CN103243713A - 预应力管桩一次性植桩方法 - Google Patents

预应力管桩一次性植桩方法 Download PDF

Info

Publication number
CN103243713A
CN103243713A CN2013101632146A CN201310163214A CN103243713A CN 103243713 A CN103243713 A CN 103243713A CN 2013101632146 A CN2013101632146 A CN 2013101632146A CN 201310163214 A CN201310163214 A CN 201310163214A CN 103243713 A CN103243713 A CN 103243713A
Authority
CN
China
Prior art keywords
pile
stake
drilling rod
sinking
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101632146A
Other languages
English (en)
Inventor
苏永刚
刘洁
崔凤祥
刘永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Original Assignee
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANCHENG JIYE GROUP CO Ltd filed Critical TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority to CN2013101632146A priority Critical patent/CN103243713A/zh
Publication of CN103243713A publication Critical patent/CN103243713A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开一种预应力管桩一次性植桩方法,该方法步骤为:植桩机就位;引孔作业;提升喷浆搅拌;下沉搅拌;二次提升喷浆搅拌;植桩机回原位吊装沉桩装置及管桩;旋入植桩;预留接桩工作面;为防止桩体下落特在孔口设置卡箍装置将下节桩体环抱固定后接入上节桩;焊接接桩;再次旋入植桩、作业完毕移至下一桩位。该方法的效果是可解决沉桩反力大,确保工程质量、提高桩周摩阻力30%,避免直接沉桩引起的对相邻建筑物影响和以往引孔机与沉桩机分开施工的过程,植桩机一次性完成引孔、土体搅拌加固和沉桩工艺,使工效提高一倍以上。节省了人力、时间,又使施工现场环境文明整洁,更重要的是节省了工程造价费用40%。

Description

预应力管桩一次性植桩方法
技术领域
本发明涉及一种植桩方法,特别是一种预应力管桩一次性植桩方法。
背景技术
随着城市建设的迅猛发展,可用于建设的土地资源越来越少,因此房屋建筑向高层发展,各种高层及超高层建筑成为当前建设的主导。对于高层及超高层建筑的基础工程,基础承载力的要求越来越高,建筑物沉降变形要求也越来越高。为满足承载力及变形要求,设计往往采用深长桩基础。
管桩及高强预应力混凝土管桩因其工厂化批量生产供应,具有单桩承载力高,桩身质量易控制保证,施工质量易控制,施工周期短,尤其静力压桩工艺具有施工噪声小的特点,得到广泛应用。由于建筑上部荷载较大,设计桩径和桩长多较大,桩往往打不到位;再者新建建筑比邻其他已建建筑和其他管线,直接打桩会使其受到影响和破坏,遇到这种情况,往往需要引孔后再把桩植入。以往植桩施工的过程,均是采用引孔机械和沉桩机沉桩两种设备,分开施工,一台引孔机、一台沉桩机交叉施工,场地占用面积大,交叉施工衔接不利,场地脏乱,既浪费了人力、时间又使现场施工环境脏乱嘈杂,更重要的是工程造价费用大大提升。
发明内容
针对上述存在的技术缺陷,本发明的目的是提出了一种预应力管桩一次性植桩方法,解决沉桩反力大和两台不同机型交叉施工的问题,以利于确保工程质量、降低工程造价、提高桩周摩阻力、减少占用施工场地,减少交叉施工和工序时差及避免直接沉桩引起的对相邻建筑物影响。
为实现上述目的,本发明采用的技术方案是提出一种预应力管桩一次性植桩方法,该方法包括有以下步骤:
a.植桩机就位:植桩机到指定桩位并对中就位;
b.引孔作业:启动植桩机,将植桩机的钻杆沿导向架下沉,启动植桩机的钻杆钻至设计深度;
c.提升喷浆搅拌:提升植桩机钻杆、开启送浆泵,向指定桩位的土体喷水泥浆,植桩机的钻杆边提升边喷水泥浆并搅拌水泥土;
d.下沉搅拌:植桩机提升钻杆喷浆至地面后,再次下沉并启动植桩机搅拌水泥土;
e.二次提升喷浆搅拌:重复c步骤的操作过程,然后植桩机钻杆移位至下一桩位重复a步骤和b步骤,卸下成孔钻杆至孔口,待喷浆、搅拌和沉桩;
f.植桩机回原位吊装沉桩装置及管桩:植桩机吊装沉桩装置,吊装管桩入b步骤引孔内;
g.旋入植桩:将管桩旋入已搅拌成型的桩孔内;
h.预留接桩工作面;
i.焊接接桩:上下节桩头之间用电焊接桩,为防止桩体下落,在孔口设置卡箍装置,将下节桩体环抱固定后焊接接上节桩;
j.再次旋入植桩:将连接好的桩体再次旋入水泥土中至设计标高;作业完毕移至下一已沉入成孔钻杆的桩位,进行下一节桩施工。
本发明的效果是:
1、能够保证水泥浆在桩体中分布均匀;
2、能够保证水泥浆在桩体中的掺入量;
3、能够保证孔内水泥土充分搅拌均匀,确保成桩质量和桩身质量;
4、植桩机一次性完成土体搅拌加固和沉桩使工效提高一倍以上。
通过该方法的实施,可解决沉桩反力大,确保工程质量、提高桩周摩阻力30%、避免直接沉桩引起的对相邻建筑物影响和以往施工的过程,钻机与沉桩机分开施工,既节省了人力、时间又改善了以往现场施工环境脏乱嘈杂的现象,更重要的是节省了工程造价费用40%。
附图说明
图1为本发明的预应力管桩一次性植桩方法实施例的现场操作示意图。
具体实施方式
结合附图对本发明的预应力管桩一次性植桩方法具体加以说明。
本发明的预应力管桩一次性植桩方法包括有以下步骤:
a.钻机就位:首先,对施工现场必进行平整压实,保证路、水、电通,根据设计意图,配备好人员及植桩机、经纬仪等机械仪器设备,操作人员必须熟悉地质条件,然后在平整压实的施工现场准确定好桩位点,做好明显的标志,包括成孔后的标志,植桩机到指定桩位并对中就位。
b.引孔作业:启动植桩机,将钻杆沿导向架向下沉至设计深度。植桩机就位准备引孔,植桩机在垂直、平稳就位后,首先稳定钻杆,再用两台经纬仪双向校正,然后开始作业成孔,如发现钻机钻头遇到障碍,应立即停钻处理,如引孔时发现严重塌孔,应立即提起钻头,采取有效措施,以保证成孔完成,在施工过程中要灵活掌握钻进的速度。植桩孔深度控制在桩尖高程以上的适当位置或不大于植入桩长总长的三分之二左右,以保持桩有一定的锚固长度和击入深度,以满足单桩容许承载力要求。同时,注意引孔孔距,以保证桩与桩的间距为3-4倍的桩径或桩的边长。
c.提升喷浆搅拌:提升植桩机的钻杆、开启送浆泵,向土体喷水泥浆,植桩机钻杆边提升边喷水泥浆并搅拌水泥土,直到孔口。
d.下沉搅拌:植桩机提升钻杆喷浆至地面后,再次下沉并启动植桩机搅拌水泥土。再次搅拌目的以使孔内水泥土充分搅拌,保证成孔质量。
e.二次喷浆搅拌:重复c步骤的操作过程,提升植桩机钻杆、开启送浆泵,向土体喷水泥浆,植桩机钻杆边提升边喷水泥浆并搅拌水泥土,直到孔口.然后植桩机钻杆移位至下一桩位重复a步骤和b步骤的操作过程,卸下成孔钻杆至孔口,待喷浆、搅拌和沉桩;以上三次搅拌两次喷浆过程保证了水泥浆在桩体分布均匀;能够保证水泥浆在桩体中的掺入量,能够保证桩孔内水泥土充分搅拌均匀,确保成桩质量和桩身质量。
f.植桩机回原位吊装沉桩装置及管桩:植桩机通过吊装沉桩装置将桩顶固定,起吊管桩入孔内。
g.旋入植桩:利用植桩机动力系统直接把桩旋入水泥土中,打桩机垂直、平稳就位,在孔内植入预应力管桩,在植桩过程应严格控制桩身垂直偏差不大于1%、沉桩深度达到设计要求、并作好一切技术资料的记录。由于该植桩机将引孔机械和沉桩机两种设备一体化,既节省人力、减少了交叉施工,减少场地占用工序时差,又使以往现场施工脏乱嘈杂的环境得到改善,更重要的是工程造价费用大大降低。
h.预留接桩面
i.焊接接桩:对于长桩需采用分段施工,桩接头之间用电焊接桩。当下节桩打至便于焊接的操作高度,距地面1m左右,同时应使桩尖避开硬土夹层时,将上节桩用桩架吊起,对准下节桩头用经纬仪在两个互成90°方向校正垂直度,然后将上下节桩端板对缝焊接。焊接应连续饱满,焊接时间应尽量缩短,以防止固结现象。焊接时为防止桩体下落,在孔口设置卡箍装置,将下节桩体环抱固定后接入上节桩。
j.再次旋入植桩:将连接好的桩体再次旋入水泥土中至设计标高;作业完毕移至下一已沉入成孔钻杆的桩位,进行下一节桩施工。然后作业完毕移至下一桩位,在送桩部位的虚孔回填虚土,防止人体下落,酿成事故。并及时清理现场水泥浆,保持施工现场文明施工,避免因流滑而发生安全事故。
该预应力管桩一次性植桩方法,通过引孔、三次搅拌两次喷浆、吊装沉桩、植桩、焊接等工艺过程,使植桩工艺应用范围扩大;该植桩机一次性完成引孔、土体搅拌加固和沉桩使工效提高一倍以上。
通过该方法的实施,解决沉桩反力大和两台不同机型交叉施工的问题,确保工程质量、提高桩周摩阻力30%、避免了由于建筑上部荷载较大,设计桩径和桩长多较大,桩往往打不到位;再者新建建筑比邻其他已建建筑和其他管线,直接打桩会使其受到影响和破坏的现象,引孔机与沉桩机分开施工一台引孔机、一台沉桩机交叉施工,既节省人力、减少了交叉施工,减少场地占用工序时差,又使以往现场施工脏乱嘈杂的环境得到改善,更重要的是节省了工程造价费用40%。

Claims (1)

1.一种预应力管桩一次性植桩方法,该方法的步骤包括有:
a.植桩机就位:植桩机到指定桩位并对中就位;
b.引孔作业:启动植桩机,将植桩机的钻杆沿导向架下沉,启动植桩机的钻杆钻至设计深度;
c.提升喷浆搅拌:提升植桩机钻杆、开启送浆泵,向指定桩位的土体喷水泥浆,植桩机的钻杆边提升边喷水泥浆并搅拌水泥土;
d.下沉搅拌:植桩机提升钻杆喷浆至地面后,再次下沉并启动植桩机搅拌水泥土;
e.二次提升喷浆搅拌:重复c步骤的操作过程,然后植桩机钻杆移位至下一桩位重复a步骤和b步骤,卸下成孔钻杆至孔口,待喷浆、搅拌和沉桩;
f.植桩机回原位吊装沉桩装置及管桩:植桩机吊装沉桩装置,吊装管桩入b步骤引孔内;
g.旋入植桩:将管桩旋入已搅拌成型的桩孔内;
h.预留接桩工作面;
i.焊接接桩:上下节桩头之间用电焊接桩,为防止桩体下落,在孔口设置卡箍装置,将下节桩体环抱固定后焊接接上节桩;
j.再次旋入植桩:将连接好的桩体再次旋入水泥土中至设计标高;作业完毕移至下一已沉入成孔钻杆的桩位,进行下一节桩施工。
CN2013101632146A 2013-05-07 2013-05-07 预应力管桩一次性植桩方法 Pending CN103243713A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101632146A CN103243713A (zh) 2013-05-07 2013-05-07 预应力管桩一次性植桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101632146A CN103243713A (zh) 2013-05-07 2013-05-07 预应力管桩一次性植桩方法

Publications (1)

Publication Number Publication Date
CN103243713A true CN103243713A (zh) 2013-08-14

Family

ID=48923565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101632146A Pending CN103243713A (zh) 2013-05-07 2013-05-07 预应力管桩一次性植桩方法

Country Status (1)

Country Link
CN (1) CN103243713A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019422A (zh) * 2015-06-04 2015-11-04 河海大学 表层土就地固化与桩组合承载的地基施工方法
CN105064351A (zh) * 2015-08-14 2015-11-18 云南大学 一种植桩方法
CN105297723A (zh) * 2015-10-28 2016-02-03 岩土科技股份有限公司 连续性水桩植入装置
CN105350539A (zh) * 2015-10-28 2016-02-24 岩土科技股份有限公司 推进式植桩机
CN105862861A (zh) * 2016-06-13 2016-08-17 上海强劲地基工程股份有限公司 一种刚性桩的植入设备与施工方法
CN106930273A (zh) * 2017-03-17 2017-07-07 济南轨道交通集团有限公司 一种钻孔高压气流振动植桩工艺及预制桩
CN108005079A (zh) * 2018-01-09 2018-05-08 天津建城基业集团有限公司 植入式预制桩注浆装置和植入式注浆工艺
CN108086311A (zh) * 2018-02-09 2018-05-29 上海强劲地基工程股份有限公司 一种智能化植桩施工设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058819A (zh) * 1991-05-13 1992-02-19 宁波市第二建筑工程公司 钻孔植桩法施工工艺
JPH0711633A (ja) * 1993-06-23 1995-01-13 Asahi Chem Ind Co Ltd 袋付き杭の施工方法および拡大掘削装置
CN201660892U (zh) * 2010-01-11 2010-12-01 周久仁 静压植桩引孔机
CN101974905A (zh) * 2010-10-22 2011-02-16 上海中技桩业股份有限公司 一种空心桩的植桩方法及实施该方法的螺旋钻
CN103015413A (zh) * 2012-12-26 2013-04-03 杭州南联土木工程科技有限公司 内植刚性体嵌入硬持力层复合桩的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058819A (zh) * 1991-05-13 1992-02-19 宁波市第二建筑工程公司 钻孔植桩法施工工艺
JPH0711633A (ja) * 1993-06-23 1995-01-13 Asahi Chem Ind Co Ltd 袋付き杭の施工方法および拡大掘削装置
CN201660892U (zh) * 2010-01-11 2010-12-01 周久仁 静压植桩引孔机
CN101974905A (zh) * 2010-10-22 2011-02-16 上海中技桩业股份有限公司 一种空心桩的植桩方法及实施该方法的螺旋钻
CN103015413A (zh) * 2012-12-26 2013-04-03 杭州南联土木工程科技有限公司 内植刚性体嵌入硬持力层复合桩的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈跃庆: "《地基与基础工程施工技术》", 30 September 2003, article ""植桩法施工"", pages: 161 - 5-19 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019422A (zh) * 2015-06-04 2015-11-04 河海大学 表层土就地固化与桩组合承载的地基施工方法
CN105019422B (zh) * 2015-06-04 2018-11-16 河海大学 表层土就地固化与桩组合承载的地基施工方法
CN105064351A (zh) * 2015-08-14 2015-11-18 云南大学 一种植桩方法
CN105297723B (zh) * 2015-10-28 2017-05-31 岩土科技股份有限公司 连续性水桩植入装置
CN105350539B (zh) * 2015-10-28 2017-03-29 岩土科技股份有限公司 推进式植桩机
CN105350539A (zh) * 2015-10-28 2016-02-24 岩土科技股份有限公司 推进式植桩机
CN105297723A (zh) * 2015-10-28 2016-02-03 岩土科技股份有限公司 连续性水桩植入装置
CN105862861A (zh) * 2016-06-13 2016-08-17 上海强劲地基工程股份有限公司 一种刚性桩的植入设备与施工方法
CN105862861B (zh) * 2016-06-13 2018-03-23 上海强劲地基工程股份有限公司 一种植桩施工方法
CN106930273A (zh) * 2017-03-17 2017-07-07 济南轨道交通集团有限公司 一种钻孔高压气流振动植桩工艺及预制桩
CN108005079A (zh) * 2018-01-09 2018-05-08 天津建城基业集团有限公司 植入式预制桩注浆装置和植入式注浆工艺
CN108005079B (zh) * 2018-01-09 2023-07-14 天津建城基业集团有限公司 植入式预制桩注浆装置和植入式注浆工艺
CN108086311A (zh) * 2018-02-09 2018-05-29 上海强劲地基工程股份有限公司 一种智能化植桩施工设备

Similar Documents

Publication Publication Date Title
CN103243713A (zh) 预应力管桩一次性植桩方法
CN101736760B (zh) 一种预应力抗浮锚杆施工方法
CN104234055B (zh) 一种预制桩后注浆装置及其工艺
CN105780763B (zh) 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法
CN105113498A (zh) 高强劲芯复合桩施工方法
CN104895055A (zh) 一种建筑灌注桩桩基施工方法
US20160340851A1 (en) Method for installing metal piles in permafrost soil
CN105297757A (zh) 一种流砂层桩基施工方法
CN102373705A (zh) 外掘预应力离心管桩、方桩沉桩装置及其沉桩方法
CN205857173U (zh) 一种应用在水上灌注桩的新型钢护筒护套
CN103243740A (zh) 旋挖、长螺旋组合钻孔压灌混凝土咬合桩连续墙施工方法
CN102134861B (zh) 土体内预制桩试桩方法
CN205444192U (zh) 一种桥梁桩冲桩施工系统
CN205369231U (zh) 一种钻孔灌注钢管桩
CN204715382U (zh) 一种平原地区公路用钢波纹管形式渗井
CN204728318U (zh) 长螺旋钻孔水泥浆护壁式植入管桩的施工装置
CN203878590U (zh) 一种灌注桩后加固结构
CN105970917A (zh) 一种控制钻孔灌注桩桩顶超灌混凝土的方法
CN108049804B (zh) 松散地层非开挖原位换填螺旋钻进方法
CN102296592A (zh) 现浇x形钢筋混凝土桩地下连续墙的施工方法
CN101349059A (zh) 长螺旋钻机压灌钢筋混凝土新技术
CN211816292U (zh) 一种富水砂层锚杆施工防流沙装置
CN203924043U (zh) 一种竹筋混凝土桩
CN208604615U (zh) 一种用于沉井施工的加压下沉装置
CN106567397A (zh) 深基坑地下水的控制方法及控制装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130814