CN103263791A CN2013102205478A CN201310220547A CN103263791A CN 103263791 A CN103263791 A CN 103263791A CN 2013102205478 A CN2013102205478 A CN 2013102205478A CN 201310220547 A CN201310220547 A CN 201310220547A CN 103263791 A CN103263791 A CN 103263791A
Authority
CN
China
Prior art keywords
chain
plate
refuting
bearing pin
refute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102205478A
Other languages
Chinese (zh)
Other versions
CN103263791B (en
Inventor
黄居森
黄文礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310220547.8A priority Critical patent/CN103263791B/en
Publication of CN103263791A publication Critical patent/CN103263791A/en
Application granted granted Critical
Publication of CN103263791B publication Critical patent/CN103263791B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a method of chain fracture fault protection and rapid chain connecting of a nonmetal chain plate mud scraper. The method comprises the steps that automatic shutdown is performed after a detection probe arranged 0.1-3m behind a power delivery cut-in point of a power wheel rapidly detects a chain fracture fault, and then rapid chain connecting recovery running is performed. A temporary operating table is arranged on a pool surface; first barb joints or second barb joints are respectively arranged at the two ends of a specifically designed connecting chain; a shaft head connecting method or a shaft sleeve connecting method can be adopted; and an operator clamps the barb joints of the connecting chain by an operating rod on a shaft head or a shaft sleeve at a position where a front scraper and a rear scraper in chain fracture intervals are connected with a transmission chain to accomplish temporary repair, then starts the mud scraper until the chain fracture interval run to the pool surface, and finally performs maintenance recovery on the pool surface. The method is simple to operate, and can solve the problems that secondary sewage pollution is caused and the maintenance time is long due to the fact that sewage in a pool is required to be discharged and then chain connecting is performed at the pool bottom in the prior art.

Description

Nonmetal carrier bar mud scraper chain rupture error protection reaches the method for refuting chain fast
Technical field
The invention belongs to solution and will mainly rely on the nonmetal carrier bar mud scraper of equipment of import in the key technology of safety and application facet at present, be specifically related to the chain rupture error protection and reach the method for refuting chain fast.
Background technology
Over year, the nonmetal carrier bar mud scraper of import is widely used at China's water treatment field surplus in the of nearly ten.This nonmetal carrier bar mud scraper is to be made of scraper plate, chain, sprocket wheel and motor etc., and wherein most of parts are by the nonmetallic materials manufacturing, so it has the performance of light weight and erosion resistant.Nonmetal carrier bar mud scraper is applied in the square type horizontal sedimentation tank of the dark 4.5m of the wide 8m* of long 50m* usually, the two ends that scraper plate are about 7.8m are installed in respectively on the driving chain that is layed in the sedimentation basin both sides, drive chain by power chain, the scraper plate that makes spacing be about 3m constantly is transported to the mud at the bottom of the pond in the spoil disposal ditch, the scum silica frost of pond face is struck off in the skimming pipe discharge (as shown in Figure 1).But the chain rupture fault can take place in the chain of this mud scraper unavoidably, and its reason is relevant with the device structure characteristics with nonmetal chain characteristic:
Nonmetal chain characteristic
1, because selecting non-metallic material difference and manufacturing forming process difference thereof for use, can there be indivedual chain links or bearing pin bubble to occur in the local area unavoidably, influence quality and fluff because imbibition makes the elasticity of chain closed-loop after the operation with dropping in the water, break or break chain easily.
2, chain normally tensile strength is big and compression strength is little.Such as the chain link of the U.S.-HS730 of company type fiberglass after testing the maximum Fracture Force of its tensile strength be 8.5 tons, and the maximum Fracture Force of compression strength only has 0.4 ton.
3, chain be broken chain in aging meeting of later stage because mechanical performance produces relaxation phenomenon.Oneself decays to 7.5 tons to recheck its tensile strength such as HS730 type fiberglass chain link after using 2 years, and finds after 7 years that in operation the fracture of chain link has become to tear shape.
The device structure characteristics
1, the length of chain closed-loop has 100m, and the span between the sprocket wheel is big, causes the linearity of driving chain center line overproof during installation easily, has influenced the normal engagement of chain and sprocket wheel and chain is broken.When forward and backward changed course sprocket wheel 4 and 3 plane verticality deviation at the bottom of the hypothesis pond are 1 when spending, deviate=the 50000*sin1/cos1=871mm of the linearity of driving chain center line then, and sprocket wheel thickness is 31mm, the chain drum width is 50mm, its deviate has just substantially exceeded design permissible value (50 1 31)=19mm, even if chain is to flexibly connect normal engagement that also cannot say for sure to demonstrate,prove chain and sprocket wheel.
2, the wear extent increase of the axle sleeve (nylon) that cooperates with spool (stainless steel 316) of changed course sprocket wheel can cause the beat amount of sprocket wheel to increase thereupon, can break chain easily. and when the beat amount surpasses 19mm, mud scraper just takes off chain or chain rupture at once after startup, can't move fully.
When chain when the chain rupture fault takes place at the bottom of the pond; cause all torsional deformations or fracture of all scraper plates because can not in time shutting down; the solution of existing fault is: refute chain at the bottom of allowing maintenance mans fall the pond again after the sewage in the pond is all discharged; the sewage that this method is discharged can cause secondary pollution; and water discharge time is long; influence is produced and is reduced equipment efficiency of usage, and operation inconvenience.60 of a certain company of the Guangdong purification of water quality factory import U.S. nonmetal carrier bar mud scrapers for example, the length of this nonmetal carrier bar mud scraper is 115m, wide is 8m, dark is 4.5m, when at the beginning of 04, putting into operation, just taken place ten then surplus time chain rupture fault, and all make the destruction of going to wreck property of equipment at every turn, scraper plates all in pond torsional deformation or fracture all, often want two weeks repair time approximately and surplus lose ten ten thousand yuan.Also having 60 equipment of this factory is to be distributed in south, each 12 Da Chi of two districts, north, and each Da Chi is communicated with by 5 Xiao Chi and forms.When chain rupture has taken place a certain equipment, then going back untreated sewage in 5 Xiao Chi all wants simultaneously discharging simultaneously clean, refute chain at the bottom of allowing maintenance mans fall the pond again, the sewage of 20,000 tons (115m*8m*4.5m*5=20700 tons) of so not only having an appointment can cause secondary pollution, and draining simultaneously needs the time long.
Be CN200957311Y " modified mud scraper protective device " as notification number in the prior art; this device can be by adjusting the position of detection probe; make detection probe can fast detecting have the chain rupture fault of nonmetal carrier bar mud scraper; and stop the work of nonmetal carrier bar mud scraper immediately automatically, thereby intact protection equipment.This patent is mainly carried out the chain rupture protection to nonmetal carrier bar mud scraper; stop fault further to enlarge and damage whole equipment; but this patent does not solve the reparation problem after the chain rupture, refutes chain at the bottom of falling the pond after maintenance mans can only adopt existing method for maintaining with sewage discharge in the pond.
Summary of the invention
The objective of the invention is to solve the nonmetal carrier bar mud scraper of existing import in the key technology deficiency of safety and application facet; provide a kind of nonmetal carrier bar mud scraper chain rupture error protection to reach the method for refuting chain fast; can fast detecting have the chain rupture fault; guarantee Plant in good condition; it is easy and simple to handle that this refutes the chain method fast simultaneously; under the situation of not discharging sewage in the pond, the chain rupture chain refuted fast and connect, prevented secondary pollution, and improve and produce and the efficient of maintenance.
Purpose of the present invention can be achieved through the following technical solutions:
Nonmetal carrier bar mud scraper chain rupture error protection reaches the method for refuting chain fast, it is characterized in that: the point of penetration A place that is arranged on the power wheel transferring power after a while 0.1 meter-3 meters locational detection probe fast detecting to the chain rupture fault, and the automatic work that stops mud scraper immediately, equipment is by intact protection and send alarm signal, and can not occur on the bearing pin in scraper plate and the driving chain junction according to chain rupture point and to refute chain fast;
The feature at chain rupture scene mainly contains 5 points:
1, chain rupture point normally occurs at the bottom of the pond in the scraper plate load area.
2, the left and right scraper plate of chain rupture point all can be by intact protection.
3, front scrapping plate can be because having cut off the about 150mm of tractive force inertia reach suddenly, and then scraper plate then can be because moving about 150mm behind the differential operation quilt, and two scraper plates become Eight characters shape.
4, chain rupture point can not occur on the bearing pin in the junction of scraper plate and driving chain, because its oneself formed-individual stressed integral body with coupling (containing triangular supporting frame, base plate, wear-resisting boots, scraper plate etc.), tensile strength is big.This is to select for use the spindle nose (being that spindle nose is refuted connection) in its triangular supporting frame outside or the axle sleeve (being that axle sleeve is refuted connection) of triangular supporting frame inboard to be used as the reason of refuting the power tie point of chain fast, also is the theoretical foundation of refuting the chain technology fast.
5, make an appointment with pool side apart from 600mm scraper plate and driving chain junction.
The step of refuting chain fast is as follows:
Step 1: by claire face power chain after a while the chain sag of position judge chain chain rupture at the bottom of any side pond;
Step 2: adopt two bar detection methods, determine the chain rupture interval at the bottom of the pond, and measure chain rupture length of an interval degree at the bottom of the pond, determine to refute the length of chain;
Step 3: but at the pond face the interim operating platform of left rotation and right rotation is set according to the position of the scraper plate in chain rupture interval, described interim operating platform comprises base plate and guardrail, described interim operating platform is dismountable and be installed in pool side;
Step 4: be respectively equipped with two first barb joints at the two ends of refuting chain, two first barb joints of same end by bearing pin with refute chain and link together, at four first barb joints of refuting chain dismountable control stick is installed, control stick on two first barb joints of same end links together by connecting plate, holds two first barb joints that connecting plate is operated same end;
Step 5: mobile in along the edge of the scraper plate in chain rupture interval to the pond by being operatively connected the first barb joint that plate will refute the chain two ends, after being blocked by the side of the triangular support bracket of the scraper plate in chain rupture interval and driving chain junction or wear-resisting boots, stop;
Step 6: remove the connecting plate on two one control levers of refuting chain one end, be inserted in upper rail plate, the lower guideway plate of two same trajectories at two one control levers, described upper rail plate, lower guideway plate are installed in respectively on the base plate and guardrail on the interim operating platform, then connecting plate is reinstalled on two one control levers and locks, and by the angle of feeler and the interim operating platform of adjustment interim operating platform bottom edge is alignd with the scraper edge of the interval side of chain rupture;
Step 7: adopt spindle nose to refute the method for connecing and to refute on the bearing pin spindle nose outside the triangular support bracket of scraper plate that the first barb joint of chain one end is stuck in the interval side of chain rupture and driving chain junction;
Step 8: remove the connecting plate on two one control levers of refuting the chain other end, repetitive operation step 6 and step 7;
Step 9: start mud scraper, the chain rupture section operation is out of service behind the position after a while to power chain;
Step 10: will arrive power chain and on the face of pond, keep in repair recovery again in the chain rupture interval of position after a while.
The nonmetal carrier bar mud scraper chain rupture error protection that the present invention adopts reaches the method for refuting chain fast; the detection probe of 0.1 meter-3 meters position after a while, point of penetration A place by being arranged on the power wheel transferring power; make the detection probe fast detecting have the chain rupture fault of nonmetal carrier bar mud scraper; and stop the work of nonmetal carrier bar mud scraper automatically immediately; can intact protection scraper plate; and chain rupture point normally occurs at the bottom of the pond in the scraper plate load area; because scraper plate and chain junction (contain the coupling triangular support bracket; base plate; wear-resisting boots etc.) formed-individual stressed integral body; tensile strength is big; chain rupture point can not occur on the bearing pin in the junction, so the power tie point that the present invention adopts bearing pin (axle sleeve) in scraper plate and the chain junction to refute chain is refuted chain fast.The present invention is under the situation of not discharging sewage in the pond, to refute by action bars on the bearing pin spindle nose outside the triangular support bracket of scraper plate that the first barb joint that the chain two ends arrange is stuck in the chain rupture interval and chain junction, realized fast temporarily refuting of chain rupture interval at the bottom of the pond being connect, then the chain rupture section operation is normally repaired to the pond face again, this method is easy and simple to handle, can not take place and raw sewerage discharging in the pond will be caused secondary pollution, and the efficient that has improved maintenance greatly and produced.
Purpose of the present invention can also be achieved through the following technical solutions:
Further scheme of the present invention: described two ends of refuting chain are respectively equipped with two second barb joints, adopt axle sleeve to refute connection and will refute four second barb joints at chain two ends and be stuck on the bearing pin axle sleeve of triangular support bracket inboard of the left and right scraper plate in chain rupture interval and driving chain junction.The present invention can also adopt the bearing pin axle sleeve to refute chain fast as the power tie point of refuting chain.
Further scheme of the present invention: described length of refuting chain equals or is slightly larger than the length that the chain rupture siding-to-siding block length adds 1 chain link, and described chain link of refuting chain should be integer.
Further scheme of the present invention: described spindle nose is refuted connection: the first step, control stick directly upwards promote from the pond dolly, second step, control stick move forward along upper rail plate, lower guideway plate, the 3rd step, control stick descend vertically downward, the 4th step, control stick are stuck in the bearing pin spindle nose of triangular support bracket lateral surface until the first barb joint that will refute chain along upper rail plate, lower guideway plate move left and right, the 5th step, again control stick is promoted vertically upward, if resistance is big, then refute and be connected into merit, if resistance is little, then refute and connect failure, again operation again.Described spindle nose is refuted connection can connect the interim reparation of finishing the chain rupture interval with refuting chain fast by the bearing pin spindle nose.
Further scheme of the present invention: described axle sleeve is refuted the method for connecing: the first step, control stick directly upwards promote from the pond dolly, second step, control stick move forward along upper rail plate, lower guideway plate, the 3rd step, control stick descend vertically downward, the 4th step, control stick are stuck in the bearing pin axle sleeve of triangular support bracket medial surface until the second barb joint that will refute chain along upper rail plate, lower guideway plate move left and right, the 5th goes on foot, control stick is promoted vertically upward again, if resistance is big, then refute and be connected into merit, if resistance is little, then refute and connect failure, again operation again.Described axle sleeve is refuted connection can connect the interim reparation of finishing the chain rupture interval with refuting chain fast by the bearing pin axle sleeve.
Further scheme of the present invention: described two bar detection methods are that first scraper plate at the bottom of the pond begins to measure zone distance between two scraper plates by two test rods, when distance littler than design load when the distance that checks out the scraper plate interval and next scraper plate interval is bigger than design load, then can judges chain rupture takes place in next scraper plate interval.
Further scheme of the present invention: the track of described upper rail plate, lower guideway plate aligns, and upper rail plate, lower guideway plate is adjusted to the pond base originally to be in same levelness simultaneously; All be provided with rule on track on described upper rail plate, the lower guideway plate and the control stick.Make more convenient operation, and can improve precision.
Further scheme of the present invention: the described first barb joint is made of circular hole portion, straightway and crotch section, the crotch section radian of the described first barb joint equals semicircle, this semicircle diameter is than the big 6mm of bearing pin spindle nose diameter in the triangular support bracket outside, the distance at this semicircle center and bearing pin center equals the pitch of original nonmetal chain, the circular hole portion of the described first barb joint is connected the outside of refuting chain by bearing pin, the crotch section is stuck on the bearing pin spindle nose in the triangular support bracket outside, is provided with the threaded post that is threaded with control stick at the described first barb joint.
The front end of the first barb joint crotch section has chamfering 4*45 degree, make to refute that the first barb joint bending section center and the franchise value of bearing pin spindle nose centrally aligned on same horizontal linear are extended in the termination process≤± (6/2+4/2) 5mm, be convenient on the bearing pin spindle nose in the triangular support bracket outside that the first barb joint is stuck in the left and right scraper plate in chain rupture interval and driving chain junction, threaded post is convenient to control stick and is connected and separates with the first barb joint, and threaded post does not influence and refutes chain and pass through sprocket wheel.
Further scheme of the present invention: the described second barb joint is made of circular hole portion, straightway and crotch section, the crotch section radian of the second barb joint equals semicircle, this semicircle diameter is than the big 6mm of bearing pin axle sleeve diameter of triangular support bracket inboard, the distance at this semicircle center and bearing pin center equals the pitch of original nonmetal chain, the circular hole portion of the described second barb joint is connected the outside of refuting chain by bearing pin, the crotch section is stuck on the bearing pin axle sleeve of triangular support bracket inboard, is provided with the threaded post that is threaded with control stick at the described second barb joint.
The front end of the crotch section of the second barb joint has chamfering 4*45, be convenient on the bearing pin axle sleeve inboard on the triangular support bracket of left and right scraper plate that the second barb joint is stuck in the chain rupture interval, threaded post is convenient to control stick and is connected and separates with the second barb joint, and threaded post does not influence and refutes chain and pass through sprocket wheel.
Beneficial effect of the present invention:
1, the point of penetration A place of the present invention by being arranged on the power wheel transferring power after a while the detection probe fast detecting of position have the chain rupture fault, and the power wheel that stops mud scraper immediately rotates, avoided scraper plate be distorted the distortion or fracture, improved the safe running performance of mud scraper, and finished interim reparation rapidly for chain rupture interval at the bottom of the pond necessary condition is provided.
2, adopt the inventive method under the situation that need not discharge sewage in the pond, will refute at the bottom of chain stretches into the pond by control stick, adopt spindle nose to refute connection or axle sleeve is refuted connection to interval interim reparation of chain rupture by first, second barb joint of refuting the chain two ends, starting mud scraper then takes the chain rupture interval to Chi Mianlai and normally repairs, this method is simple to operate, keep in repair under the situation that sewage discharge goes out in need not be with the pond, not only prevented secondary pollution, more the user resumes production as early as possible and has saved a large amount of maintenance time, thereby has improved the application performance of mud scraper.
Description of drawings
Fig. 1 is the structural representation of existing nonmetal carrier bar mud scraper.
Fig. 2 is flow chart of the present invention.
Fig. 3 is the structural representation of the interval scraper plate of chain rupture of the present invention at the bottom of the pond.
Fig. 4 is the structural representation of the triangular support bracket, bearing pin spindle nose and the bearing pin axle sleeve that connect on the chain of the present invention.
Fig. 5 is the structural representation of the present invention's first barb joint.
Fig. 6 is the structural representation of the present invention's second barb joint.
The specific embodiment
The present invention is further illustrated below in conjunction with accompanying drawing.
Specific embodiment 1:
Reach the method for refuting chain fast as Fig. 2, Fig. 3, Fig. 4 and nonmetal carrier bar mud scraper chain rupture error protection shown in Figure 5, the direction of the direction indication driving chain operation of arrow.
The point of penetration A place that the detection probe of nonmetal carrier bar mud scraper is arranged on the power wheel transferring power is 0.1 meter-3 meters position after a while, arrive the chain rupture fault by the detection probe fast detecting, and the automatic work that stops mud scraper immediately, equipment is by intact protection and send alarm signal, and can not occur on the bearing pin in scraper plate and the driving chain junction according to chain rupture point and to refute chain fast;
The step of refuting chain fast is as follows:
Step 1: by claire face power chain after a while the chain sag of position judge 5 chain chain ruptures at the bottom of any side pond;
Step 2: adopt two bar detection methods, determine at the bottom of the pond 5 chain rupture interval 11, and measure the length in chain rupture interval 11 at the bottom of the pond, described two bar detection methods are that first scraper plate 6 of 5 begins to measure zone distance between two scraper plates 6 by two test rods at the bottom of the pond, when distance littler than design load when the distance of measuring the scraper plate interval and next scraper plate interval is bigger than design load, then can judges chain rupture takes place in next scraper plate interval.Determine to refute the length of chain 2, described length of refuting chain 2 equals or the length that is slightly larger than chain rupture interval 11 adds the length of 1 chain link, and described chain link of refuting chain 2 should be integer, and the described chain 2 of refuting is identical with the original nonmetal chain of equipment.
Step 3: but the interim operating platform 1 of two left rotation and right rotation is set at the pond face according to the position of the scraper plate 6 in chain rupture interval 11, described interim operating platform 1 is provided with base plate and guardrail, the base plate of described interim operating platform 1 is by detachably being installed in the fixed base plate on the pool side and can forming around the drop front of fixed base plate center rotation, and the area of drop front is greater than the area of fixed base plate, drop front is provided with guardrail, described interim operating platform 1 can be left, 30 ° of right rotations, behind the position of adjusting drop front, with bearing pin drop front is locked on the fixed base plate, maintenance mans stand on the drop front of interim operating platform 1, the length and width of the drop front of described interim operating platform 1 are 800*600mm, and guardrail height is 1000mm.
Step 4: be respectively equipped with two first barb joints 3 at the two ends of refuting chain 2, two first barb joints 3 of refuting chain 2 same ends by a bearing pin 18 with refute chain 2 and link together, the described first barb joint 3 is by circular hole portion, straightway and crotch section constitute, straightway one end links to each other with circular hole portion, the other end links to each other with the crotch section, the crotch section radian of the described first barb joint 3 equals semicircle, this semicircle diameter is than the big 6mm of bearing pin spindle nose 12 diameters in the triangular support bracket outside, the crotch segment length is 50mm, the distance at this semicircle center and bearing pin 18 centers equals the pitch of original nonmetal chain, the thickness of the first barb joint 3 is 10mm, the circular hole portion of the described first barb joint 3 is connected the outside of refuting chain 2 by bearing pin 18, crotch section at the described first barb joint 3 is provided with the threaded post 17 that is threaded with control stick 4, the front end of the first barb joint, 3 crotch sections has chamfering 4*45 degree, and the first barb joint 3 and bearing pin 18 are to be made by metal (stainless steel 316).
Be connected with four one control levers 4 by threaded post 17 refuting on four first barb joints 3 at chain 2 two ends, described control stick 4 adopts stainless steel waterpipe, length is 5800mm, control stick 4 on two first barb joints 3 of same end is connected locking by connecting plate with nut, hold two first barb joints 3 that connecting plate is operated same end;
Step 5: mobile in along the edge of the scraper plate 6 in chain rupture interval 11 to the pond by being operatively connected the first barb joint 3 that plate will refute chain 2 two ends, after being blocked by the side of the triangular support bracket 7 of the scraper plate 6 in chain rupture interval 11 and driving chain junction or wear-resisting boots 8, stop;
Step 6: remove the connecting plate on two one control levers 4 of refuting chain 2 left ends, be inserted in the upper rail plate 9 of two same trajectories at two one control levers, lower guideway plate 10, described upper rail plate 9, lower guideway plate 10 is installed in respectively on the base plate and guardrail on the interim operating platform 1, then connecting plate is reinstalled in locking on two one control levers 4, and make scraper plate 6 justified margins in interim operating platform 1 bottom edge and 11 left sides, chain rupture interval by feeler and the angle of adjusting interim operating platform 1, described upper rail plate 9, the track alignment of lower guideway plate 10 is simultaneously with upper rail plate 9, lower guideway plate 10 is adjusted to and 5 is in substantially with-levelness at the bottom of the pond; All be provided with size scale on track on described upper rail plate 9, the lower guideway plate 10 and the control stick 4.
Step 7: adopt spindle nose to refute the method for connecing and to refute on the bearing pin spindle nose 12 in triangular support bracket 7 outsides in scraper plate 6 that the crotch section of two first barb joints 3 of chain 2 left ends is inserted in interval 11 left sides of chain rupture and the driving chain junction, described spindle nose is refuted connection: the first step, control stick 45 promotes at the bottom of the pond vertically upward, second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward, the 3rd step, control stick 4 descends vertically downward, the 4th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves right on the bearing pin spindle nose 12 of triangular support bracket 7 lateral surfaces in scraper plate 6 that the first barb joint 3 that will refute chain 2 is inserted in interval 11 left sides of chain rupture and driving chain junction, the 5th step, again control stick 4 is promoted vertically upward, if resistance is big, then refute and be connected into merit, if resistance is little, then refute and connect failure, again operation again.
Step 8: remove the connecting plate on two one control levers 4 of refuting chain 2 right-hand members, repetitive operation step 6, adopting spindle nose to refute the method for connecing will refute the crotch section of two first barb joints 3 of chain 2 right-hand members and be inserted on the bearing pin spindle nose 12 in triangular support bracket 7 outsides that the scraper plate 6 of interval 11 right-hand members of chain rupture is connected with driving chain, the first step, control stick 45 promotes at the bottom of the pond vertically upward, second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward, the 3rd step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves right, the 4th step, control stick 4 descends vertically downward, the 5th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves left until the first barb joint 3 that will refute chain 2 and is inserted on the bearing pin spindle nose 12 of triangular support bracket 7 lateral surfaces of scraper plate 6 of interval 11 right-hand members of chain rupture, the 6th step, again control stick 4 is promoted vertically upward, if resistance is big, then refute and be connected into merit, if resistance is little, then refute and connect failure, again operation again.
Step 9: pull down action bars 4 on the first barb joint and the interim operating platform 1 of pond face, start mud scraper, it is out of service behind the position after a while that chain rupture interval 11 is moved to power chain;
Step 10: will arrive power chain and on the face of pond, keep in repair recovery again in the chain rupture interval 11 of position after a while.
Adopt spindle nose to refute connection, chain 2 is connected the scraper plate 6 in chain rupture interval 11 and A end bearing pin spindle nose and the B in triangular supporting frame 7 outsides in the driving chain junction holds on the bearing pin spindle nose with refuting.Distance at the bottom of the center of bearing pin spindle nose 12 and the pond between 5 is 235mm, the top edge distance of the center of bearing pin spindle nose 12 and triangular supporting frame 7 is 25mm, the outer wide of triangular supporting frame 7 is 138mm, inner width is 126mm, the pitch of original nonmetal chain is 152mm, the diameter of bearing pin spindle nose 12 is 30mm, bearing pin spindle nose 12 ledge length are 18mm, distance between two the first barb joint, 3 inboards is 144mm, distance between the outside is 180mm, the thickness of the first barb joint 3 is 10mm, width is 18mm, the crotch section radian of the described first barb joint 3 equals semicircle, this semicircle diameter is than the big 6mm of bearing pin spindle nose 12 diameters, the crotch segment length that the described first barb joint 3 adopts is 50mm, and the distance at this semicircle center and bearing pin 18 centers equals the pitch 152mm of original nonmetal chain, and the front end of the first barb joint, 3 crotch sections has chamfering 4*45 degree.
A holds the method for connecing of refuting of bearing pin spindle nose:
The first step, control stick 45 promotes (235+25+40=300mm at the bottom of the pond vertically upward, wherein 40mm is headspace) (locking, by the nut check on the control stick, prevent control stick in the track of guide rail plate to lower slider), second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward (138+3+18=159mm, wherein 3mm is the gap of the first barb joint and triangular supporting frame lateral surface, 18mm is the barb width), the 3rd step, control stick (unblanking) descend vertically downward (25,+40,+10 10)=93mm (locking, wherein 18mm is the bending section radius, the first barb bending section center and lock shaft spindle nose centrally aligned on same horizontal linear, its franchise is≤± 5mm, the 4th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves right until the bearing pin spindle nose 12 that the crotch section of the first barb joint 3 is inserted in A end triangular supporting frame 7 lateral surfaces, the 5th step, again control stick 4 is promoted vertically upward, if resistance is big, then finished to refute connecing.If non-resistance, then explanation is refuted and is connect failure, again operation again.
B holds the method for connecing of refuting of bearing pin spindle nose:
The first step, control stick 45 promotes 235+25+40=300mmmm (locking) at the bottom of the pond vertically upward, second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward 159mm, the 3rd step, control stick 4 is along upper rail plate 9, lower guideway plate 10 120mm(that moves right is inserted in spindle nose for next step barb is moved to the left and shifts to an earlier date reserved location), the 4th step, descend vertically downward 93mm(locking of control stick 4 (unblanking)), the 5th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 is moved to the left until the bearing pin spindle nose 12 that the crotch section of the first barb joint 3 is inserted in B end triangular supporting frame 7 lateral surfaces, the 6th step, again control stick 4 is promoted vertically upward, if resistance is big, then finished to refute connecing.If non-resistance, then explanation is refuted and is connect failure, again operation again.
Specific embodiment 2:
As Fig. 2, Fig. 3, Fig. 4 and shown in Figure 6, the characteristics of present embodiment are: described two ends of refuting chain 2 are connected with two second barb joint 3-1 respectively, two second barb joint 3-1 of described same end are connected the outside of refuting chain 2 by a bearing pin 18, the described second barb joint 3 is by circular hole portion, straightway and crotch section constitute, straightway one end links to each other with circular hole portion, the other end links to each other with the crotch section, the crotch section radian of the second barb joint 3-1 equals semicircle, this semicircle diameter is than the big 6mm of bearing pin axle sleeve 13 diameters of triangular support bracket 7 inboards, the crotch segment length is 50mm, the thickness of the described second barb joint 3-1 is 10mm, width 15mm, the distance at this semicircle center and bearing pin 18 centers equals the pitch of the nonmetal chain of existing equipment, the circular hole portion of the described second barb joint 3-1 is connected the outside of refuting chain 2 by bearing pin 18, crotch section at the described second barb joint 3-1 is provided with the threaded post 17 that is threaded with control stick 4, be connected with four one control levers 4 by threaded post 17 refuting on four second barb joint 3-1 at chain 2 two ends, adopt axle sleeve to refute connection and will refute on the bearing pin axle sleeve 13 of scraper plate 6 that the crotch section of the second barb joint 3-1 at chain 2 two ends is inserted in chain rupture interval 11 and triangular support bracket 7 inboards of driving chain junction, the front end of the crotch section of the second barb joint 3-1 has chamfering to count the 4*45 degree.
Described axle sleeve is refuted the method for connecing: the first step, control stick 45 promotes at the bottom of the pond vertically upward, second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward, the 3rd step, control stick 4 descends vertically downward, the 4th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 move left and right be inserted in until the crotch section of the second barb joint 3-1 that will refute chain 2 chain rupture interval 11 scraper plate 6 on the bearing pin axle sleeve 13 of triangular support bracket 7 medial surfaces, the 5th step, again control stick 4 is promoted vertically upward, if resistance is big, then refute and be connected into merit, if resistance is little, then refute and connect failure, again operation again.Other characteristics are identical with specific embodiment 1.
Adopt axle sleeve to refute connection, be connected the scraper plate 6 in chain rupture interval 11 and A end bearing pin axle sleeve and the B end bearing pin axle sleeve of triangular supporting frame 7 inboards in the driving chain junction with refuting chain 2.Distance at the bottom of the center of bearing pin spindle nose 12 and the pond between 5 is 235mm, the diameter of bearing pin axle sleeve 13 is 40mm, outer lateral extent between the bearing pin two ends axle sleeve 13 is 126mm, inner distance is 84mm, the length of bearing pin axle sleeve 13 is 21mm, the pitch of original nonmetal chain is 152mm, the distance of two second barb joint 3-1 inboards is 90mm, the distance in the outside is 120mm, the thickness of the described second barb joint 3-1 is 10mm, width is 15mm, the crotch section radian of the second barb joint 3-1 equals semicircle, and this semicircle diameter is than the big 6mm of bearing pin axle sleeve 13 diameters, and the crotch segment length that the described second barb joint 3-1 adopts is 50mm, the distance at this semicircle center and bearing pin 18 centers equals the pitch 152mm of original nonmetal chain, and this front end has chamfering 4*45 degree.
A holds the method for connecing of refuting of bearing pin axle sleeve:
The first step, control stick 4 at the bottom of the pond 5 promote vertically upward (235+25+40)=300mm(wherein 40mm be headspace) (locking), second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 move forward 126+6-3=129mm(wherein 6mm be the thickness of triangular supporting frame, 3mm is the gap of barb joint and triangular supporting frame medial surface), the 3rd step, control stick 4(unblanks) (25,+40,+10 10)=98mm(locking vertically downward descends, wherein 23mm is the bending section radius, the second barb bending section center and lock shaft axle sleeve centrally aligned on same horizontal linear, its franchise is≤± 5mm), the 4th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves right until the bearing pin axle sleeve 13 that the crotch section of the second barb joint 3-1 is inserted in A end triangular supporting frame 7 medial surfaces, the 5th step, again control stick 4 is promoted vertically upward, if resistance is big, then finished to refute and connect, if non-resistance, then explanation is refuted and is connect failure, again operation again.
B holds the method for connecing of refuting of bearing pin axle sleeve:
The first step, control stick 45 promotes 300mm(locking at the bottom of the pond vertically upward), second step, control stick 4 is along upper rail plate 9, lower guideway plate 10 moves forward 129mm, the 3rd step, control stick 4 is along upper rail plate 9, lower guideway plate 10 move right 120mm(be for the barb bending section should be to be in a left side after descending, on the locus of right bearing pin axle sleeve), the 4th step, descend vertically downward 98mm(locking of control stick 4 (unblanking)), the 5th step, control stick 4 is along upper rail plate 9, lower guideway plate 10 is moved to the left until the bearing pin axle sleeve 13 that the crotch section of the second barb joint 3-1 is inserted in B end triangular supporting frame 7 medial surfaces, the 6th step, again control stick 4 is promoted vertically upward, if resistance is big, then finished to refute and connect, if non-resistance, then explanation is refuted and is connect failure, again operation again.
Specific embodiment 3:
The characteristics of present embodiment are: the present invention adopts an interim operating platform 1, pool side in interval 11 1 sides of chain rupture is installed interim operating platform 1, when the first barb joint 3 of refuting chain one end is inserted in the scraper plate 6 of interval 11 1 sides of chain rupture and the bearing pin spindle nose 12 of driving chain junction, perhaps behind the bearing pin axle sleeve 13 of the second barb joint 3-1 scraper plate 6 that is inserted in interval 11 1 sides of chain rupture and driving chain junction, pull down interim operating platform 1, more interim operating platform 1 is installed in the pool side of interval 11 opposite sides of chain rupture.Other characteristics are identical with specific embodiment 1 or specific embodiment 2.
Specific embodiment 4:
The characteristics of present embodiment are: step 3 is arranged interim operating platform 1 and step 4 change refuting the step that chain 2 two ends arrange control stick 4 and the first barb joint 3 or the second barb joint 3-1, other characteristics are identical with specific embodiment 1 or specific embodiment 2.

Claims (10)

1. nonmetal carrier bar mud scraper chain rupture error protection reaches the method for refuting chain fast, it is characterized in that: the point of penetration A place that is arranged on the power wheel transferring power after a while 0.1 meter-3 meters locational detection probe fast detecting to the chain rupture fault, and the automatic work that stops mud scraper immediately, equipment is by intact protection and send alarm signal, and can not occur on the bearing pin in scraper plate and the driving chain junction according to chain rupture point and to refute chain fast;
The step of refuting chain fast is as follows:
Step 1: by claire face power chain after a while the chain sag of position judge (5) chain chain rupture at the bottom of any side pond;
Step 2: adopt two bar detection methods, determine the chain rupture interval (11) of (5) at the bottom of the pond, and measure the length in chain rupture interval (11) at the bottom of the pond, determine to refute the length of chain (2);
Step 3: according to the scraper plate (6) of chain rupture interval (11) but the position arranges the interim operating platform (1) of left rotation and right rotation at the pond face, described interim operating platform (1) comprises base plate and guardrail, the dismountable pool side that is installed in of the base plate of described interim operating platform (1);
Step 4: be respectively equipped with two first barb joints (3) at the two ends of refuting chain (2), two first barb joints (3) of same end by bearing pin (18) with refute chain (2) and link together, at four first barb joints (3) of refuting chain (2) dismountable control stick (4) is installed, control stick (4) on two first barb joints (3) of same end links together by connecting plate, holds two first barb joints (3) that connecting plate is operated same end;
Step 5: mobile in along the edge of the scraper plate (6) of chain rupture interval (11) to the pond by being operatively connected the first barb joint (3) that plate will refute chain (2) two ends, after being blocked by the side of the triangular support bracket (7) of the scraper plate of chain rupture interval (11) (6) and driving chain junction or wear-resisting boots (8), stop;
Step 6: remove the connecting plate on two one control levers (4) of refuting chain (2) one ends, be inserted in the upper rail plate (9) of two same trajectories at two one control levers (4), lower guideway plate (10), described upper rail plate (9), lower guideway plate (10) is installed in respectively on the base plate and guardrail on the interim operating platform (1), then connecting plate is reinstalled in two one control levers (4) and goes up locking, and make scraper plate (6) justified margin of interim operating platform (1) bottom edge and chain rupture interval (11) one sides by the angle of the interim operating platform of feeler adjustment (1);
Step 7: adopt spindle nose to refute the method for connecing and to refute on the bearing pin spindle nose (12) in scraper plate (6) that the first barb joint (3) of chain (2) one ends is stuck in chain rupture interval (11) one sides and triangular support bracket (7) outside of driving chain junction;
Step 8: remove the connecting plate on two one control levers (4) of refuting chain (2) other end, repetitive operation step 6 and step 7;
Step 9: start mud scraper, it is out of service behind the position after a while that chain rupture interval (11) are moved to power chain;
Step 10: will arrive power chain and on the face of pond, keep in repair recovery again in the chain rupture interval (11) of position after a while.
2. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 reaches the method for refuting chain fast; it is characterized in that: described two ends of refuting chain (2) are respectively equipped with two second barb joints (3-1), adopt axle sleeve to refute connection and will refute on the inboard bearing pin axle sleeve (13) of scraper plate (6) that four second barb joints (3-1) at chain (2) two ends are stuck in chain rupture interval (11) and the triangular support bracket (7) of driving chain junction.
3. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 and 2 reaches the method for refuting chain fast; it is characterized in that: described length of refuting chain (2) equals or is slightly larger than the length that chain rupture interval (11) adds 1 chain link, and described chain link of refuting chain (2) should be integer.
4. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 reaches the method for refuting chain fast; it is characterized in that: described spindle nose is refuted connection: the first step; control stick (4) (5) at the bottom of the pond promotes vertically upward; second step; control stick (4) is along upper rail plate (9); lower guideway plate (10) moves forward; the 3rd step; control stick (4) descends vertically downward; the 4th step; control stick (4) is along upper rail plate (9); lower guideway plate (10) move left and right is stuck on the bearing pin spindle nose (12) of triangular support bracket (7) lateral surface until the first barb joint (3) that will refute chain (2); the 5th step; again control stick (4) is promoted vertically upward; if resistance is big; then refute and be connected into merit; if resistance is little; then refute and connect failure, again operation again.
5. nonmetal carrier bar mud scraper chain rupture error protection according to claim 2 reaches the method for refuting chain fast; it is characterized in that: described axle sleeve is refuted the method for connecing: the first step; control stick (4) (5) at the bottom of the pond promotes vertically upward; second step; control stick (4) is along upper rail plate (9); lower guideway plate (10) moves forward; the 3rd step; control stick (4) descends vertically downward; the 4th step; control stick (4) is along upper rail plate (9); lower guideway plate (10) move left and right is stuck on the bearing pin axle sleeve (13) of triangular support bracket (7) medial surface until the second barb joint (3-1) that will refute chain (2); the 5th step; again control stick (4) is promoted vertically upward; if resistance is big; then refute and be connected into merit; if resistance is little; then refute and connect failure, again operation again.
6. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 reaches the method for refuting chain fast; it is characterized in that: described two bar detection methods are that first scraper plate (6) of (5) begins to measure zone distance between two scraper plates (6) by two test rods at the bottom of the pond; when distance littler than design load when the distance of measuring the scraper plate interval and next scraper plate interval is bigger than design load, then can judges chain rupture takes place in next scraper plate interval.
7. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 reaches the method for refuting chain fast, it is characterized in that: the track of described upper rail plate (9), lower guideway plate (10) aligns, and simultaneously upper rail plate (9), lower guideway plate (10) is adjusted to (5) at the bottom of the pond to be in substantially together-levelness; All be provided with scale on track on described upper rail plate (9), the lower guideway plate (10) and the control stick (4).
8. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 reaches the method for refuting chain fast; it is characterized in that: the described first barb joint (3) is by circular hole portion; straightway and crotch section constitute; the crotch section radian of the described first barb joint (3) equals semicircle; this semicircle diameter is than the big 6mm of bearing pin spindle nose (12) diameter in the triangular support bracket outside; the distance at this semicircle center and bearing pin (18) center equals the pitch of original nonmetal chain; the circular hole portion of the described first barb joint (3) is connected the outside of refuting chain (2) by bearing pin (18); the crotch section is stuck on the bearing pin spindle nose (12) in triangular support bracket (7) outside, is provided with the threaded post (17) that is threaded with control stick (4) at the described first barb joint (3).
9. nonmetal carrier bar mud scraper chain rupture error protection according to claim 2 reaches the method for refuting chain fast; it is characterized in that: the described second barb joint (3-1) is by circular hole portion; straightway and crotch section constitute; the crotch section radian of the second barb joint (3-1) equals semicircle; this semicircle diameter is than the big 6mm of bearing pin axle sleeve (13) diameter of triangular support bracket inboard; the distance at this semicircle center and bearing pin (18) center equals the pitch of original nonmetal chain; the circular hole portion of the described second barb joint (3-1) is connected the outside of refuting chain (2) by bearing pin (18); the crotch section is stuck on the inboard bearing pin axle sleeve (13) of triangular support bracket (7), is provided with the threaded post (17) that is threaded with control stick (4) at the described second barb joint (3-1).
10. nonmetal carrier bar mud scraper chain rupture error protection according to claim 1 and refute the method for chain fast is characterized in that: described interim operating platform (1) can left and right rotation 30 °.
CN201310220547.8A 2012-12-13 2013-06-05 Method of chain fracture fault protection and rapid chain connecting of nonmetal chain plate mud scraper Expired - Fee Related CN103263791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310220547.8A CN103263791B (en) 2012-12-13 2013-06-05 Method of chain fracture fault protection and rapid chain connecting of nonmetal chain plate mud scraper

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN 201210541320 CN102974134A (en) 2012-12-13 2012-12-13 Method for protecting broken chain fault and fast connecting chain for nonmetal chain board mud scraper
CN201210541320.9 2012-12-13
CN201310220547.8A CN103263791B (en) 2012-12-13 2013-06-05 Method of chain fracture fault protection and rapid chain connecting of nonmetal chain plate mud scraper

Publications (2)

Publication Number Publication Date
CN103263791A true CN103263791A (en) 2013-08-28
CN103263791B CN103263791B (en) 2014-12-10

Family

ID=47848654

Family Applications (2)

Application Number Title Priority Date Filing Date
CN 201210541320 Pending CN102974134A (en) 2012-12-13 2012-12-13 Method for protecting broken chain fault and fast connecting chain for nonmetal chain board mud scraper
CN201310220547.8A Expired - Fee Related CN103263791B (en) 2012-12-13 2013-06-05 Method of chain fracture fault protection and rapid chain connecting of nonmetal chain plate mud scraper

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN 201210541320 Pending CN102974134A (en) 2012-12-13 2012-12-13 Method for protecting broken chain fault and fast connecting chain for nonmetal chain board mud scraper

Country Status (1)

Country Link
CN (2) CN102974134A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4927537A (en) * 1989-03-09 1990-05-22 Envirotech Corporation Tape drive with self-expanding coils for sludge collector
EP0607447A1 (en) * 1992-05-14 1994-07-27 FUJIWARA, Michihiro Sludge scraping-up apparatus
JP2005138023A (en) * 2003-11-06 2005-06-02 Hitachi Plant Eng & Constr Co Ltd Chain flight type sludge scraper
CN101054207A (en) * 2007-03-12 2007-10-17 南通华新环保设备工程有限公司 Dirt removing and squeezing integrated machine
CN201354257Y (en) * 2009-02-21 2009-12-02 南通华新环保设备工程有限公司 Chain breakage protection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4927537A (en) * 1989-03-09 1990-05-22 Envirotech Corporation Tape drive with self-expanding coils for sludge collector
EP0607447A1 (en) * 1992-05-14 1994-07-27 FUJIWARA, Michihiro Sludge scraping-up apparatus
JP2005138023A (en) * 2003-11-06 2005-06-02 Hitachi Plant Eng & Constr Co Ltd Chain flight type sludge scraper
CN101054207A (en) * 2007-03-12 2007-10-17 南通华新环保设备工程有限公司 Dirt removing and squeezing integrated machine
CN201354257Y (en) * 2009-02-21 2009-12-02 南通华新环保设备工程有限公司 Chain breakage protection device

Also Published As

Publication number Publication date
CN102974134A (en) 2013-03-20
CN103263791B (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
US20140224746A1 (en) Seawater infiltration method and water infiltration intake unit
KR101065620B1 (en) Curved psc girder making method using camber control apparatus and curved girder bridge construction method therewith
CN105965671A (en) Hydraulic T-beam formwork construction device and technology
CN203307734U (en) External prestress tensioning and controlling system
CN103263791B (en) Method of chain fracture fault protection and rapid chain connecting of nonmetal chain plate mud scraper
AU2021102008A4 (en) Concrete pouring guiding device and construction method for sewage treatment tank
CN101905923B (en) Overwater-installed submersible water impeller
CN205399505U (en) Fixing device of deviational survey pipe
CN111347537A (en) Production process and assembly method of shield tunnel segment
CN114215044B (en) Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof
CN206161419U (en) Bituminous mixture's selfreparing performance test mould
CN115506272A (en) Installation and construction method for regular octagonal steel ladle concrete cable tower
CN205688420U (en) A kind of steel structure device of power station maintenance construction in operation
CN210033436U (en) Light-duty circle of guaranteeing support system of shield tunnel
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN102127909A (en) Construction method and device for preventing plastic tube concrete pile from bending deflection
CN209509006U (en) A kind of fixed device of tower crane
CN208649870U (en) A kind of prefabricated steel and concrete combination beam trestle
CN207309726U (en) A kind of derusting roller of anacidity environment-friendly metal material handling device
CN220302136U (en) Dangerous rock falling rock area tunnel portal protection structure
CN216405316U (en) Gas shield dam construction modularization heterogeneous anchoring row
CN221001150U (en) Steel-edged water stop clamp
CN211574508U (en) Drainage pipeline plugging device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20180605