CN103289424A - Preparation method of middle-temperature cured high-temperature epoxy asphalt - Google Patents
Preparation method of middle-temperature cured high-temperature epoxy asphalt Download PDFInfo
- Publication number
- CN103289424A CN103289424A CN2013102620199A CN201310262019A CN103289424A CN 103289424 A CN103289424 A CN 103289424A CN 2013102620199 A CN2013102620199 A CN 2013102620199A CN 201310262019 A CN201310262019 A CN 201310262019A CN 103289424 A CN103289424 A CN 103289424A
- Authority
- CN
- China
- Prior art keywords
- preparation
- asphalt
- epoxy
- temperature
- temperature setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a preparation method of middle-temperature cured high-temperature epoxy asphalt. The preparation method comprises the following steps of: feeding matrix asphalt into a reactor according to the mass in a formula, wherein the matrix asphalt is heated to 90 to 140 DEG C and hydrated; adding maleimide or a maleimide derivative that is 2 to 20% of the mass of the asphalt; charging N2 after the pressure is stabilized; keeping the total pressure to 0.25 to 1MPa; reacting for 3 to 6 hours; slowly releasing the pressure to reach 0.1MPa; gradually lowering the temperature to reach 100 to 110 DEG C; adding other materials of a component A to obtain a part A, wherein the other materials are preheated to reach 90 to 100 DEG C and are uniformly mixed in advance; and then uniformly mixing the part A with a part B in proportion as required so as to obtain the middle-temperature cured high-temperature epoxy asphalt. The epoxy resin modified asphalt prepared by the preparation method is high in strength and outstanding in flexibility; the corresponding epoxy asphalt concrete is remarkable in high-temperature performance and low-temperature performance and can be quickly put into service for traffic after construction. The middle-temperature cured high-temperature epoxy asphalt is applicable to places such as highways and roads and bridges with relatively high requirements and can also be used for urban roads, bus stops and airport pavements.
Description
Technical field
The present invention relates to a kind of chemical modified bitumen, the preparation method of the high-performance bituminous epoxy of definite a kind of intermediate temperature setting of saying so.
Background technology
Pitch is typically used as paves the way and water-proof material, belongs to a kind of thermoplastic material in essence.This property list is used the road surface of asphalt paving now, in summer high-temperature season, the road surface is prone to rut under the heavy lift effect, in cold season in winter, be prone to warm draw seam, along with the raising of road quality classification and the generally employing of large-span steel box-beam structure bridge, intensity, deformation stability and the fatigue durability etc. of pavement material have been proposed very high requirement, high agglutinating value(of coal) and particular requirement such as waterproof have been proposed again on use properties simultaneously.As the important component part of bridge car system, the quality of deck paving directly has influence on traveling security, comfortableness, bridge durability and economic benefit of investment.Obviously, so high performance requriements is that plain asphalt institute is incompetent, must use modifying asphalt.
The method of asphalt modification is more, as a whole, the excellent properties of bituminous epoxy gains public acceptance, but at present, bituminous epoxy must could be constructed when summer high temperature, and requires will continue after construction is finished sealing curing long period (generally needing for four to six weeks) ability open to traffic.People wish that certainly bituminous epoxy can select the construction time in the larger context as plain asphalt, and mat formation finish after open to traffic rapidly, especially for recovery project.Therefore, the open to traffic time after increasing the elasticity of construction time selection and shortening completion, namely improve the solidification rate of bituminous epoxy after the compacting that paves, just become the key that bituminous epoxy is further applied.
Summary of the invention
The purpose of this invention is to provide a kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method is carried out modification to pitch, makes pitch itself become a kind of epoxy curing agent; Other room temperature of adding again and middle temperature epoxy resin amine curing agent and curing catalyst have been improved with the consistency of pitch, being used of multiple solidifying agent makes that curing speed is controlled, the cured product performance is adjustable, can satisfy the different requirements under the various different conditions, reliable and stable high-performance epoxy bitumen material finally is provided.
The objective of the invention is to be achieved through the following technical solutions:
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting is characterized in that this method steps is as follows:
1) by the quality of prescription, the matrix pitch that is warmed up to after 90-140 ℃ the dehydration is added reactor, add the maleimide or derivatives thereof of the 2-20% of asphalt quality, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25-1MPa, react after 3-6 hour, slowly pressure release is to 0.1MPa; Then cool to 100-110 ℃ of adding gradually and be warming up to other material of the 90-100 ℃ of uniform A component of pre-mixing in advance, last redispersion is even, obtains the A part; The quality group of A part becomes: maleimide modifying asphalt 40-84 part, aliphatic amide 10-45 part, polymeric amide/polyetheramine 5-25 part, compatilizer 1-15 part;
2) mixed is even on request with A, B two portions, namely gets the high-performance bituminous epoxy of intermediate temperature setting, and B partly is Resins, epoxy, and the A part is 2.2:1-10:1 with the mass ratio of B part.
Among the present invention, described maleimide modifying asphalt is to make with maleimide and derivative thereof and plain asphalt reaction.Described plain asphalt can be petroleum pitch, oxidized bitumen, coal-tar pitch or lake pitch.Can choose one or several mixture wherein.
Described aliphatic amide refers to contain the aliphatic amide of 3 above reactive hydrogens, can be polyamines polyene, polymethylene two amines, also can be diamines and the unsaturated aliphatic diamines of C 5 fraction correspondence, can also be the diamines that contains aromatic nucleus, as G-328 of Mitsubishi's gas chemistry etc.It can be one or several the mixture that to choose wherein.
Described polymeric amide can low-molecular-weight polyamide resin and modified resin thereof, be preferably 40 ℃ of viscosity 3,000-80,000mPa.s within, the polyamide resin of amine value within 50mgKOH/g-500mgKOH/g, preferred 40 ℃ of viscosity are 5,000-50,000mPa.s within, the polyamide resin of amine value within 50mgKOH/g-300mgKOH/g, as river, capital 9650, Versamid 140, Versamid 125 and Fuji change into 2154,215X etc.Described polyetheramine, it can be the diaminobenzene ethers, as diaminodiphenyl oxide sulfobenzide, diaminodiphenyl oxide phenyl ether etc., diamino dihydroxyphenyl propane class, as diaminodiphenyl oxide dihydroxyphenyl propane etc., also can be the polyetheramine that does not contain benzene ring structure, as huntsman D-230, D-400, D-2000 or T-5000 etc.Both can choose wherein a kind of, also can choose wherein several mixtures.
Described compatilizer can be the extraction oil of furfural section in the oil refinery, and hydrogen phosphide cumene decomposes the phenolic aldehyde residual oil that distillates, and pine tar is rubber oil, and coal tar is rubber oil, also can be that oil such as paraffinic base, cycloalkyl or aryl are rubber oil.More excellent selection is that the furfural section in the oil refinery is extracted oil out and oil is rubber oil.Both can choose wherein a kind of, also can choose wherein several mixtures.
Can change the performance of epoxy bitumen material to satisfy the different requirements under the different condition by the ratio of adjusting A each component partly.
The present invention is by the quality of prescription, and the matrix pitch that is warmed up to after 90-140 ℃ the dehydration is added reactor, adds the maleimide or derivatives thereof of the 2-20% of asphalt quality, keeps 10-60 minute, treat pressure-stabilisation after, feeding N
2, make total pressure remain on 0.25-1MPa, react after 3-6 hour, slowly pressure release is to 0.1MPa; Then cool to 100-110 ℃ of adding gradually and be warming up to other material of the 90-100 ℃ of uniform A component of pre-mixing in advance, disperse just to obtain the A component by high speed dispersion machine tools such as colloidal mills more at last.During use, mixed is even on request with being warmed up to A, the B two portions that require temperature, namely gets high-performance thermosetting epoxy asphalt material of the present invention, can be sprayed within a certain period of time on road surface or the steel plate as the bituminous epoxy bonding layer material; If admix and gather materials according to certain bitumen aggregate ratio (general high-performance thermosetting epoxy asphalt material is 4.0:100-9.3:100 with the ratio of building stones) again, can mat formation within a certain period of time on the road surface and compacting.
The present invention at first carries out amination modifying with matrix pitch, as Fig. 1, shown in Figure 2, reaction mechanism may be bituminous matter in the pitch and maleimide and derivative thereof by Michael addition, diene synthesis or π-π charge transfer reaction, make pitch itself become a kind of epoxy curing agent; This has greatly improved other room temperature of adding again and middle temperature epoxy resin amine curing agent and curing catalyst with the consistency of pitch, cooperates preferred amine curing agent again, just obtains the bituminous epoxy A component of stable storing.Being used of multiple solidifying agent makes that curing speed is controlled, the cured product performance is adjustable, can satisfy the different requirements under the various different conditions, and reliable and stable high-performance epoxy bitumen material finally is provided.Because curing reaction temperature carries out under middle gentle room temperature, thus the construction time range of choice enlarge greatly, and construction finish after open to traffic fast.
Bituminous epoxy has formed a kind of network structure of 3 D stereo behind curing reaction; Because the multiple solidifying agent that wherein contains is not quite similar with the reactive behavior of Resins, epoxy, causing reaction to interlock carries out, thereby formed a kind of inierpeneirating network structure, the inierpeneirating network structure of this 3 D stereo provides theoretical foundation for its high strength, snappiness just.
The present invention carries out modification to pitch, makes pitch itself become a kind of epoxy curing agent; Other room temperature of adding again and middle temperature epoxy resin amine curing agent and curing catalyst have been improved with the consistency of pitch, being used of multiple solidifying agent makes that curing speed is controlled, the cured product performance is adjustable, can satisfy the different requirements under the various different conditions, reliable and stable high-performance epoxy bitumen material finally is provided.The present invention can provide the corresponding operating time according to different requirements; Also can arbitrarily adjust and satisfy the different performance requirement, stability in storage is good, corresponding epoxy asphalt concrete fatigue performance excellence, the construction time range of choice big and mat formation finish after open to traffic rapidly, be applicable to the occasion that motorway and bridge etc. are had relatively high expectations, also can be used for arterial street, motorbus bus stop and airstrip.
Description of drawings
Fig. 1 is the mechanism synoptic diagram of maleimide modifying asphalt.
Fig. 2 is
NThe mechanism synoptic diagram of-phenyl maleimide modifying asphalt.
Embodiment
The present invention is further described below by specific embodiment, but embodiment all is not limitation of the present invention.
Embodiment 1
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
Be warmed up to 90-140 ℃ petroleum pitch (place of production: the Dan Jia temple) 67 parts (quality, down with) add reactors, add 1.14 parts of maleimides, are warmed up to 130-135 ℃, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa, react after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add 12 parts of triethylene tetramines, back temperature programming was to 130-135 ℃ of reaction 1-3 hour.Add 9650,16.2 parts in river, capital, 5 parts of the furfural extract oils that is warming up to 90-140 ℃ in advance, pre-mixing 30 minutes then; And then obtain the A part by the colloidal mill high speed dispersion, add B part epoxy (E-51, Wuxi resin processing plant) in the 2.2:1 ratio at last and mix.This material can be used as the tack coat of mating formation and uses, and specific performance sees Table 1.
Embodiment 2
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
Be warmed up to 90-140 ℃ petroleum pitch (place of production: the Dan Jia temple) 67 parts (quality, down with) add reactors, add 1.14 parts of maleimides, are warmed up to 130-135 ℃, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa, react after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add 15 parts of hexanediamines, back temperature programming was to 130-135 ℃ of reaction 1-3 hour.Add the T-5000(huntsman be warming up to 90-140 ℃ in advance then, the U.S.), 6 parts of 18.2 parts, naphthenic rubber oil, pre-mixing 30 minutes; And then obtain the A part by the colloidal mill high speed dispersion, add B part epoxy (E-51, Wuxi resin processing plant) in the 4.3:1 ratio at last and mix.This material can be used as the tack coat of mating formation and uses, and specific performance sees Table 1.
Embodiment 3
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
Be warmed up to 90-140 ℃ petroleum pitch (place of production: the Dan Jia temple) 65 parts (quality, down with) add reactors, add 1.14 parts of maleimides, are warmed up to 130-135 ℃, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa, react after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, totally 13.2 parts of 1:1 adding dimethyl diamines and octadienes, back temperature programming was to 130-135 ℃ of reaction 1-3 hour.Add 9650,21.5 parts in the river, capital, 6 parts of the naphthenic rubber oil that are warming up to 90-140 ℃ in advance then, pre-mixing 30 minutes; And then obtain the A part by the colloidal mill high speed dispersion, add B part epoxy (E-51, Wuxi resin processing plant) in the 8.3:1 ratio at last and mix.This material can be used as the tack coat of mating formation and uses, and specific performance sees Table 1.
Embodiment 4
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
57 parts of the coal-tar pitch (Shanxi permanent Dehua worker company limited) (quality, down with) that are warmed up to 90-140 ℃ are added reactors, add 1.34 parts of maleimides, be warmed up to 130-135 ℃, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa, react after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add the Epicure-870(Celanese, the U.S.) 12 parts, back temperature programming was reacted 1-3 hour to 130-135 ℃.Add 9650,15.6 parts in river, capital, 7 parts in the phenolic aldehyde residual oil that is warming up to 90-140 ℃ in advance, pre-mixing 30 minutes then; And then obtain the A part by the colloidal mill high speed dispersion, add B part epoxy (E-51, Wuxi resin processing plant) in the 5.2:1 ratio at last and mix.This material can be used as the tack coat of mating formation and uses, and specific performance sees Table 1.
Embodiment 5
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
The oxidized bitumen (prompt friendship farm six another arena oxidized bitumen factories in state-run) that is warmed up to 90-140 ℃ is added reactor for 65 parts, add
N3 parts of-phenyl maleimides are warmed up to 150-155 ℃, keep 20 minutes, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa; React after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add 10.45 parts of the diaminodiphenyl-methanes, the Fuji that are warming up to 90-140 ℃ in advance and change into 215X, 25 parts, 8 parts of naphthenic rubber oil, pre-mixing 30 minutes was taken out under the vacuum of 0.05MPa 30 minutes after finishing; And then obtain the A part by the colloidal mill high speed dispersion, and in the 3.8:1 ratio A part is mixed with B part epoxy (E-44), admix by the bitumen aggregate ratio of 5-8% again and gather materials, be incubated 50 minutes, carry out road pavement.The performance of material own and corresponding epoxy asphalt concrete performance see Table 2.
Embodiment 6
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
The petroleum pitch (U.S.'s shell) that is warmed up to 90-140 ℃ is added reactor for 57 parts, add
N3.35 parts of-phenyl maleimides are warmed up to 150-155 ℃, keep 20 minutes, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa; React after 4 hours, slowly pressure release is to 0.1MPa.Then cooling to 100-110 ℃ gradually, add the G-328(Mitsubishi gas chemistry be warming up to 90-140 ℃ in advance, Japan) 9.5 parts, Fuji change into 2154,25 parts, 6.5 parts of furfural extract oils, pre-mixing 30 minutes was taken out under the vacuum of 0.05MPa 30 minutes after finishing; And then obtain the A part by the colloidal mill high speed dispersion, and in the 2.9:1 ratio A part is mixed with B part epoxy (E-44), admix by the bitumen aggregate ratio of 5-8% again and gather materials, be incubated 50 minutes, carry out road pavement.The performance of material own and corresponding epoxy asphalt concrete performance see Table 2.
Embodiment 7
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
The petroleum pitch (U.S.'s shell) that is warmed up to 90-140 ℃ is added reactor for 55 parts, add
N3 parts of-phenyl maleimides are warmed up to 150-155 ℃, keep 20 minutes, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa; React after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add 8.4 parts of the isophorone diamines, 140,25 parts of the Versamid that are warming up to 90-140 ℃ in advance, 8 parts of aromatic rubber oils, pre-mixing 30 minutes was taken out under the vacuum of 0.05MPa 30 minutes after finishing; And then obtain the A part by the colloidal mill high speed dispersion, and in the 4.8:1 ratio A part is mixed with B part epoxy (E-44), admix by the bitumen aggregate ratio of 5-8% again and gather materials, be incubated 50 minutes, carry out road pavement.The performance of material own and corresponding epoxy asphalt concrete performance see Table 2.
Embodiment 8
A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting, this method steps is as follows:
The petroleum pitch (U.S.'s shell) that is warmed up to 90-140 ℃ is added reactor for 68 parts, add
N3 parts of-phenyl maleimides are warmed up to 150-155 ℃, keep 20 minutes, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25MPa; React after 4 hours, slowly pressure release is to 0.1MPa.Then cool to 100-110 ℃ gradually, add the Epikure z(shell be warming up to 90-140 ℃ in advance, the U.S.) 125,25 parts of 15.2 parts, Versamid, pine tar is 10 parts of rubber oil, pre-mixing 30 minutes was taken out under the vacuum of 0.05MPa 30 minutes after finishing; And then obtain the A part by the colloidal mill high speed dispersion, and in the 9.6:1 ratio A part is mixed with B part epoxy (E-44), admix by the bitumen aggregate ratio of 5-8% again and gather materials, be incubated 50 minutes, carry out road pavement.The performance of material own and corresponding epoxy asphalt concrete performance see Table 2.
Table 2 epoxy asphalt concrete test-results
Claims (7)
1. the preparation method of the high-performance bituminous epoxy of an intermediate temperature setting is characterized in that this method steps is as follows:
1) by the quality of prescription, the matrix pitch that is warmed up to after 90-140 ℃ the dehydration is added reactor, add the maleimide or derivatives thereof of the 2-20% of asphalt quality, treat pressure-stabilisation after, feed N
2, make total pressure remain on 0.25-1MPa, react after 3-6 hour, slowly pressure release is to 0.1MPa; Then cool to 100-110 ℃ of adding gradually and be warming up to other material of the 90-100 ℃ of uniform A component of pre-mixing in advance, last redispersion is even, obtains the A part; The quality group of A part becomes: maleimide modifying asphalt 40-84 part, aliphatic amide 10-45 part, polymeric amide/polyetheramine 5-25 part, compatilizer 1-15 part;
2) mixed is even on request with A, B two portions, namely gets the high-performance bituminous epoxy of intermediate temperature setting, and B partly is Resins, epoxy, and the A part is 2.2:1-10:1 with the mass ratio of B part.
2. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1 is characterized in that: described maleimide modifying asphalt is to be made by maleimide and derivative thereof and plain asphalt reaction; Described plain asphalt is petroleum pitch, oxidized bitumen, coal-tar pitch or lake pitch.
3. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1, it is characterized in that: described aliphatic amide refers to contain the aliphatic amide of 3 above reactive hydrogens, be polyamines polyene, polymethylene two amines, or the diamines of C 5 fraction correspondence and unsaturated aliphatic diamines, or contain the diamines of aromatic nucleus; Or one or several the mixture in above-mentioned.
4. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1, it is characterized in that: described polymeric amide is low-molecular-weight polyamide resin and modified resin thereof.
5. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1 is characterized in that: polymeric amide be 40 ℃ of viscosity at 3,000-80, within the 000mPa.s, the polyamide resin of amine value within 50mgKOH/g-500mgKOH/g.
6. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1, it is characterized in that: described polyetheramine is the diaminobenzene ethers, diamino dihydroxyphenyl propane class, or do not contain one or more mixture in the polyetheramine of benzene ring structure.
7. the preparation method of the high-performance bituminous epoxy of intermediate temperature setting according to claim 1, it is characterized in that: described compatilizer is the extraction oil of furfural section in the oil refinery, hydrogen phosphide cumene decomposes the phenolic aldehyde residual oil that distillates, pine tar is rubber oil, coal tar is rubber oil, or paraffinic base, cycloalkyl or aromatic base crude are one or more the mixture in the rubber oil.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310262019.9A CN103289424B (en) | 2013-06-27 | 2013-06-27 | A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310262019.9A CN103289424B (en) | 2013-06-27 | 2013-06-27 | A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103289424A true CN103289424A (en) | 2013-09-11 |
CN103289424B CN103289424B (en) | 2015-11-11 |
Family
ID=49090986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310262019.9A Active CN103289424B (en) | 2013-06-27 | 2013-06-27 | A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103289424B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103834186A (en) * | 2014-03-25 | 2014-06-04 | 南京仁恒路桥科技有限公司 | Warm-mix and fast-set epoxy asphalt material and preparation method thereof |
CN104448859A (en) * | 2014-11-30 | 2015-03-25 | 梁子兰 | Preparation method of high-temperature-resistant modified asphalt |
CN112280326A (en) * | 2020-11-24 | 2021-01-29 | 南京阿斯孚特新材料科技有限公司 | High-speed railway ballastless track convex blocking platform filling material and preparation method thereof |
CN112897995A (en) * | 2020-11-21 | 2021-06-04 | 江阴誉球耐火材料有限公司 | Anhydrous fire-resistant stemming and preparation method thereof |
CN115287783A (en) * | 2022-09-06 | 2022-11-04 | 中钢集团鞍山热能研究院有限公司 | Preparation method of high-performance asphalt-based carbon fiber |
CN115838528A (en) * | 2022-11-02 | 2023-03-24 | 浙江交通资源投资集团有限公司沥青科技分公司 | High-temperature shear-resistant epoxy asphalt and preparation method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4882373A (en) * | 1987-07-24 | 1989-11-21 | Exxon Research And Engineering Company | Asphaltic composition |
CN102382549A (en) * | 2011-08-26 | 2012-03-21 | 长安大学 | Colored solar heat reflecting coating for bituminous road surface |
CN103146205A (en) * | 2013-03-04 | 2013-06-12 | 西北农林科技大学 | High-performance epoxy asphalt composite material capable of enabling roads to be rapidly open to traffic and preparation method thereof |
-
2013
- 2013-06-27 CN CN201310262019.9A patent/CN103289424B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4882373A (en) * | 1987-07-24 | 1989-11-21 | Exxon Research And Engineering Company | Asphaltic composition |
CN102382549A (en) * | 2011-08-26 | 2012-03-21 | 长安大学 | Colored solar heat reflecting coating for bituminous road surface |
CN103146205A (en) * | 2013-03-04 | 2013-06-12 | 西北农林科技大学 | High-performance epoxy asphalt composite material capable of enabling roads to be rapidly open to traffic and preparation method thereof |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103834186A (en) * | 2014-03-25 | 2014-06-04 | 南京仁恒路桥科技有限公司 | Warm-mix and fast-set epoxy asphalt material and preparation method thereof |
CN104448859A (en) * | 2014-11-30 | 2015-03-25 | 梁子兰 | Preparation method of high-temperature-resistant modified asphalt |
CN112897995A (en) * | 2020-11-21 | 2021-06-04 | 江阴誉球耐火材料有限公司 | Anhydrous fire-resistant stemming and preparation method thereof |
CN112280326A (en) * | 2020-11-24 | 2021-01-29 | 南京阿斯孚特新材料科技有限公司 | High-speed railway ballastless track convex blocking platform filling material and preparation method thereof |
CN115287783A (en) * | 2022-09-06 | 2022-11-04 | 中钢集团鞍山热能研究院有限公司 | Preparation method of high-performance asphalt-based carbon fiber |
CN115838528A (en) * | 2022-11-02 | 2023-03-24 | 浙江交通资源投资集团有限公司沥青科技分公司 | High-temperature shear-resistant epoxy asphalt and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103289424B (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11572445B2 (en) | Modified asphalt and preparation method therefor | |
CN103289424B (en) | A kind of preparation method of high-performance bituminous epoxy of intermediate temperature setting | |
CN103289321B (en) | Pavement thermoregulation paving material based on phase-change heat accumulation microcapsules | |
CN102206064B (en) | Cold-patch bituminous mixture and preparation method thereof | |
CN100348668C (en) | Thermosetting epoxy asphalt materials for pavement and bridge and process for preparing same | |
CN101074321B (en) | Road-surface asphalt modified additive at normal temperature and its production | |
CN103146205A (en) | High-performance epoxy asphalt composite material capable of enabling roads to be rapidly open to traffic and preparation method thereof | |
CN101255276A (en) | Epoxy asphalt material for road-bridge and environment-friendly preparation method thereof | |
CN102617070A (en) | Polyurethane asphalt concrete as well as preparation method and application thereof | |
CN103242665A (en) | Epoxy asphalt material for highways and bridges and preparation method thereof | |
CN103030981A (en) | High-viscosity bitumen modifier for steel deck paving and preparation method of bitumen modifier | |
CN101003688A (en) | High performance pavement material of epoxy asphalt, preparation method and application | |
CN102924936A (en) | Bituminous cold reclaiming agent and application of bituminous cold reclaiming agent in cold reclaiming of bituminous concrete | |
CN103289320A (en) | Two-component color thermo-setting epoxy asphalt composite material and preparation method thereof | |
CN103333511A (en) | Three-component thermosetting fluorescent epoxy asphalt composite material and preparation method thereof | |
CN109180071B (en) | High-performance cold-mix mixture for road surface layer and preparation method thereof | |
CN103289425B (en) | Preparation method of of pavement thermoregulation paving material based on phase-change heat accumulation microcapsules | |
CN102464863A (en) | Color pavement cementing material and application thereof | |
CN101439946A (en) | Preparation of modified rubber asphalt mixture | |
CN100406508C (en) | Normal temperature modification additive for pavement asphalt and its preparation method and uses | |
CN103725023A (en) | Rubber powder modified asphalt and preparation method thereof | |
CN103305016B (en) | Preparation method of bi-component thermosetting epoxy asphalt composite material | |
CN103305017B (en) | Preparation method of pavement material with self-adapting pavement temperature adjustment function | |
CN104724980A (en) | Cold-mix asphalt concrete mixture and preparation method thereof | |
CN106082792B (en) | Composite asphalt cold-patch material and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |