CN203307810U - Pulling-up device for spiral load tester dowel bars - Google Patents

Pulling-up device for spiral load tester dowel bars Download PDF

Info

Publication number
CN203307810U
CN203307810U CN2013203438216U CN201320343821U CN203307810U CN 203307810 U CN203307810 U CN 203307810U CN 2013203438216 U CN2013203438216 U CN 2013203438216U CN 201320343821 U CN201320343821 U CN 201320343821U CN 203307810 U CN203307810 U CN 203307810U
Authority
CN
China
Prior art keywords
dowel bar
wire rope
pulling
steel wire
fluctuating orbit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203438216U
Other languages
Chinese (zh)
Inventor
王国斌
詹建辉
利奕年
陈宝
肜增湘
於开炳
王红明
张纯根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LICHENG GEOTECHNICAL Co Ltd
Communications Planning & Design Institute Of Hubei
Original Assignee
WUHAN LICHENG GEOTECHNICAL Co Ltd
Communications Planning & Design Institute Of Hubei
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LICHENG GEOTECHNICAL Co Ltd, Communications Planning & Design Institute Of Hubei filed Critical WUHAN LICHENG GEOTECHNICAL Co Ltd
Priority to CN2013203438216U priority Critical patent/CN203307810U/en
Application granted granted Critical
Publication of CN203307810U publication Critical patent/CN203307810U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a pulling-up device for spiral load tester dowel bars. The dowel bars are connected by dowel bar joints; the pulling-up device comprises left and right lifting tracks, a lifting frame and a pulling-up arm arranged under a base; the two lifting tracks are parallel steel channels with opposite openings, are vertically connected oonto the base, and are connected by a top beam; the pulling-up arm is fixed on the lifting frame; an upper pulley and a steel wire rope anchoring lug are arranged under the top beam, a lower pulley is arranged at the upper part of the lifting frame, a steel wire rope winch is arranged in the middles of the lifting tracks, and a hand crank is arranged on the steel wire rope winch; one end of a steel wire rope is fixed on the steel wire rope anchoring lug, and the other end of the steel wire rope is wound on the steel wire rope winch after passing through the lower pulley and the upper pulley. According to the pulling-up device, the problems of time waste and labor waste caused by manual operation in pulling up of a spiral plate load tester dowel bar are solved, and each dowel bar of a spiral plate load tester can be pulled up in a time-saving and labor-saving manner. The pull-up device is simple in structure and improves the test efficiency, and is applicable to pulling up a feeler lever for static penetration tests.

Description

A kind of for spiral load test instrument dowel bar pull-up
Technical field
The utility model relates to the soil test field, more relates to a kind ofly for screw plate test instrument dowel bar pull-up, and after screw plate test can being finished, dowel bar be extracted ground quickly and easily.
Background technology
Screw plate test is the plate evolving development of nearly 30 years cause routines and come, and is most widely used in-situ testing technique at present.Screw plate test is a spiral bearing plate (hereinafter to be referred as spiral plate) to be used to manpower or mechanical force revolve the predetermined test degree of depth of people's below ground, by dowel bar to the spiral plate load application, by the resistance strain type sensor survey that the dowel bar lower end is connected with spiral plate, read the load that spiral plate bears, the corresponding deformation when distortion of the dowel bar be connected by observation and spiral plate is surveyed and read spiral plate and bear different load, the stress one distortion one time relation curve that passes through to obtain, ask for the bearing capacity of foundation soil, modulus of deformation, the design parameterss such as the coefficient of consolidation and saturated soft clay undrained shear strength.
After the spiral plate off-test, the general using pipe grippers relies on manpower one to save at leisure dowel bar is extracted, take very much so on the one hand manpower, also very time-consuming on the other hand, cause test efficiency low, therefore, in order to overcome the above problems, be badly in need of development a kind of for spiral load test instrument dowel bar pull-up, use facility laborsaving, improve testing efficiency.
The utility model content
The purpose of this utility model is to be to provide a kind of for spiral load test instrument dowel bar pull-up, simple in structure, easy to use, this device can be easily will be extracted dowel bar is a section after the spiral load off-test fast, not only convenient laborsaving but also improve testing efficiency, solved because manpower works the problem that wastes time and energy of pulling out screw plate test instrument dowel bar, can quickly and easily dowel bar have been extracted, improved test efficiency; Can also be applicable to rising of cone penetration test sounding rod pulls out.
In order to realize above-mentioned purpose, the utility model adopts following technical measures:
A kind ofly for spiral load test instrument dowel bar pull-up, comprise dowel bar, dowel bar joint and base, it is characterized in that: between the first dowel bar and the second dowel bar, connect by the dowel bar joint, dowel bar joint both sides are provided with square orifice; Be arranged on the first fluctuating orbit, the second fluctuating orbit, the crane of base below and rise and pull out arm, the first fluctuating orbit, the second fluctuating orbit be opening in opposite directions, the channel-section steel that is parallel to each other, and be vertically connected on base, the first fluctuating orbit, the second fluctuating orbit connect by back timber; The roller of crane is arranged in the first fluctuating orbit, the second fluctuating orbit and can moves up and down along the first fluctuating orbit, the second fluctuating orbit, rises to pull out arm and be fixed on crane; The back timber below is equipped with top sheave and hoisting cable anchorage ear, and crane top is equipped with lower sheave, and the first fluctuating orbit, the second fluctuating orbit middle part are equipped with the wire rope capstan winch, and the wire rope capstan winch is equipped with wind; Wire rope one end is fixed on the hoisting cable anchorage ear, and the other end is walked around after lower sheave, top sheave successively on the wire rope capstan winch.
Advantage of the present utility model and have effect:
1. the utility model has solved because manpower works the problem that wastes time and energy of pulling out screw plate test instrument dowel bar, has guaranteed the power transmission of screw plate test instrument to be extracted time saving and energy savingly.
2. the utility model is simple in structure, light, can quickly and easily dowel bar be extracted, and has improved test efficiency.
3. the utility model is applicable to rising of cone penetration test sounding rod and pulls out.
The accompanying drawing explanation
Fig. 1 is a kind of front view for spiral load test instrument dowel bar pull-up.
Fig. 2 is a kind of left view for spiral load test instrument dowel bar pull-up.
Wherein: 1a. the first dowel bar, 1b the second dowel bar, dowel bar, 2. the dowel bar joint, 3. base, 4a. the first fluctuating orbit, 4b. the second fluctuating orbit, 5. back timber, 6. crane, 7. pull out arm, 8. wire rope capstan winch, 9. wind, 10. wire rope, 11. hoisting cable anchorage ears, 12. top sheaves, 13. lower sheaves.
The specific embodiment
Embodiment 1:
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As shown in Figure 1 and Figure 2, a kind of for spiral load test instrument dowel bar pull-up, comprise dowel bar 1, dowel bar joint 2 and base 3, it is characterized in that: between the first dowel bar 1a and the second dowel bar 1b, connect by dowel bar joint 2, dowel bar joint 2 both sides are provided with square orifice; Be arranged on the first fluctuating orbit 4a, the second fluctuating orbit 4b, the crane 6 of base 3 belows and rise and pull out arm 7, the first fluctuating orbit 4a, the second fluctuating orbit 4b be opening in opposite directions, the channel-section steel that is parallel to each other, and be vertically connected on base 3, the first fluctuating orbit 4a, the second fluctuating orbit 4b connect by back timber 5; The roller of crane 6 is arranged in the first fluctuating orbit 4a, the second fluctuating orbit 4b and can moves up and down along the first fluctuating orbit 4a, the second fluctuating orbit 4b, rises to pull out arm 7 and be fixed on crane 6; Back timber 5 belows are equipped with top sheave 12 and hoisting cable anchorage ear 11, and crane 6 tops are equipped with lower sheave 13, the first fluctuating orbit 4a, the second fluctuating orbit 4b middle part is equipped with wire rope capstan winch 8, and wire rope capstan winch 8 is equipped with wind 9; Wire rope 10 1 ends are fixed on hoisting cable anchorage ear 11, and the other end is walked around after lower sheave 13, top sheave 12 successively on wire rope capstan winch 8.
During work, by wind 9, driving steel wire winch 8 rotates, wire rope 10 progressively is coiled on wire rope capstan winch 8, lower sheave 13 is moved upward by wire rope 10 tractions, and crane 6 moves upward with lower sheave 13, pulls out arm 7 and directly inserts the square opening of dowel bar joint 2 both sides, rise and to pull out arm 7 and be raised with crane 6, thereby the first dowel bar 1a progressively is pulled out, when 2 of the dowel bar joints of dowel bar 1a bottom are extracted ground, can have stopped pulling out; By pipe grippers, second section dowel bar 1b is fixed, utilize the dowel bar 1a that pipe grippers will be extracted to lay down, allowed and pulled out the dowel bar joint 2 that arm 7 inserts dowel bar 1b tops, successively the first dowel bar 1a and the second dowel bar 1b are extracted according to the aforesaid operations step.

Claims (2)

1. one kind for spiral load test instrument dowel bar pull-up, comprise the first dowel bar (1a), dowel bar joint (2) and base (3), it is characterized in that: by dowel bar joint (2), connect between the first dowel bar (1a) and the second dowel bar (1b), be arranged on first fluctuating orbit (4a) of base (3) below, the second fluctuating orbit (4b), crane (6) and rise and to pull out arm (7), two fluctuating orbits (4) be opening in opposite directions, the channel-section steel be parallel to each other, be vertically connected on base (3), the first fluctuating orbit (4a), the second fluctuating orbit (4b) connects by back timber (5), rise and to pull out arm (7) and be fixed on crane (6), back timber (5) below is equipped with top sheave (12) and hoisting cable anchorage ear (11), crane (6) top is equipped with lower sheave (13), the first fluctuating orbit (4a), the second fluctuating orbit (4b) middle part are equipped with wire rope capstan winch (8), wire rope capstan winch (8) is equipped with wind (9), it is upper that wire rope (10) one ends are fixed on hoisting cable anchorage ear (11), and the other end is walked around after lower sheave (13), top sheave (12) successively on wire rope capstan winch (8).
2. according to claim 1 a kind of for spiral load test instrument dowel bar pull-up, it is characterized in that: described dowel bar joint (2) both sides are provided with square orifice.
CN2013203438216U 2013-06-14 2013-06-14 Pulling-up device for spiral load tester dowel bars Expired - Fee Related CN203307810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203438216U CN203307810U (en) 2013-06-14 2013-06-14 Pulling-up device for spiral load tester dowel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203438216U CN203307810U (en) 2013-06-14 2013-06-14 Pulling-up device for spiral load tester dowel bars

Publications (1)

Publication Number Publication Date
CN203307810U true CN203307810U (en) 2013-11-27

Family

ID=49614028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203438216U Expired - Fee Related CN203307810U (en) 2013-06-14 2013-06-14 Pulling-up device for spiral load tester dowel bars

Country Status (1)

Country Link
CN (1) CN203307810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306286A (en) * 2013-06-14 2013-09-18 湖北省交通规划设计院 Dowel bar pulling device for spiral plate load tester

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306286A (en) * 2013-06-14 2013-09-18 湖北省交通规划设计院 Dowel bar pulling device for spiral plate load tester
CN103306286B (en) * 2013-06-14 2015-10-28 湖北省交通规划设计院 A kind of for spiral load test instrument dowel bar pull-up

Similar Documents

Publication Publication Date Title
CN206848068U (en) A kind of draw-off gear for anchor rod drawing experiment
CN109403396B (en) A combined horizontal and upward pull-out loading device and method for pile foundation model testing
CN206146749U (en) A device for testing the tensile impact mechanical properties of anchor bolts and cables
CN201569603U (en) Connecting clamp for geogrid field pull-out test
WO2018014466A1 (en) Drop hammer height adjusting device used for high strain detection of pile foundation
CN101839001A (en) Compressive pile load detection device and method
CN204858424U (en) Cable tunnel inspection shaft pulls cabling composite set
CN106120694A (en) A kind of improved automatic GCO probe GCO equipment
CN203307810U (en) Pulling-up device for spiral load tester dowel bars
CN104677540A (en) Testing device for measuring lateral soil resistance of pipeline
CN201051061Y (en) Cutting creep test instrument
CN103306286B (en) A kind of for spiral load test instrument dowel bar pull-up
CN206873432U (en) A kind of heavy dynamic penetration machine
CN201713839U (en) Compressive pile load detector
CN109024714A (en) A kind of pulling resistance testing device of anchor pole
CN205483780U (en) But split grade beam formula moves rig loading device
CN205259235U (en) High strain detection isolated plant of foundation pile
CN220626034U (en) Rock material drawing test device under three-dimensional stress condition
CN203546793U (en) Cast-in-place pile hole digging and earth taking device
CN214219608U (en) Foundation planning equipment for building planning engineering
CN206074245U (en) Water surface test device
CN204530801U (en) Foundation pile pulling resistance testing device
CN210049239U (en) Pile hammer punches a hole convenient to straightness inspection that hangs down
CN109853641A (en) A kind of test method of offshore wind farm sand compaction pile
CN213740985U (en) Dynamic penetration test device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131127

Termination date: 20150614

EXPY Termination of patent right or utility model