CN103257074A - 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 - Google Patents
通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 Download PDFInfo
- Publication number
- CN103257074A CN103257074A CN2013101538322A CN201310153832A CN103257074A CN 103257074 A CN103257074 A CN 103257074A CN 2013101538322 A CN2013101538322 A CN 2013101538322A CN 201310153832 A CN201310153832 A CN 201310153832A CN 103257074 A CN103257074 A CN 103257074A
- Authority
- CN
- China
- Prior art keywords
- spring
- fixed
- frame
- harness cord
- testing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种通丝线弹簧高速测试设备的支撑装置,包括底座,底座上固定有机架,机架顶端固定有电机安装座,机架上固定有安装板,安装板底部固定有两个伸出支架,安装板一侧固定有平衡块。同时公开了一种包括所述支撑装置的通丝线弹簧高速测试设备,通丝线弹簧检测设备的电机通过偏心轮带动传动轴,传动轴直接带动滑轴作上下往复运动,滑轴带动与之固定的通丝线固定框,从而带动通丝线作上下往复运动来模拟纺织机纺织的动作,以此来测试弹簧的性能,由于传动机构简单直接,使得通丝线弹簧的往复运动能够高速运行,使得测试结果大大缩短,并可在高速运行条件下对弹簧进行选取。
Description
技术领域
本发明涉及纺织机械领域,特别是一种通丝线上的弹簧的测试设备。
背景技术
目前,各种提花机、纺织机上都有配套的通丝装造,通丝装造用于在织布过程中对经线的进行不断提升和下降。如图1,通丝装造一般包括通丝线101、综丝杆102、综丝103、弹簧104,综丝杆102一端连通丝线101,另一端连综丝103,综丝103连接在弹簧104上,综丝杆102上设置有综眼105,织布用的经线就穿过综眼105,在织布过程中,通过拉动通丝线101来带动经线不断的提升和下降,在通丝线提升和下降过程中,连接综丝103的弹簧104起到回位的作用。由于弹簧不断的拉升回复,所以对于弹簧的强度等指标就有很高的要求,每使用一批弹簧就需要对其先进行检测,原先只能通过人工手段进行测试,凭技术人员的经验来判定,测试时间较长。本申请人申请的专利号为201220161399.8,专利名称为“一种通丝线弹簧测试设备”的专利公开了一种对通丝线弹簧进行测试的设备,但是由于其传动机构的复杂性,在使用过程中效果不佳,无法满足高速测试的要求。
发明内容
本发明提供了一种通丝线弹簧的高速测试设备的支撑装置,能够对高速测试设备上的传动机构、穿线机构以及通丝线固定机构进行固定支撑,从而使得测试设备能够连续稳定的工作,优化弹簧的选取和使用。
为了达到上述目标,本发明的技术方案为:
一种通丝线弹簧高速测试设备的支撑装置,包括底座,底座上固定有机架,机架顶端固定有电机安装座,机架上固定有安装板,安装板底部固定有两个伸出支架,安装板一侧固定有平衡块。
一种通丝线弹簧高速测试设备,包括所述的支撑装置;所述支撑装置的电机安装座上固定有电机,电机输出端连接偏心轮,偏心轮连接传动轴,传动轴连接滑轴,滑轴径向固定在机架上,滑轴上固定有通丝线固定框,通丝线固定框上设置有钩夹,钩夹上固定有接头钩子,接头钩子上连接有用于连接通丝线的快速接头,快速接头下方设置有通丝线依次穿过的穿线板和目板框,穿线板上设置有穿线孔,目板框上设置有孔眼,底座底部设置有固定弹簧的回综框。
所述的滑轴通过上下两个固定座径向固定在安装板上,安装板固定在机架上。
所述的滑轴上套有压簧,压簧设置在通丝线固定框底部,压簧一端顶着通丝线固定框,另一端抵着固定座。
本发明的通丝线弹簧高速测试设备的支撑装置对高速测试设备上的传动机构、穿线机构以及通丝线固定机构进行固定支撑,从而使得测试设备能够连续稳定的工作,优化弹簧的选取和使用。
同时通丝线弹簧检测设备的电机通过偏心轮带动传动轴,传动轴直接带动滑轴作上下往复运动,滑轴带动与之固定的通丝线固定框,从而带动通丝线作上下往复运动来模拟纺织机纺织的动作,以此来测试弹簧的性能,由于传动机构简单直接,使得通丝线弹簧的往复运动能够高速运行,使得测试结果大大缩短,并可在高速运行条件下对弹簧进行选取。
附图说明
图1是现有纺织机中通丝装造的通丝线连接示意图。
图2是本发明的测试设备立体结构示意图。
图3是本发明的测试设备部分结构示意图一。
图4是本发明的测试设备部分结构示意图二。
图5为图2中A处的放大示意图。
图6为图2中弹簧连接头部分的放大示意图。
具体实施方式
如图2-5,一种通丝线弹簧高速测试设备的支撑装置,包括底座1,底座1上固定有机架20,机架20顶端固定有电机安装座19,机架20上固定有安装板6,安装板6底部固定有两个伸出支架61,安装板6一侧固定有平衡块62。
使用本实施例支撑装置的高速测试设备,包括固定在电机安装座19上的电机2,电机2输出端连接偏心轮18,偏心轮18连接传动轴11,传动轴11连接滑轴21,滑轴21径向固定在安装板6上,滑轴21上固定有通丝线固定框12,通丝线固定框12上设置有钩夹13,钩夹13上固定有接头钩子14,接头钩子14上连接有用于连接通丝线的快速接头15,快速接头15下方设置有通丝线16依次穿过的穿线板3和目板框,穿线板3上设置有穿线孔31,目板框上设置有孔眼,底座1底部设置有固定弹簧的回综框5。
如图3,滑轴21通过上下两个固定座7径向固定在安装板6上,安装板6固定在机架20上。滑轴21通过上下两个固定座7,相当于两点固定,这样不会产生偏移。安装板6上固定有两个伸出支架61,穿线板3固定在伸出支架61上。安装板6的一侧固定有平衡块62,在测试设备工作的时候起到对设备的稳定作用。
通丝线固定框12上固定有钩夹13,钩夹13为多个,并排的固定在通丝线固定框12的顶端,每个钩夹13上固定有多个接头钩子14,每个接头钩子14上连接有一个快速接头15。回综框5固定在机架1底部。回综框5上固定有弹簧连接头51,弹簧连接头51上设置有螺纹511,弹簧17通过旋进螺纹511与弹簧连接头51固定连接。
在对弹簧进行测试的时候,一次可以对很多弹簧进行测试,如图6,我们将需要测试的通丝线弹簧17一端旋进弹簧连接头51的螺纹上,与弹簧连接头51连接,弹簧17另一端连接通丝线16,通丝线16另外一头是连接在快速接头15上的,通丝线16从快速接头15连到弹簧17,中间通丝线16先经过穿线板3,穿线板3上开有很多均匀排布的穿线孔31,通丝线1就从穿线孔31内穿过,可以每根通丝线穿过一个穿线孔,为了节约穿线孔也可以多根通丝线穿过一个穿线孔,通丝线穿过穿线板3之后,再穿过目板框,目板框上开有很多的孔眼,每根通丝线16穿过一个孔眼,通丝线穿过孔眼之后再连接到一根根的弹簧上去,使得弹簧能够全部分开,在拉升过程中不会相互摩擦,这样通丝线和弹簧能够模拟纺织机上纺织的时候弹簧的一个受力情况。
连接通丝线16的快速接头15能够与接头钩子14之间实现快速方便的插拔,接头钩子14一排很多个固定在钩夹13上。
进行弹簧测试的时候,启动电机2,电机2输出轴带动偏心轮18转动,偏心轮18带动传动轴11转动,由于传动轴11固定在偏心轮18的边缘,所以传动轴11随着偏心轮18转动作圆周往复运动,这样传动轴11就带动与之连接的滑轴21运动,滑轴21通过上下两个固定座7径向固定在安装板6上,所以滑轴21只能轴向的上下运动,滑轴21轴向上下运动就带动通丝线固定框12上下运动,从而带动固定在其上钩夹13上下运动,当钩夹13上升的时候,就相当于通丝线16拉动弹簧17进行拉伸,当钩夹13下降的时候,弹簧17就会回位,这样弹簧不断的拉伸回复,这样当弹簧17经过一段时间测试后发生损坏断掉等情形,就可以知道弹簧的使用寿命和使用频率,从而得知检测的弹簧的质量如何。
滑轴21上套有压簧8,压簧8设置在通丝线固定框12底部,压簧8一端顶着通丝线固定框12,另一端抵着下面的固定座7。压簧8设置在通丝线固定框12的底部一是对通丝线固定框12向下运动的时候有一个缓冲,同时在通丝线固定框12向上的时候有一个弹力,使得上升的速度更快。
Claims (2)
1.一种通丝线弹簧高速测试设备的支撑装置,其特征在于,包括底座(1),底座(1)上固定有机架(20),机架(20)顶端固定有电机安装座(19),机架(20)上固定有安装板(6),安装板(6)底部固定有两个伸出支架(61),安装板(6)一侧固定有平衡块(62)。
2.一种通丝线弹簧高速测试设备,其特征在于,包括如权利要求1所述的的支撑装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101538322A CN103257074A (zh) | 2013-04-27 | 2013-04-27 | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101538322A CN103257074A (zh) | 2013-04-27 | 2013-04-27 | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103257074A true CN103257074A (zh) | 2013-08-21 |
Family
ID=48961124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101538322A Pending CN103257074A (zh) | 2013-04-27 | 2013-04-27 | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103257074A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103837779A (zh) * | 2014-03-17 | 2014-06-04 | 王荣春 | 提花织机组件的动态检测仪 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10260122A (ja) * | 1997-03-17 | 1998-09-29 | Mitsubishi Heavy Ind Ltd | バネ用疲労試験装置 |
US20040159361A1 (en) * | 2003-01-16 | 2004-08-19 | Bram Vanderjeugt | Harness device for a weaving machine |
CN2695463Y (zh) * | 2003-06-27 | 2005-04-27 | 王学培 | 提花通丝定位装置 |
CN200982938Y (zh) * | 2006-12-18 | 2007-11-28 | 任再瑞 | 一种弹簧拉压试验机 |
CN102338722A (zh) * | 2011-07-19 | 2012-02-01 | 大连液压件有限公司 | 弹簧疲劳强度检测装置 |
CN102621016A (zh) * | 2012-04-16 | 2012-08-01 | 浙江旷达纺织机械有限公司 | 一种通丝线弹簧测试设备 |
CN102680315A (zh) * | 2012-05-19 | 2012-09-19 | 浙江旷达纺织机械有限公司 | 一种通丝线弹簧测试设备上的弹簧平衡装置 |
CN203241289U (zh) * | 2013-04-27 | 2013-10-16 | 浙江旷达纺织机械有限公司 | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 |
-
2013
- 2013-04-27 CN CN2013101538322A patent/CN103257074A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10260122A (ja) * | 1997-03-17 | 1998-09-29 | Mitsubishi Heavy Ind Ltd | バネ用疲労試験装置 |
US20040159361A1 (en) * | 2003-01-16 | 2004-08-19 | Bram Vanderjeugt | Harness device for a weaving machine |
CN2695463Y (zh) * | 2003-06-27 | 2005-04-27 | 王学培 | 提花通丝定位装置 |
CN200982938Y (zh) * | 2006-12-18 | 2007-11-28 | 任再瑞 | 一种弹簧拉压试验机 |
CN102338722A (zh) * | 2011-07-19 | 2012-02-01 | 大连液压件有限公司 | 弹簧疲劳强度检测装置 |
CN102621016A (zh) * | 2012-04-16 | 2012-08-01 | 浙江旷达纺织机械有限公司 | 一种通丝线弹簧测试设备 |
CN102680315A (zh) * | 2012-05-19 | 2012-09-19 | 浙江旷达纺织机械有限公司 | 一种通丝线弹簧测试设备上的弹簧平衡装置 |
CN203241289U (zh) * | 2013-04-27 | 2013-10-16 | 浙江旷达纺织机械有限公司 | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103837779A (zh) * | 2014-03-17 | 2014-06-04 | 王荣春 | 提花织机组件的动态检测仪 |
CN103837779B (zh) * | 2014-03-17 | 2016-08-17 | 王荣春 | 提花织机组件的动态检测仪 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1333394A (zh) | 探测提花型织布机梭口中异常情况的方法和装置 | |
CN103267694A (zh) | 通丝线安装装置、弹簧高速测试设备 | |
CN202522491U (zh) | 一种通丝线弹簧测试设备 | |
CN203241289U (zh) | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 | |
CN102628771B (zh) | 一种通丝线弹簧测试设备上的支撑装置 | |
CN203203889U (zh) | 通丝线安装装置、弹簧高速测试设备 | |
CN103257074A (zh) | 通丝线弹簧高速测试设备的支撑装置、弹簧高速测试设备 | |
CN203203870U (zh) | 通丝线弹簧高速测试机上的传动装置、弹簧高速测试机 | |
CN203203890U (zh) | 一种通丝线弹簧高速测试设备 | |
CN102621016B (zh) | 一种通丝线弹簧测试设备 | |
CN202522471U (zh) | 一种通丝线弹簧测试设备上的穿线装置 | |
CN103234812A (zh) | 通丝线弹簧高速测试机上的传动装置、弹簧高速测试机 | |
CN102680315A (zh) | 一种通丝线弹簧测试设备上的弹簧平衡装置 | |
CN103234846A (zh) | 一种通丝线弹簧高速测试设备 | |
CN102619002A (zh) | 一种用于通丝线弹簧测试设备上的通丝线升降机构 | |
CN202559026U (zh) | 一种通丝线弹簧测试设备上的电机传动装置 | |
CN202559027U (zh) | 一种用于通丝线弹簧测试设备上的通丝线升降机构 | |
CN202562803U (zh) | 一种通丝线弹簧测试设备上的弹簧平衡装置 | |
CN202522472U (zh) | 一种通丝线弹簧测试设备上的通丝线安装机构 | |
CN202522473U (zh) | 一种通丝线弹簧测试设备的底架 | |
CN220671190U (zh) | 一种耐磨性测试装置 | |
CN202522470U (zh) | 一种通丝线弹簧测试设备上的曲柄摇杆机构 | |
CN102628772A (zh) | 一种通丝线弹簧测试设备上的穿线装置 | |
CN102619000A (zh) | 一种通丝线弹簧测试设备上的传动带设置方法和设置结构 | |
CN102636384A (zh) | 一种通丝线弹簧测试设备的底架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130821 |