CN103280113B - Self-adaptive intersection signal control method - Google Patents

Self-adaptive intersection signal control method Download PDF

Info

Publication number
CN103280113B
CN103280113B CN201310167669.5A CN201310167669A CN103280113B CN 103280113 B CN103280113 B CN 103280113B CN 201310167669 A CN201310167669 A CN 201310167669A CN 103280113 B CN103280113 B CN 103280113B
Authority
CN
China
Prior art keywords
time
moment
queue
green light
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310167669.5A
Other languages
Chinese (zh)
Other versions
CN103280113A (en
Inventor
安毅生
赵祥模
贺冰花
袁绍欣
南春丽
姚迪
张曼
杨峰
雷鹏
梁超
尚龙华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201310167669.5A priority Critical patent/CN103280113B/en
Publication of CN103280113A publication Critical patent/CN103280113A/en
Application granted granted Critical
Publication of CN103280113B publication Critical patent/CN103280113B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Traffic Control Systems (AREA)

Abstract

The invention belongs to the field of urban traffic control, and provides a self-adaptive intersection signal control method. By installing vehicle monitors to detect the number of vehicles, the lengths of vehicle queues are acquired, and a signal control strategy for the next cycle is determined according to the lengths of vehicle queues at an intersection in the previous cycle. The method utilizes the vehicle detectors already arranged in a city to acquire traffic flow data and calculate the length of the queue of each lane, and the signal timing scheme of the next cycle is dynamically adjusted according to the different proportions of queue lengths. Taking a cycle as a unit, a timing scheme is calculated, the load of calculation is low, and moreover, the method also can achieve the purpose that intersection signals can be self-adaptively controlled according to the density of traffic flow. In addition, the algorithm of the method is simple, and the method has low requirement on hardware and construction quantity, and therefore is convenient to popularize.

Description

A kind of adaptive intersection signal control method
Technical field
The invention belongs to urban traffic control field, be specifically related to a kind of adaptive intersection signal control method.
Background technology
Traffic signalization with crossing microcosmic wagon flow for control object, with phase place and time for yardstick distributes the right of way of vehicle in crossing, be separated from the time wagon flow of conflicting, traffic flow reasonably guided and dispatches, reach minimizing traffic hazard, improve the object of traffic safety and conevying efficiency.
At present, intersection signal control method both domestic and external mainly contains timing controlled, induction controls and adaptive control three class, and timing controlled is suitable for the crossing that the comparatively large and traffic of the volume of traffic is evenly distributed; It is less than normal that induction control is suitable for the volume of traffic, changes uneven crossing, but when the volume of traffic is large, cannot adjusts and optimize signal condition to alleviate traffic congestion according to transport need; Adaptive control is the traffic data sent here according to detecting device, best timing scheme under certain performance index of real-time generation, the signal timing dial parameters such as automatic adjustment split, Cycle Length and the green time difference, the traffic flow of signal timing dial and change is adapted, at present, SCOOT and SCATS is the city traffic signal lamp self-adaptation control method of two kinds of main flows.SCATS system, according to traffic flow situation of change, adjusts signal controling parameters in real time, but possibility limited amount, perform each scheme time long (change in a tens minutes scheme), do not possess feedback function, and before checkout equipment is placed on stop line, cannot vehicle queue length be detected; SCOOT system availability is strong, can adopt continuity inching to timing parameter, but its relevant Controlling model all by mathematical model simulation out, and mathematical model is more complicated, and required simulation time is longer, can produce contradiction between reliability and real-time.In addition, SCOOT and SCATS system all needs to gather mass data, and construction cost is high.
Intersection vehicles queue length is the important indicator characterizing traffic behavior, and current optimum real-time signal control mainly solves based on each import track queue length in crossing.But calculate queue length comparatively complicated, usually rely on multiple detecting device or utilize vedio data, the calculated amount of scan picture is very large, expensive, and is subject to weather effect, and the reliability of system is poor.The equipment such as inductive coil have been laid to obtain the volume of traffic in present most cities, vehicle holding time, road occupancy, the Real-time Traffic Information such as the degree of crowding and queue length, but the transport need of crossing all directions might not balance, the queue length in each import track is also not necessarily equal, particularly when the volume of traffic is larger, when detecting device is taken by certain vehicle commander in queue the time, be unable to estimate the information such as the vehicle number that arrives in real time and queue length, thus cause vehicle queue length computational accuracy not high, signal time distributing conception out of true.If install multiple detecting device on every bar track, not only cause many places to damage to original road surface, and quantities is large, installs inconvenient, the feasibility of engineering and the operability of enforcement lower.
Summary of the invention
For the shortcomings and deficiencies that prior art exists, the object of the invention is to a kind of adaptive intersection signal control method, the method realizes integrative design intersection by the intersection vehicles queue length in upper cycle.
A kind of adaptive intersection signal control method, the method is carried out according to following steps:
Step one, 1 wagon detector is installed in each track, crossing, and the distance of wagon detector and stop line is designated as L, and each wagon detector opens the bright moment for the red light gathering each phase place n-th cycle the green light in the n-th cycle opens the bright moment the red light in the (n+1)th cycle opens the bright moment each vehicle is by holding time t during wagon detector o, wagon detector free time interval t fand pass through the vehicle number n of detecting device;
Described phase place comprises the craspedodrome phase place at craspedodrome queue place and the phase place of turning left at queue place of turning left;
One-period extinguishes the moment for opening the bright moment from red light to green light, note G minfor minimum green time, note g layfor unit green light extends or the time of shortening, note G mainfor maximum total green time of major trunk roads;
Step 2, at the end of one-period effective green time, detection data are transferred to back-end data disposal system by wagon detector, analyze the change of traffic behavior in this cycle, find out the transition moment T of wagon detector eigenstate a, T band T c;
T athe transition between states moment that red light opens that bright rear vehicle v1 starts to take for a long time wagon detector, T aafter moment, wagon detector is taken for a long time by vehicle v1, moment T acan be used to determine whether this phase place track exists longer vehicle platoon;
T bthe transition moment that green light opens that bright rear vehicle v1 sails out of wagon detector, green light open bright after, T bbefore moment, the vehicle before stop line sails out of crossing with saturation volume rate successively, but is 0 by the vehicle number of detecting device, at T bafterwards, vehicle is with maximum current flow rate by wagon detector, and the holding time of wagon detector and interval time reduce;
T cthat in vehicle queue's queue, last car v2, by the transition between states moment of wagon detector, determines last car of queue v 2according to being: in queue queue, during continuous vehicle passing detection device, interval time is less, when a car and its Following Car pass through detecting device interval greater than threshold value A, illustrate in Following Car not Queue here queue;
The value obtaining threshold value A according to current traffic survey data statistics is 3s;
Step 3, adopt from moment is to T aby the vehicle number n of detecting device in time period in moment lcalculate the vehicle density k under saturated conditions j, then k j=n l/ L; Adopt from moment is to T bdistance L between time period in moment and stop line to wagon detector calculates the dissipation speed v of vehicle queue's queue, then and then pass through T band T cby the vehicle number n of detecting device in time period jcalculate the maximum queue length Q in this cycle;
(1) if there is not T amoment, then Q < L;
(2) if there is T amoment, then determine T further cmoment;
If there is T in (a) cmoment, then Q=L+n j/ k j;
If there is not T in (b) cmoment, then red light of lower cycle is opened the bright moment as transition moment T c, statistics T bwith by the vehicle number n of detecting device in time period j, then Q > L+n j/ k j;
Step 4, the signal control strategy of adjustment major trunk roads, detailed process is as described below:
Craspedodrome queue length Q is calculated respectively according to the method for step 3 swith the queue length Q that turns left l;
(1) if the length of two queues is all less than L, then turn left phase time and craspedodrome phase time all distribute minimum green time, i.e. T g1=T g2=G min;
(2) if only have a certain queue length to be less than L, then the minimum green time T of the phase assignments at this queue place g1=G min, the queue that another length is more than or equal to L then needs to determine whether this queue exists transition moment T c:
If there is transition moment T in (a) c, then according to T cwith to calculate in this time interval vehicle by minimum speed v needed for L m, then have determine whether there is green light Slack Time:
If a) v m, then there is green light Slack Time in < v, former long green light time is cut unit green light and change time g lay, i.e. T g2=T g2-g lay;
If b) v m, then there is not green light Slack Time, namely indicate residual queue in>=v, if T g2< G main-T g1, then g is added at former long green light time lay, i.e. T g2=T g2+ g layif, T g2=G main-T g1, then T g2=T g2;
If there is not transition moment T in (b) c, then represent at the end of green time, detecting device upstream also has queue queue, then the long green light time of this phase place is T g2=G main-T g1;
(3) if the queue length of two queues is all more than or equal to L, then determine whether individual queue exists transition moment T c, then have:
If both there is moment T in (a) c, then determine whether each phase place has green time more than needed, perform green light according to the strategy (a) of step (2) and extend or reduce to obtain long green light time T g1and T g2, wherein: T g1+ T g2≤ G main;
If there is moment T in (b) queue c, there is not moment T in another c, then there is moment T cphase place according to the strategy (a) of step (2) perform green light extend or reduce to obtain long green light time T g1, there is not moment T cthe green time of phase place be T g2=G main-T g1;
If neither there is transition moment T in (c) c, then according to Q sand Q llength ratio distribute the green time of phase place and craspedodrome phase place of turning left, namely T L = G main &times; Q L Q L + Q S T S = G main &times; Q S Q L + Q S
Wherein: T lthe long green light time of phase place of turning left, T sthe long green light time of craspedodrome phase place, Q scraspedodrome phase alignment length, Q lphase alignment length of turning left;
Step 5, the signal control strategy of adjustment subsidiary road, detailed process is as described below:
Subsidiary road is kept straight on and is turned left and to be controlled by a phase place, remembers G minorfor the maximum green time of subsidiary road, G minfor minimum green time, g layfor unit green light extends or the time of shortening, first calculate the queue length Q of subsidiary road according to the method for step 3, T gfor subsidiary road green time;
(1) if queue length Q < is L, then Minimum Green Time T is distributed g=G min;
(2) if queue length Q>=L, then transition moment T is determined whether there is c, then have:
If there is transition moment T in (a) c, then according to T cwith to calculate in this time interval vehicle by minimum speed v needed for L m, then have determine whether there is green light Slack Time:
If a) v m, then there is green light Slack Time, then T in < v g=T g-g lay;
If b) v m, then there is not green light Slack Time, namely indicate residual queue in>=v, if T g< G minor, then T g=T g+ g layif, T g=G minor, then T g=T g;
If there is not transition moment T in (b) c, then T g=G minor.
Compared with prior art, beneficial effect is in the present invention:
Method of the present invention utilizes the wagon detector laid in city to obtain traffic flow data, calculates the queue length in each track, according to the signal time distributing conception in next cycle of different proportion dynamic conditioning of queue length.The method carries out the calculating of timing scheme in units of the cycle, and operand is little, and can reach intersection signal realizes adaptive control object according to vehicle density.In addition, the method algorithm is simple, requires lower, do not increase construction cost by existing device to hardware and quantities, convenient popularization.
Accompanying drawing explanation
Fig. 1 is main and secondary road intersection vehicles detector layout schematic diagram.
Fig. 2 is the time dependent schematic diagram of vehicle queue queue on a track.
Transition moment T is there is in Tu3Shi vehicle queue queue evanishment cand have the time dependent schematic diagram of the queue of green time more than needed.
Transition moment T is there is in Tu4Shi vehicle queue queue evanishment cbut the time dependent schematic diagram of queue of green time not more than needed.
Transition moment T is there is not in Tu5Shi vehicle queue queue evanishment cthe time dependent schematic diagram of queue.
Fig. 6 is major trunk roads signal adaptive control flow chart.
Fig. 7 is subsidiary road signal adaptive control flow chart.
Below in conjunction with drawings and Examples, particular content of the present invention is described in more detail.
Embodiment
It should be noted that the dimension of the physical quantity that the present embodiment provides is the unified standard dimension in this area, those skilled in the art are according to physical quantity and its dimension known, and therefore following content provides no longer one by one.
It should be noted that one-period is open the bright moment from red light to extinguish the moment to green light, according to prevailing traffic rule, vehicle during amber light flicker within stop line can not pass through, and therefore in the present invention, the flicker duration of amber light is grouped into inside red light duration in the lump, no longer will consider amber light in following embodiment.
Defer to technique scheme, as shown in Figure 1, it is main and secondary road intersection vehicles detector layout schematic diagram, in figure, east-west direction is major trunk roads, in the craspedodrome road of distance crossing La be provided with wagon detector on turning left, North and South direction is subsidiary road, and in distance, Ls place, crossing is provided with wagon detector.Major trunk roads are provided with turn left phase place and craspedodrome phase place, and subsidiary road is kept straight on and turned left by a phase control.Crossing is provided with signal controller, and all wagon detectors are implemented detect the volume of traffic, detecting device holding time, free time and be transferred to back-end data disposal system.The Real-Time Data Handling System (RTDHS) on backstage dynamically determines the signal time distributing conception in next cycle according to result of calculation, and is transferred to signal controller.
Because major trunk roads are identical with the vehicle queue length computing method of subsidiary road, therefore following proposal controls for an arterial highway, and the distance of detector distance stop line is L.
A time dependent schematic diagram of track queue queue as shown in Figure 2, when red light open bright after, vehicle start stop queue up until when green light opens bright, queue queue start dissipate, go round and begin again like this.When not occurring transition moment T in the red light time period apoint, illustrates queue length Q < L, otherwise, account for queued queue overflow detecting device.According to to T athe vehicle number n of the queuing in the time period lcalculate the vehicle density under saturated conditions:
k j=n L/L
The bright moment is opened from green light to moment T b, queue rolls crossing away from saturation volume rate, and the dissipation speed of queue is:
v = L / ( T B - T G n )
There is transition moment T in queue queue's evanishment as shown in Figure 3 cand have the time dependent schematic diagram of the queue of green time more than needed; There is transition moment T in queue queue's evanishment shown in Fig. 4 cbut the time dependent schematic diagram of queue of green time not more than needed.According to T cwith interval calculation if v m< v, then as Fig. 3 exists green time more than needed; If v m>=v, then as Fig. 4 does not exist green time more than needed.Utilize T band T ccalculated the maximum queue length in this cycle by the vehicle number n of wagon detector in time period:
Q=L+n/k j
There is not transition moment T in queue queue's evanishment as shown in Figure 5 cthe time dependent schematic diagram of queue, moment T cdo not exist and show that, at the end of effective green time, detector back also has waiting list, now will regard T as c, statistics T bwith by the vehicle number n of detecting device in time period j, then queue length is:
Q>L+n j/k j
Next, determine the parameter in control program, because an intersection signal cycle can not be long or too short, if too short, then each Phase-switching is frequent, and vehicle parking number increases and vehicle is started to walk continually and stopped, if long, the time that then in queue queue, vehicle is waited for is just long, in this programme, therefore establish minimum green time G min(being generally 15s), unit green light changes time g lay(3s), maximum total green time G of major trunk roads main(being generally 80s), the maximum green time G of subsidiary road minor(being generally 45s).
Be major trunk roads signal adaptive control flow chart as shown in Figure 6, first calculate craspedodrome queue length Q swith the queue length Q that turns left l, then carry out signal control according to following steps:
(1) if the length of two queues is all less than L, then phase place of turning left and craspedodrome phase place all distribute minimum green time, i.e. T g1=T g2=G min;
(2) if a certain queue length is less than L, then the minimum green time T of this phase assignments g1=G min, and the length of another queue is more than or equal to L, then determine whether this queue exists T c:
If there is transition moment T in (a) c, then according to T cwith the time interval to calculate in this time interval vehicle by minimum speed needed for L determine whether there is green light Slack Time
If a) v m, there is green light Slack Time and then former long green light time cut unit green light change time g in < v lay, i.e. T g2=T g2-g lay;
If b) v m, there is not green light Slack Time and then indicate residual queue, if T in>=v g2< G main-T g1, then add unit green light at former long green light time and change time g lay, i.e. T g2=T g2+ g layif, T g2=G main-T g1, then T g2=T g2;
If there is not transition moment T in (b) c, then illustrate at the end of green time, detecting device upstream also has queue queue, then the long green light time of this phase place is T g2=G main-T g1;
(3) if the queue length of two queues is all more than or equal to L, then individual queue whether existence transition moment T is determined c:
If both there is transition moment T in (a) c, then determine whether each phase place has green time more than needed, perform green light according to the strategy (a) of step (2) and extend or reduction;
If there is transition moment T in (b) c, one does not exist, then the phase place that there is the transition moment performs green light prolongation according to the strategy (a) of step (2) or reduces to obtain long green light time T g1, the green time of another phase place is T g2=G main-T g1;
If neither there is transition moment T in (c) c, then according to Q sand Q llength ratio distribute the green time of phase place and craspedodrome phase place of turning left, namely T L = G main &times; Q L Q L + Q S T S = G main &times; Q S Q L + Q S .
Wherein: T lthe long green light time of phase place of turning left, T sthe long green light time of craspedodrome phase place, Q scraspedodrome phase alignment length, Q lphase alignment length of turning left.
Be subsidiary road signal adaptive control flow chart as shown in Figure 7, subsidiary road is kept straight on and is turned left by a phase control, so first calculate the queue length Q of subsidiary road,
(1) if queue length Q < is L, then Minimum Green Time T is distributed g=G min;
(2) if queue length Q>=L, then transition moment T is determined whether there is c, then have:
If there is transition moment T in (a) c, then according to T cwith to calculate in this time interval vehicle by minimum speed v needed for L m, then have determine whether there is green light Slack Time:
If a) v m, then there is green light Slack Time, then T in < v g=T g-g lay;
If b) v m, then there is not green light Slack Time, namely indicate residual queue in>=v, if T g< G minor, then T g=T g+ g layif, T g=G minor, then T g=T g;
If there is not transition moment T in (b) c, then T g=G minor.
Below provide specific embodiments of the invention, it should be noted that the present invention is not limited to following specific embodiment, all equivalents done on technical scheme basis all fall into protection scope of the present invention.
Embodiment:
As the cross junction in Fig. 1, arranging east-west direction is major trunk roads, and wagon detector is apart from the distance L of stop line a=80m, North and South direction is subsidiary road, and wagon detector is apart from the distance L of stop line b=60m, the maximum total long green light time G of major trunk roads mainfor 80s, the maximum long green light time G of subsidiary road minorfor 45s, minimum long green light time G minfor 15s, unit green light changes duration g layfor 3s.
The timing state of the signal lamp obtained from 10:00:00 for the present embodiment as shown in table 1.
Suppose the moment for a red light start time of major trunk roads, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as craspedodrome road transition moment point T at the moment a9:59:10, craspedodrome road transition moment T b9:59:24, craspedodrome road transition moment T c9:59:30, craspedodrome green light start time turn left green light start time to T aby the equivalent vehicle number n of wagon detector in time l=20, T bto T ctime is interior is n by the equivalent vehicle number of wagon detector j=2, turn left and there is not transition moment T a, T b, T c.Calculate saturation flow density: k j=n l/ L a=20/80=0.25, queue dissipation speed with v m = L a / ( T G , L 0 - T C ) = 80 / ( 44 - 30 ) = 5.71 m / s , Due to vm < v, there is green time more than needed, queue length Q s=L a+ n j/ k j=80+2/0.25=88m, therefore craspedodrome of lower cycle long green light time T s=T s-g lay=30s-3s=27s, long green light time of turning left is T l=G min=15s.
And the moment for the red light start time of subsidiary road, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as green light start time at the moment for 10:00:00, long green light time T gfor 30s, there is not transition moment point T a, therefore the long green light time in lower cycle is T g=G min=15s;
Moment for another red light start time of major trunk roads, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as craspedodrome green light start time at the moment for 10:00:31, there is not transition moment point T a, turn left red light start time for 10:00:00, turn left transition moment point T a10:00:47, turn left transition moment T b10:01:08, turn left transition moment T c10:01:11, turns left green light start time to T aby the equivalent vehicle number n of wagon detector in time l=19, T bto T ctime is interior is n by the equivalent vehicle number of wagon detector j=1.Calculating is turned left track saturation flow density: k j=n l/ L a=19/80=0.23, queue dissipation speed v = L a / ( T B - T G , L 1 ) = 80 / 10 = 8 m / s With v m = L a / ( T R , L 2 - T C ) = 80 / 2 = 40 m / s , Due to v mv green time not more than needed, Q l=L a+ n j/ k j=80+1/0.23=84m, therefore craspedodrome of lower cycle long green light time is T s=G min=15s, long green light time of turning left is T l=T l+ g lay=15s+3s=18s;
Moment for another red light start time of subsidiary road, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as the red light start time at the moment for 10:00:31, transition moment T afor 10:01:02, green light start time for 10:01:13, transition moment T bfor 10:01:21, transition moment T cfor 10:01:25, to T aby the equivalent vehicle number n of wagon detector in time l=14, T bto T ctime is interior is n by the equivalent vehicle number of wagon detector j=3.Calculate track saturation flow density: k j=n l/ L b=14/60=0.23, queue dissipation speed v = L b / ( T B - T G 1 ) = 60 / 8 = 7.5 m / s With v m = L b / ( T R , C 2 - T C ) = 60 / 4 = 15 m / s , Due to v m> v, green time not more than needed, Q=L b+ n j/ k j=60+3/0.23=73m, therefore long green light time of lower cycle is T g=T g+ g lay=15s+3s=18s;
Moment for the another red light start time of major trunk roads, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as the transition moment T in craspedodrome road at the moment afor 10:01:20, green light start time for 10:01:28, transition moment T bfor 10:01:38, transition moment T cfor 10:01:42, to T aby the equivalent vehicle number n of wagon detector in time l=18, T bto T ctime is interior is n by the equivalent vehicle number of wagon detector j=2.Calculate Through Lane saturation flow density: k j=n l/ L a=18/80=0.225, queue dissipation speed with due to v mv, green time, therefore craspedodrome queue length Q not more than needed s=L a+ n j/ k j=80+2/0.225=88m; The transition moment T turned left afor 10:01:27, green light start time for 10:01:43, transition moment T bfor 10:01:55, there is not transition moment T c, to T bby the equivalent vehicle number n of wagon detector in time l=20, T bextremely time is interior is n by the equivalent vehicle number of wagon detector j=4, calculate track saturation flow density: the k that turns left j=n l/ L a=20/80=0.25, queue dissipation speed therefore turn left queue length Q l> L a+ n j/ k j=80+4/0.25=96m, therefore craspedodrome of lower cycle long green light time T s=T s+ g lay=15s+3s=18s, long green light time of turning left is T l=G main-T s=80s-18s=62s;
Moment for the another red light start time of subsidiary road, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as the transition moment T of subsidiary road this moment afor 10:01:45, green light start time for 10:02:01, transition moment T bfor 10:02:10, there is not transition moment T c, to T bby the equivalent vehicle number n of wagon detector in time l=14, T bextremely time is interior is n by the equivalent vehicle number of wagon detector j=11, calculate track saturation flow density of upper cycle: k j=n l/ L b=14/60=0.23, queue length Q > L b+ n j/ k j=60+11/0.23=108m, at the end of Effective Green Time, still has queue after wagon detector, and therefore the long green light time in lower cycle is T g=G minor=45s;
Moment for another red light start time of major trunk roads, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as craspedodrome road transition moment T this moment afor 10:02:03, green light start time for 10:02:19, transition moment T bfor 10:02:30, there is not transition moment T c, to T bby the equivalent vehicle number n of wagon detector in time l=19, T bextremely time is interior is n by the equivalent vehicle number of wagon detector j=14, calculate Through Lane saturation flow density of upper cycle: k j=n l/ L a=19/80=0.2375, queue length Q s> L a+ n j/ k j=80+14/0.2375=139m; Turn left transition moment T afor 10:02:29, green light start time for 10:02:37, transition moment T bfor 10:02:55, there is not transition moment T c, to T bthe interior equivalent vehicle number n by detecting device l=20, T bextremely the interior equivalent vehicle number n by wagon detector j=27, the upper cycle that calculates turns left track saturation flow density: k j=n l/ L a=20/80=0.25 queuing queue Q l> L a+ n j/ k j=80+27/0.25=188m, at the end of Effective Green Time, still has queue after the detecting device in two tracks, and therefore craspedodrome of lower cycle long green light time is
T S = G main &times; Q S Q S + Q L = 80 s &times; 139 m 139 m + 180 m = 35 s , Long green light time of turning left is
T L = G main &times; Q L Q S + Q L = 80 s &times; 188 m 139 m + 188 m = 45 s ;
Moment for another red light start time of subsidiary road, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as track transition moment T this moment this moment afor 10:03:05, green light start time for 10:03:39, transition moment T bfor 10:03:50, transition moment T cfor 10:03:58, to T btime is interior is n by the equivalent vehicle number of wagon detector l=14, T bto T ctime is interior is n by the equivalent vehicle number of wagon detector j=8, calculating track saturation flow density of upper cycle is k j=n l/ L b=14/60=0.23, queue length Q=L b+ n j/ k j=60+8/0.23=94m, queue dissipation speed v = L b / ( T B - T G 3 ) = 60 / 11 = 5 . 45 m / s , Queue is dissipated completely, again v m< v, has green time more than needed, then the long green light time T in lower cycle g=T g-g lay=45s-3s=42s;
Moment for a red light start time of major trunk roads, statistics obtains the wagon detector data in upper cycle and signal lamp phase tranformation data as craspedodrome road transition moment T this moment afor 10:03:50, green light start time for 10:04:59, transition moment T bfor 10:04:35, transition moment T cfor 10:04:40, to T btime is interior is n by the equivalent vehicle number of wagon detector l=20, T bto T cbe n by the equivalent vehicle number of wagon detector j=2, calculate the craspedodrome road saturation flow density k in upper cycle j=n l/ L a=20/80=0.25, queue dissipation speed queue is dissipated completely, again v m = L a / ( T G , L 4 - T C ) = 80 / 19 = 4 . 21 m / s , V m< v, has green time more than needed, queue length Q s=L a+ n j/ k j=80+2/0.25=88m; The transition moment T turned left afor 10:04:38, green light start time for 10:04:59, transition moment T bfor 10:05:20, there is not transition moment T c, to T btime is interior is n by the equivalent vehicle number of wagon detector l=21, T bextremely time is interior is n by the equivalent vehicle number of wagon detector j=20, the upper cycle that calculates turns left saturation flow density k j=n l/ L a=21/80=0.26, queue length Q l> L a+ n j/ k j=80+20/0.26=157m, at the end of Effective Green Time, still has queue after detecting device, therefore the craspedodrome long green light time T in lower cycle s=T s-g lay=36s-3s=33s, long green light time of turning left is T l=G main-T s=80s-33s=47s.
The timing state of the signal lamp that table 1 obtains from 10:00:00
Period Signal lamp state Duration (s)
10:00:00-10:00:30 Major trunk roads are kept straight on, all red lights of turning left, subsidiary road green light 30
10:00:31-10:00:57 Major trunk roads craspedodrome green light, red light of turning left, subsidiary road red light 27
10:00:58-10:01:12 Major trunk roads craspedodrome red light, green light of turning left, subsidiary road red light 15
10:01:13-10:01:27 Major trunk roads are kept straight on, all red lights of turning left, subsidiary road green light 15
10:01:28-10:01:42 Major trunk roads craspedodrome green light, red light of turning left, subsidiary road red light 15
10:01:43-10:02:00 Major trunk roads craspedodrome red light, green light of turning left, subsidiary road red light 18
10:02:01-10:02:18 Major trunk roads are kept straight on, all red lights of turning left, subsidiary road green light 18
10:02:19-10:02:36 Major trunk roads craspedodrome green light, red light of turning left, subsidiary road red light 18
10:02:37:10:03:38 Major trunk roads craspedodrome red light, green light of turning left, subsidiary road red light 62
10:03:39-10:04:23 Major trunk roads are kept straight on, all red lights of turning left, subsidiary road green light 45
10:04:24-10:04:58 Major trunk roads craspedodrome green light, red light of turning left, subsidiary road red light 35
10:04:59-10:05:44 Major trunk roads craspedodrome red light, green light of turning left, subsidiary road red light 45
10:05:45-10:06:26 Major trunk roads are kept straight on, all red lights of turning left, subsidiary road green light 42
10:06:27-10:06:59 Major trunk roads craspedodrome green light, red light of turning left, subsidiary road red light 33
10:07:00-10:07:47 Major trunk roads craspedodrome red light, green light of turning left, subsidiary road red light 47

Claims (1)

1. an adaptive intersection signal control method, is characterized in that, the method is carried out according to following steps:
Step one, 1 wagon detector is installed in each track, crossing, and the distance of wagon detector and stop line is designated as L, and each wagon detector opens the bright moment for the red light gathering each phase place n-th cycle , the n-th cycle green light open the bright moment , the (n+1)th cycle red light open the bright moment , each vehicle by wagon detector time holding time t o, wagon detector free time interval t fand pass through the vehicle number n of detecting device;
Described phase place comprises the craspedodrome phase place at craspedodrome queue place and the phase place of turning left at queue place of turning left;
One-period extinguishes the moment for opening the bright moment from red light to green light, note G minfor minimum green time, note g layfor unit green light extends or the time of shortening, note G mainfor maximum total green time of major trunk roads;
Step 2, at the end of one-period effective green time, detection data are transferred to back-end data disposal system by wagon detector, analyze the change of traffic behavior in this cycle, find out the transition moment T of wagon detector eigenstate a, T band T c;
T athat red light opens bright rear vehicle v 1start the transition between states moment taking wagon detector for a long time, T aafter moment, wagon detector is by vehicle v 1take for a long time, moment T acan be used to determine whether this phase place track exists longer vehicle platoon;
T bthat green light opens bright rear vehicle v 1sail out of the transition moment of wagon detector, green light open bright after, T bbefore moment, the vehicle before stop line sails out of crossing with saturation volume rate successively, but is 0 by the vehicle number of detecting device, at T bafterwards, vehicle is with maximum current flow rate by wagon detector, and the holding time of wagon detector and interval time reduce;
T clast car v in vehicle queue's queue 2by the transition between states moment of wagon detector, determine last car of queue v 2according to being: in queue queue, during continuous vehicle passing detection device, interval time is less, when a car and its Following Car pass through detecting device interval greater than threshold value A, illustrate in Following Car not Queue here queue;
The value obtaining threshold value A according to current traffic survey data statistics is 3s;
Step 3, adopt from moment is to T aby the vehicle number n of detecting device in time period in moment lcalculate the vehicle density k under saturated conditions j, then k j=n l/ L; Adopt from moment is to T bdistance L between time period in moment and stop line to wagon detector calculates the dissipation speed v of vehicle queue's queue, then and then pass through T band T cby the vehicle number n of detecting device in time period jcalculate the maximum queue length Q in this cycle;
(1) if there is not T amoment, then Q < L;
(2) if there is T amoment, then determine T further cmoment;
If there is T in (a) cmoment, then Q=L+n j/ k j;
If there is not T in (b) cmoment, then red light of lower cycle is opened the bright moment as transition moment T c, statistics T bwith by the vehicle number n of detecting device in time period j, then Q > L+n j/ k j;
Step 4, the signal control strategy of adjustment major trunk roads, detailed process is as described below:
Craspedodrome queue length Q is calculated respectively according to the method for step 3 swith the queue length Q that turns left l;
(1) if the length of two queues is all less than L, then turn left phase time and craspedodrome phase time all distribute minimum green time, i.e. T g1=T g2=G min;
(2) if only have a certain queue length to be less than L, then the minimum green time T of the phase assignments at this queue place g1=G min, the queue that another length is more than or equal to L then needs to determine whether this queue exists transition moment T c:
If there is transition moment T in (a) c, then according to T cwith to calculate in this time interval vehicle by minimum speed v needed for L m, then have determine whether there is green light Slack Time:
If a) v m, then there is green light Slack Time in < v, former long green light time is cut unit green light and change time g lay, i.e. T g2=T g2-g lay;
If b) v m, then there is not green light Slack Time, namely indicate residual queue in>=v, if T g2< G main-T g1, then g is added at former long green light time lay, i.e. T g2=T g2+ g layif, T g2=G main-T g1, then T g2=T g2;
If there is not transition moment T in (b) c, then represent at the end of green time, detecting device upstream also has queue queue, then the long green light time of this phase place is T g2=G main-T g1;
(3) if the queue length of two queues is all more than or equal to L, then determine whether individual queue exists transition moment T c, then have:
If both there is moment T in (a) c, then determine whether each phase place has green time more than needed, perform green light according to the strategy (a) of step (2) and extend or reduce to obtain long green light time T g1and T g2, wherein: T g1+ T g2≤ G main;
If there is moment T in (b) queue c, there is not moment T in another c, then there is moment T cphase place according to the strategy (a) of step (2) perform green light extend or reduce to obtain long green light time T g1, there is not moment T cthe green time of phase place be T g2=G main-T g1;
If neither there is transition moment T in (c) c, then according to Q sand Q llength ratio distribute the green time of phase place and craspedodrome phase place of turning left, namely T L = G main &times; Q L Q L + Q S T S = G main &times; Q S Q L + Q S
Wherein: T lthe long green light time of phase place of turning left, T sthe long green light time of craspedodrome phase place, Q scraspedodrome phase alignment length, Q lphase alignment length of turning left;
Step 5, the signal control strategy of adjustment subsidiary road, detailed process is as described below:
Subsidiary road is kept straight on and is turned left and to be controlled by a phase place, remembers G minorfor the maximum green time of subsidiary road, G minfor minimum green time, g layfor unit green light extends or the time of shortening, first calculate the queue length Q of subsidiary road according to the method for step 3, T gfor subsidiary road green time;
(1) if queue length Q < is L, then Minimum Green Time T is distributed g=G min;
(2) if queue length Q>=L, then transition moment T is determined whether there is c, then have:
If there is transition moment T in (a) c, then according to T cwith to calculate in this time interval vehicle by minimum speed v needed for L m, then have determine whether there is green light Slack Time:
If a) v m, then there is green light Slack Time, then T in < v g=T g-g lay;
If b) v m, then there is not green light Slack Time, namely indicate residual queue in>=v, if T g< G minor, then T g=T g+ g layif, T g=G minor, then T g=T g;
If there is not transition moment T in (b) c, then T g=G minor.
CN201310167669.5A 2013-05-08 2013-05-08 Self-adaptive intersection signal control method Expired - Fee Related CN103280113B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310167669.5A CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310167669.5A CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Publications (2)

Publication Number Publication Date
CN103280113A CN103280113A (en) 2013-09-04
CN103280113B true CN103280113B (en) 2014-12-24

Family

ID=49062615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310167669.5A Expired - Fee Related CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Country Status (1)

Country Link
CN (1) CN103280113B (en)

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605358B (en) * 2013-11-22 2016-08-31 公安部交通管理科学研究所 Road traffic signal controller function in-circuit emulation test device
CN103927866B (en) * 2013-12-31 2016-02-10 北京航空航天大学 Traffic light time Forecasting Methodology waited for by vehicle based on GPS
CN103810868B (en) * 2014-02-25 2016-04-27 安徽科力信息产业有限责任公司 A kind of traffic overflow suppressing method based on high-altitude video information
CN104778845B (en) * 2014-12-29 2017-05-03 河南科技学院 Multi-phase-jump and vehicle full-dynamic induction traffic control method
CN104637317B (en) * 2015-01-23 2017-01-04 同济大学 A kind of crossing based on real-time vehicle track actuated signal control method
CN104700633B (en) * 2015-03-12 2016-04-06 深圳市金迈高智能科技有限公司 Intellectual traffic control method and device
CN104794910A (en) * 2015-04-27 2015-07-22 江苏物联网研究发展中心 Queuing length based fully-actuated signal control method with phase jumping function
CN104778848A (en) * 2015-04-30 2015-07-15 安徽超远信息技术有限公司 Traffic signal optimal control method for road intersection vehicle coordinated optimization state
CN105427629A (en) * 2015-11-16 2016-03-23 邹谋炎 Implementing technology for road traffic light adaptive control
CN105788302B (en) * 2016-04-08 2018-05-04 华北电力大学(保定) A kind of city traffic signal lamp dynamic timing method of biobjective scheduling
CN106128128B (en) * 2016-07-21 2018-04-03 哈尔滨工业大学 The traffic signal control method of adaptive intersection traffic stream random fluctuation
CN106485928A (en) * 2016-10-18 2017-03-08 郑州云海信息技术有限公司 A kind of method for controlling traffic signal lights, control terminal, business platform and system
CN107240252B (en) * 2017-05-05 2019-10-11 长安大学 A kind of active vehicle dispatching method of intersection
GB2564882B (en) * 2017-07-25 2022-04-13 Red Fox Id Ltd Apparatus and methods for assessing vehicles straddled between lanes
CN107886725B (en) * 2017-11-16 2021-02-12 山东交通学院 Method and device for calculating queuing length based on bayonet data
CN109979191B (en) * 2017-12-28 2022-02-11 杭州海康威视系统技术有限公司 Traffic signal control method, traffic signal control device, electronic equipment and computer-readable storage medium
CN108288379B (en) * 2018-02-01 2020-12-15 迈锐数据(北京)有限公司 Traffic data processing method and device
CN108831163B (en) * 2018-03-22 2021-06-25 宁波崛马信息科技有限公司 Main road cooperative annunciator control method based on geomagnetism
CN108447275A (en) * 2018-04-25 2018-08-24 安徽超远信息技术有限公司 Incude the traffic signal optimization control method being combined based on fleet's induction and vehicle
CN108922204B (en) * 2018-05-10 2021-07-20 华南理工大学 Cell transmission model improvement method considering intersection signal control
CN108682168B (en) * 2018-05-15 2020-09-22 哈尔滨工业大学 Vehicle speed guiding system and method for reducing stopping at signalized intersection
CN111396224B (en) * 2019-01-03 2022-07-15 奥迪股份公司 Method, apparatus and storage medium for controlling shutdown and startup of vehicle engine
CN109637141B (en) * 2019-01-14 2020-11-03 杭州电子科技大学 Dynamic timing traffic light control method based on breadth-first search
CN110047299B (en) * 2019-04-10 2020-11-03 合肥学院 Dynamic allocation method for traffic signals of motor vehicles at intersection
CN111028519B (en) * 2019-12-28 2021-01-12 江苏航天大为科技股份有限公司 Self-adaptive control method based on video flow detector
CN111429721B (en) * 2020-03-27 2021-11-09 江苏智通交通科技有限公司 Intersection traffic signal scheme optimization method based on queuing dissipation time
CN111612669B (en) * 2020-04-24 2023-04-25 浙江大华技术股份有限公司 Lane queuing length estimation method, system, computer device and storage medium
CN113903166A (en) * 2020-07-06 2022-01-07 奥迪股份公司 Fleet driving assistance system, corresponding method and computer-readable storage medium
CN112037507B (en) * 2020-08-10 2021-07-27 东南大学 Supersaturated traffic state trunk line adaptive signal coordination design method and device
CN111951576A (en) * 2020-08-17 2020-11-17 国为(南京)软件科技有限公司 Traffic light control system based on vehicle identification and method thereof
CN113516857B (en) * 2021-04-19 2022-08-16 安徽达尔智能控制系统股份有限公司 Intersection signal timing dynamic allocation method and system based on radar monitoring
CN113538943A (en) * 2021-07-19 2021-10-22 昭通亮风台信息科技有限公司 Traffic light control method and system
CN114694393B (en) * 2022-03-24 2023-11-07 浙江大华技术股份有限公司 Method and device for adjusting phase duration, storage medium and electronic equipment
CN117351742A (en) * 2023-11-03 2024-01-05 广东宏畅市政工程有限公司 Traffic light control method and system based on road junction flow detection

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101470965A (en) * 2007-12-26 2009-07-01 奥城同立科技开发(北京)有限公司 Automatic control type traffic light control system
AU2009304571A1 (en) * 2008-10-15 2010-04-22 National Ict Australia Limited Tracking the number of vehicles in a queue
JP5343637B2 (en) * 2009-03-09 2013-11-13 オムロン株式会社 Signal control device
JP4924692B2 (en) * 2009-11-02 2012-04-25 住友電気工業株式会社 Traffic signal control analyzer
CN101763734B (en) * 2010-01-21 2011-06-08 上海交通大学 Traffic signal light intelligent control system and control method thereof
CN101976510A (en) * 2010-10-26 2011-02-16 隋亚刚 Method for optimally controlling crossing vehicle signal under high definition video detection condition
CN102915643B (en) * 2012-08-22 2014-09-17 浙江浙大中控信息技术有限公司 Method and system for calculating green time of each phase of signalized intersection

Also Published As

Publication number Publication date
CN103280113A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN103280113B (en) Self-adaptive intersection signal control method
CN103559795B (en) Multi-strategy and multi-object self-adaptation traffic control method
CN103000027B (en) Intelligent traffic guidance method based on floating car under congestion condition
CN103473935B (en) Crossing traffic based on sensor detector blocks up judgement and control method and system
CN104332058B (en) A kind of Intelligent traffic light control method and system
CN103871241B (en) One dynamically divides control method towards track, Weaving Sections of Urban Expressway
CN101789183B (en) Self-adaptive control system and method for entrance ramp
CN110136455B (en) Traffic signal lamp timing method
CN105679032B (en) A kind of traffic control sub-area division method under urban traffic flow hypersaturated state
CN103186984B (en) Method for triggering transformation of steering function of variable guidance lanes at urban intersections
CN103198681B (en) A kind of intersection signal control method towards public traffic in priority
CN106652493A (en) Intersection signal optical control method in environment of Internet of vehicles
CN105489034A (en) Main line full traffic control system and method
CN104299432A (en) Supersaturated intersection signal lamp control method and device
CN103236164B (en) Vehicle controlling method for guaranteeing public transport vehicle prior passing
CN103794066B (en) A kind of Bus Priority signal control method without dedicated bus lanes
CN107730886A (en) Dynamic optimization method for traffic signals at urban intersections in Internet of vehicles environment
CN104637317A (en) Intersection inductive signal control method based on real-time vehicle trajectory
CN104252788B (en) Signal controls lower crossing pedestrian&#39;s green time method to set up
CN107730926A (en) A kind of intellectual traffic control method, apparatus and system
CN103680157A (en) Vehicle queuing overflow anticipation method for city bottleneck road section
CN102280036A (en) Bus rapid transit signal priority timing method under trunk line coordination control
CN104916142A (en) Adaptive intersection traffic signal control method of trunk road priority
CN106469507A (en) Dynamic green wave system and method automatically adjusted based on Real-Time Traffic Volume data
CN110889967B (en) Overflow risk balance signal control optimization method based on main road segmentation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20200508