CN103258302A - Informatization management method applied to gas industry - Google Patents

Informatization management method applied to gas industry Download PDF

Info

Publication number
CN103258302A
CN103258302A CN2013101731090A CN201310173109A CN103258302A CN 103258302 A CN103258302 A CN 103258302A CN 2013101731090 A CN2013101731090 A CN 2013101731090A CN 201310173109 A CN201310173109 A CN 201310173109A CN 103258302 A CN103258302 A CN 103258302A
Authority
CN
China
Prior art keywords
information
management system
gas industry
management method
method applied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101731090A
Other languages
Chinese (zh)
Inventor
张飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA XINHANG INFORMATION TECHNOLOGY Co Ltd
Original Assignee
NINGXIA XINHANG INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA XINHANG INFORMATION TECHNOLOGY Co Ltd filed Critical NINGXIA XINHANG INFORMATION TECHNOLOGY Co Ltd
Priority to CN2013101731090A priority Critical patent/CN103258302A/en
Publication of CN103258302A publication Critical patent/CN103258302A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the technical field of computers, and particularly relates to an informatization management method applied to a gas industry. The informatization management method applied to the gas industry is composed of a user information management system, an underground pipe network management system, a comprehensive scheduling system, an information feedback system, a failure service system and working platforms matched with the user information management system, the underground pipe network management system, the comprehensive scheduling system, the information feedback system and the failure service system respectively. Each working platform is provided with an independent computer information system. The computer information systems are connected through the Internet. A set of thorough intelligent scheduling management system with the functions of information acquisition, information transferring, information processing, information feedback, decision reference, information tidying and filing and the like is offered to coordinately command operation, and production efficiency and service levels are improved.

Description

A kind of informatization management method that is applied to gas industry
Technical field
The invention belongs to field of computer technology, be specifically related to a kind of informatization management method that is applied to gas industry.
Background technology
At present, large size city all has the regional gasification station of different scales and advances more than thousand kilometer burning line, has 1,000,000 family gas supply capacities, and serves for city dweller's pipeline user provides safe and reliable pipeline petroleum gas supply.It is swift and violent that large size city was decided the pipeline gas career development greatly in recent years, the user just advances with the speed in 10000 family/years, how to guarantee the air feed of urban gas supply system safety and stability, for numerous citizen offer high-quality service, become one of problem that the city manager will solve.Traditional method exists needs personnel many, and the shortcoming that information channel is not smooth can only be carried out transmission, the production scheduling of internal information usually by phone, fulfils assignment and records and data management by manually filling out single method.Owing to containing much information and the transfer means backwardness, information often can not get transmission accurately and timely, causes to cooperate imbalance, inefficiency between each production division.
Summary of the invention
The objective of the invention is the defective to existing gas industry management, and the method for developing that information system management is applied to gas industry.The intelligent dispatch management system that the invention provides the functions such as sorting and file of setting up a cover perfect information acquisition, information transmission, information processing, information feedback, decision references and information is come the coordinative command running, has improved production efficiency and service level.
The present invention is achieved in that the present invention is made up of customer information control system, underground pipe network management system, synthesis scheduling system, information feedback system and failed services five big systems and the workbench that matches with it, each workbench all has separately independent computerized information system, is connected by the internet.Customer information control system, be used for using the pipeline gas situation to carry out comprehensive normalized management urban duct gas user, by operation centre's workbench subscriber data is input to customer information control system, set up the customer information control system database, and issuing job order by the failed services system keeps in repair and safety inspection etc. the user, and service scenario is noted, be entered in the customer information control system database by the feedback management platform, form a complete user profile database.The underground pipe network management system, this system is entered in the underground pipe network management system by the particulars such as planning, design, construction, completion and air feed of data input platform with indoor underground gas pipeline, distribution situation, pipeline grade and the contingent incident classification factor of base area underground pipelines have been worked out burst accident and have been participated in repairing scheme program simultaneously, call when supplying to meet accident accident.Synthesis scheduling system: this system carries out comprehensive scientific management to the running of gas company on the basis of Subscriber Management System and underground pipe network management system.When the user beats the Service Phone of gas company, the telephone receiving person of company is after essential informations such as user's newspaper numbering, just can access subscriber data rapidly by the user information management system, the problem that convenient answer user proposes, if the user proposes maintenance, change pipe, services such as repairing, as long as the person of answering is selected just user's demand to be automatically recorded the formation job order, send to corresponding production division by Intranet, job order separately just can be received by each production division in several seconds, and divide and to task corresponding workman and make house calls, if telephone receiving person receives the underground gas pipeline phone of speedily carrying out rescue work, after noting essential informations such as accident spot, immediately this information is passed to the control engineer, the slip-stick artist notes gas ductwork figure and the predetermined reference scheme of accident spot fast by dispatching system, database from the underground pipe network management system accesses, and be sent to from the nearest breakdown gang of accident spot, the team member is after receiving task in repairing, can arrive in the scene of the accident fast and effectively handle.
After dispatching management information system puts into operation, the gas company leader can grasp all function situations of company at any time by the computer network inquiry system in office, comprise monitoring service phone, each production division's workload and schedule, customer complaint and disposition etc., and science decision as the case may be.If running into great gas accidents reports to the police, the control engineer can access the conduit line map of accident spot and the emergency plan of formulating in advance rapidly from the gas pipeline data bank, by network destined from the nearest breakdown gang of accident spot, report simultaneously and give relevant leader, both sides are according to the actual conditions of the data of grasping in the hand in conjunction with the scene, make best repairing scheme, causality loss is reduced to minimum.
Embodiment
Described in detail below in conjunction with the present invention of embodiment.
Embodiment 1
The used combustion gas subscriber data in this city is registered in certain city, has set up the user information management system database, has set up Buried Pipeline Network Systems and synthesis scheduling system simultaneously.A certain user proposes the service of maintenance to the doorstep, as long as the person of answering selects to overhaul to the doorstep button, just user's demand can be automatically recorded the formation job order, send to corresponding production division by Intranet, job order separately just can be received by each production division in 10 seconds, and divided and to task corresponding workman and make house calls.After making house calls, the staff is reported to user information management system there with service content, upgrades the Subscriber Management System database.
Embodiment 2
The used combustion gas subscriber data in this city is registered in certain city, has set up the user information management system database, has set up Buried Pipeline Network Systems and synthesis scheduling system simultaneously.The underground gas pipeline that telephone receiving person receives certain unit phone of speedily carrying out rescue work, telephone receiving person is after noting essential informations such as accident spot, immediately this information is passed to the control engineer, the slip-stick artist notes gas ductwork figure and the predetermined reference scheme of accident spot fast by dispatching system, database from the underground pipe network management system accesses, and be sent to from the nearest breakdown gang of accident spot, the team member is after receiving task in repairing, can arrive in the scene of the accident fast effectively handles, result after the repairing team member will handle is reported to user information management system there, upgrades the Subscriber Management System database.
The present invention is not limited to above-mentioned embodiment, and the same or similar method of all employings and the present invention and structure realize all technical schemes of the present invention, all should be in protection scope of the present invention.

Claims (2)

1. informatization management method that is applied to gas industry is characterized in that this system is made up of customer information control system, underground pipe network management system, synthesis scheduling system, information feedback system and failed services five big systems and the workbench that matches with it.
2. a kind of informatization management method that is applied to gas industry according to claim 1 is characterized in that each workbench all has separately independent computerized information system, is connected by the internet.
CN2013101731090A 2013-05-13 2013-05-13 Informatization management method applied to gas industry Pending CN103258302A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101731090A CN103258302A (en) 2013-05-13 2013-05-13 Informatization management method applied to gas industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101731090A CN103258302A (en) 2013-05-13 2013-05-13 Informatization management method applied to gas industry

Publications (1)

Publication Number Publication Date
CN103258302A true CN103258302A (en) 2013-08-21

Family

ID=48962199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101731090A Pending CN103258302A (en) 2013-05-13 2013-05-13 Informatization management method applied to gas industry

Country Status (1)

Country Link
CN (1) CN103258302A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739607A (en) * 2008-11-11 2010-06-16 常岭 Method for applying computer information management to gas industry
CN102270383A (en) * 2011-08-10 2011-12-07 李蓉 Remote intelligent meter reading system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739607A (en) * 2008-11-11 2010-06-16 常岭 Method for applying computer information management to gas industry
CN102270383A (en) * 2011-08-10 2011-12-07 李蓉 Remote intelligent meter reading system

Similar Documents

Publication Publication Date Title
CN108418902B (en) Intelligent railway comprehensive transportation junction integrated control system
CN107909238A (en) A kind of city collaboration processing and interlinked command system and command hall
CN103264717B (en) A kind of track traffic synthetic monitoring and scheduling is worked in coordination with and O&M information system
CN108876140B (en) Scheduling method, device, server and medium for power communication maintenance task
CN102663240B (en) Analysis system and evaluation method for power telecommunication business risks
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN101887547A (en) Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment
CN109767513B (en) Pipe network equipment inspection device and pipe network equipment inspection method
CN110288176A (en) Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN109359900A (en) A kind of inspection management platform
CN103177327A (en) Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures
CN108860223B (en) Data processing system and method
CN103065215A (en) Power grid dispatching method
CN108196494A (en) A kind of building control platform
CN112749877A (en) Intelligent community daily patrol management system and method
CN110633916A (en) Energy efficiency control system for coal mine enterprise
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN105913177A (en) Scheduling power failure plan information processing method based on cloud
CN105512862A (en) Hotel cleaning scheduling method and system
CN113656872B (en) FM intelligent construction site operation and maintenance management and control system and method based on BIM
CN109242113A (en) A kind of station operation process recording method based on wearable device
CN103295164A (en) Power grid safety monitoring management information system and management method
CN113869627A (en) Subway vehicle inspection and adjustment intelligent management system
CN103258302A (en) Informatization management method applied to gas industry
CN112288180A (en) Comprehensive order dispatching method and system for distribution network maintenance work order

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130821