CN103306286B - A kind of for spiral load test instrument dowel bar pull-up - Google Patents
A kind of for spiral load test instrument dowel bar pull-up Download PDFInfo
- Publication number
- CN103306286B CN103306286B CN201310237838.8A CN201310237838A CN103306286B CN 103306286 B CN103306286 B CN 103306286B CN 201310237838 A CN201310237838 A CN 201310237838A CN 103306286 B CN103306286 B CN 103306286B
- Authority
- CN
- China
- Prior art keywords
- dowel bar
- fluctuating orbit
- crane
- test instrument
- wireline winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The invention discloses a kind of for spiral load test instrument dowel bar pull-up, connected by dowel bar joint between dowel bar and dowel bar, be arranged on two, the left and right fluctuating orbit below base, crane and rise and pull out arm, two fluctuating orbits be opening in opposite directions, the channel-section steel that is parallel to each other, be vertically connected on base, two fluctuating orbits are connected by back timber; Rise and pull out arm and be fixed on crane; Be provided with top sheave and hoisting cable anchorage ear below back timber, crane top is provided with lower sheave, is provided with wireline winch in the middle part of fluctuating orbit, and wireline winch is provided with wind; Wire rope one end is fixed on hoisting cable anchorage ear, and the other end is walked around after lower sheave, top sheave successively around on wireline winch.Solve because manpower works the problem that wastes time and energy of pulling out screw plate test instrument dowel bar, ensure that and the power transmission of screw plate test instrument is extracted time saving and energy savingly.Structure is simple, improves test efficiency.Be applicable to rising of cone penetration test sounding rod pull out.
Description
Technical field
The present invention relates to soil test field, more relate to a kind of for screw plate test instrument dowel bar pull-up, screw plate test can be terminated rear dowel bar and extract ground quickly and easily.
Background technology
Screw plate test is the plate evolving development of nearly 30 years cause routines and comes, and is in-situ testing technique most widely used at present.Screw plate test a spiral bearing plate (hereinafter referred to as spiral plate) is used manpower or mechanical force revolves the predetermined test degree of depth of people's below ground, by dowel bar to spiral plate load application, the resistance strain type sensor be connected with spiral plate by dowel bar lower end surveys the load read spiral plate and bear, corresponding deformation when bearing different load by observing the distortion of dowel bar be connected from spiral plate survey reading spiral plate, pass through obtained stress one and be out of shape a time curve, ask for the bearing capacity of foundation soil, modulus of deformation, the design parameterss such as the coefficient of consolidation and saturated soft clay undrained shear strength.
After spiral plate off-test, general pipe grippers relies on manpower one to save and is extracted by dowel bar at leisure, such one side takes manpower very much, also very time-consuming on the other hand, cause test efficiency low, therefore, in order to overcome the above problems, be badly in need of development a kind of for spiral load test instrument dowel bar pull-up, use convenient laborsaving, improve testing efficiency.
Summary of the invention
The object of the invention is to there are provided one for spiral load test instrument dowel bar pull-up, structure is simple, easy to use, this device can be extracted after spiral load off-test a section for dowel bar easily fast, not only convenient laborsaving but also improve testing efficiency, solve because manpower works the problem that wastes time and energy of pulling out screw plate test instrument dowel bar, quickly and easily dowel bar can be extracted, improve test efficiency; Rising of cone penetration test sounding rod can also be applicable to pull out.
In order to realize above-mentioned object, the present invention adopts following technical measures:
A kind of for spiral load test instrument dowel bar pull-up, comprise dowel bar, dowel bar joint and base, it is characterized in that: connected by dowel bar joint between the first dowel bar and the second dowel bar, dowel bar joint both sides are provided with square orifice; Be arranged on the first fluctuating orbit below base, the second fluctuating orbit, crane and rise and pull out arm, first fluctuating orbit, the second fluctuating orbit be opening in opposite directions, the channel-section steel that is parallel to each other, and being vertically connected on base, the first fluctuating orbit, the second fluctuating orbit are connected by back timber; The roller of crane is arranged in the first fluctuating orbit, the second fluctuating orbit and can moving up and down along the first fluctuating orbit, the second fluctuating orbit, rises to pull out arm and be fixed on crane; Be provided with top sheave and hoisting cable anchorage ear below back timber, crane top is provided with lower sheave, and be provided with wireline winch in the middle part of the first fluctuating orbit, the second fluctuating orbit, wireline winch is provided with wind; Wire rope one end is fixed on hoisting cable anchorage ear, and the other end is walked around after lower sheave, top sheave successively around on wireline winch.
Advantage of the present invention and there is effect:
1. the invention solves because manpower works the problem that wastes time and energy of pulling out screw plate test instrument dowel bar, ensure that and the power transmission of screw plate test instrument is extracted time saving and energy savingly.
2. structure of the present invention is simple, light, can be extracted by dowel bar quickly and easily, improve test efficiency.
3. the present invention be applicable to cone penetration test sounding rod rise pull out.
Accompanying drawing explanation
Fig. 1 is a kind of front view for spiral load test instrument dowel bar pull-up.
Fig. 2 is a kind of left view for spiral load test instrument dowel bar pull-up.
Wherein: 1a. first dowel bar, 1b second dowel bar, dowel bar, 2. dowel bar joint, 3. base, 4a. first fluctuating orbit, 4b. second fluctuating orbit, 5. back timber, 6. crane, 7. pull out arm, 8. wireline winch, 9. wind, 10. wire rope, 11. hoisting cable anchorage ears, 12. top sheaves, 13. lower sheaves.
Detailed description of the invention
Embodiment 1:
Below in conjunction with accompanying drawing, the present invention is described in further detail:
As shown in Figure 1 and Figure 2, a kind of for spiral load test instrument dowel bar pull-up, comprise dowel bar 1, dowel bar joint 2 and base 3, it is characterized in that: connected by dowel bar joint 2 between the first dowel bar 1a and the second dowel bar 1b, dowel bar joint 2 both sides are provided with square orifice; Be arranged on the first fluctuating orbit 4a below base 3, the second fluctuating orbit 4b, crane 6 and rise and pull out arm 7, first fluctuating orbit 4a, the second fluctuating orbit 4b be opening in opposite directions, the channel-section steel that is parallel to each other, and being vertically connected on base 3, the first fluctuating orbit 4a, the second fluctuating orbit 4b are connected by back timber 5; The roller of crane 6 is arranged in the first fluctuating orbit 4a, the second fluctuating orbit 4b and can moves up and down along the first fluctuating orbit 4a, the second fluctuating orbit 4b, rises and pulls out arm 7 and be fixed on crane 6; Be provided with top sheave 12 and hoisting cable anchorage ear 11 below back timber 5, crane 6 top is provided with lower sheave 13, and be provided with wireline winch 8 in the middle part of the first fluctuating orbit 4a, the second fluctuating orbit 4b, wireline winch 8 is provided with wind 9; Wire rope 10 one end is fixed on hoisting cable anchorage ear 11, and the other end is walked around after lower sheave 13, top sheave 12 successively around on wireline winch 8.
During work, steel wire winch 8 is driven to rotate by wind 9, wire rope 10 is progressively coiled on wireline winch 8, lower sheave 13 is moved upward by wire rope 10 traction, and crane 6 moves upward with lower sheave 13, pulls out the square opening that arm 7 directly inserts dowel bar joint 2 both sides, rise and pull out arm 7 and promoted with crane 6, thus the first dowel bar 1a is progressively pulled out, when the dowel bar joint 2 of dowel bar 1a bottom is when extracting ground, can stop pulling out; By pipe grippers, second section dowel bar 1b is fixed, utilize pipe grippers to be laid down by the dowel bar 1a extracted, allowed and pulled out the dowel bar joint 2 that arm 7 inserts dowel bar 1b top, successively the first dowel bar 1a and the second dowel bar 1b is extracted according to aforesaid operations step.
Claims (1)
1. one kind for spiral load test instrument dowel bar pull-up, comprise the first dowel bar (1a), dowel bar joint (2) and base (3), it is characterized in that: connected by dowel bar joint (2) between the first dowel bar (1a) and the second dowel bar (1b), be arranged on first fluctuating orbit (4a) of base (3) top, second fluctuating orbit (4b), crane (6) and rise pull out arm (7), two fluctuating orbits (4) for opening in opposite directions, the channel-section steel be parallel to each other, be vertically connected on base (3), first fluctuating orbit (4a), second fluctuating orbit (4b) is connected by back timber (5), rise and pull out arm (7) and be fixed on crane (6), back timber (5) below is provided with top sheave (12) and hoisting cable anchorage ear (11), crane (6) top is provided with lower sheave (13), first fluctuating orbit (4a), the second fluctuating orbit (4b) middle part is provided with wireline winch (8), wireline winch (8) is provided with wind (9), wire rope (10) one end is fixed on hoisting cable anchorage ear (11), the other end is walked around after lower sheave (13), top sheave (12) successively around on wireline winch (8)
Dowel bar joint (2) both sides are provided with square orifice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310237838.8A CN103306286B (en) | 2013-06-14 | 2013-06-14 | A kind of for spiral load test instrument dowel bar pull-up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310237838.8A CN103306286B (en) | 2013-06-14 | 2013-06-14 | A kind of for spiral load test instrument dowel bar pull-up |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103306286A CN103306286A (en) | 2013-09-18 |
CN103306286B true CN103306286B (en) | 2015-10-28 |
Family
ID=49131972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310237838.8A Expired - Fee Related CN103306286B (en) | 2013-06-14 | 2013-06-14 | A kind of for spiral load test instrument dowel bar pull-up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103306286B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643017A (en) * | 2018-07-06 | 2018-10-12 | 蚌埠市神舟机械有限公司 | A kind of device for dismantling road surface connect band |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2430472Y (en) * | 2000-07-27 | 2001-05-16 | 天津市水利科学研究所 | Static force pull press plate inserting machine |
CN2518902Y (en) * | 2001-09-19 | 2002-10-30 | 孔祥民 | Drill prospecting machine |
JP3429251B2 (en) * | 2000-06-01 | 2003-07-22 | 有限会社ジェイディエフ | Dynamic cone penetration tester and sampling machine |
CN2597549Y (en) * | 2003-02-21 | 2004-01-07 | 曹茂杰 | Split-type pile extractor |
CN2685395Y (en) * | 2004-02-10 | 2005-03-16 | 赵全 | Small size construction electric drilling and investigation machine |
KR20090091551A (en) * | 2008-02-25 | 2009-08-28 | 조석동 | Section steel-pile pulling machine |
JP4728819B2 (en) * | 2006-01-24 | 2011-07-20 | 株式会社丸建興業 | Pile extraction device and pile extraction method |
CN102433868A (en) * | 2011-12-26 | 2012-05-02 | 曾国海 | Insert plate device capable of walking on blown-filled mud soil |
CN202214715U (en) * | 2011-06-29 | 2012-05-09 | 广东省长大公路工程有限公司 | Static-pressure-type device for measuring compaction degree of layered filled embankment |
CN102465519A (en) * | 2010-11-02 | 2012-05-23 | 陕西龙海工程建设有限公司 | Drill rod detector |
CN203307810U (en) * | 2013-06-14 | 2013-11-27 | 湖北省交通规划设计院 | Pulling-up device for spiral load tester dowel bars |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009035945A (en) * | 2007-08-02 | 2009-02-19 | Japan Health Science Foundation | Device for testing foldable static cone penetration |
-
2013
- 2013-06-14 CN CN201310237838.8A patent/CN103306286B/en not_active Expired - Fee Related
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3429251B2 (en) * | 2000-06-01 | 2003-07-22 | 有限会社ジェイディエフ | Dynamic cone penetration tester and sampling machine |
CN2430472Y (en) * | 2000-07-27 | 2001-05-16 | 天津市水利科学研究所 | Static force pull press plate inserting machine |
CN2518902Y (en) * | 2001-09-19 | 2002-10-30 | 孔祥民 | Drill prospecting machine |
CN2597549Y (en) * | 2003-02-21 | 2004-01-07 | 曹茂杰 | Split-type pile extractor |
CN2685395Y (en) * | 2004-02-10 | 2005-03-16 | 赵全 | Small size construction electric drilling and investigation machine |
JP4728819B2 (en) * | 2006-01-24 | 2011-07-20 | 株式会社丸建興業 | Pile extraction device and pile extraction method |
KR20090091551A (en) * | 2008-02-25 | 2009-08-28 | 조석동 | Section steel-pile pulling machine |
CN102465519A (en) * | 2010-11-02 | 2012-05-23 | 陕西龙海工程建设有限公司 | Drill rod detector |
CN202214715U (en) * | 2011-06-29 | 2012-05-09 | 广东省长大公路工程有限公司 | Static-pressure-type device for measuring compaction degree of layered filled embankment |
CN102433868A (en) * | 2011-12-26 | 2012-05-02 | 曾国海 | Insert plate device capable of walking on blown-filled mud soil |
CN203307810U (en) * | 2013-06-14 | 2013-11-27 | 湖北省交通规划设计院 | Pulling-up device for spiral load tester dowel bars |
Also Published As
Publication number | Publication date |
---|---|
CN103306286A (en) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614021B (en) | Moment test device | |
CN203551388U (en) | Indoor stretching-shearing testing device for anchor rod | |
CN104452758B (en) | A kind of drop-down rotation anchor device of suction penetrated and construction method thereof | |
CN108984957B (en) | Method for calculating effective anchoring length of non-prestressed anchor cable of rock slope | |
CN203034498U (en) | Horizontal bearing capability test device of piles in permafrost region | |
CN104653208A (en) | Simple micro-added resistance large-deformation anchorage device and method | |
CN103306286B (en) | A kind of for spiral load test instrument dowel bar pull-up | |
CN203037472U (en) | Static-load test apparatus for petroleum drilling machine | |
CN203307810U (en) | Pulling-up device for spiral load tester dowel bars | |
CN203587815U (en) | Shallow geological exploration operation device | |
CN211948353U (en) | Soil dynamic penetration test device | |
CN202117057U (en) | Full-hydraulic static pipe drawing machine | |
CN204594859U (en) | A kind of pseudo-ginseng stem stalk is chosen force measuring device | |
CN104032720B (en) | It is applicable to test method and the device of deep supporting course bearing capacity | |
CN203702251U (en) | Anchorage device spring gripper push rod installation device | |
CN206873515U (en) | A kind of device for realizing the loading of screw pile foundation fast load-keeping method and dynamometry | |
CN203546793U (en) | Cast-in-place pile hole digging and earth taking device | |
CN203289001U (en) | Wiring pile extractor | |
CN206873432U (en) | A kind of heavy dynamic penetration machine | |
CN201678993U (en) | Static sounding device | |
CN205879071U (en) | Simple and easy measuring device of floor thickness | |
CN105696614B (en) | One kind solves the super heavy resetting means of open caisson using top of above leaving behind | |
CN202476193U (en) | Ground pile for roping | |
CN108265707A (en) | One kind can the multi-functional middle pick of tuning fetch earth and plant stake device and its construction method | |
CN203855991U (en) | Device for conducting anti-pulling frictional resistance test on bed rock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 |