CN103281886A - Auxiliary assembling and disassembling structure for heavy components in equipment cabinet and application method of auxiliary assembling and disassembling structure - Google Patents

Auxiliary assembling and disassembling structure for heavy components in equipment cabinet and application method of auxiliary assembling and disassembling structure Download PDF

Info

Publication number
CN103281886A
CN103281886A CN201310186482XA CN201310186482A CN103281886A CN 103281886 A CN103281886 A CN 103281886A CN 201310186482X A CN201310186482X A CN 201310186482XA CN 201310186482 A CN201310186482 A CN 201310186482A CN 103281886 A CN103281886 A CN 103281886A
Authority
CN
China
Prior art keywords
heavy components
pallet
rack
right support
alignment pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310186482XA
Other languages
Chinese (zh)
Other versions
CN103281886B (en
Inventor
肖武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HUIYA ELECTRONIC CO Ltd
Shanghai Viasystems EMS Co Ltd
Original Assignee
SHANGHAI HUIYA ELECTRONIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HUIYA ELECTRONIC CO Ltd filed Critical SHANGHAI HUIYA ELECTRONIC CO Ltd
Priority to CN201310186482.XA priority Critical patent/CN103281886B/en
Publication of CN103281886A publication Critical patent/CN103281886A/en
Application granted granted Critical
Publication of CN103281886B publication Critical patent/CN103281886B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pallets (AREA)

Abstract

The invention relates to an auxiliary assembling and disassembling structure for heavy components in an equipment cabinet and an application method of the auxiliary assembling and disassembling structure. In a particular situation, especially in the field, limited by conditions, no corresponding equipment can be adopted to assemble and disassemble the heavy components. The auxiliary assembling and disassembling structure for the heavy components in the equipment cabinet can be used for assisting in assembling and disassembling the heavy components in the equipment cabinet while no lifting appliances can be adopted. The auxiliary assembling and disassembling structure for the heavy components in the equipment cabinet consists of a left support, a right support, a tray, binding bands, gaskets, upper locating pins and side locating pins. The auxiliary assembling and disassembling structure for the heavy components in the equipment cabinet provided by the invention has the positive effects that the heavy components in the equipment cabinet can be safely and smoothly assembled and disassembled by means of the structure aided with manpower under the particular situation that no other listing appliances can be adopted. Moreover, the auxiliary assembling and disassembling structure for the heavy components in the equipment cabinet can be stored in the equipment cabinet, so that the installation and maintenance cost is greatly saved.

Description

Heavy components auxiliary mounting or dismounting structure and using method in the rack
Technical field
The present invention relates to supplementary structure and the using method of heavy components installation and removal in a kind of rack, dismounting and the supplementary structure of reinstalling when particularly relating to the interior heavy components installation of a kind of outdoor cabinet and maintenance.
Background technology
At present, industrialization infrastructure constantly enlarges, the outdoor equipment that some are large-scale, and as the continuous increase of equipment such as communication, the energy, heavy parts or module are equipped with in the rack inside that a lot of equipment occurred.When in factory floor, mounting and dismounting these heavy components and module, can be undertaken by crane and other machineries; But under specific circumstances, especially open-air, be subjected to condition restriction, when not having corresponding equipment to carry out these heavy components of installation and removal.Can only be by manually carrying on one's shoulders or with both hands, but the space in the rack is limited, manually many also making not energetically again can't resolve problem.Be a long felt need for a kind of instrument, can when not having some jacking equipments, can assist the heavy components in the installation and removal rack.
Summary of the invention
In order to overcome the deficiencies in the prior art, can as the field, carry out installation or removal to some inside heavy components to rack not having under the condition of equipment, make product be convenient to I﹠M, economize on resources.Be built-in with the rack of heavy components at this class, the structural design that a kind of auxiliary installation and removal are provided is purpose of the present invention.
Technical scheme of the present invention is to come specific implementation by following technical measures: heavy components auxiliary mounting or dismounting structure and using method in a kind of rack, it is characterized in that it comprises right support 1, left socle 2, regulate pad 3, pallet 4, bandage 5, heavy components 6, last alignment pin 7, side alignment pin 8, handle 9, fastening bolt 10, pedestal 11 and glass bar 12, described right support 1 and left socle 2 material of main parts are made by electrolytic galvanized sheet, be shaped as 20 °-30 ° right-angled triangle, a left side, two right-angle sides of the right-angled triangle of right two supports have passed through bending and welding procedure respectively, making it form one pair has very high-intensity, symmetrical triangular supports, respectively be equipped with 2 on described right support 1 and the long right angle flanging above the left socle 2 and go up alignment pin 7, be used for fixing pallet 4; On the short right angle flanging of described right support 1 and left socle 2 sides 2 side alignment pins 8 are installed respectively, support can be fixed on the rack by side alignment pin 8; Described pad is installed on the last alignment pin of right angle upper hem of left and right support, when being installed, heavy components tying up the pallet of heavy parts with raising, make the horizontal level of heavy components be higher than its installation site in rack, be convenient to push smoothly, the thickness of pad is 3mm-8mm; The material of main part of described pallet 4 is made by electrolytic galvanized sheet, has passed through bending and welding procedure, makes it have very high intensity, the square plate shape of flanging be arranged all around; Two of the parallel installations of the right and left exceed gantry shape handle 9 of card, and being connected of handle 9 and pallet 4 adopts fastening bolt 10 fixing; Card as pallet 4 is pedestal 11, and several (general 2-4 root) the glass bar 12 on the described pallet 4 is processed by the thick glass plate of 3mm wear-resisting and that coefficient of friction is little FR-4; The handle 9 of pallet 4 adopts fastening bolt 10 to be fastenedly connected the spacing that can regulate left and right two handles with pallet 4, and is also detachable, is convenient to compress the storage area; Side alignment pin 8 on right support 1 and the left socle 2 can be fixed on support on the rack by side alignment pin 8, and the last alignment pin 7 of opposite side is used for fixed tray 4, and two handles 9 are arranged on the pallet 4, extracts for the people, when this mechanism does not use, can be stored in the rack.
The using method of the auxiliary mounting or dismounting of heavy components structure in the rack of the present invention, it is characterized in that: 1) during installing component: at first left and right sides support is fixed on rack inside by side alignment pin 8, pad 3 is enclosed within a left side, on the last alignment pin 7 on the right support, then heavy components 6 is fixed on the pallet 4, fix with bandage 5, weight according to object, can lift the pallet 4 that heavy components 6 is housed by many people is fixed on the support of the left and right sides by last alignment pin 7, unclamp bandage 5 then, on the glass bar 12 of pallet 4 bottoms, heavy components 6 pushed heavy components 6 required installation positions in the rack; When 2) dismantling parts: at first left and right sides support is fixed on rack inside by side alignment pin 8, need not to place pad 3 on support, pallet 4 is fixed on the support of the left and right sides by last alignment pin 7, again heavy components 6 is drawn out to from rack in the middle of the pallet 4, fix heavy components 6 with bandage 5, according to the weight of object, by many people pallet 4 is carried off, when not using, support and pallet can be used as subsidiary body and are stored in the rack.
Heavy components auxiliary mounting or dismounting structure and using method in the rack of the present invention is characterized in that described structure can install and remove the heavy components of 30kg to 200kg.
Good effect of the present invention is can in addition manpower is auxiliary by auxiliary body of the present invention, can be under the specific condition of the launching and recovering equipment that does not have other, particularly can be safely during field work the heavy components of installation and removal rack inside successfully.And this auxiliary body can be stored in rack inside installation and the maintenance cost of having saved greatly.
Description of drawings
Accompanying drawing 1: the structural representation of the auxiliary mounting or dismounting of heavy components structure in the rack of the present invention.
Accompanying drawing 2: the explosive view of the auxiliary mounting or dismounting of heavy components structure in the rack of the present invention.
Accompanying drawing 3: the support holder structure front view of the auxiliary mounting or dismounting of heavy components structure in the rack of the present invention.
Accompanying drawing 4: the support holder structure vertical view of the auxiliary mounting or dismounting of heavy components structure in the rack of the present invention.
The meaning that each Reference numeral among the figure is expressed as follows respectively:
1----right support, 2----left socle, 3----pad, 4----pallet, 5----bandage, 6----heavy components, the last alignment pin of 7----, 8----side alignment pin, 9----handle, 10----fastening bolt, 11----pedestal, 12----glass bar.
Embodiment
Below in conjunction with embodiment and accompanying drawing 1, accompanying drawing 2, accompanying drawing 3, the invention will be further described for accompanying drawing 4:
The implementation case is a kind of stand-by power supply rack, mainly is used as the redundant electrical power of communication apparatus.See accompanying drawing 1 and accompanying drawing 2, it is to be weighed by right support 1, left socle 2, pad 3, pallet 4, bandage 5, battery 6(140kg).Left and right sides support and tray main body material have passed through bending and welding procedure by being made by electrolytic galvanized sheet, make it have very high intensity.See accompanying drawing 3,3 slivers on the pallet are processed by the thick glass plate of 3mm FR-4, and are wear-resisting and coefficient of friction is little.The handle of pallet adopts screw threads for fastening to be connected with pallet, and is detachable, is convenient to compress the storage area.Design and installation hole in the rack is used for the left and right sides, location support.Mode of operation: 1) installing component process: at first left and right sides support is fixed on rack inside by pilot pin, pad is placed on the support.Then the 140kg battery is fixed on the pallet, ties up with bandage.Lifting the pallet that battery is housed by 4 people is fixed on the support of the left and right sides by alignment pin.Unclamp bandage, battery is pushed the installation place.Pack up this structure at last and store in the rack.2) dismounting parts process: at first left and right sides support is fixed on the rack by pilot pin and (need not to place pad on support).Empty pallet is fixed on the support of the left and right sides by alignment pin, again battery is pulled to from rack in the middle of the pallet, fix battery with bandage.By 4 people pallet is carried off then.Pack up this structure at last and store in the rack.Prove that through case this structure can need not to load and unload weight safely and effectively under the situation by other equipment, and easily stores.

Claims (3)

1. the interior heavy components of rack is assisted the mounting or dismounting structure, it is characterized in that it comprises right support, left socle, pad, pallet, bandage, heavy components, goes up alignment pin, side alignment pin, handle, fastening bolt, pedestal and glass bar, described right support and left socle material of main part are made by electrolytic galvanized sheet, be shaped as 20 °-30 ° right-angled triangle, two right-angle sides of the right-angled triangle of left and right two supports have passed through bending and welding procedure respectively, make it form one pair and have very high intensity, symmetrical triangular supports; Respectively be equipped with 2 on the long flanging of described right support and the right angle above the left socle and go up alignment pin, be used for fixing pallet; On the short flanging in the right angle of described right support and left socle side 2 side alignment pins are installed respectively, left and right support can be fixed on the rack by the side alignment pin; Described pad is installed on the last alignment pin of the long flanging in right angle of left and right support, when being installed, heavy components tying up the pallet of heavy parts with raising, make the horizontal level of heavy components be higher than its installation site in rack, be convenient to push smoothly, the thickness of pad is 3mm-8mm; Described pallet comprises handle, fastening bolt, pedestal and glass bar; Pallet is made by electrolytic galvanized sheet, has passed through bending and welding, make its have very high-intensity, the square plate shape of flanging arranged all around; Exceed gantry shape handle of card two of the parallel installations of pallet the right and left, extract for the people, handle and being connected with fastening bolt of pallet are fixed; Card as pallet is pedestal, and 2-5 root glass bar is installed on the seat surface, and the glass bar is processed by the thick glass plate of 3mm, and is wear-resisting and coefficient of friction is little; When this mechanism does not use, can be stored in the rack.
2. the interior heavy components of above-mentioned rack is assisted the using method of installing and removing structure, it is characterized in that: when 1) heavy components being installed: at first with a left side, right support is fixed on rack inside by the side alignment pin, pad is enclosed within a left side, on the last alignment pin on the right support, then heavy components is fixed on the pallet, with bandage heavy components and pallet are fixed together, weight according to object, can lift the pallet that heavy components is housed by many people and be fixed on a left side by last alignment pin, on the right support, unclamp bandage then, on the glass bar of tray bottom, heavy components pushed location, the required installation position of heavy components in the rack; When 2) dismantling heavy components: at first left and right support is fixed on rack inside by the side alignment pin, need not to place pad on left and right support, pallet is fixed on the left and right support by last alignment pin, heavy components is drawn out in the middle of the pallet from rack again, with bandage heavy components and pallet are fixed together, according to the weight of object, by many people pallet is carried off together with heavy components; This supplementary structure is not when using, and left and right support and pallet can be used as subsidiary body and be stored in the rack.
3. according to the auxiliary mounting or dismounting structure of heavy components in claim 1 and the 2 described a kind of racks and using method, it is characterized in that described structure can install and remove the heavy components of 30kg to 200kg.
CN201310186482.XA 2013-05-20 2013-05-20 The auxiliary assembling-disassembling structure of heavy components and using method in rack Expired - Fee Related CN103281886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310186482.XA CN103281886B (en) 2013-05-20 2013-05-20 The auxiliary assembling-disassembling structure of heavy components and using method in rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310186482.XA CN103281886B (en) 2013-05-20 2013-05-20 The auxiliary assembling-disassembling structure of heavy components and using method in rack

Publications (2)

Publication Number Publication Date
CN103281886A true CN103281886A (en) 2013-09-04
CN103281886B CN103281886B (en) 2016-05-18

Family

ID=49064282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310186482.XA Expired - Fee Related CN103281886B (en) 2013-05-20 2013-05-20 The auxiliary assembling-disassembling structure of heavy components and using method in rack

Country Status (1)

Country Link
CN (1) CN103281886B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104394673A (en) * 2014-05-21 2015-03-04 南车株洲电力机车研究所有限公司 Frequency converter module guiding and positioning device and installation method thereof
CN104582395A (en) * 2015-01-16 2015-04-29 南车株洲电力机车研究所有限公司 Auxiliary device for disassembling and assembling heavy components in equipment cabinet
CN106335757A (en) * 2016-08-24 2017-01-18 中国科学院合肥物质科学研究院 High-safety transfer platform for spaceborne trace gas hyperspectral detecting instrument
CN112665027A (en) * 2020-12-22 2021-04-16 杭州卿安电子商务有限公司 Rat-proof structure of compressor bin

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201417897Y (en) * 2009-06-01 2010-03-03 江苏金华厦电气有限公司 Carrier loader of middle-arranged switch cabinet
CN202406401U (en) * 2011-11-25 2012-08-29 艾默生网络能源有限公司 Outdoor cabinet having assembled structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201417897Y (en) * 2009-06-01 2010-03-03 江苏金华厦电气有限公司 Carrier loader of middle-arranged switch cabinet
CN202406401U (en) * 2011-11-25 2012-08-29 艾默生网络能源有限公司 Outdoor cabinet having assembled structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104394673A (en) * 2014-05-21 2015-03-04 南车株洲电力机车研究所有限公司 Frequency converter module guiding and positioning device and installation method thereof
CN104394673B (en) * 2014-05-21 2016-04-13 南车株洲电力机车研究所有限公司 Guide locating device provided and the installation method of frequency converter module
CN104582395A (en) * 2015-01-16 2015-04-29 南车株洲电力机车研究所有限公司 Auxiliary device for disassembling and assembling heavy components in equipment cabinet
CN106335757A (en) * 2016-08-24 2017-01-18 中国科学院合肥物质科学研究院 High-safety transfer platform for spaceborne trace gas hyperspectral detecting instrument
CN112665027A (en) * 2020-12-22 2021-04-16 杭州卿安电子商务有限公司 Rat-proof structure of compressor bin

Also Published As

Publication number Publication date
CN103281886B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN103281886A (en) Auxiliary assembling and disassembling structure for heavy components in equipment cabinet and application method of auxiliary assembling and disassembling structure
CN203850679U (en) Elevating disassembly and assembly platform with limiting support for current transformer in high-voltage switchgear
CN201997019U (en) Safety belt hanging device for channel steel
CN205159883U (en) Portable high voltage isolator examines and repair work platform
CN205680927U (en) Switch cabinet frame structure and include the switch cubicle of this switch cabinet frame structure
CN209667168U (en) A kind of secondary screen cabinet handling device
CN203387823U (en) Heavy part auxiliary assembling and disassembling structure in cabinet
CN204558922U (en) A kind of hoisting structure of power distribution cabinet
CN206516955U (en) Electromechanical equipment transfer car(buggy) and transfer car(buggy) system
CN210307596U (en) Device for replacing current transformer of switch cabinet
CN203843745U (en) Assembling and disassembling fixture for electric generator of loader
CN201889945U (en) Disassembly/assembly jig for printing-plate shaft of rotary press
CN202728274U (en) Multifunctional test car for maintaining relaying protection device
CN205811479U (en) A kind of bus structure
CN104134944A (en) Fast CT replacing device for 10kV switch cabinet
CN206322583U (en) A kind of capacitor installation structure
CN109514507A (en) A kind of motor shaft protection mechanism
CN206148501U (en) UPS rack -type (taking out drawer type ) battery holder
CN204867531U (en) Folding flexible drilling equipment of assembled
CN209461896U (en) A kind of ring network cabinet maintenance aid
CN204558921U (en) A kind of power distribution cabinet of electric machine controller
CN202217923U (en) Quickly-assembled bus bridge
CN210378689U (en) High-low voltage distribution transformer convenient to install and maintain
CN202887566U (en) Maintenance training device for mobile power disconnecting switch operating mechanism
CN207250285U (en) Reactor fixed structure and electrical equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20200520

CF01 Termination of patent right due to non-payment of annual fee