CN103280113A - Self-adaptive intersection signal control method - Google Patents

Self-adaptive intersection signal control method Download PDF

Info

Publication number
CN103280113A
CN103280113A CN2013101676695A CN201310167669A CN103280113A CN 103280113 A CN103280113 A CN 103280113A CN 2013101676695 A CN2013101676695 A CN 2013101676695A CN 201310167669 A CN201310167669 A CN 201310167669A CN 103280113 A CN103280113 A CN 103280113A
Authority
CN
China
Prior art keywords
time
constantly
green light
vehicle
queue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101676695A
Other languages
Chinese (zh)
Other versions
CN103280113B (en
Inventor
安毅生
赵祥模
贺冰花
袁绍欣
南春丽
姚迪
张曼
杨峰
雷鹏
梁超
尚龙华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201310167669.5A priority Critical patent/CN103280113B/en
Publication of CN103280113A publication Critical patent/CN103280113A/en
Application granted granted Critical
Publication of CN103280113B publication Critical patent/CN103280113B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the field of urban traffic control, and provides a self-adaptive intersection signal control method. By installing vehicle monitors to detect the number of vehicles, the lengths of vehicle queues are acquired, and a signal control strategy for the next cycle is determined according to the lengths of vehicle queues at an intersection in the previous cycle. The method utilizes the vehicle detectors already arranged in a city to acquire traffic flow data and calculate the length of the queue of each lane, and the signal timing scheme of the next cycle is dynamically adjusted according to the different proportions of queue lengths. Taking a cycle as a unit, a timing scheme is calculated, the load of calculation is low, and moreover, the method also can achieve the purpose that intersection signals can be self-adaptively controlled according to the density of traffic flow. In addition, the algorithm of the method is simple, and the method has low requirement on hardware and construction quantity, and therefore is convenient to popularize.

Description

A kind of adaptive intersection signal control method
Technical field
The invention belongs to the urban traffic control field, be specifically related to a kind of adaptive intersection signal control method.
Background technology
Traffic signals control is control object with crossing microcosmic wagon flow, be that yardstick distributes vehicle at the right of way of crossing with phase place and time, separate the wagon flow of conflicting from the time, traffic flow is reasonably guided and dispatches, reach the minimizing traffic hazard, improve the purpose of traffic safety and conevying efficiency.
At present, intersection signal control method both domestic and external mainly contains timing controlled, induction control and adaptive control three classes, and timing controlled is suitable for the crossing that the volume of traffic is big and traffic is evenly distributed; It is less than normal that induction control is suitable for the volume of traffic, changes inhomogeneous crossing, but the volume of traffic is when big, can't adjust and optimize signal condition with the alleviation traffic congestion according to transport need; Adaptive control is the traffic data of sending here according to detecting device, produce the best timing scheme under certain performance index in real time, automatically regulate signal timing dial parameters such as split, Cycle Length and the green time difference, the traffic flow of signal timing dial and variation is adapted, at present, SCOOT and SCATS are the city traffic signal lamp self-adaptation control methods of two kinds of main flows.The SCATS system adjusts the signal controlling parameter in real time according to the traffic flow situation of change, but the possibility limited amount, carry out each scheme time long (scheme of variation in tens minutes), do not possess feedback function, and before checkout equipment is placed on stop line, can't detect vehicle queue length; The SCOOT system availability is strong, can adopt the continuity inching to timing parameter, but its relevant control model all comes out by mathematical model simulation, and mathematical model is more complicated, and required simulation time is just more long, can produce contradiction between reliability and the real-time.In addition, SCOOT and SCATS system all need to gather mass data, the construction cost height.
The crossing vehicle queue length is an important indicator that characterizes traffic behavior, and present optimum live signal control is mainly found the solution based on each import track queue length of crossing.But, calculate comparatively complexity of queue length, rely on a plurality of detecting devices usually or utilize vedio data, the calculated amount that realtime graphic is handled is very big, expensive, and is subject to weather effect, and the reliability of system is relatively poor.Present most of city has been laid equipment such as inductive coil and has been obtained the volume of traffic, the vehicle holding time, the road occupancy, Real-time Traffic Information such as the degree of crowding and queue length, but the transport need of crossing all directions might not balance, the queue length in each import track also not necessarily equates, particularly under the bigger situation of the volume of traffic, when detecting device is taken by certain in the formation vehicle commander time, be unable to estimate information such as the vehicle number of real-time arrival and queue length, thereby cause the vehicle queue length computational accuracy not high, the signal time distributing conception out of true.If in every track a plurality of detecting devices are installed, not only cause many places to damage to original road surface, and quantities is big, inconvenience is installed, the feasibility of engineering and the operability of enforcement are lower.
Summary of the invention
Shortcomings and deficiencies at prior art exists the objective of the invention is to a kind of adaptive intersection signal control method, and this method realizes intersection signal control by the crossing vehicle queue length in last cycle.
A kind of adaptive intersection signal control method, this method is carried out according to following steps:
Step 1,1 wagon detector is installed in each track in the crossing, and the distance of vehicle sensors and stop line is designated as L, and each wagon detector is used for gathering the red light in each phase place n cycle and opens the bright moment
Figure BDA00003160787000021
The green light in n cycle opens the bright moment
Figure BDA00003160787000022
The red light in n+1 cycle opens the bright moment
Figure BDA00003160787000023
Holding time t when each vehicle passes through wagon detector o, wagon detector free time t at interval fReach the vehicle number n by detecting device;
Described phase place comprises the phase place of turning left at the craspedodrome phase place at craspedodrome formation place and the formation place of turning left;
One-period is carved into green light when bright for opening from red light and extinguishes constantly note G MinBe minimum green time, note g LayFor the unit green light prolongs or the shortening time, note G MainMaximum total green time for major trunk roads;
Step 2, when the one-period effective green time finishes, wagon detector will detect data transmission and give the back-end data disposal system, analyze the variation of traffic behavior in this cycle, find out the transition moment T of wagon detector eigenstate A, T BAnd T C
T ABe that red light opens bright back vehicle v 1Beginning takies the transition between states moment of wagon detector, T for a long time AConstantly, wagon detector is by vehicle v 1Take for a long time, constantly T ACan be used to determine whether this phase place track exists long vehicle formation;
T BBe that green light opens bright back vehicle v 1Sail out of the transition of wagon detector constantly, green light open bright after, T BConstantly, the vehicle before the stop line sails out of the crossing with saturation volume rate successively, but is 0 by the vehicle number of detecting device, at T BAfterwards, by wagon detector, reduce by the holding time of wagon detector and interval time with the current flow rate of maximum for vehicle;
T CBe last car v in the vehicle queue formation 2By the transition between states moment of wagon detector, determine last car of formation v 2Foundation be: in the queue queue continuously during the vehicle passing detection device interval time less, when a car and its Following Car pass through detecting device interval greater than threshold value A, illustrate in not Queue here of the Following Car formation;
The value that obtains threshold value A according to present traffic study data statistics result is 3s;
Step 3, adopt from
Figure BDA00003160787000031
The time be carved into T APass through the vehicle number n of detecting device in time period constantly LCalculate the vehicle density k under the saturated conditions j, k then j=n L/ L; Employing from
Figure BDA00003160787000032
The time be carved into T BTime period and stop line calculate the dissipation speed v of vehicle queue formation to the distance L between wagon detector constantly, then
Figure BDA00003160787000033
And then pass through T BAnd T CPass through the vehicle number n of detecting device in time period jCalculate the maximum queue length Q in this cycle;
(1) if there is not T AConstantly, Q<L then;
(2) if there is T AConstantly, then further determine T CConstantly;
(a) if there is T CConstantly, Q=L+n then j/ k j
(b) if there is not T CConstantly, then red light of following cycle is opened the bright moment
Figure BDA00003160787000041
As transition moment T C, statistics T BWith
Figure BDA00003160787000042
Pass through the vehicle number n of detecting device in time period j, Q>L+n then j/ k j
Step 4, the signal control strategy of adjustment major trunk roads, detailed process is as described below:
Calculate craspedodrome queue length Q according to the method for step 3 respectively SWith the queue length Q that turns left L
(1) if the length of two formations all less than L, then turn left phase time and craspedodrome phase time all distribute minimum green time, i.e. T G1=T G2=G Min
(2) if having only a certain queue length less than L, the minimum green time T of the phase assignments at this formation place then G1=G Min, another length needs then to determine more than or equal to the formation of L whether this formation exists transition T constantly C:
(a) if there is transition T constantly C, then according to T CWith
Figure BDA00003160787000043
Calculate interior vehicle of this time interval by the required minimum speed v of L m, then have v m = L / ( T R n + 1 - T C ) , Determine whether to exist green light to have more than needed the time:
A) if v m<v then exists green light to have more than needed the time, with the former green light duration green light change time g of the unit of cutting Lay, i.e. T G2=T G2-g Lay
B) if v m〉=v does not then exist green light to have more than needed the time, i.e. expression has residual queue, if T G2<G Main-T G1, then add g at former green light duration Lay, i.e. T G2=T G2+ g Lay, if T G2=G Main-T G1, T then G2=T G2
(b) if there is not transition T constantly C, when then being illustrated in the green time end, the detecting device upstream also has queue queue, and then the green light duration of this phase place is T G2=G Main-T G1
(3) if, then determining individual queue all more than or equal to L, the queue length of two formations whether has transition T constantly C, then have:
(a) if there is T constantly in the both C, determine then whether each phase place has green time more than needed, according to the strategy (a) of step (2) carry out green light prolong or reduce green light duration T G1And T G2, wherein: T G1+ T G2≤ G Main
(b) if there is T constantly in a formation C, there is not T constantly in another C, then have T constantly CPhase place according to the strategy (a) of step (2) carry out green light prolong or reduce green light duration T G1, do not have T constantly CThe green time of phase place be T G2=G Main-T G1
(c) if neither there is transition T constantly C, then according to Q SAnd Q LLength ratio distribute the green time of turn left phase place and craspedodrome phase place, namely T L = G main × Q L Q L + Q S T S = G main × Q S Q L + Q S
Wherein: T LBe the green light duration of phase place of turning left, T SBe the green light duration of craspedodrome phase place, Q SBe craspedodrome phase place queue length, Q LIt is the phase place queue length of turning left.
Step 5, the signal control strategy of adjustment subsidiary road, detailed process is as described below:
Subsidiary road is kept straight on and is turned left and controlled by a phase place, note G MinorBe the maximum green time of subsidiary road, G MinBe minimum green time, g LayFor the unit green light prolongs or the shortening time, at first calculate the queue length Q of subsidiary road according to the method for step 3;
(1) if queue length Q<L then distributes Minimum Green Time T g=G Min
(2) if queue length Q 〉=L then determines whether to exist transition T constantly C, then have:
(a) if there is transition T constantly C, then according to T CWith
Figure BDA00003160787000052
Calculate interior vehicle of this time interval by the required minimum speed v of L m, then have v m = L / ( T R n + 1 - T C ) , Determine whether to exist green light to have more than needed the time:
A) if v m<v then exists green light have more than needed time, then T g=T g-g Lay
B) if v m〉=v does not then exist green light to have more than needed the time, i.e. expression has residual queue, if T g<G Minor, T then g=T g+ g Lay, if T g=G Minor, T then g=T g
(b) if there is not transition T constantly C, T then g=G Minor
The present invention compared with prior art, beneficial effect is:
Method of the present invention utilizes the wagon detector of having laid in the city to obtain traffic flow data, calculates the queue length in each track, dynamically adjusts the signal time distributing conception of following one-period according to the different proportion of queue length.This method is the calculating that unit carries out the timing scheme with the cycle, and operand is little, and can reach intersection signal is realized adaptive control according to vehicle density purpose.In addition, this method algorithm is simple, and is lower to hardware and quantities requirement, do not increase construction cost by existing device, the convenient popularization.
Description of drawings
Fig. 1 is main and secondary road crossing wagon detector schematic layout pattern.
Fig. 2 is the time dependent synoptic diagram of vehicle queue queue on the track.
There is transition T constantly in Fig. 3 in the vehicle queue formation evanishment CAnd the time dependent synoptic diagram of the formation that green time more than needed is arranged.
There is transition T constantly in Fig. 4 in the vehicle queue formation evanishment CBut the time dependent synoptic diagram of formation of the green time of not having more than needed.
There is not transition T constantly in Fig. 5 in the vehicle queue formation evanishment CThe time dependent synoptic diagram of formation.
Fig. 6 is major trunk roads signal adaptive control flow chart.
Fig. 7 is subsidiary road signal adaptive control flow chart.
Below in conjunction with drawings and Examples particular content of the present invention is done explanation in further detail.
Embodiment
The dimension that need to prove the physical quantity that present embodiment provides is the unified standard dimension in this area, and those skilled in the art are according to i.e. its dimension as can be known of physical quantity, and therefore following content provides no longer one by one.
Need to prove that one-period is to open from red light to be carved into green light when bright and to extinguish constantly, according to existing traffic rules, stop line can not pass through with interior vehicle during the amber light flicker, so the flicker duration of amber light is grouped into red light duration the inside in the lump among the present invention, will no longer consider amber light among the following embodiment.
Defer to technique scheme, as shown in Figure 1, it is main and secondary road crossing wagon detector schematic layout pattern, east-west direction is major trunk roads among the figure, craspedodrome road at distance crossing La is equipped with wagon detector with turning left, North and South direction is subsidiary road, and the Ls place is equipped with wagon detector in the distance crossing.Major trunk roads are provided with turn left phase place and craspedodrome phase place, and subsidiary road is kept straight on and turned left by a phase control.Crossing is provided with signal controller, and all wagon detectors are implemented the volume of traffic, detecting device holding time, free time is detected and be transferred to the back-end data disposal system.The Real-Time Data Handling System (RTDHS) on backstage is dynamically determined the signal time distributing conception of following one-period according to result of calculation, and is transferred to signal controller.
Because the vehicle queue length computing method of major trunk roads and subsidiary road are identical, so following proposal is that example is controlled with an arterial highway, and the distance of detector distance stop line is L.
Be a time dependent synoptic diagram of track queue queue as shown in Figure 2, when red light open bright after, the vehicle queuing that begins to stop is opened when bright until green light, queue queue begins to dissipate, and goes round and begins again like this.When transition T does not constantly appear in red light in the time period APoint illustrates queue length Q<L, otherwise, account for queued formation overflow detector.According to
Figure BDA00003160787000074
To T AThe vehicle number n of the queuing in the time period LCalculate the vehicle density under the saturated conditions:
k j=n L/L
Open the bright moment from green light
Figure BDA00003160787000075
To moment T B, formation is rolled the crossing away from saturation volume rate, and the dissipation speed of formation is:
v = L / ( T B - T G n )
Be to have transition T constantly in queue queue's evanishment as shown in Figure 3 CAnd the time dependent synoptic diagram of the formation that green time more than needed is arranged; Shown in Figure 4 is to have transition T constantly in queue queue's evanishment CBut the time dependent synoptic diagram of formation of the green time of not having more than needed.According to T CWith
Figure BDA00003160787000072
Interval calculation
Figure BDA00003160787000073
If v mThen there is green time more than needed in<v as Fig. 3; If v mThen there is not green time more than needed in 〉=v as Fig. 4.Utilize T BAnd T CTime period, interior vehicle number n by wagon detector calculated the maximum queue length in this cycle:
Q=L+n/k j
Be not have transition T constantly in queue queue's evanishment as shown in Figure 5 CThe time dependent synoptic diagram of formation, T constantly CDo not exist to show that detector back also has waiting list when effective green time finishes, this moment will
Figure BDA00003160787000081
Regard T as C, statistics T BWith
Figure BDA00003160787000082
Pass through the vehicle number n of detecting device in time period j, then queue length is:
Q>L+n j/k j
Next, determine the parameter in the control scheme, because an intersection signal cycle can not be long or too short, if it is too short, then each phase place is switched frequently, and the increase of vehicle parking number and vehicle are started to walk continually and stopped, if long, then the time of vehicle wait is just long in the queue queue, therefore establishes minimum green time G in this programme Min(being generally 15s), the green light change time g of unit Lay(3s), maximum total green time G of major trunk roads Main(being generally 80s), the maximum green time G of subsidiary road Minor(being generally 45s).
Be major trunk roads signal adaptive control flow chart as shown in Figure 6, at first calculate craspedodrome queue length Q SWith the queue length Q that turns left L, carry out signal controlling according to following steps then:
(1) if the length of two formations all less than L, the phase place of then turning left and craspedodrome phase place are all distributed minimum green time, i.e. T G1=T G2=G Min
(2) if a certain queue length less than L, the minimum green time T of this phase assignments then G1=G Min, and the length of another formation determines then more than or equal to L whether this formation exists T C:
(a) if there is transition T constantly C, then according to T CWith The time interval calculate in this time interval vehicle by the required minimum speed of L v m = L / ( T R n + 1 - T C ) , Determine whether to exist green light to have more than needed the time
A) if v m<v exists the green light time more than needed then with the former green light duration green light change time g of the unit of cutting Lay, i.e. T G2=T G2-g Lay
B) if v m〉=v does not exist the green light time more than needed then to represent to have residual queue, if T G2<G Main-T G1, then add the green light change time g of unit at former green light duration Lay, i.e. T G2=T G2+ g Lay, if T G2=G Main-T G1, T then G2=T G2
(b) if there is not transition T constantly C, illustrate that then when green time finished, the detecting device upstream also had queue queue, then the green light duration of this phase place is T G2=G Main-T G1
(3) if whether existence transition T constantly of individual queue, is then determined in the queue length of two formations all more than or equal to L C:
(a) if there is transition T constantly in the both C, determine then whether each phase place has green time more than needed, carry out green light according to the strategy (a) of step (2) and prolong or reduce;
(b) if one exists transition T constantly C, one does not exist, then exist transition phase place constantly according to the strategy (a) of step (2) carry out green light prolong or reduce green light duration T G1, the green time of another phase place is T G2=G Main-T G1
(c) if neither there is transition T constantly C, then according to Q SAnd Q LLength ratio distribute the green time of turn left phase place and craspedodrome phase place, namely T L = G main × Q L Q L + Q S T S = G main × Q S Q L + Q S
Wherein: T LBe the green light duration of phase place of turning left, T SBe the green light duration of craspedodrome phase place, Q SBe craspedodrome phase place queue length, Q LIt is the phase place queue length of turning left.
Be subsidiary road signal adaptive control flow chart as shown in Figure 7, subsidiary road is kept straight on and is turned left by a phase control, thus at first calculate the queue length Q of subsidiary road,
1) if queue length Q<L then distributes Minimum Green Time T g=G Min
2) if queue length Q 〉=L then determines whether to exist transition T constantly C
(a) if there is transition T constantly C, then according to T CWith
Figure BDA00003160787000092
Calculate interior vehicle of this time interval by the required minimum speed v of L m, then have
Figure BDA00003160787000101
Determine whether to exist green light to have more than needed the time:
A) if v m<v then exists green light have more than needed time, then T g=T g-g Lay
B) if v m〉=v does not then exist green light to have more than needed the time, i.e. expression has residual queue, if T g<G Minor, T then g=T g+ g Lay, if T g=G Minor, T then g=T g
(b) if there is not transition T constantly C, T then g=G Minor
Below provide specific embodiments of the invention, need to prove that the present invention is not limited to following specific embodiment, all equivalents of doing on present techniques scheme basis all fall into protection scope of the present invention.
Embodiment:
As the cross junction among Fig. 1, it is major trunk roads that east-west direction is set, and wagon detector is apart from the distance L of stop line a=80m, North and South direction is subsidiary road, wagon detector is apart from the distance L of stop line b=60m, the maximum total green light duration G of major trunk roads MainBe 80s, the maximum green light duration of subsidiary road G MinorBe 45s, minimum green light duration G MinBe 15s, the green light change duration g of unit LayBe 3s.
As shown in table 1ly begin the timing state of resulting signal lamp for present embodiment from 10:00:00.
Suppose constantly
Figure BDA00003160787000102
Be red light zero hour of major trunk roads, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as craspedodrome road transition moment point T at the moment A9:59:10, the transition of craspedodrome road is T constantly B9:59:24, the transition of craspedodrome road is T constantly C9:59:30, craspedodrome green light zero hour
Figure BDA00003160787000103
Turn left green light zero hour
Figure BDA00003160787000104
To T APass through the equivalent vehicle number n of wagon detector in time L=20, T BTo T CEquivalent vehicle number by wagon detector in time is n j=2, turning left does not exist transition T constantly A, T B, T CCalculate saturation flow density: k j=n L/ L a=20/80=0.25, formation dissipation speed v = L a / ( T B - T G , S 0 ) = 80 / ( 24 - 14 ) = 8 m / s With v m = L a / ( T G , L 0 - T C ) = 80 / ( 44 - 30 ) = 5 · 71 m / s , Because v m<v has green time more than needed, queue length Q S=L a+ n j/ k j=80+2/0.25=88m, therefore craspedodrome of following cycle green light duration T S=T S-g Lay=30s-3s=27s, the green light duration of turning left is T L=G Min=15s.
And constantly
Figure BDA000031607870001114
Be the red light zero hour of subsidiary road, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as green light zero hour at the moment
Figure BDA00003160787000111
Be 10:00:00, green light duration T GBe 30s, do not have transition moment point T A, therefore the green light duration in following cycle is T G=G Min=15s;
Constantly Be another red light of major trunk roads zero hour, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as craspedodrome green light zero hour at the moment
Figure BDA00003160787000112
Be 10:00:31, do not have transition moment point T A, the red light zero hour of turning left
Figure BDA00003160787000113
Be 10:00:00, the transition moment point of turning left T A10:00:47, the transition of turning left is T constantly B10:01:08, the transition of turning left is T constantly C10:01:11, the green light zero hour of turning left
Figure BDA00003160787000114
Figure BDA00003160787000115
To T APass through the equivalent vehicle number n of wagon detector in time L=19, T BTo T CEquivalent vehicle number by wagon detector in time is n j=1.Calculating track saturation flow density: the k that turns left j=n L/ L a=19/80=0.23, formation dissipation speed v = L a / ( T B - T G , L 1 ) = 80 / 10 = 8 m / s With v m = L a / ( T R , L 2 - T C ) = 80 / 2 = 40 m / s , Because v m
Figure BDA000031607870001116
V green time not more than needed, Q L=L a+ n j/ k j=80+1/0.23=84m, therefore craspedodrome of following cycle green light duration is T S=G Min=15s, the green light duration of turning left is T L=T L+ g Lay=15s+3s=18s;
Constantly Be another red light of subsidiary road zero hour, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as the red light start time at the moment
Figure BDA00003160787000119
Be 10:00:31, transition is T constantly ABe 10:01:02, green light zero hour
Figure BDA000031607870001110
Be 10:01:13, transition is T constantly BBe 10:01:21, transition is T constantly CBe 10:01:25, To T APass through the equivalent vehicle number n of wagon detector in time L=14, T BTo T CEquivalent vehicle number by wagon detector in time is n j=3.Calculate track saturation flow density: k j=n L/ L b=14/60=0.23, formation dissipation speed v = L b / ( T B - T G 1 ) = 60 / 8 = 7 · 5 m / s With v m = L b / ( T R , C 2 - T C ) = 60 / 4 = 15 m / s , Because v m>v, green time not more than needed, Q=L b+ n j/ k j=60+3/0.23=73m, therefore green light duration of following cycle is T G=T G+ g Lay=15s+3s=18s;
Constantly
Figure BDA00003160787000121
Be the another red light zero hour of major trunk roads, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as the transition moment T in craspedodrome road at the moment ABe 10:01:20, green light zero hour
Figure BDA00003160787000122
Be 10:01:28, transition is T constantly BBe 10:01:38, transition is T constantly CBe 10:01:42,
Figure BDA00003160787000123
To T APass through the equivalent vehicle number n of wagon detector in time L=18, T BTo T CEquivalent vehicle number by wagon detector in time is n j=2.Calculate Through Lane saturation flow density: k j=n L/ L a=18/80=0.225, formation dissipation speed v = L a / ( T B - T G , S 2 ) = 80 / 10 = 8 m / s With v m = L a / ( T G , L 2 - T C ) = 80 / 1 = 80 m / s , Because v m
Figure BDA000031607870001214
V, green time not more than needed, queue length Q therefore keeps straight on S=L a+ n j/ k j=80+2/0.225=88m; The transition of turning left is T constantly ABe 10:01:27, green light zero hour
Figure BDA00003160787000126
Be 10:01:43, transition is T constantly BBe 10:01:55, do not have transition T constantly C,
Figure BDA00003160787000127
To T BPass through the equivalent vehicle number n of wagon detector in time L=20, T BExtremely
Figure BDA00003160787000128
Equivalent vehicle number by wagon detector in time is n j=4, calculate track saturation flow density: the k that turns left j=n L/ L a=20/80=0.25, formation dissipation speed v = L a / ( T B - T G , L 2 ) = 80 / 12 = 6 · 66 m / s , Therefore queue length Q turns left L>L a+ n j/ k j=80+4/0.25=96m, therefore craspedodrome of following cycle green light duration T S=T S+ g Lay=15s+3s=18s, the green light duration of turning left is T L=G Main-T S=80s-18s=62s;
Constantly
Figure BDA000031607870001210
Be the another red light zero hour of subsidiary road, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as the transition moment T of subsidiary road this moment ABe 10:01:45, green light zero hour
Figure BDA000031607870001211
Be 10:02:01, transition is T constantly BBe 10:02:10, do not have transition T constantly C, To T BPass through the equivalent vehicle number n of wagon detector in time L=14, T BExtremely
Figure BDA000031607870001213
Equivalent vehicle number by wagon detector in time is n j=11, calculate track saturation flow density of last cycle: k j=n L/ L b=14/60=0.23, queue length Q>L b+ n j/ k j=60+11/0.23=108m when Effective Green Time finishes, still has formation behind the wagon detector, therefore the green light duration in following cycle is T G=G Minor=45s;
Constantly Be another red light zero hour of major trunk roads, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as craspedodrome road transition moment T this moment ABe 10:02:03, green light zero hour
Figure BDA00003160787000132
Be 10:02:19, transition is T constantly BBe 10:02:30, do not have transition T constantly C,
Figure BDA00003160787000133
To T BPass through the equivalent vehicle number n of wagon detector in time L=19, T BExtremely
Figure BDA00003160787000134
Equivalent vehicle number by wagon detector in time is n j=14, calculate Through Lane saturation flow density of last cycle: k j=n L/ L a=19/80=0.2375, queue length Q S>L a+ n j/ k j=80+14/0.2375=139m; The transition of turning left is T constantly ABe 10:02:29, green light zero hour
Figure BDA00003160787000135
Be 10:02:37, transition is T constantly BBe 10:02:55, do not have transition T constantly C,
Figure BDA00003160787000136
To T BInterior equivalent vehicle number n by detecting device L=20, T BExtremely
Figure BDA00003160787000137
Interior equivalent vehicle number n by wagon detector j=27, track saturation flow density: the k that turns left of the last cycle of calculating j=n L/ L a=20/80=0.25 queuing queue Q L>L a+ n j/ k jWhen=80+27/0.25=188m finishes at Effective Green Time, all still have formation behind the detecting device in two tracks, therefore craspedodrome of following cycle green light duration is
T S = G main × Q S Q S + Q L = 80 s × 139 m 139 m + 180 m = 35 s , The green light duration of turning left is
T L = G main × Q L Q S + Q L = 80 s × 188 m 139 m + 188 m = 45 s ;
Constantly
Figure BDA000031607870001310
Be another red light zero hour of subsidiary road, this moment statistics obtain the wagon detector data in cycle and signal lamp phase tranformation data as: the track transition moment is T this moment ABe 10:03:05, green light zero hour Be 10:03:39, transition is T constantly BBe 10:03:50, transition is T constantly CBe 10:03:58, To T BEquivalent vehicle number by wagon detector in time is n L=14, T BTo T CEquivalent vehicle number by wagon detector in time is n j=8, calculating track saturation flow density of last cycle is k j=n L/ L b=14/60=0.23, queue length Q=L b+ n j/ k j=60+8/0.23=94m, formation dissipation speed v = L b / ( T B - T G 3 ) = 60 / 11 = 5 · 45 m / s , Formation is dissipated fully, again v m = L b / ( T R , C 4 - T C ) = 60 / 26 = 2 · 3 m / s , v m<v has green time more than needed, then the green light duration T in following cycle G=T G-g Lay=45s-3s=42s;
Constantly
Figure BDA00003160787000142
Be red light zero hour of major trunk roads, statistics is obtained the wagon detector data in cycle and signal lamp phase tranformation data as craspedodrome road transition moment T this moment ABe 10:03:50, green light zero hour
Figure BDA00003160787000143
Be 10:04:59, transition is T constantly BBe 10:04:35, transition is T constantly CBe 10:04:40,
Figure BDA00003160787000144
To T BEquivalent vehicle number by wagon detector in time is n L=20, T BTo T CEquivalent vehicle number by wagon detector is n j=2, calculate the craspedodrome road saturation flow density k in last cycle j=n L/ L a=20/80=0.25, formation dissipation speed v = L a / ( T B - T G , S 4 ) = 80 / 11 = 7 · 27 m / s , Formation is dissipated fully, again v m = L a / ( T G , C 4 - T C ) = 80 / 19 = 4 · 21 m / s , v m<v has green time more than needed, queue length Q S=L a+ n j/ k j=80+2/0.25=88m; The transition of turning left is T constantly ABe 10:04:38, green light zero hour
Figure BDA00003160787000149
Be 10:04:59, transition is T constantly BBe 10:05:20, do not have transition T constantly C,
Figure BDA00003160787000147
To T BEquivalent vehicle number by wagon detector in time is n L=21, T BExtremely
Figure BDA00003160787000148
Equivalent vehicle number by wagon detector in time is n j=20, the saturation flow density k that turns left of the last cycle of calculating j=n L/ L a=21/80=0.26, queue length Q L>L a+ n j/ k j=80+20/0.26=157m when Effective Green Time finishes, still has formation behind the detecting device, therefore the craspedodrome green light duration T in following cycle S=T S-g Lay=36s-3s=33s, the green light duration of turning left is T L=G Main-T S=80s-33s=47s.
Table 1 begins the timing state of resulting signal lamp from 10:00:00
Period The signal lamp state Duration (s)
10:00:00-10:00:30 Major trunk roads are kept straight on, all red lights of turning left, the subsidiary road green light 30
10:00:31-10:00:57 Major trunk roads craspedodrome green light, the red light of turning left, the subsidiary road red light 27
10:00:58-10:01:12 Major trunk roads craspedodrome red light, the green light of turning left, the subsidiary road red light 15
10:01:13-10:01:27 Major trunk roads are kept straight on, all red lights of turning left, the subsidiary road green light 15
10:01:28-10:01:42 Major trunk roads craspedodrome green light, the red light of turning left, the subsidiary road red light 15
10:01:43-10:02:00 Major trunk roads craspedodrome red light, the green light of turning left, the subsidiary road red light 18
10:02:01-10:02:18 Major trunk roads are kept straight on, all red lights of turning left, the subsidiary road green light 18
10:02:19-10:02:36 Major trunk roads craspedodrome green light, the red light of turning left, the subsidiary road red light 18
10:02:37:10:03:38 Major trunk roads craspedodrome red light, the green light of turning left, the subsidiary road red light 62
10:03:39-10:04:23 Major trunk roads are kept straight on, all red lights of turning left, the subsidiary road green light 45
10:04:24-10:04:58 Major trunk roads craspedodrome green light, the red light of turning left, the subsidiary road red light 35
10:04:59-10:05:44 Major trunk roads craspedodrome red light, the green light of turning left, the subsidiary road red light 45
10:05:45-10:06:26 Major trunk roads are kept straight on, all red lights of turning left, the subsidiary road green light 42
10:06:27-10:06:59 Major trunk roads craspedodrome green light, the red light of turning left, the subsidiary road red light 33
10:07:00-10:07:47 Major trunk roads craspedodrome red light, the green light of turning left, the subsidiary road red light 47

Claims (1)

1. adaptive intersection signal control method is characterized in that this method is carried out according to following steps:
Step 1,1 wagon detector is installed in each track in the crossing, and the distance of vehicle sensors and stop line is designated as L, and each wagon detector is used for gathering the red light in each phase place n cycle and opens the bright moment
Figure FDA00003160786900011
The green light in n cycle opens the bright moment
Figure FDA00003160786900012
The red light in n+1 cycle opens the bright moment
Figure FDA00003160786900013
Holding time t when each vehicle passes through wagon detector o, wagon detector free time t at interval fReach the vehicle number n by detecting device;
Described phase place comprises the phase place of turning left at the craspedodrome phase place at craspedodrome formation place and the formation place of turning left;
One-period is carved into green light when bright for opening from red light and extinguishes constantly note G MinBe minimum green time, note g LayFor the unit green light prolongs or the shortening time, note G MainMaximum total green time for major trunk roads;
Step 2, when the one-period effective green time finishes, wagon detector will detect data transmission and give the back-end data disposal system, analyze the variation of traffic behavior in this cycle, find out the transition moment T of wagon detector eigenstate A, T BAnd T C
T ABe that red light opens bright back vehicle v 1Beginning takies the transition between states moment of wagon detector, T for a long time AConstantly, wagon detector is by vehicle v 1Take for a long time, constantly T ACan be used to determine whether this phase place track exists long vehicle formation;
T BBe that green light opens bright back vehicle v 1Sail out of the transition of wagon detector constantly, green light open bright after, T BConstantly, the vehicle before the stop line sails out of the crossing with saturation volume rate successively, but is 0 by the vehicle number of detecting device, at T BAfterwards, by wagon detector, reduce by the holding time of wagon detector and interval time with the current flow rate of maximum for vehicle;
T CBe last car v in the vehicle queue formation 2By the transition between states moment of wagon detector, determine last car of formation v 2Foundation be: in the queue queue continuously during the vehicle passing detection device interval time less, when a car and its Following Car pass through detecting device interval greater than threshold value A, illustrate in not Queue here of the Following Car formation;
The value that obtains threshold value A according to present traffic study data statistics result is 3s;
Step 3, adopt from
Figure FDA00003160786900021
The time be carved into T APass through the vehicle number n of detecting device in time period constantly LCalculate the vehicle density k under the saturated conditions j, k then j=n L/ L; Employing from The time be carved into T BTime period and stop line calculate the dissipation speed v of vehicle queue formation to the distance L between wagon detector constantly, then
Figure FDA00003160786900023
And then pass through T BAnd T CPass through the vehicle number n of detecting device in time period jCalculate the maximum queue length Q in this cycle;
(1) if there is not T AConstantly, Q<L then;
(2) if there is T AConstantly, then further determine T CConstantly;
(a) if there is T CConstantly, Q=L+n then j/ k j
(b) if there is not T CConstantly, then red light of following cycle is opened the bright moment
Figure FDA00003160786900026
As transition moment T C, statistics T BWith
Figure FDA00003160786900027
Pass through the vehicle number n of detecting device in time period j, Q>L+n then j/ k j
Step 4, the signal control strategy of adjustment major trunk roads, detailed process is as described below:
Calculate craspedodrome queue length Q according to the method for step 3 respectively SWith the queue length Q that turns left L
(1) if the length of two formations all less than L, then turn left phase time and craspedodrome phase time all distribute minimum green time, i.e. T G1=T G2=G Min
(2) if having only a certain queue length less than L, the minimum green time T of the phase assignments at this formation place then G1=G Min, another length needs then to determine more than or equal to the formation of L whether this formation exists transition T constantly C:
(a) if there is transition T constantly C, then according to T CWith Calculate interior vehicle of this time interval by the required minimum speed v of L m, then have
Figure FDA00003160786900025
Determine whether to exist green light to have more than needed the time:
A) if v m<v then exists green light to have more than needed the time, with the former green light duration green light change time g of the unit of cutting Lay, i.e. T G2=T G2-g Lay
B) if v m〉=v does not then exist green light to have more than needed the time, i.e. expression has residual queue, if T G2<G Main-T G1, then add g at former green light duration Lay, i.e. T G2=T G2+ g Lay, if T G2=G Main-T G1, T then G2=T G2
(b) if there is not transition T constantly C, when then being illustrated in the green time end, the detecting device upstream also has queue queue, and then the green light duration of this phase place is T G2=G Main-T G1
(3) if, then determining individual queue all more than or equal to L, the queue length of two formations whether has transition T constantly C, then have:
(a) if there is T constantly in the both C, determine then whether each phase place has green time more than needed, according to the strategy (a) of step (2) carry out green light prolong or reduce green light duration T G1And T G2, wherein: T G1+ T G2≤ G Main
(b) if there is T constantly in a formation C, there is not T constantly in another C, then have T constantly CPhase place according to the strategy (a) of step (2) carry out green light prolong or reduce green light duration T G1, do not have T constantly CThe green time of phase place be T G2=G Main-T G1
(c) if neither there is transition T constantly C, then according to Q SAnd Q LLength ratio distribute the green time of turn left phase place and craspedodrome phase place, namely T L = G main × Q L Q L + Q S T S = G main × Q S Q L + Q S
Wherein: T LBe the green light duration of phase place of turning left, T SBe the green light duration of craspedodrome phase place, Q SBe craspedodrome phase place queue length, Q LIt is the phase place queue length of turning left.
Step 5, the signal control strategy of adjustment subsidiary road, detailed process is as described below:
Subsidiary road is kept straight on and is turned left and controlled by a phase place, note G MinorBe the maximum green time of subsidiary road, G MinBe minimum green time, g LayFor the unit green light prolongs or the shortening time, at first calculate the queue length Q of subsidiary road according to the method for step 3;
(1) if queue length Q<L then distributes Minimum Green Time T g=G Min
(2) if queue length Q 〉=L then determines whether to exist transition T constantly C, then have:
(a) if there is transition T constantly C, then according to T CWith
Figure FDA00003160786900041
Calculate interior vehicle of this time interval by the required minimum speed v of L m, then have Determine whether to exist green light to have more than needed the time:
A) if v m<v then exists green light have more than needed time, then T g=T g-g Lay
B) if v m〉=v does not then exist green light to have more than needed the time, i.e. expression has residual queue, if T g<G Minor, T then g=T g+ g Lay, if T g=G Minor, T then g=T g
(b) if there is not transition T constantly C, T then g=G Minor
CN201310167669.5A 2013-05-08 2013-05-08 Self-adaptive intersection signal control method Expired - Fee Related CN103280113B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310167669.5A CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310167669.5A CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Publications (2)

Publication Number Publication Date
CN103280113A true CN103280113A (en) 2013-09-04
CN103280113B CN103280113B (en) 2014-12-24

Family

ID=49062615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310167669.5A Expired - Fee Related CN103280113B (en) 2013-05-08 2013-05-08 Self-adaptive intersection signal control method

Country Status (1)

Country Link
CN (1) CN103280113B (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605358A (en) * 2013-11-22 2014-02-26 公安部交通管理科学研究所 Function online simulation testing device of road traffic signal control machine
CN103810868A (en) * 2014-02-25 2014-05-21 安徽科力信息产业有限责任公司 Traffic overflow inhibition method based on high altitude video information
CN103927866A (en) * 2013-12-31 2014-07-16 北京航空航天大学 Method for forecasting traffic light waiting time of vehicle based on GPS
CN104637317A (en) * 2015-01-23 2015-05-20 同济大学 Intersection inductive signal control method based on real-time vehicle trajectory
CN104700633A (en) * 2015-03-12 2015-06-10 深圳市金迈高智能科技有限公司 Intelligent traffic control method and device
CN104778848A (en) * 2015-04-30 2015-07-15 安徽超远信息技术有限公司 Traffic signal optimal control method for road intersection vehicle coordinated optimization state
CN104778845A (en) * 2014-12-29 2015-07-15 河南科技学院 Multi-phase-jump and vehicle full-dynamic induction traffic control method
CN104794910A (en) * 2015-04-27 2015-07-22 江苏物联网研究发展中心 Queuing length based fully-actuated signal control method with phase jumping function
CN105427629A (en) * 2015-11-16 2016-03-23 邹谋炎 Implementing technology for road traffic light adaptive control
CN105788302A (en) * 2016-04-08 2016-07-20 华北电力大学(保定) Dual-target-optimization-based dynamic timing method for urban traffic signal lamp
CN106128128A (en) * 2016-07-21 2016-11-16 哈尔滨工业大学 The traffic signal control system of self adaptation intersection traffic stream random fluctuation and method
CN106485928A (en) * 2016-10-18 2017-03-08 郑州云海信息技术有限公司 A kind of method for controlling traffic signal lights, control terminal, business platform and system
CN107240252A (en) * 2017-05-05 2017-10-10 长安大学 A kind of active vehicle dispatching method of intersection
CN107886725A (en) * 2017-11-16 2018-04-06 山东交通学院 Queue length computational methods and device based on bayonet socket data
CN108288379A (en) * 2018-02-01 2018-07-17 迈锐数据(北京)有限公司 A kind of processing method and processing device of traffic data
CN108447275A (en) * 2018-04-25 2018-08-24 安徽超远信息技术有限公司 Incude the traffic signal optimization control method being combined based on fleet's induction and vehicle
CN108682168A (en) * 2018-05-15 2018-10-19 哈尔滨工业大学 A kind of speed guiding system and method reducing signal intersection parking
CN108831163A (en) * 2018-03-22 2018-11-16 南京推推兔信息科技有限公司 A kind of trunk roads synergistic signal machine control method based on earth magnetism
CN108922204A (en) * 2018-05-10 2018-11-30 华南理工大学 A kind of Cell Transmission Model improved method considering integrative design intersection
CN109637141A (en) * 2019-01-14 2019-04-16 杭州电子科技大学 A kind of dynamic timing method for controlling traffic signal lights based on breadth-first search
CN109979191A (en) * 2017-12-28 2019-07-05 杭州海康威视系统技术有限公司 Traffic signal control method, device, electronic equipment and computer readable storage medium
CN110047299A (en) * 2019-04-10 2019-07-23 合肥学院 Intersection automobile traffic signal dynamics concocting method
CN111028519A (en) * 2019-12-28 2020-04-17 江苏航天大为科技股份有限公司 Self-adaptive control method based on video flow detector
CN111108536A (en) * 2017-07-25 2020-05-05 红狐I.D.有限公司 Apparatus and method for evaluating vehicles between straddle lanes
CN111396224A (en) * 2019-01-03 2020-07-10 奥迪股份公司 Method, apparatus and storage medium for controlling shutdown and startup of vehicle engine
CN111429721A (en) * 2020-03-27 2020-07-17 江苏智通交通科技有限公司 Intersection traffic signal scheme optimization method based on queuing dissipation time
CN111612669A (en) * 2020-04-24 2020-09-01 浙江大华技术股份有限公司 Lane queuing length estimation method, system, computer device and storage medium
CN111951576A (en) * 2020-08-17 2020-11-17 国为(南京)软件科技有限公司 Traffic light control system based on vehicle identification and method thereof
CN112037507A (en) * 2020-08-10 2020-12-04 东南大学 Supersaturated traffic state trunk line adaptive signal coordination design method and device
CN113516857A (en) * 2021-04-19 2021-10-19 安徽达尔智能控制系统股份有限公司 Intersection signal timing dynamic allocation method and system based on radar monitoring
CN113538943A (en) * 2021-07-19 2021-10-22 昭通亮风台信息科技有限公司 Traffic light control method and system
CN113903166A (en) * 2020-07-06 2022-01-07 奥迪股份公司 Fleet driving assistance system, corresponding method and computer-readable storage medium
CN114694393A (en) * 2022-03-24 2022-07-01 浙江大华技术股份有限公司 Phase duration adjusting method and device, storage medium and electronic equipment
CN117351742A (en) * 2023-11-03 2024-01-05 广东宏畅市政工程有限公司 Traffic light control method and system based on road junction flow detection

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101470965A (en) * 2007-12-26 2009-07-01 奥城同立科技开发(北京)有限公司 Automatic control type traffic light control system
JP2010027074A (en) * 2009-11-02 2010-02-04 Sumitomo Electric Ind Ltd Traffic signal control analysis device
WO2010042973A1 (en) * 2008-10-15 2010-04-22 National Ict Australia Limited Tracking the number of vehicles in a queue
CN101763734A (en) * 2010-01-21 2010-06-30 上海交通大学 Traffic signal light intelligent control system and control method thereof
JP2010211365A (en) * 2009-03-09 2010-09-24 Omron Corp Traffic signal controller
CN101976510A (en) * 2010-10-26 2011-02-16 隋亚刚 Method for optimally controlling crossing vehicle signal under high definition video detection condition
CN102915643A (en) * 2012-08-22 2013-02-06 浙江浙大中控信息技术有限公司 Method and system for calculating green time of each phase of signalized intersection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101470965A (en) * 2007-12-26 2009-07-01 奥城同立科技开发(北京)有限公司 Automatic control type traffic light control system
WO2010042973A1 (en) * 2008-10-15 2010-04-22 National Ict Australia Limited Tracking the number of vehicles in a queue
JP2010211365A (en) * 2009-03-09 2010-09-24 Omron Corp Traffic signal controller
JP2010027074A (en) * 2009-11-02 2010-02-04 Sumitomo Electric Ind Ltd Traffic signal control analysis device
CN101763734A (en) * 2010-01-21 2010-06-30 上海交通大学 Traffic signal light intelligent control system and control method thereof
CN101976510A (en) * 2010-10-26 2011-02-16 隋亚刚 Method for optimally controlling crossing vehicle signal under high definition video detection condition
CN102915643A (en) * 2012-08-22 2013-02-06 浙江浙大中控信息技术有限公司 Method and system for calculating green time of each phase of signalized intersection

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
代磊磊,等: "饱和信号交叉口排队长度预测", 《吉林大学学报(工学版)》 *
李明利,等: "基于排队状态的单点交叉口动态信号配时算法", 《交通运输工程学报》 *

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605358B (en) * 2013-11-22 2016-08-31 公安部交通管理科学研究所 Road traffic signal controller function in-circuit emulation test device
CN103605358A (en) * 2013-11-22 2014-02-26 公安部交通管理科学研究所 Function online simulation testing device of road traffic signal control machine
CN103927866B (en) * 2013-12-31 2016-02-10 北京航空航天大学 Traffic light time Forecasting Methodology waited for by vehicle based on GPS
CN103927866A (en) * 2013-12-31 2014-07-16 北京航空航天大学 Method for forecasting traffic light waiting time of vehicle based on GPS
CN103810868B (en) * 2014-02-25 2016-04-27 安徽科力信息产业有限责任公司 A kind of traffic overflow suppressing method based on high-altitude video information
CN103810868A (en) * 2014-02-25 2014-05-21 安徽科力信息产业有限责任公司 Traffic overflow inhibition method based on high altitude video information
CN104778845A (en) * 2014-12-29 2015-07-15 河南科技学院 Multi-phase-jump and vehicle full-dynamic induction traffic control method
CN104778845B (en) * 2014-12-29 2017-05-03 河南科技学院 Multi-phase-jump and vehicle full-dynamic induction traffic control method
CN104637317A (en) * 2015-01-23 2015-05-20 同济大学 Intersection inductive signal control method based on real-time vehicle trajectory
CN104700633A (en) * 2015-03-12 2015-06-10 深圳市金迈高智能科技有限公司 Intelligent traffic control method and device
CN104794910A (en) * 2015-04-27 2015-07-22 江苏物联网研究发展中心 Queuing length based fully-actuated signal control method with phase jumping function
CN104778848A (en) * 2015-04-30 2015-07-15 安徽超远信息技术有限公司 Traffic signal optimal control method for road intersection vehicle coordinated optimization state
CN105427629A (en) * 2015-11-16 2016-03-23 邹谋炎 Implementing technology for road traffic light adaptive control
CN105788302A (en) * 2016-04-08 2016-07-20 华北电力大学(保定) Dual-target-optimization-based dynamic timing method for urban traffic signal lamp
CN105788302B (en) * 2016-04-08 2018-05-04 华北电力大学(保定) A kind of city traffic signal lamp dynamic timing method of biobjective scheduling
CN106128128B (en) * 2016-07-21 2018-04-03 哈尔滨工业大学 The traffic signal control method of adaptive intersection traffic stream random fluctuation
CN106128128A (en) * 2016-07-21 2016-11-16 哈尔滨工业大学 The traffic signal control system of self adaptation intersection traffic stream random fluctuation and method
CN106485928A (en) * 2016-10-18 2017-03-08 郑州云海信息技术有限公司 A kind of method for controlling traffic signal lights, control terminal, business platform and system
CN107240252A (en) * 2017-05-05 2017-10-10 长安大学 A kind of active vehicle dispatching method of intersection
CN107240252B (en) * 2017-05-05 2019-10-11 长安大学 A kind of active vehicle dispatching method of intersection
CN111108536A (en) * 2017-07-25 2020-05-05 红狐I.D.有限公司 Apparatus and method for evaluating vehicles between straddle lanes
CN111108536B (en) * 2017-07-25 2022-08-09 红狐I.D.有限公司 Apparatus and method for evaluating vehicles between straddle lanes
CN107886725A (en) * 2017-11-16 2018-04-06 山东交通学院 Queue length computational methods and device based on bayonet socket data
CN109979191A (en) * 2017-12-28 2019-07-05 杭州海康威视系统技术有限公司 Traffic signal control method, device, electronic equipment and computer readable storage medium
CN109979191B (en) * 2017-12-28 2022-02-11 杭州海康威视系统技术有限公司 Traffic signal control method, traffic signal control device, electronic equipment and computer-readable storage medium
CN108288379A (en) * 2018-02-01 2018-07-17 迈锐数据(北京)有限公司 A kind of processing method and processing device of traffic data
CN108831163A (en) * 2018-03-22 2018-11-16 南京推推兔信息科技有限公司 A kind of trunk roads synergistic signal machine control method based on earth magnetism
CN108831163B (en) * 2018-03-22 2021-06-25 宁波崛马信息科技有限公司 Main road cooperative annunciator control method based on geomagnetism
CN108447275A (en) * 2018-04-25 2018-08-24 安徽超远信息技术有限公司 Incude the traffic signal optimization control method being combined based on fleet's induction and vehicle
CN108922204A (en) * 2018-05-10 2018-11-30 华南理工大学 A kind of Cell Transmission Model improved method considering integrative design intersection
CN108682168A (en) * 2018-05-15 2018-10-19 哈尔滨工业大学 A kind of speed guiding system and method reducing signal intersection parking
CN108682168B (en) * 2018-05-15 2020-09-22 哈尔滨工业大学 Vehicle speed guiding system and method for reducing stopping at signalized intersection
CN111396224A (en) * 2019-01-03 2020-07-10 奥迪股份公司 Method, apparatus and storage medium for controlling shutdown and startup of vehicle engine
CN109637141A (en) * 2019-01-14 2019-04-16 杭州电子科技大学 A kind of dynamic timing method for controlling traffic signal lights based on breadth-first search
CN110047299A (en) * 2019-04-10 2019-07-23 合肥学院 Intersection automobile traffic signal dynamics concocting method
CN111028519A (en) * 2019-12-28 2020-04-17 江苏航天大为科技股份有限公司 Self-adaptive control method based on video flow detector
CN111429721A (en) * 2020-03-27 2020-07-17 江苏智通交通科技有限公司 Intersection traffic signal scheme optimization method based on queuing dissipation time
CN111612669A (en) * 2020-04-24 2020-09-01 浙江大华技术股份有限公司 Lane queuing length estimation method, system, computer device and storage medium
CN111612669B (en) * 2020-04-24 2023-04-25 浙江大华技术股份有限公司 Lane queuing length estimation method, system, computer device and storage medium
CN113903166A (en) * 2020-07-06 2022-01-07 奥迪股份公司 Fleet driving assistance system, corresponding method and computer-readable storage medium
CN112037507A (en) * 2020-08-10 2020-12-04 东南大学 Supersaturated traffic state trunk line adaptive signal coordination design method and device
CN111951576A (en) * 2020-08-17 2020-11-17 国为(南京)软件科技有限公司 Traffic light control system based on vehicle identification and method thereof
CN113516857A (en) * 2021-04-19 2021-10-19 安徽达尔智能控制系统股份有限公司 Intersection signal timing dynamic allocation method and system based on radar monitoring
CN113538943A (en) * 2021-07-19 2021-10-22 昭通亮风台信息科技有限公司 Traffic light control method and system
CN114694393A (en) * 2022-03-24 2022-07-01 浙江大华技术股份有限公司 Phase duration adjusting method and device, storage medium and electronic equipment
CN114694393B (en) * 2022-03-24 2023-11-07 浙江大华技术股份有限公司 Method and device for adjusting phase duration, storage medium and electronic equipment
CN117351742A (en) * 2023-11-03 2024-01-05 广东宏畅市政工程有限公司 Traffic light control method and system based on road junction flow detection

Also Published As

Publication number Publication date
CN103280113B (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN103280113B (en) Self-adaptive intersection signal control method
CN103559795B (en) Multi-strategy and multi-object self-adaptation traffic control method
CN106652493B (en) A kind of intersection signal optimal control method under car networking environment
CN109544945B (en) Regional control phase timing optimization method based on lane saturation
CN104103180B (en) City expressway enters ring road and main line synergistic signal control system and method
CN110136455B (en) Traffic signal lamp timing method
CN103473935B (en) Crossing traffic based on sensor detector blocks up judgement and control method and system
CN104332058B (en) A kind of Intelligent traffic light control method and system
CN103186984B (en) Method for triggering transformation of steering function of variable guidance lanes at urban intersections
CN104778845A (en) Multi-phase-jump and vehicle full-dynamic induction traffic control method
CN104299432A (en) Supersaturated intersection signal lamp control method and device
CN107730886A (en) Dynamic optimization method for traffic signals at urban intersections in Internet of vehicles environment
CN105679032B (en) A kind of traffic control sub-area division method under urban traffic flow hypersaturated state
CN104282162A (en) Adaptive intersection signal control method based on real-time vehicle track
CN105225500A (en) A kind of traffic control aid decision-making method and device
CN104835335A (en) Road network traffic optimization control system and method
CN103236164B (en) Vehicle controlling method for guaranteeing public transport vehicle prior passing
CN105489034A (en) Main line full traffic control system and method
CN103680157A (en) Vehicle queuing overflow anticipation method for city bottleneck road section
CN103258436A (en) Method for determining length of variable guide lane for signal control intersection approach
CN106469507A (en) Dynamic green wave system and method automatically adjusted based on Real-Time Traffic Volume data
CN104916142A (en) Adaptive intersection traffic signal control method of trunk road priority
CN110889967B (en) Overflow risk balance signal control optimization method based on main road segmentation
CN104952263A (en) Emergency vehicle priority signal control method based on phase difference progressive and circulatory coordination
CN109377751A (en) A kind of non-separation guardrail control system of Intelligent road machine and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20200508