CN103246035A - 一种输煤管道与通信光缆同沟穿越河流的敷设方法 - Google Patents

一种输煤管道与通信光缆同沟穿越河流的敷设方法 Download PDF

Info

Publication number
CN103246035A
CN103246035A CN201310175411XA CN201310175411A CN103246035A CN 103246035 A CN103246035 A CN 103246035A CN 201310175411X A CN201310175411X A CN 201310175411XA CN 201310175411 A CN201310175411 A CN 201310175411A CN 103246035 A CN103246035 A CN 103246035A
Authority
CN
China
Prior art keywords
pipe
optical cable
river
convey coal
silicon core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310175411XA
Other languages
English (en)
Inventor
张卫东
张亚利
刘睿
刘姣
刘红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Original Assignee
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Design and Research Institute of China Coal Technology and Engineering Group filed Critical Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority to CN201310175411XA priority Critical patent/CN103246035A/zh
Publication of CN103246035A publication Critical patent/CN103246035A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

本发明公开了一种输煤管道与通信光缆同沟穿越河流的敷设方法。该方法分输煤管道穿越河流不采用混凝土保护和采用混凝土保护两种情况进行。与顶混凝土套管穿越不同的是,在光缆和输煤管道的大开挖河流穿越中,输煤管道被挖沟直埋,而光缆同样是经φ40/33的硅芯管和φ75聚乙烯管或φ114×4的无缝钢管的双层保护后埋设。光缆与保护钢管在这里沿管沟沟底布放,即钢管底部与输煤管道底部平齐。1)、当管道未采用现浇混凝土保护时,光缆的保护钢管需要用水泥砂袋压重;2)、当管道采用现浇混凝土保护时,钢管应直接布放在混凝土保护层之下,无需再压水泥砂袋。大开挖河流穿越法最适合的条件是,泥沙型河床,且河床的冲刷深度浅,工序简单,与之非开挖河底相比,工期短,成本低,机械化程度要求不高,广泛用于管道运输行业。

Description

一种输煤管道与通信光缆同沟穿越河流的敷设方法
技术领域
本发明属管道运输通信,涉及一种输煤管道与通信光缆同沟穿越河流的敷设方法。
背景技术
较之非开挖工程,开挖工程的主要缺点是开挖和回填工程量大,但它却同时具有施工工序简单、机械化程度要求不高等优点。更主要的是,本输煤管道工程地处黄土高原,光缆线路所穿越河流多为稳定的泥砂型河床,而且河床的冲刷深度也较浅。这就是本光缆线路采用大开挖穿越所具备的得天独厚的条件。
发明内容
本发明的目的是提供一种工序简单,与之非开挖河底相比,工期短,成本低,机械化程度要求不高的一种输煤管道与通信光缆同沟穿越河流的敷设方法。
为了保证穿越工程的顺利进行,本发明的技术方案是这样解决的:一种输煤管道与通信光缆同沟穿越河流的敷设方法,该穿越方法分输煤管道穿越河流不采用混凝土保护和采用混凝土保护两种情况进行,具体按下述步骤进行:
一、输煤管道穿越河流不采用混凝土保护
1)、在河床洪水冲刷线以下3m~5m处开挖一条折线式梯形沟糟;
2)、当河床洪水冲刷线以下为粘土层时,在梯形沟糟底部中央直接敷设输煤管道;
3)、与输煤管道底面两侧各相距不小于300㎜的回填细土中,分别挑出两条小沟,小沟内敷设硅芯管且外穿φ75聚乙烯管保护,所述硅芯管内腔穿入通信光缆;
4)、当输煤管道与通信光缆同沟全部用原状土回填时,φ75聚乙烯管用水泥砂袋压重,每米布放2个砂袋,水泥砂袋重35㎏,水泥∶粗砂混合比为1:9。
5)、敷设时,硅芯管的最小曲率半径应不小于硅芯管外径的15倍;
6)、硅芯管两端应做严密有效的封堵处理。
二、输煤管道穿越河流采用混凝土保护
1)、当河床洪水冲刷线以下为岩石层时,在梯形沟糟底部中央先回填100㎜~200㎜的细土,然后再敷设输煤管道;
2)、在输煤管道与通信光缆同沟用混凝土浇筑保护时,φ114×4钢套管与通信光缆直接敷设在沟底的混凝土保护层之下,所述φ114×4钢套管内腔穿入硅芯管,所述硅芯管内腔穿入通信光缆;不再压水泥砂袋;
3)、钢套管两端应做严密有效的封堵处理。
所述的硅芯管为φ40/33㎜。
所述的聚乙烯管为φ75㎜高密度聚乙烯管。
所述的钢套管为Φ114×4mm无缝钢套管,所述无缝钢套管延伸至梯形沟糟长度两侧各2m。
本发明具有以不有益效果:工序简单,与之非开挖河底相比,工期短,成本低,机械化程度要求不高,广泛用于管道运输行业。
附图说明
图1为穿越粘土层的纵断面图;
图2为图1的剖面图;
图3为穿越岩石河床的纵断面图;
图4为图3的剖面图。
1为最大水面宽度;2为设计洪水冲刷线;3为通信光缆;4为Φ40/33硅芯管;5为Φ75聚乙烯管;6为输煤管道;7为河床表面;8为河床冲击物;9为回填土;10为水泥砂袋;11为Φ114×4钢管;12为自然河(沟)床;13为块(卵、碎)石土回填;14为岩石层界面;15为混凝土浇筑;16为土质沟壁。
具体实施方式
以下结合附图和实施例对发明内容做进一步说明:
参照图1、图2、图3、图4所示,一种输煤管道与通信光缆同沟穿越河流的敷设方法,该穿越方法分输煤管道穿越河流不采用混凝土保护和采用混凝土保护两种情况进行,具体按下述步骤进行:
一、输煤管道穿越河流不采用混凝土保护
1)、在河床洪水冲刷线2以下3m~5m处开挖一条折线式梯形沟糟;
2)、当河床洪水冲刷线2以下为粘土层时,在梯形沟糟底部中央直接敷设输煤管道6;
3)、与输煤管道6底面两侧各相距不小于300㎜的回填细土中,分别挑出两条小沟,小沟内敷设硅芯管4且外穿φ75聚乙烯管5保护,所述硅芯管4内腔穿入通信光缆3;
4)、当输煤管道与通信光缆同沟全部用原状土回填时,硅芯管4用水泥砂袋10压重,每米布放2个砂袋,水泥砂袋重35㎏,水泥∶粗砂混合比为1:9。
5)、敷设时,硅芯管4的最小曲率半径应不小于硅芯管外径的15倍;
6)、硅芯管4两端应做严密有效的封堵处理。
二、输煤管道穿越河流采用混凝土保护
1)、当河床洪水冲刷线2以下为岩石层时,在梯形沟糟底部中央先回填100㎜~200㎜的细土,然后再敷设输煤管道6;
2)、在输煤管道6与通信光缆3同沟用混凝土浇筑15保护时,φ114钢套管11与通信光缆3直接敷设在沟底的混凝土保护层之下,所述φ114钢套管11内腔穿入硅芯管4,所述硅芯管4内腔穿入通信光缆3;不再压水泥砂袋;
3)、钢套管11两端应做严密有效的封堵处理。
所述的硅芯管为φ40/33㎜。
所述的钢套管为Φ114×4mm的无缝钢套管,所述无缝钢套管延伸至梯形沟糟长度两侧各2m。
实施例1
光缆采用φ40/33的硅芯管保护,硅芯管再外加φ75聚乙烯管或φ114×4的无缝钢管保护,保护管伸出管道大开挖长度两侧各2m,硅芯管延伸至一般线路埋深。
实施例2
在用原状土回填时,钢套管用水泥砂袋压重,每米布放2个砂袋,水泥砂袋重35㎏,水泥、粗砂混合比为1:9。
实施例3
在输煤管道用现浇混凝土保护时,套管的光缆直接敷设在沟底的混凝土保护层之下,不需再压水泥砂袋。
实施例4
敷设时,硅芯管的最小曲率半径应不小于硅芯管外径的15倍。
实施例5
保护套管两端应做严密有效的封堵处理。

Claims (3)

1.一种输煤管道与通信光缆同沟穿越河流的敷设方法,该穿越方法分输煤管道穿越河流不采用混凝土保护和采用混凝土保护两种情况进行,具体按下述步骤进行:
一、输煤管道穿越河流不采用混凝土保护
1)、在河床洪水冲刷线(2)以下3m~5m处开挖一条折线式梯形沟糟;
2)、当河床洪水冲刷线(2)以下为粘土层时,在梯形沟糟底部中央直接敷设输煤管道(6);
3)、与输煤管道(6)底面两侧各相距不小于300㎜的回填细土中,分别挑出两条小沟,小沟内敷设硅芯管(4)且外穿φ75聚乙烯管(5)保护,所述硅芯管(4)内腔穿入通信光缆(3);
4)、当输煤管道与通信光缆同沟全部用原状土回填时,φ75聚乙烯管(5)用水泥砂袋(10)压重,每米布放2个砂袋,水泥砂袋重35㎏,水泥∶粗砂混合比为1:9。
5)、敷设时,硅芯管(4)的最小曲率半径应不小于硅芯管外径的15倍;
6)、硅芯管(4)两端应做严密有效的封堵处理。
二、输煤管道穿越河流采用混凝土保护
1)、当河床洪水冲刷线(2)以下为岩石层时,在梯形沟糟底部中央先回填100㎜~200㎜的细土,然后再敷设输煤管道(6);
2)、在输煤管道(6)与通信光缆(3)同沟用混凝土浇筑(15)保护时,φ114×4钢套管(11)与通信光缆(3)直接敷设在沟底的混凝土保护层之下,所述φ114×4钢套管(11)内腔穿入硅芯管(4),所述硅芯管(4)内腔穿入通信光缆(3);不再压水泥砂袋;
3)、钢套管(11)两端应做严密有效的封堵处理。
2.根据权利要求1所述的一种输煤管道与通信光缆同沟穿越河流的敷设方法,其特征在于所述的硅芯管为φ40/33㎜。
3.根据权利要求1所述的一种输煤管道与通信光缆同沟穿越河流的敷设方法,其特征在于所述的钢套管为Φ114×4mm的无缝钢套管,所述无缝钢套管延伸至梯形沟糟长度两侧各2m。
CN201310175411XA 2013-05-14 2013-05-14 一种输煤管道与通信光缆同沟穿越河流的敷设方法 Pending CN103246035A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310175411XA CN103246035A (zh) 2013-05-14 2013-05-14 一种输煤管道与通信光缆同沟穿越河流的敷设方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310175411XA CN103246035A (zh) 2013-05-14 2013-05-14 一种输煤管道与通信光缆同沟穿越河流的敷设方法

Publications (1)

Publication Number Publication Date
CN103246035A true CN103246035A (zh) 2013-08-14

Family

ID=48925664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310175411XA Pending CN103246035A (zh) 2013-05-14 2013-05-14 一种输煤管道与通信光缆同沟穿越河流的敷设方法

Country Status (1)

Country Link
CN (1) CN103246035A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912722A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种管道穿越河流的组对沉管方法
CN103912721A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种水下开槽、沉管穿越河流的施工方法
CN104098830A (zh) * 2014-08-06 2014-10-15 上海贝思特管业有限公司 一种硅芯管的制备方法
CN111119217A (zh) * 2020-01-21 2020-05-08 天津市管道工程集团有限公司 一种管道接口焊接空间阻水装置
CN112212075A (zh) * 2020-10-14 2021-01-12 浙江世润建创科技发展有限公司 钢管穿越河道的穿越结构的施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413281A (zh) * 2007-10-15 2009-04-22 四川科宏石油天然气工程有限公司 管道穿越河流在河道底部开槽施工方法
CN101270561B (zh) * 2007-03-23 2010-04-21 单瑶 解决城市路面排水及公共设施铺设的方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101270561B (zh) * 2007-03-23 2010-04-21 单瑶 解决城市路面排水及公共设施铺设的方法
CN101413281A (zh) * 2007-10-15 2009-04-22 四川科宏石油天然气工程有限公司 管道穿越河流在河道底部开槽施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴勇: "输油管道长距离穿越黄河的方案优化与实施", 《石油工程建设》 *
李富强等: "贵重管道同沟敷设光缆施工技术选择", 《科技资讯》 *
邹绍明: "清水溪治污工程D4标段排污管道的快速施工技术", 《重庆建筑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912722A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种管道穿越河流的组对沉管方法
CN103912721A (zh) * 2014-04-23 2014-07-09 中国化学工程第三建设有限公司 一种水下开槽、沉管穿越河流的施工方法
CN103912721B (zh) * 2014-04-23 2016-01-13 中国化学工程第三建设有限公司 一种水下开槽、沉管穿越河流的施工方法
CN103912722B (zh) * 2014-04-23 2016-01-13 中国化学工程第三建设有限公司 一种管道穿越河流的组对沉管方法
CN104098830A (zh) * 2014-08-06 2014-10-15 上海贝思特管业有限公司 一种硅芯管的制备方法
CN111119217A (zh) * 2020-01-21 2020-05-08 天津市管道工程集团有限公司 一种管道接口焊接空间阻水装置
CN112212075A (zh) * 2020-10-14 2021-01-12 浙江世润建创科技发展有限公司 钢管穿越河道的穿越结构的施工方法

Similar Documents

Publication Publication Date Title
CN106015737B (zh) 跨河沉管整体安装的施工方法
CN107780425A (zh) 一种黄土丘陵沟壑区大型填土场地排水盲沟设置方法
CN107859145A (zh) 一种排水管水下接驳施工方法
CN103246035A (zh) 一种输煤管道与通信光缆同沟穿越河流的敷设方法
CN208965598U (zh) 灌浆帷幕与地下洞室相交部位的防渗处理结构
CN103225306A (zh) 一种邻近水源基坑开挖过程中防止基坑渗漏的方法
CN102878351A (zh) 一种长距离管道输煤的管道敷设方法
CN104895173A (zh) 砂质土壤埋地波纹管防沉降方法
CN110080169A (zh) 一种基于地下室利用的围海造地的施工方法
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
Zhang et al. The largest curved pipe roofing tunnel project in the world
CN105220701A (zh) 垂直插膜防渗方法
CN104612128A (zh) 适用于水下淤泥环境的真空预压加固施工方法
CN103422467B (zh) 淤泥质土充填袋筑堤方法
CN214363565U (zh) 用于悬挂式帷幕的基坑底部快速降排水结构及管道网络
CN102434719A (zh) 一种分层开挖沉管施工工艺
CN210621746U (zh) 一种用于高压天然气管道敷设的淤泥管沟管基设施
CN109119943A (zh) 电缆在顶管两端的敷设方式优化方法
CN201580547U (zh) 适用于水面挖掘作业的浮箱
CN103775735A (zh) 管道穿越河流的施工方法
CN203247606U (zh) 深厚淤泥地基污水管和综合管沟穿越中心沟的施工结构
CN103322295A (zh) 长距离输煤管道与通信光缆同沟敷设的方法
CN1262779C (zh) 聚乙烯管道穿越滩涂与浅水河道的施工方法
CN213267733U (zh) 一种格栅式水利防护装置
CN214033745U (zh) 用于长输管道顺坡敷设水工保护的生态结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant after: Wuhan Design and Research Institute Co., Ltd. pf China Coal Technology & Engineering Group

Address before: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant before: Wuhan Design and Research Institute of China Coal Technology & Engineering Group

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: WUHAN DESIGN AND RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP TO: WUHAN DESIGN AND RESEARCH INSTITUTE CO., LTD. PF CHINA COAL TECHNOLOGY + ENGINEERING GROUP

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130814