CN103255427A - 一种地下管道的阴极保护测试桩位置的设置方法 - Google Patents

一种地下管道的阴极保护测试桩位置的设置方法 Download PDF

Info

Publication number
CN103255427A
CN103255427A CN2013101740386A CN201310174038A CN103255427A CN 103255427 A CN103255427 A CN 103255427A CN 2013101740386 A CN2013101740386 A CN 2013101740386A CN 201310174038 A CN201310174038 A CN 201310174038A CN 103255427 A CN103255427 A CN 103255427A
Authority
CN
China
Prior art keywords
test
arranges
cathode protection
stake
detective pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101740386A
Other languages
English (en)
Inventor
陈雁星
刘建平
涂昌德
郑光军
饶云普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Original Assignee
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Design and Research Institute of China Coal Technology and Engineering Group filed Critical Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority to CN2013101740386A priority Critical patent/CN103255427A/zh
Publication of CN103255427A publication Critical patent/CN103255427A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Prevention Of Electric Corrosion (AREA)

Abstract

本发明涉及一种阴极保护测试设置,特别是涉及一种地下管道的阴极保护测试桩位置的设置方法。其包括:检测阴极保护效果、了解阴极保护设施的运行状况,需要在管道沿线设置阴极保护检测装置,通常为测试桩。目前测试桩还包括里程桩和标识桩,统称三桩合一。保护数据的遥测传控是提高阴极保护自动化水平的方向,因此将所有阴极保护站设备的输出电压信号、输出电流信号、保护电位信号和断电测试远控接口等纳入管道调控中心的监测范围。

Description

一种地下管道的阴极保护测试桩位置的设置方法
技术领域
 本发明涉及一种阴极保护测试设置,特别是设计一种长距离管道输煤的阴极保护测试设置。
背景技术
当阴极保护站出现事故时,将有信号传送到控制中心,及时发现并迅速处理阴极保护站的各种故障,随时检测并根据需要调试设备的运行参数。阴极保护设备应具有数据远传和断电测量功能,相关保护数据将进入站控系统,始终处于监控状态。
发明内容
为了保证管道输煤的安全运行,本发明提供了一种长距离管道输煤的阴极保护测试设置,其设置方式如下:
1. 一种地下管道的阴极保护测试桩位置的设置方法,该方法按下述步骤进行:
1)、阴极保护测试桩位置选择原则:测试桩应选在路边、田埂、沟边,尽量少占农田,测试桩应位于介质流动向的左侧距离管道中心线1.5m处;
2)、电位测试桩每1km~2km设置一个,在城镇区或工业区,每500m~1km设置一个,杂散电流较严重区域不大于500m设置一个;
3)、电流测试桩每4km~8km设置一支,并且取代此处的电位测试桩;
4)、绝缘接头测试桩每一绝缘连接处设置一支,用于测试绝缘接头两侧的电位,检测绝缘接头的绝缘效果;
5)、交叉测试桩与其他管道、电缆交叉处设置一支;
6)、站内测试桩视需要设置;
7)、牺牲阳极测试桩两组阳极中间部位设电位测试桩,其中,阳极埋设点处设置一支;
8)、大型河流穿跨越,当穿跨越>200m时应在两岸各设置一支测试桩;
9)、穿越等级公路公路、铁路,每一穿越点设置一支测试桩。
本发明的有益效果是:方便对阴极保护效果进行检测,方便对管道交直流干扰检测,方便对管道外防腐层进行检测,可代替里程桩、标识桩,埋设方便,节省投资。可在长距离管道输煤领域推广使用。
具体实施方式
下面给出的实施例以对本发明作出进一步说明,但所给出的实施例不能理解为对本发明保护范围的限制,因而本专业的技术人员根据上述发明的内容和设计思想所作出的非本质的改进和调整也属于本发明的保护范围。
1. 一种地下管道的阴极保护测试桩位置的设置方法,该方法按下述步骤进行:
1)、阴极保护测试桩位置选择原则:测试桩应选在路边、田埂、沟边,尽量少占农田,测试桩应位于介质流动向的左侧距离管道中心线1.5m处;
2)、电位测试桩每1km~2km设置一个,在城镇区或工业区,每500m~1km设置一个,杂散电流较严重区域不大于500m设置一个;
3)、电流测试桩每4km~8km设置一支,并且取代此处的电位测试桩;
4)、绝缘接头测试桩每一绝缘连接处设置一支,用于测试绝缘接头两侧的电位,检测绝缘接头的绝缘效果;
5)、交叉测试桩与其他管道、电缆交叉处设置一支;
6)、站内测试桩视需要设置;
7)、牺牲阳极测试桩两组阳极中间部位设电位测试桩,其中,阳极埋设点处设置一支;
8)、大型河流穿跨越,当穿跨越>200m时应在两岸各设置一支测试桩;
9)、穿越等级公路公路、铁路,每一穿越点设置一支测试桩。

Claims (1)

1. 一种地下管道的阴极保护测试桩位置的设置方法,该方法按下述步骤进行:
1)、阴极保护测试桩位置选择原则:测试桩应选在路边、田埂、沟边,尽量少占农田,测试桩应位于介质流动向的左侧距离管道中心线1.5m处;
2)、电位测试桩每1km~2km设置一个,在城镇区或工业区,每500m~1km设置一个,杂散电流较严重区域不大于500m设置一个;
3)、电流测试桩每4km~8km设置一支,并且取代此处的电位测试桩;
4)、绝缘接头测试桩每一绝缘连接处设置一支,用于测试绝缘接头两侧的电位,检测绝缘接头的绝缘效果;
5)、交叉测试桩与其他管道、电缆交叉处设置一支;
6)、站内测试桩视需要设置;
7)、牺牲阳极测试桩两组阳极中间部位设电位测试桩,其中,阳极埋设点处设置一支;
8)、大型河流穿跨越,当穿跨越长度>200m时应在两岸各设置一支测试桩;
9)、穿越等级公路公路、铁路,每一穿越点设置一支测试桩。
CN2013101740386A 2013-05-11 2013-05-11 一种地下管道的阴极保护测试桩位置的设置方法 Pending CN103255427A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101740386A CN103255427A (zh) 2013-05-11 2013-05-11 一种地下管道的阴极保护测试桩位置的设置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101740386A CN103255427A (zh) 2013-05-11 2013-05-11 一种地下管道的阴极保护测试桩位置的设置方法

Publications (1)

Publication Number Publication Date
CN103255427A true CN103255427A (zh) 2013-08-21

Family

ID=48959624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101740386A Pending CN103255427A (zh) 2013-05-11 2013-05-11 一种地下管道的阴极保护测试桩位置的设置方法

Country Status (1)

Country Link
CN (1) CN103255427A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106119856A (zh) * 2016-08-19 2016-11-16 中国石油化工股份有限公司 一种智能区域阴极保护监控系统及其控制方法
CN106483065A (zh) * 2015-08-31 2017-03-08 中国石油天然气股份有限公司 一种在模拟井下套管外壁腐蚀环境中检测牺牲阳极电化学性能的方法和装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国国家标准 GB/T 21448-2008: "《埋地钢质管道阴极保护技术规范》", 13 February 2008 *
胡士信 等: "《阴极防护手册》", 31 January 1999, 化学工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106483065A (zh) * 2015-08-31 2017-03-08 中国石油天然气股份有限公司 一种在模拟井下套管外壁腐蚀环境中检测牺牲阳极电化学性能的方法和装置
CN106483065B (zh) * 2015-08-31 2020-08-07 中国石油天然气股份有限公司 一种在模拟井下套管外壁腐蚀环境中检测牺牲阳极电化学性能的方法和装置
CN106119856A (zh) * 2016-08-19 2016-11-16 中国石油化工股份有限公司 一种智能区域阴极保护监控系统及其控制方法

Similar Documents

Publication Publication Date Title
CN202189153U (zh) 地下管线探测仪
KR100778089B1 (ko) 도심지 다중 변압기 설치 장소에서의 지중 저압 회선 탐사 시스템 및 방법
CN103792466B (zh) 架空线路-电力电缆混连线路双端故障定位方法
CN103558507A (zh) 用于直流接地选线和交流窜入选线的传感器
CN103353568B (zh) T接线路故障支路选择方法
CN103823155A (zh) 一种at牵引网短路故障测距方法
CN102520318B (zh) 一种输电线路故障识别方法
CN105259584A (zh) 一种水域电法勘探系统
CN105158643A (zh) 一种变电站接地网水平均压导体腐蚀状态遥控检测装置
CN103163561A (zh) 一种电缆路径带电探测方法及装置
CN203587095U (zh) 分布式光纤监测隧道沉降的装置
CN104374466B (zh) 路基塌陷光纤振动实时监测及报警系统
CN103591930A (zh) 分布式光纤监测隧道沉降的装置和方法
CN103995171B (zh) 非接触式直流输电线路电流测量方法
CN103424627B (zh) 双端测量平行电网线路零序阻抗的方法
CN103255427A (zh) 一种地下管道的阴极保护测试桩位置的设置方法
CN103760473B (zh) 架空线路-电力电缆混连线路故障支路判别方法
CN104898022B (zh) 一种高速铁路高压全电缆贯通线路的在线故障定位系统和方法
Irannejad et al. Remote monitoring of oil pipelines cathodic protection system via GSM and its application to SCADA system
CN103424628A (zh) 测量平行电网线路正序阻抗的方法
CN204114445U (zh) 地下管线定位装置
CN104374984A (zh) 高精度磁调制式直流电流测量方法
CN204346572U (zh) 路基塌陷光纤振动实时监测及报警系统
CN204989391U (zh) 一种变电站接地网水平均压导体腐蚀状态遥控检测装置
CN103336219A (zh) 一种高速铁路综合贯通地线断线故障点位置检测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant after: Wuhan Design and Research Institute Co., Ltd. pf China Coal Technology & Engineering Group

Address before: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant before: Wuhan Design and Research Institute of China Coal Technology & Engineering Group

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: WUHAN DESIGN AND RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP TO: WUHAN DESIGN AND RESEARCH INSTITUTE CO., LTD. PF CHINA COAL TECHNOLOGY + ENGINEERING GROUP

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130821