), and two rigid baffles (1) are connected with the second connector draw-in groove (7) by the first connector draw-in groove (2) with snap close pipe (5); Be provided with steel bar end (6) in the bottom surface of snap close pipe (5), be provided with reinforcing bar draw-in groove (4) at stiff baseplate (3), steel bar end (6) and reinforcing bar draw-in groove (4) match with, snap close pipe (5) links together with stiff baseplate (3).
2. the job practices of a diaphragm wall rigid baffle joint as claimed in claim 1 is characterized in that the method comprises the steps:
The first step: according to diaphragm wall width and the degree of depth, design rigid baffle (1) and stiff baseplate (3),, the position of the first connector draw-in groove (2) and size, the second connector draw-in groove (7) position and size, position and the size of stiff baseplate (3) size, reinforcing bar draw-in groove (4), (6) position, snap close pipe (5) bottom reinforcement bars termination and size;
Second step: according to designing and producing rigid baffle (1), stiff baseplate (3), snap close pipe (5);
The 3rd step: the rigid baffle of making (1) is welded to connect with stiff baseplate (3), forms rigid baffle joint (8);
The 4th step: diaphragm wall milling slot;
The 5th step: assembly unit rigid baffle joint (8) and snap close pipe (5), rigid baffle joint (8) and snap close pipe (5) are installed in above-mentioned groove simultaneously;
The 6th step: the first reinforcing cage (9) is installed, again first diaphragm wall (10) of concreting formation in the groove of a side of rigid baffle joint (8);
The 7th step: extract snap close pipe (5), the part of rigid baffle joint (8) is cast in the body of wall of established the first diaphragm wall (10), and part is exposed in the adjacent slot section;
The 8th step: continue the construction of adjacent slot section, the rigid baffle joint (8) that previous step is exposed is cast in the concrete, and rigid baffle joint (8) construction is complete, forms complete the first diaphragm wall (10) and the second diaphragm wall (12).
3. the job practices of diaphragm wall rigid baffle joint as claimed in claim 2 is characterized in that the length of described rigid baffle and reinforcing cage are isometric, width is got the diaphragm wall width 1.5~2.0 times, thickness 10~20mm; Described stiff baseplate length is that rigid baffle width, width are that the diaphragm wall width subtracts 30~50mm, thickness and rigid baffle uniform thickness.
CN201310246594.XA 2013-06-20 2013-06-20 Underground diaphragm wall plate-type rigid joint and construction method thereof Active CN103306312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310246594.XA CN103306312B (en) 2013-06-20 2013-06-20 Underground diaphragm wall plate-type rigid joint and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310246594.XA CN103306312B (en) 2013-06-20 2013-06-20 Underground diaphragm wall plate-type rigid joint and construction method thereof

Publications (2)

Publication Number Publication Date
CN103306312A true CN103306312A (en) 2013-09-18
CN103306312B CN103306312B (en) 2015-04-01

Family

ID=49131998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310246594.XA Active CN103306312B (en) 2013-06-20 2013-06-20 Underground diaphragm wall plate-type rigid joint and construction method thereof

Country Status (1)

Country Link
CN (1) CN103306312B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153396A (en) * 2014-07-17 2014-11-19 中国十七冶集团有限公司 Anti-seepage continuous wall construction method
CN104278672A (en) * 2014-10-30 2015-01-14 天津深基工程有限公司 Diaphragm wall protection layer plate

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239995Y (en) * 1995-04-14 1996-11-13 上海宝钢冶金建设公司第五工程公司 Rigid joint for underground continuous wall
JP2011122386A (en) * 2009-12-14 2011-06-23 Toda Constr Co Ltd Method of construction of underground structure, underground structure, and precast concrete side wall or intermediate wall/column for the same
CN202175961U (en) * 2011-08-03 2012-03-28 天津深基工程有限公司 Swallow-tailed seal head structure of diaphragm wall steel reinforcement cage
CN102817377A (en) * 2012-09-04 2012-12-12 同济大学 Double plug pin type fore shaft pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239995Y (en) * 1995-04-14 1996-11-13 上海宝钢冶金建设公司第五工程公司 Rigid joint for underground continuous wall
JP2011122386A (en) * 2009-12-14 2011-06-23 Toda Constr Co Ltd Method of construction of underground structure, underground structure, and precast concrete side wall or intermediate wall/column for the same
CN202175961U (en) * 2011-08-03 2012-03-28 天津深基工程有限公司 Swallow-tailed seal head structure of diaphragm wall steel reinforcement cage
CN102817377A (en) * 2012-09-04 2012-12-12 同济大学 Double plug pin type fore shaft pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈令强: "新型地下连续墙接头的开发与应用", 《市政技术》, vol. 25, no. 1, 31 January 2007 (2007-01-31), pages 62 - 64 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153396A (en) * 2014-07-17 2014-11-19 中国十七冶集团有限公司 Anti-seepage continuous wall construction method
CN104278672A (en) * 2014-10-30 2015-01-14 天津深基工程有限公司 Diaphragm wall protection layer plate

Also Published As

Publication number Publication date
CN103306312B (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN101205717A (en) Ultra-deep underground continuous wall connector
CN203782682U (en) Guide slot assembly type pile-intermediate plate device
CN104975609A (en) Lock catch type steel tube pile cofferdam and construction method
CN106088102A (en) Lattice type combined steel sheet pile cement soil composite pile and construction method thereof
CN103827396B (en) Steel slit dam
CN103276752A (en) Construction method of underground continuous wall expansive concrete joint
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
CN106759265A (en) A kind of diaphram wall of fill concrete, its steel design and its construction method
CN108035337A (en) For the connector of diaphram wall and the construction method of diaphram wall
CN103306312B (en) Underground diaphragm wall plate-type rigid joint and construction method thereof
CN202577363U (en) H-shaped steel joint structure of underground diaphragm wall
CN201428137Y (en) Water-proof sheet pile cofferdam
CN211395686U (en) Foundation pit supporting system next to existing dangerous building
CN203429665U (en) Immersed tunnel axis dry dock opening structure
CN112030947A (en) Construction method of T-shaped load-bearing underground continuous wall
CN203613562U (en) Flexible joint for underground continuous wall
CN111236223B (en) Method for designing and testing cement mixing pile under high water level condition
CN106088142B (en) A kind of prefabricated assembled pipeline foundation and its assembly method
CN108468339B (en) Skeleton type foundation pit supporting and basement exterior wall assembly structure and construction method thereof
CN204825936U (en) Lock catch type steel -pipe pile is used in cofferdam
CN207812470U (en) A kind of plastic sheet pile with injected hole
CN205369321U (en) Ground is flexible prevention of seepage body structure of wall even
CN105951844A (en) Roof node structure adopting cover-excavation method and construction method of roof node structure
CN220768017U (en) Waterproof prefabricated underground continuous wall
CN205617367U (en) Can have enough to meet need bad ground bored concrete pile test pile pile extension protects a section of thick bamboo

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant