CN103277085B - 酸化作业用绕组传感器 - Google Patents

酸化作业用绕组传感器 Download PDF

Info

Publication number
CN103277085B
CN103277085B CN201310220432.9A CN201310220432A CN103277085B CN 103277085 B CN103277085 B CN 103277085B CN 201310220432 A CN201310220432 A CN 201310220432A CN 103277085 B CN103277085 B CN 103277085B
Authority
CN
China
Prior art keywords
winding
central tube
urceolus
terminations
outer barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310220432.9A
Other languages
English (en)
Other versions
CN103277085A (zh
Inventor
冯强
党伟
王瑶
贾红战
程智远
何志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201310220432.9A priority Critical patent/CN103277085B/zh
Publication of CN103277085A publication Critical patent/CN103277085A/zh
Application granted granted Critical
Publication of CN103277085B publication Critical patent/CN103277085B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasket Seals (AREA)
  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)

Abstract

本发明公开了一种酸化作业用绕组传感器,其安装在酸化管线中,包括依次螺纹连接且接口处密封的上接头、外筒和下接头,在所述外筒内、上接头和下接头之间安装有一中心管,所述中心管采用工程陶瓷中心管,在所述中心管的外周面上均布有多个周向槽和至少一个轴向槽,绕组经所述周向槽和轴向槽绕制在所述中心管上,在所述外筒上与所述绕组的两个端头相对应的位置处形成有过线孔,所述绕组的两个端头在所述过线孔处分别与一外接导线连接,在所述过线孔内、所述中心管与外筒之间的间隙中以及所述周向槽、轴向槽与绕组的间隙中均填充有耐酸填料。该传感器耐压、抗酸蚀,有效保证了该传感器的感应灵敏度。

Description

酸化作业用绕组传感器
技术领域
本发明涉及油气井井下工具领域,特别是涉及一种酸化作业用绕组传感器。
技术背景
随着国内各油田逐步进入勘探开发的中后期,尤其是必须进行储层改造的低渗透储层以及致密气、致密油和页岩气的勘探开发的大量增加,各油田对储层改造技术的需要越来越大。酸化改造是油层改造常用的技术之一,它是通过酸液溶蚀岩石孔隙中的堵塞物或基岩本身的某些矿物成份,从而改善岩石内部孔道的连通性,解除地层的污染,从而提高油水井的生产能力。
酸化技术正在朝着智能化控制的方向发展,通过向流体内加入信号介质并对其进行检测,可以实现对过程中流体的监控或控制酸化工作设备。其中对酸化流体中信号介质的检测传感技术是酸化技术智能化发展方向的重要技术之一,该技术要求该传感器的测试范围覆盖所有经过的流体。但酸化施工中管内流体压力较高,且对传感线圈及组件腐蚀性强,因此目前的传感器不具备在该工况下耐压、抗腐蚀的工作能力。
发明内容
为了解决上述技术问题,本发明提供一种耐压、抗腐蚀的酸化作业用绕组传感器。
为此,本发明的技术方案如下:
一种酸化作业用绕组传感器,其安装在酸化管线中,包括依次螺纹连接且接口处密封的上接头、外筒和下接头,在所述外筒内、上接头和下接头之间安装有一中心管,所述中心管采用工程陶瓷中心管,在所述中心管的外周面上均布有多个周向槽和至少一个轴向槽,绕组经所述周向槽和轴向槽绕制在所述中心管上,在所述外筒上与所述绕组的两个端头相对应的位置处形成有过线孔,所述绕组的两个端头在所述过线孔处分别与一外接导线连接,在所述过线孔内、所述中心管与外筒之间的间隙中以及所述周向槽、轴向槽与绕组的间隙中均填充有耐酸填料。
优选的是,所述绕组的两个端头位于同一侧,这样在外筒上设置一个过线孔即可。另外,绕组的两个端头分别与相应的外接导线焊接在一起,这样连接更牢固。
优选的是,所述中心管与外筒之间为过盈配合,这样密封效果更好。
在所述外筒的内壁上与所述上、下接头端口附近的外端面对应的位置处设置有密封圈槽,在所述密封圈槽内安装有密封圈,上下接头与外筒的内壁之间通过密封圈密封。
本发明的酸化作业用绕组传感器可以接在酸化管线中,用于检测酸化施工中流体内的感应信号。高性能的工程陶瓷中心管具有耐压、抗酸蚀的特点,不仅为绕组提供了第一层保护,还能承受一定压力;耐酸填料对绕组提供了第二层保护,从而有效保证了该传感器的感应灵敏度。
附图说明
图1是本发明的酸化作业用绕组传感器的结构示意图;
图2是图1中中心管的结构示意图。
具体实施方式
下面结合附图对本发明的酸化作业用绕组传感器的结构进行详细说明。
如图1和图2所示,本发明的酸化作业用绕组传感器包括:依次螺纹连接且接口处密封的上接头1、外筒2和下接头7,上接头1和下接头7的一端均为连接管串的密封扣,另一端均为连接外筒2的螺纹扣。在外筒2内、上接头1和下接头7之间安装有中心管3,在中心管3的外周面上均布有多个周向槽a和至少一个轴向槽b。轴向槽b的数量可以根据具体测试需要而定,可以设置一个,也可以设置2个或多个。在图2所示的实施例中,在中心管3的外周面上等间距设置了两个轴向槽b。
绕组5经周向槽a和轴向槽b绕制在中心管3上。绕组5的绕制方式可以根据测试需要而定,可以以普通方式绕制,也可以按一定方式绕制;绕组5的两个端头可以位于同一侧,也可以位于两侧。在图1所示的实施例中,将两个端头设置在了同一侧。在外筒2上与绕组5的两个端头相对应的位置处形成有过线孔8,绕组5的两个端头在所述过线孔处分别与一外接导线4连接,最好是焊接在一起。在过线孔8内、中心管3与外筒2之间的间隙中以及周向槽a、轴向槽b与绕组5的间隙中均填充有耐酸填料,例如环氧树脂胶,以保护绕组和外接导线,防止其受腐蚀。
由于绕组5的两个端头位于同一侧,这样在外筒上设置一个过线孔即可。另外,中心管3与外筒2之间为过盈配合,通过盈热装工艺装配在一起,提高了密封性。
在所述外筒2的内壁上与上、下接头1、7端口附近的外端面对应的位置处设置有密封圈槽,在密封圈槽内安装有密封圈,以防止腐蚀性流体泄漏。
该传感器的组装过程如下:
1、经周向槽a和轴向槽b将绕组5缠绕在中心管3上,留出绕组5的两个端头,然后用耐酸填料将周向槽a和轴向槽b填平并待其凝固;
2、将组装好的中心管3装入外筒2内,通过过线孔8焊接外接导线4与绕组5;
3、在中心管2内的密封槽内安装密封圈8,然后将上接头1与下接头7安装在外筒2上;
4、通过外筒2上的过线孔向中心管3与外筒2的间隙内注入耐酸填料并待其凝固。
中心管3外壁与外筒2内壁要求较高的加工精度与较低的粗糙度,中心管3外径比外筒2内径略大,二者采用过盈热装工艺装配,即安装时先将外筒2加热使其内孔膨胀后将中心管3装入,待其冷却后装配结束。该过盈热装工艺可有效隔绝腐蚀流体,并能承受一定的密封压力。中心管3外壁上的周向槽之间的凸起结构可提高绕组5位置中心管3的抗压强度。
使用时将该传感器两端分别接入酸化管线中,将两根外接导线接入测试仪器,即可实现对经过的流体进行检测。

Claims (5)

1.一种酸化作业用绕组传感器,其安装在酸化管线中,包括依次螺纹连接且接口处密封的上接头(1)、外筒(2)和下接头(7),在所述外筒(2)内、上接头(1)和下接头(7)之间安装有一中心管(3),其特征在于:所述中心管(3)为工程陶瓷中心管,在所述中心管(3)的外周面上均布有多个周向槽(a)和至少一个轴向槽(b),绕组(5)经所述周向槽(a)和轴向槽(b)绕制在所述中心管(3)上,在所述外筒(2)上与所述绕组(5)的两个端头相对应的位置处形成有过线孔(8),所述绕组(5)的两个端头在所述过线孔处分别与一外接导线(4)连接,在所述过线孔(8)内、所述中心管(3)与外筒(2)之间的间隙中以及所述周向槽(a)、轴向槽(b)与绕组(5)的间隙中均填充有耐酸填料。
2.根据权利要求1所述的酸化作业用绕组传感器,其特征在于:所述绕组(5)的两个端头位于同一侧。
3.根据权利要求1所述的酸化作业用绕组传感器,其特征在于:所述中心管(3)与外筒(2)之间为过盈配合。
4.根据权利要求1所述的酸化作业用绕组传感器,其特征在于:在所述外筒(2)的内壁上与所述上、下接头(1、7)端口附近的外端面对应的位置处设置有密封圈槽,在所述密封圈槽内安装有密封圈。
5.根据权利要求1所述的酸化作业用绕组传感器,其特征在于:所述绕组(5)的两个端头分别与相应的外接导线(4)焊接在一起。
CN201310220432.9A 2013-06-05 2013-06-05 酸化作业用绕组传感器 Active CN103277085B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310220432.9A CN103277085B (zh) 2013-06-05 2013-06-05 酸化作业用绕组传感器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310220432.9A CN103277085B (zh) 2013-06-05 2013-06-05 酸化作业用绕组传感器

Publications (2)

Publication Number Publication Date
CN103277085A CN103277085A (zh) 2013-09-04
CN103277085B true CN103277085B (zh) 2015-07-22

Family

ID=49059689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310220432.9A Active CN103277085B (zh) 2013-06-05 2013-06-05 酸化作业用绕组传感器

Country Status (1)

Country Link
CN (1) CN103277085B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2228976Y (zh) * 1994-09-02 1996-06-12 华北石油管理局油气井测试公司 直读电子压力计携载装置
CN2493738Y (zh) * 2001-07-26 2002-05-29 中国石油天然气股份有限公司勘探开发研究院 同心管式泡沫发生器
GB2444060A (en) * 2006-11-21 2008-05-28 Swelltec Ltd Swellable downhole apparatus
CN102587882A (zh) * 2012-03-18 2012-07-18 荆州市赛瑞能源技术有限公司 可回收式一趟管柱压裂酸化完井工艺及其工具
CN203321496U (zh) * 2013-06-05 2013-12-04 中国石油集团渤海钻探工程有限公司 酸化作业用绕组传感器

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7036363B2 (en) * 2003-07-03 2006-05-02 Pathfinder Energy Services, Inc. Acoustic sensor for downhole measurement tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2228976Y (zh) * 1994-09-02 1996-06-12 华北石油管理局油气井测试公司 直读电子压力计携载装置
CN2493738Y (zh) * 2001-07-26 2002-05-29 中国石油天然气股份有限公司勘探开发研究院 同心管式泡沫发生器
GB2444060A (en) * 2006-11-21 2008-05-28 Swelltec Ltd Swellable downhole apparatus
CN102587882A (zh) * 2012-03-18 2012-07-18 荆州市赛瑞能源技术有限公司 可回收式一趟管柱压裂酸化完井工艺及其工具
CN203321496U (zh) * 2013-06-05 2013-12-04 中国石油集团渤海钻探工程有限公司 酸化作业用绕组传感器

Also Published As

Publication number Publication date
CN103277085A (zh) 2013-09-04

Similar Documents

Publication Publication Date Title
CN101849079B (zh) 用于金属管的包括至少一个带端部唇部的螺纹元件的螺纹连接件
CA2804367C (en) Electrical wiring for drill pipe, casing, and tubing
CN101673899B (zh) 耐高压密封连接器及其转接插座
US8726743B2 (en) Shoulder yielding detection during tubular makeup
CN202928792U (zh) 多功能封隔器试验装置
CN103696705B (zh) 偏梯形特殊扣螺纹石油套管螺纹过盈量控制方法
US8783369B2 (en) Downhole pressure barrier and method for communication lines
CN111878069A (zh) 一种复合连续管缆油水井套管找漏系统及方法
CN203321496U (zh) 酸化作业用绕组传感器
CN103277085B (zh) 酸化作业用绕组传感器
CN209929568U (zh) 一种水密型压电超声波检测探头-电缆连接结构
CN204854987U (zh) 一种浅层地温监测传感器串
CN111963153A (zh) 一种复合连续管缆水平井出水段测试系统及方法
CN108005587B (zh) 一种三通道连续柔性复合管连接接头及安装方法
CN105510211A (zh) 水下跨接管的在线监测装置
CN203321498U (zh) 压裂作业用绕组传感器
CN207863906U (zh) 一种台阶镶嵌式金属密封芯轴式悬挂器
CN201867287U (zh) 一种管线中的管件螺纹密封检测装置
CN105387980A (zh) 一种套管螺纹气密封性外检测装置
CN205968826U (zh) 一种lwd井下仪器密封接头拉拔器
CN205778688U (zh) 火烧吞吐/火驱井套管头
CN102305028B (zh) 高密封性耐高压双导龙头
CN211549639U (zh) 一种层间隔离穿越密封装置
CN204609869U (zh) 地质钻探用井温探管
CN212898470U (zh) 一种随钻测漏装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210203

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106, Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.