Engineering steel silk rope fixing device
Technical field
The present invention relates to fields such as colliery, tunnel piercing, specifically a kind of engineering steel silk rope fixing device.
Background technique
In all multiple-projects fields such as coal mining and tunnel piercing, the wire rope of the supplementary equipment of a large amount of liftings, towage need be fixed on the rock stratum, uses more extensive.But the user in use, and wire rope easily breaks away from the rock stratum, so that cause disorder cable and bring potential safety hazard and influence work.At the problem of above appearance, designed a kind of engineering steel silk rope fixing device, it has not only solved above-mentioned defective, has improved project progress, has strengthened the safe application performance of equipment.The existing market solution of the above problems belongs to the first.
Summary of the invention
The technical problem to be solved in the present invention is: design a kind of engineering with preventing that wire rope breaks away from the fixing device of rock stratum.
Technological scheme of the present invention:
Engineering steel silk rope fixing device comprises wedge, U-loop, wire clips, the collar, wire rope, overcoat, tapered plug, and it is characterized in that: described wedge is provided with through hole, and fixedly there is U-loop the through hole by screw and nut; One end of described wire rope is fixed on the collar in the one circle wire rope by wire clips, and the other end of wire rope is installed in the overcoat, and adds tapered plug in the wire rope and pour into a mould coal, and this end wire rope and overcoat, tapered plug are linked into an integrated entity.
Described engineering steel silk rope fixing device is characterized in that: that end wire rope of described wedge and described cast coal is positioned in the rock hole.
Effect of the present invention: rational in infrastructure, with low cost, installation, easy to use, safe and reliable has significantly reduced the amount of maintenance in the working procedure, has improved working efficiency.
Description of drawings
Fig. 1 is used for structural representation on the rock stratum for the present invention.
Fig. 2 is the schematic representation of wedge of the present invention.
Fig. 3 is sectional view and the worm's eye view of wedge awl end.
Fig. 4 is wire rope overcoat schematic representation.
Fig. 5 is wire rope tapered plug schematic representation.
Embodiment
Referring to accompanying drawing, device of the present invention is made up of wedge 1, U-loop 2, wire clips 3, the collar 4, wire rope 5, overcoat 6, tapered plug 7, tungsten gold 8; Wherein U-loop 2, screw 3, nut 4, wire clips 3, the collar 4 buyables; Fixedly there is U-loop wedge 1 through hole by screw and nut, and it is stand-by to clamp the back; After wire rope 5 one ends are contained in the overcoat 6, add tapered plug 7 in the middle of the rope, the tungsten gold 8 of casting at last makes wire rope 5 one ends, overcoat 6, tapered plug 7 junctions be connected into integral body; After wire rope 5 the other ends are loaded onto the collar 4, go up in place with 3 clampings of two wire clips; As Fig. 1, when work, according to the situation of scene use, earlier hole to certain-length in suitable position on the rock stratum, the gradient groove of wedge 1 assembly, one end is attached on the cylindrical of wire rope 5 assembly overcoats 6 after, be contained in the formation pore together, wedge 1 is pounded tightly at last, i.e. assembling is finished; Wherein the U-loop 2 on the wedge 1 is replacing work-yard, usefulness for convenience detach; At work, itself and wedge cooperation place were more tight when wire rope was subjected to pulling force, had avoided wire rope to break away from the rock stratum, had reduced the generation of security incident.