CN103291208B - Using method of auxiliary ladder of steel tube tower - Google Patents

Using method of auxiliary ladder of steel tube tower Download PDF

Info

Publication number
CN103291208B
CN103291208B CN201310260307.0A CN201310260307A CN103291208B CN 103291208 B CN103291208 B CN 103291208B CN 201310260307 A CN201310260307 A CN 201310260307A CN 103291208 B CN103291208 B CN 103291208B
Authority
CN
China
Prior art keywords
hanger
pair
hook
steel tube
tube tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310260307.0A
Other languages
Chinese (zh)
Other versions
CN103291208A (en
Inventor
徐成勇
周立军
陈冬林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIZHENG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Yizheng Power Supply Co Of Jiangsu Electric Power Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yizheng Power Supply Co Of Jiangsu Electric Power Co, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical Yizheng Power Supply Co Of Jiangsu Electric Power Co
Priority to CN201310260307.0A priority Critical patent/CN103291208B/en
Publication of CN103291208A publication Critical patent/CN103291208A/en
Application granted granted Critical
Publication of CN103291208B publication Critical patent/CN103291208B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses an auxiliary ladder of a steel tube tower and a using method thereof, and relates to the field of a ladder. A flange plate is arranged at the end face of the steel tube tower; a plurality of bolt mounting holes which are evenly distributed are formed in the flange plate; a reinforcing rib is arranged at the lower part adjacent to the mounting holes; eyelets are arranged on the reinforcing rib; the auxiliary ladder comprises a movable rack and a supporting ladder; the movable rack comprises a pair of racks and at least one slide rail component; at least one pair of hooks is arranged on the tops of the racks; a pair of hooks is rotationally connected to the tops of the rack; the slide rail component is arranged between the pair of racks, so that the pair of racks is connected through the slide rail component in a sliding manner; the pair of racks is a rack 1 and a rack 2 respectively; the supporting ladder is fixedly connected to the end face of one side of the rack 1 far away from the rack 2. The auxiliary ladder has the characteristics of delicate structure, good stability, high strength and the like, and is convenient.

Description

A kind of mounting attachment using method of steel tube tower
Technical field
The present invention relates to ladder field, particularly relate to the mounting attachment of steel tube tower and the improvement of using method thereof.
Background technology
In order to be conducive to controlling of urban planning, the shaft tower that overhead wire is used in electric power facility, adopts steel tube tower to build usually.And when construction, consider that steel tube tower weight is large, by landform restriction, from factors such as the charged close together of bypass, often adopt the steel tube tower that only gin pole or crane merogenesis group are stood.Between adjacent two joint steel tube towers, adopt flange plate structure to connect, and interfixed by the uniform screw bolt and nut of a circle on flange.But, staff is when climbing up steel tube tower and installing screw bolt and nut, the staff limited length because steel tube tower diameter is comparatively large, when causing staff to stand in high-altitude erection bolt, staff cannot get at all bolt installation sites simultaneously, meanwhile, staff cannot change position again in the air easily at height.Therefore, when installing steel tube tower or overhauling, how can provide effective support to human body, can facilitate again, safety the high-level position of conversion human body become those skilled in the art's technical problem urgently to be resolved hurrily.
For the problems referred to above, traditional construction method can be following several usually:
One, outside steel tube tower, except the vertical cat ladder of routine, set up a pair symmetrically arranged auxiliary cat ladder, and auxiliary cat ladder is fixedly connected on the outer wall of steel tube tower; This type of auxiliary cat ladder using method is simple, and safety and reliability is high; But, if also also exist construction cost high, cannot use when overhauling old steel tube tower time steel tube tower diameter excessive (more than 10 meters) and still cannot get at the defects such as all bolt installation sites;
Two, carrying an annular safety rope by operating personnel and climb up vertical cat ladder, and be connected on flange by the top of safety rope, making operating personnel can step on safety rope by a pin when operating, a pin is stepped on vertical cat ladder and is installed bolt; But this type of safety rope is only applicable to the installation of the steel tube tower of minor diameter, Simultaneous Stabilization is poor, operation time security risk large;
Three, owing to being typically provided with reinforcing rib between bolt hole adjacent on flange, and reinforcing rib is typically provided with eyelet, therefore operating personnel can carry a mounting attachment and climb up steel tube tower, and by iron wire etc., mounting attachment is connected to below eyelet, thus operating personnel are stood on mounting attachment can install bolt; But operating personnel find in practice, this type of mounting attachment rocks comparatively large and mobile very inconvenience when work high above the ground, uses that operating efficiency is extremely low and construction effect is poor.
Therefore, above-mentioned three kinds of construction methods all cannot effectively solve can provide effective support to human body, can facilitate again, the problem of the high-level position of conversion human body of safety.In addition, in above-mentioned several construction method, operating personnel all stand in below and install the bolt more than crown, waste time and energy, and after installing, bolt very easily produces loosening, brings great potential safety hazard.
Summary of the invention
The present invention is directed to above problem, provide a kind of delicate structure, easy to use and use safety coefficient is high, good stability, effective support can be provided to human body, can facilitate again, safety the high-level position of conversion human body, be in mounting attachment and the using method thereof of the steel tube tower in below operating personnel chest when making bolt install simultaneously.
Technical scheme of the present invention is: the end face of described steel tube tower is provided with flange, and described flange is provided with the installing hole of some equally distributed bolts, and the below of adjacent described installing hole is provided with reinforcing rib, and described reinforcing rib is provided with eyelet; Described mounting attachment comprises flexible hanger and supporting ladder;
Described flexible hanger comprises a pair hanger and at least one slide track component; Described hanger top is provided with at least one pair of hook, and described in a pair, hook is rotatably connected on described hanger top; Described slide track component is located at described in a pair between hanger, and hanger described in a pair is slidably connected by slide track component;
Hanger described in a pair is divided into hanger one and hanger two, and described supporting ladder is fixedly connected on the side end face of described hanger one away from described hanger two.
Described slide track component comprises mutually adaptive arc shaped slider and arc chute;
The cross section of described arc shaped slider is in T shape and be fixedly connected on the end face of described hanger two, and described arc chute is T-slot and is fixedly connected on the end face of described hanger one; The length of described arc chute is greater than the width sum of hanger described in a pair.
Described slide track component comprises mutually adaptive arc fin and arc dovetail groove;
The cross section of described arc fin is trapezoidal and is fixedly connected on the end face of described hanger one, and described arc dovetail groove is fixedly connected on the end face of described hanger two; The length of described arc dovetail groove is greater than the width sum of hanger described in a pair.
Described supporting ladder comprises the support section and linkage section that are connected as a single entity from top to bottom, and described linkage section is fixedly connected with described hanger one, and described support section comprises the vertical section and horizontal segment that are connected as a single entity from top to bottom.
The linkage section bottom of described supporting ladder is provided with at least one strut, and described strut is expansion link, and described strut is connected with horizontally disposed pulley away from one end of described supporting ladder.
The top of described hanger offers the consistent connecting hole of some height, and the bottom of described hook is provided with ships and resell on another market, described in ship and resell on another market and run through described connecting hole.
Use according to the following steps:
1), setting hook: the hook at hanger two top is linked into down in the eyelet of a pair reinforcing rib;
2), hook is unloaded: the hook pulling down hanger one top;
3), slippage: the hand steered steel tube tower of operating personnel, sliding support ladder, makes hanger one in the drive lower slider of supporting ladder to the outside of hanger two;
4), hook is changed: the hook being linked into hook one top, and the hook taking off hanger two top;
5), erection bolt: screw bolt and nut to be loaded in the installing hole between a pair reinforcing rib and to lock;
6), carry: pull-out hanger two, makes hanger two slide into the below of lower a pair reinforcing rib again;
7), step 1 is got back to).
The present invention has the features such as delicate structure, good stability, intensity is high and easy to use, in use can according to setting hook, unload hook, slippage, change hook, erection bolt, this six steps cycling of carry make operating personnel simply, effectively can carry out installation adjustment to the screw bolt and nut in installing hole any on steel tube tower, reach and can provide effective support to human body, can facilitate again, the effect of the high-level position of conversion human body of safety.Meanwhile, when practical operation, significantly reduce labour intensity and the security risk of operating personnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention,
Fig. 2 be the A-A of Fig. 1 to sectional view,
Fig. 3 is embodiments of the present invention schematic diagrames;
Fig. 4 is the top view of steel tube tower in the present invention;
Fig. 5 is the structural representation of supporting ladder in the present invention,
Fig. 6 is the left view of Fig. 5,
Fig. 7 is the top view of Fig. 5;
Fig. 8 is the structural representation of flexible hanger in the present invention,
Fig. 9 is the left view of Fig. 8;
Figure 10 is using state schematic diagram one of the present invention,
Figure 11 is using state schematic diagram two of the present invention,
Figure 12 is using state schematic diagram three of the present invention,
Figure 13 is using state schematic diagram four of the present invention,
Figure 14 is using state schematic diagram five of the present invention;
In figure, 1 is steel tube tower, and 11 is flange, and 110 is installing holes, and 111 is reinforcing ribs, and 1110 is eyelets;
2 is mounting attachments, and 21 is flexible hangers, and 211 is hangers one, and 212 is hangers two, and 213 is slide track components, and 2131 is arc shaped sliders, and 2132 is arc chutes, and 214 is hooks, and 215 is connecting holes, and 216 is ship and resell on another market;
22 is supporting ladders, and 221 is support sections, and 2211 is vertical sections, and 2212 is horizontal segments, and 222 is links, and 223 is struts, and 2230 is pulleys.
Detailed description of the invention
The present invention as represented in figures 1 through 14, the end face of described steel tube tower 1 is provided with flange 11, described flange 11 is provided with the installing hole 110 of some equally distributed bolts, and the below of adjacent described installing hole 110 is provided with reinforcing rib 111, and described reinforcing rib 111 is provided with eyelet 1110; Described mounting attachment 2 comprises flexible hanger 21 and supporting ladder 22;
Described flexible hanger 21 comprises a pair hanger and at least one slide track component 213; Described hanger top is provided with at least one pair of hook 214 (mouth of hook of described hook is provided with snap close), links up with and 214 to be rotationally connected (can hinged or by connection of shipping and reselling on another market) at described hanger top described in a pair; Described slide track component 213 is located at described in a pair between hanger, and hanger described in a pair is slidably connected by slide track component 213;
Hanger described in a pair is divided into hanger 1 and hanger 2 212, and described supporting ladder 22 is fixedly connected on the side end face of described hanger 1 away from described hanger 2 212.Like this, hanger one and hanger two slide mutually by slide track component, make supporting ladder can with hanger one synchronization-sliding simultaneously, and then out position change can be done in the air at height, make operating personnel simply, effectively can carry out installation adjustment to the screw bolt and nut in installing hole any on steel tube tower.
The first embodiment of slide track component in the present invention, as Figure 8-9, described slide track component 213 comprises mutually adaptive arc shaped slider 2131 and arc chute 2132; The two ends of described arc chute are provided with limited block.
The cross section of described arc shaped slider 2131 is in T shape and be fixedly connected on the end face of described hanger 2 212, and described arc chute 2132 is T-slot and is fixedly connected on the end face of described hanger 1; The length of described arc chute 2132 is greater than the width sum of hanger described in a pair.
The second embodiment of slide track component in the present invention, described slide track component 213 comprises mutually adaptive arc fin and arc dovetail groove; The two ends of described arc dovetail groove are provided with limited block.
The cross section of described arc fin is trapezoidal and is fixedly connected on the end face of described hanger one, and described arc dovetail groove is fixedly connected on the end face of described hanger two; The length of described arc dovetail groove is greater than the width sum of hanger described in a pair.
Described supporting ladder 22 comprises the support section 221 and linkage section 222 that are connected as a single entity from top to bottom, and described linkage section 222 is fixedly connected with described hanger 1, and described support section 221 comprises the vertical section 2211 and horizontal segment 2212 that are connected as a single entity from top to bottom.On the linkage section that can stand on supporting ladder when using at the scene or be sitting on the horizontal segment of supporting ladder, the vertical section of supporting ladder provide effective can to the back of operating personnel to support and protection simultaneously.Can be in below operating personnel chest all the time when bolt is installed, convenient operation personnel have an effect.
Linkage section 222 bottom of described supporting ladder 22 is provided with at least one strut 223, and described strut 223 is expansion link, and described strut 223 is connected with horizontally disposed pulley 2230 away from one end of described supporting ladder 22.Like this, by be linked into reinforcing rib eyelet in after, can make compliance to the length of strut and regulate, make this case when the steel tube tower for different size, the pulley of strut near one end of steel tube tower all effectively can prop up the outer wall of steel tube tower.On the one hand, provide effective support to the bottom of supporting ladder, improve overall stability and intensity; On the other hand, avoid supporting ladder and be directly fitted on the outer wall of steel tube tower, leave enough large human users space, improve overall operability and usability.In addition, effective guiding and supplemental support is provided when supporting ladder moves.
The top of described hanger offers the consistent connecting hole of some height 215, and the bottom of described hook 214 is provided with ships and resell on another market 216, described in ship and resell on another market and 216 run through described connecting hole 215.Because the spacing of the reinforcing rib of the steel tube tower of different size is different, hanger top is connected to by dismountable for hook, and be provided with multiple station, make the spacing between linking up with can make corresponding adjustment according to the specification of steel tube tower, thus make hook to be linked in the eyelet of reinforcing rib smoothly.
Use according to the following steps:
1), setting hook: as shown in Figure 10, after completing the installation of bolt, nut, the hook 214 at hanger 2 212 top is linked into down in the eyelet 1110 of a pair reinforcing rib 111, prepares slippage;
2), unload hook: as shown in figure 11, pull down the hook 214 at hanger 1 top, now provide support to the operating personnel of work high above the ground by the hook at hanger 2 212 top, slide track component 213 and strut 223;
3), slippage: as shown in figure 12, the hand steered steel tube tower 1 of operating personnel, by frictional force (frictional force of the frictional force of staff and steel tube tower, the person and supporting ladder) and reaction force sliding support ladder 22, make hanger 1 in the drive lower slider of supporting ladder 22 to the outside of hanger 2 212, complete slippage;
4), change hook: as shown in figure 13, be linked into the hook at hook 1 top, and take off the hook at hanger 2 212 top;
5), erection bolt: screw bolt and nut to be loaded in the installing hole 110 between a pair reinforcing rib 111 and to lock, completing the installation of this installation site;
6), carry: as shown in figure 14, pull-out hanger 2 212, makes hanger 2 212 slide into the below of lower a pair reinforcing rib 111 again, complete carry;
7), step 1 is got back to).

Claims (6)

1. a mounting attachment using method for steel tube tower, the end face of described steel tube tower is provided with flange, and described flange is provided with the installing hole of some equally distributed bolts, and the below of adjacent described installing hole is provided with reinforcing rib, and described reinforcing rib is provided with eyelet; It is characterized in that: described mounting attachment comprises flexible hanger and supporting ladder;
Described flexible hanger comprises a pair hanger and at least one slide track component; Described hanger top is provided with at least one pair of hook, and described in a pair, hook is rotatably connected on described hanger top; Described slide track component is located at described in a pair between hanger, and hanger described in a pair is slidably connected by slide track component;
Hanger described in a pair is divided into hanger one and hanger two, and described supporting ladder is fixedly connected on the side end face of described hanger one away from described hanger two;
Use according to the following steps:
1), setting hook: the hook at hanger two top is linked into down in the eyelet of a pair reinforcing rib;
2), hook is unloaded: the hook pulling down hanger one top;
3), slippage: the hand steered steel tube tower of operating personnel, sliding support ladder, makes hanger one in the drive lower slider of supporting ladder to the outside of hanger two;
4), hook is changed: the hook being linked into hook one top, and the hook taking off hanger two top;
5), erection bolt: screw bolt and nut to be loaded in the installing hole between a pair reinforcing rib and to lock;
6), carry: pull-out hanger two, makes hanger two slide into the below of lower a pair reinforcing rib again;
7), step 1 is got back to).
2. the mounting attachment using method of a kind of steel tube tower according to claim 1, is characterized in that, described slide track component comprises mutually adaptive arc shaped slider and arc chute;
The cross section of described arc shaped slider is in T shape and be fixedly connected on the end face of described hanger two, and described arc chute is T-slot and is fixedly connected on the end face of described hanger one; The length of described arc chute is greater than the width sum of hanger described in a pair.
3. the mounting attachment using method of a kind of steel tube tower according to claim 1, is characterized in that, described slide track component comprises mutually adaptive arc fin and arc dovetail groove;
The cross section of described arc fin is trapezoidal and is fixedly connected on the end face of described hanger one, and described arc dovetail groove is fixedly connected on the end face of described hanger two; The length of described arc dovetail groove is greater than the width sum of hanger described in a pair.
4. the mounting attachment using method of a kind of steel tube tower according to claim 1, it is characterized in that, described supporting ladder comprises the support section and linkage section that are connected as a single entity from top to bottom, described linkage section is fixedly connected with described hanger one, and described support section comprises the vertical section and horizontal segment that are connected as a single entity from top to bottom.
5. the mounting attachment using method of a kind of steel tube tower according to claim 4, it is characterized in that, the linkage section bottom of described supporting ladder is provided with at least one strut, and described strut is expansion link, and described strut is connected with horizontally disposed pulley away from one end of described supporting ladder.
6. the mounting attachment using method of a kind of steel tube tower according to claim 1, is characterized in that, the top of described hanger offers the consistent connecting hole of some height, and the bottom of described hook is provided with ships and resell on another market, described in ship and resell on another market and run through described connecting hole.
CN201310260307.0A 2013-06-27 2013-06-27 Using method of auxiliary ladder of steel tube tower Active CN103291208B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310260307.0A CN103291208B (en) 2013-06-27 2013-06-27 Using method of auxiliary ladder of steel tube tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310260307.0A CN103291208B (en) 2013-06-27 2013-06-27 Using method of auxiliary ladder of steel tube tower

Publications (2)

Publication Number Publication Date
CN103291208A CN103291208A (en) 2013-09-11
CN103291208B true CN103291208B (en) 2015-03-25

Family

ID=49092673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310260307.0A Active CN103291208B (en) 2013-06-27 2013-06-27 Using method of auxiliary ladder of steel tube tower

Country Status (1)

Country Link
CN (1) CN103291208B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106246094A (en) * 2016-10-10 2016-12-21 国网江苏省电力公司扬州市江都区供电公司 A kind of novel mounting attachment and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005087267A (en) * 2003-09-12 2005-04-07 Minoru Oota Evacuation device
JP2005213996A (en) * 2004-01-28 2005-08-11 Shozaburo Sato Escape ladder device
CN202832172U (en) * 2012-09-03 2013-03-27 河南省电力公司驻马店供电公司 Combined ladder for climbing up and down electric transmission line steel tube tower
CN202926197U (en) * 2012-10-08 2013-05-08 河南省电力公司南阳供电公司 Auxiliary hooking device for safety belt of steel tube tower

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE522451C2 (en) * 2001-11-14 2004-02-10 Scania Cv Abp Foldable ladder
KR20090017181A (en) * 2007-08-14 2009-02-18 김동철 Ladder for power cable
CN201284616Y (en) * 2008-09-25 2009-08-05 潍坊供电公司 Assisted climbing ladder of steel pipe column
CN201314191Y (en) * 2008-10-14 2009-09-23 河南省电力公司郑州供电公司 Portable auxiliary ladder for climbing steel tube tower
CN201762976U (en) * 2010-08-23 2011-03-16 上海电力带电作业技术开发有限公司 High-altitude operation platform of folding steel pipe tower
CN203321304U (en) * 2013-06-27 2013-12-04 国家电网公司 Auxiliary ladder of steel tube tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005087267A (en) * 2003-09-12 2005-04-07 Minoru Oota Evacuation device
JP2005213996A (en) * 2004-01-28 2005-08-11 Shozaburo Sato Escape ladder device
CN202832172U (en) * 2012-09-03 2013-03-27 河南省电力公司驻马店供电公司 Combined ladder for climbing up and down electric transmission line steel tube tower
CN202926197U (en) * 2012-10-08 2013-05-08 河南省电力公司南阳供电公司 Auxiliary hooking device for safety belt of steel tube tower

Also Published As

Publication number Publication date
CN103291208A (en) 2013-09-11

Similar Documents

Publication Publication Date Title
US11808250B2 (en) Method and equipment for replacing wind turbine components
CN104989094B (en) Installing method of walking hanging basket
CN105226560B (en) A kind of crossing frame and its construction method
CN107473102A (en) A kind of miniature crawler belt derrick car of substation equipment maintenance and repair
CN106136561A (en) Electrician can backpack Self-unlocking lifting tool bag
CN205429566U (en) Crossing structure
CN207347032U (en) A kind of movable hanging for building is unloaded
CN109066467B (en) Insulating platform with all-round regulatory function
CN103291208B (en) Using method of auxiliary ladder of steel tube tower
CN207829430U (en) A kind of lifting type operating platform for hanging operation
CN108560510B (en) Movable overhaul platform for surface runner of hydropower station
CN203321304U (en) Auxiliary ladder of steel tube tower
CN217419356U (en) Self-lifting pier high-altitude construction anti-falling device
CN206285368U (en) A kind of substation equipment maintenance and repair safety belt suspension device
CN106246094A (en) A kind of novel mounting attachment and using method thereof
CN207108176U (en) Wind-driven generator and its instrument conveying device
CN207330285U (en) A kind of removable spider-man's lifting-point device
CN211201101U (en) Movable construction platform for bridge foundation construction
CN206053827U (en) A kind of extending insulating ladder
CN213326443U (en) Quick unloading platform
CN208200107U (en) A kind of escalator or moving sidewalk electric cabinet auxiliary lifting apparatus
CN206144452U (en) Novel supplementary ladder
CN208525688U (en) A kind of steel I-beam spraying safety belt suspension protective device
CN207484995U (en) A kind of green construction integration discharging platform
CN206188299U (en) Dedicated assembled handling instrument of fan cabin internal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: YIZHENG POWER SUPPLY COMPANY, JIANGSU ELECTRIC POW

Free format text: FORMER NAME: STATE GRID CORPORATION OF CHINA

CP03 Change of name, title or address

Address after: 211400 Yizheng City, Jiangsu Province workers and peasants North Road, No. 154, No.

Patentee after: Yizheng Power Supply Company of Jiangsu Electric Power Company

Patentee after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: Jiangsu Electric Power Company

Patentee before: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Patentee before: Yizheng Power Supply Company of Jiangsu Electric Power Company