CN103244149A - Construction method for repairing tunnel collapse through insertion pipe grouting - Google Patents

Construction method for repairing tunnel collapse through insertion pipe grouting Download PDF

Info

Publication number
CN103244149A
CN103244149A CN2013101805126A CN201310180512A CN103244149A CN 103244149 A CN103244149 A CN 103244149A CN 2013101805126 A CN2013101805126 A CN 2013101805126A CN 201310180512 A CN201310180512 A CN 201310180512A CN 103244149 A CN103244149 A CN 103244149A
Authority
CN
China
Prior art keywords
subsides
intubate
handle hole
tunnel
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101805126A
Other languages
Chinese (zh)
Other versions
CN103244149B (en
Inventor
魏发利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310180512.6A priority Critical patent/CN103244149B/en
Publication of CN103244149A publication Critical patent/CN103244149A/en
Application granted granted Critical
Publication of CN103244149B publication Critical patent/CN103244149B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a construction method for repairing tunnel collapse through insertion pipe grouting. The construction method for repairing the tunnel collapse through the insertion pipe grouting comprises the following steps of: step 1, drilling operating holes: finding the portion of the tunnel collapse before construction; step 2, drilling to determine the range of the collapse; step 3, cleaning the operating holes; and step 4, inserting an insertion pipe and grouting. The construction method for repairing the tunnel collapse through the insertion pipe grouting has the advantages that the road surface and the internal rock structure of the tunnel are not damaged during tunnel collapse repairing so that the potential safety hazard of the tunnel is eliminated; the usage is safe and reliable, and the working efficiency is high; and the operability is strong, and the construction cost is reduced.

Description

The job practices that the tunnel subsides is repaired in intubate slip casting
Technical field
The present invention relates to a kind of job practices that the tunnel subsides of repairing, in particular, relate to a kind of intubate slip casting that does not damage tunnel structure and repair the job practices that the tunnel subsides.
Background technology
Fast development along with road construction, constructing tunnel has also been accelerated pace of construction, at present the method for tunnel construction that adopts is with forms of construction work such as blower fan boring and explosions to Mining in Rock Mass, these modes cause bigger change to rock mass structure in work progress, some change is can't observe from outward appearance, but exists crag to collapse and potential safety hazard such as landslide.After tunnel and rock mass were built moulding, tunnel outer wall and crag also had the stage of one section stable solidification, and concrete and crag are combined into one, but owing to reasons such as underground river, ground water of karst caves, subsiding of tunnel may be caused, if do not repair timely and effectively, the safety in tunnel will be influenced.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of and do not damage road surface and tunnel structure, the job practices that the tunnel subsides is repaired in intubate slip casting simple to operate, safe and reliable, that construction cost is low and labour intensity is little.
In order to achieve the above object, the present invention has taked following technical scheme:
The job practices that the tunnel subsides is repaired in a kind of intubate slip casting, comprises the steps:
A, brill handle hole:
Find out the position that the tunnel subsides before the construction, bore handle hole at the position that subsides earlier, if the size that dry handle hole is observed the gap that subsides by intense light source if seepage is arranged in the handle hole, checks that by the pipe video instrument inside subsides and the situation of seepage;
Scope is determined in B, boring:
According to subside in the handle hole, the situation of seepage, near boring again origin operation hole drill hole, the size that continues to observe the gap that subsides in the handle hole again is up to the position of finding the gap that do not subside, according to the size of the area that subsides, get out the handle hole of respective numbers again;
C, cleaning operation hole:
The suction pipe of silt particle sucking pump is inserted handle hole, the mud in the handle hole, sandy soil, ponding are extracted;
D, intubate slip casting:
After finishing in the cleaning operation hole, the porous intubate of grouting is inserted in the handle hole, the porous intubate is connected with high-pressure injection pump by carrier pipe, and high-pressure injection pump applies high pressure slip casting cement is injected in porous intubate subsiding between the slit on every side.
The handle hole diameter is 80~120mm in the described steps A, and quantity is 3~6.Described high-pressure injection pump (1) operating pressure is 10MPa, and described silt particle sucking pump (4) intet diameter is not less than 50mm.Described porous intubate (3) is made of metal, inner rounded sealing taper.
Beneficial effect of the present invention: (1) reparation tunnel subsides and does not damage road surface and tunnel internal rock texture, eliminates tunnel safety hidden danger; (2) safe and reliable, high efficiency; (3) workable, reduce construction cost.
Description of drawings
Fig. 1 is the schematic diagram of work operation of the present invention;
Among the figure: high-pressure injection pump 1, carrier pipe 2, porous intubate 3, silt particle sucking pump 4, suction pipe 5.
The specific embodiment
Below in conjunction with accompanying drawing slotting the doing of the present invention described in further detail.
As shown in the figure: the device in the job practices that intubate slip casting reparation of the present invention tunnel subsides mainly is made up of high-pressure injection pump 1, carrier pipe 2, porous intubate 3, silt particle sucking pump 4, suction pipe 5.
High-pressure injection pump 1: function mainly is that the mud that will stir pressurizes, and carries to porous intubate 3 by carrier pipe 2.
Carrier pipe 2: adopt high pressure resistant rubber, internal diameter of the pipeline generally between 40mm~50mm, can bear operating pressure at 10MPa.
Porous intubate 3: intubate is that metal is made, one end is inside and outside screw thread part, be used for firmly being connected with carrier pipe 2, inner rounded sealing taper, tube head stops up when preventing 3 insertions of porous intubate, hinders intubate to spray mud, open around the intubate inner pipe wall and be evenly equipped with gunniting hole, by high-pressure injection pump 1, mud is injected in mud between porous intubate 3 slit on every side from the ejection of tube wall spray-hole.
Silt particle sucking pump 4: select a little bit smaller, the easy to operate sand pump of volume for use, intet diameter is not less than 50mm, is convenient to draw larger-diameter sandstone particle, and outlet opening is equipped with the water band, and the mud, the sandstone that extract are discharged.
Suction pipe 5: adopting internal diameter 50mm, wall thickness is the hose of 8mm, and length arranges that according to the scene end is connected on the silt particle sucking pump 4, and the other end inserts cleaning eye, by the suction of silt particle sucking pump 4, extracts bottom sediment and ponding.
The job practices that the tunnel subsides is repaired in intubate slip casting of the present invention, comprises the steps:
A, brill handle hole:
Find out the position that the tunnel subsides before the construction, bore 3 handle holes that diameter is 100mm at the position that subsides earlier, if the size that dry handle hole is observed the gap that subsides by intense light source if seepage is arranged in the handle hole, checks that by the pipe video instrument inside subsides and the situation of seepage;
Scope is determined in B, boring:
According to subside in the handle hole, the situation of seepage, near boring again origin operation hole drill hole, the size that continues to observe the gap that subsides in the handle hole again is up to the position of finding the gap that do not subside, according to the size of the area that subsides, get out the handle hole of respective numbers again;
C, cleaning operation hole:
The suction pipe 5 of silt particle sucking pump 4 is inserted handle hole, the mud in the handle hole, sandy soil, ponding are released;
D, intubate slip casting:
After finish in the cleaning operation hole, the porous intubate 3 of grouting is inserted in the handle hole, porous intubate 3 is connected with high-pressure injection pump 1 by carrier pipe 2, and high-pressure injection pump 1 operating pressure is 10MPa, and high-pressure injection pump 1 is injected in porous intubate 3 subsiding between the slit on every side with cement injection.
The job practices that intubate slip casting reparation of the present invention tunnel subsides is used in and may has the tunnel that subsides and the tunnel that has subsided, can prevention and maintenance is integrated, the reparation tunnel subsides and does not damage road surface and tunnel internal rock texture, eliminates tunnel safety hidden danger, safe and reliable, high efficiency; Workable, reduce construction cost.

Claims (4)

1. the job practices that the tunnel subsides is repaired in an intubate slip casting, it is characterized in that, comprises the steps:
A, brill handle hole:
Find out the position that the tunnel subsides before the construction, bore handle hole at the position that subsides earlier, if the size that dry handle hole is observed the gap that subsides by intense light source if seepage is arranged in the handle hole, checks that by the pipe video instrument inside subsides and the situation of seepage;
Scope is determined in B, boring:
According to subside in the handle hole, the situation of seepage, near boring again origin operation hole drill hole, the size that continues to observe the gap that subsides in the handle hole again is up to the position of finding the gap that do not subside, according to the size of the area that subsides, get out the handle hole of respective numbers again;
C, cleaning operation hole:
The suction pipe (5) of silt particle sucking pump (4) is inserted handle hole, the mud in the handle hole, sandy soil, ponding are released;
D, intubate slip casting:
After finish in the cleaning operation hole, the porous intubate (3) of grouting is inserted in the handle hole, porous intubate (3) is connected with high-pressure injection pump (1) by carrier pipe (2), and high-pressure injection pump (1) is injected in porous intubate (3) subsiding between the slit on every side with cement injection.
2. the job practices that the tunnel subsides is repaired in intubate slip casting according to claim 1, it is characterized in that the handle hole diameter is 80~120mm in the described steps A, and quantity is 3~6.
3. the job practices that the tunnel subsides is repaired in intubate slip casting according to claim 1, it is characterized in that described high-pressure injection pump (1) operating pressure is 10MPa,
The job practices that the tunnel subsides is repaired in intubate slip casting according to claim 1, it is characterized in that described silt particle sucking pump (4) intet diameter is not less than 50mm.
4. the job practices that the tunnel subsides is repaired in intubate slip casting according to claim 1, it is characterized in that described porous intubate (3) is made of metal, inner rounded sealing taper.
CN201310180512.6A 2013-05-16 2013-05-16 Construction method for repairing tunnel collapse through insertion pipe grouting Active CN103244149B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310180512.6A CN103244149B (en) 2013-05-16 2013-05-16 Construction method for repairing tunnel collapse through insertion pipe grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310180512.6A CN103244149B (en) 2013-05-16 2013-05-16 Construction method for repairing tunnel collapse through insertion pipe grouting

Publications (2)

Publication Number Publication Date
CN103244149A true CN103244149A (en) 2013-08-14
CN103244149B CN103244149B (en) 2015-05-20

Family

ID=48923990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310180512.6A Active CN103244149B (en) 2013-05-16 2013-05-16 Construction method for repairing tunnel collapse through insertion pipe grouting

Country Status (1)

Country Link
CN (1) CN103244149B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481555A (en) * 2014-11-18 2015-04-01 中铁三局集团广东建设工程有限公司 Method of grouting and drilling construction by passing through weak surrounding rock
CN105544368A (en) * 2015-12-07 2016-05-04 江美娣 Method and system for pre-repairing road before road damage
CN105625153A (en) * 2015-12-18 2016-06-01 安徽优特公路养护科技有限公司 High-polymer repair method for road base damages
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN107366218A (en) * 2017-08-09 2017-11-21 李英章 A kind of restorative procedure for collapsing road surface
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2005882C1 (en) * 1990-11-11 1994-01-15 Штумпф Генрих Георгиевич Method for reconditioning and supporting of workings caved with enclosing rocks
CN102182472A (en) * 2011-04-02 2011-09-14 中国建筑第五工程局有限公司 Backfill repairing method for tunnel collapse cavity
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN103015428A (en) * 2013-01-18 2013-04-03 中国十七冶集团有限公司 Double-pump pipe inserting and grouting adjusting and controlling device and double-pump pipe inserting and grouting adjusting and controlling method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2005882C1 (en) * 1990-11-11 1994-01-15 Штумпф Генрих Георгиевич Method for reconditioning and supporting of workings caved with enclosing rocks
CN102182472A (en) * 2011-04-02 2011-09-14 中国建筑第五工程局有限公司 Backfill repairing method for tunnel collapse cavity
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN103015428A (en) * 2013-01-18 2013-04-03 中国十七冶集团有限公司 Double-pump pipe inserting and grouting adjusting and controlling device and double-pump pipe inserting and grouting adjusting and controlling method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张春佳: "《黄织线岩脚隧道岩溶塌陷处理施工技术》", 《铁道运营技术》 *
王灵辉: "《湿土地质处理隧道口仰坡滑坡施工措施》", 《中国新技术新产品》 *
胡仕涛: "《高压旋喷注浆技术在隧道泥砂地层加固中的应用》", 《石家庄铁道大学学报(自然科学版)》 *
黄兆恩: "《高压喷射注浆法在路基处理工程的应用》", 《城市道桥与防洪》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481555A (en) * 2014-11-18 2015-04-01 中铁三局集团广东建设工程有限公司 Method of grouting and drilling construction by passing through weak surrounding rock
CN105544368A (en) * 2015-12-07 2016-05-04 江美娣 Method and system for pre-repairing road before road damage
CN105625153A (en) * 2015-12-18 2016-06-01 安徽优特公路养护科技有限公司 High-polymer repair method for road base damages
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN107165652B (en) * 2017-06-02 2019-03-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN107366218A (en) * 2017-08-09 2017-11-21 李英章 A kind of restorative procedure for collapsing road surface
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method

Also Published As

Publication number Publication date
CN103244149B (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN103244149B (en) Construction method for repairing tunnel collapse through insertion pipe grouting
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN104747075B (en) Anti-collapsing drilling method for grout spraying of soft coal seam
CN102444118A (en) Construction method for grouting reinforcement of sleeve valve pipe
CN206352481U (en) Pipe-following drilling system and the anti-collapse aperture apparatus of steel floral tube
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN203452801U (en) Sectional pulse grouting system for tunnel construction
CN109138904B (en) Double-packer layered grouting water stop device and use method thereof
CN201165660Y (en) Steel pipe hole bottom grouting apparatus
CN104975611B (en) The heavy of the well-points dewatering pipe of liquid soil layer sets device and heavy equipment, method
CN203499698U (en) Advanced curtain grouting system applied to underground engineering construction
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN203050780U (en) Pipe-jacking ground-water lowering device of low-permeability saturated silty sand stratum tunnel construction
JP5439320B2 (en) Construction method of two-way pressurized injection short rock bolt
CN105804690B (en) In-situ leaching process drilling inverse water mud device
CN203374202U (en) High-pressure underwater down-hole hammer
CN202882810U (en) Novel multifunctional dust falling device
CN207498944U (en) The guard aperture casing of ultra-deep jet groutinl guide hole
CN102635365B (en) Construction method for holing of shield machine
CN206173985U (en) Well casing
CN115199296A (en) Disassembly-free grouting and tapping method for shield segment
CN102242635B (en) Embedding construction method of orifice pipe
CN204326061U (en) A kind of pile tube be drawn out easily
CN106640025A (en) High-pressure hydro-fracture aggregate adding device for coal seam of mine
CN204113152U (en) A kind of oil well positive negative sand washing nozzle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant