CN103240281B - 一种轧制镁合金输送辊道的保温装置 - Google Patents

一种轧制镁合金输送辊道的保温装置 Download PDF

Info

Publication number
CN103240281B
CN103240281B CN201310163919.8A CN201310163919A CN103240281B CN 103240281 B CN103240281 B CN 103240281B CN 201310163919 A CN201310163919 A CN 201310163919A CN 103240281 B CN103240281 B CN 103240281B
Authority
CN
China
Prior art keywords
air
hot
heat
roller
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310163919.8A
Other languages
English (en)
Other versions
CN103240281A (zh
Inventor
李昕涛
黄庆学
冯晓鹏
黄志权
袁东磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Science and Technology
Original Assignee
Taiyuan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Science and Technology filed Critical Taiyuan University of Science and Technology
Priority to CN201310163919.8A priority Critical patent/CN103240281B/zh
Publication of CN103240281A publication Critical patent/CN103240281A/zh
Application granted granted Critical
Publication of CN103240281B publication Critical patent/CN103240281B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Rolling (AREA)

Abstract

一种轧制镁合金输送辊道的保温装置,属于轧机输送辊道技术领域,特征是在轧机前后辊道组上分别安装了一个在其箱内装有温度传感器和压力传感器的辊道保温箱,在保温箱的外侧分别安装有一个在箱内安装有温度传感器和压力传感器的热空气制备箱,热空气制备箱将制备的热空气通过管道输送到辊道保温箱中,对镁板材进行保温,同时保温箱中,将冷却了的热空气通过管道回收到热空气制备箱内循环加热,热空气制备箱还与补气管道相连接,将新鲜空气通过干燥过滤器和鼓风机进入热空气制备箱中。优点是通过辊道保温箱对轧制件进行保温,可有效地保证了镁板材在轧制过程中温度不受外部冷热变化的影响,避免产生裂纹和力学性能的降低。

Description

一种轧制镁合金输送辊道的保温装置
技术领域
本发明属于轧机输送辊道技术领域,具体涉及一种轧制镁合金输送辊道的保温装置。
背景技术
目前,国内外采用轧制镁板材料的生产过程是将加热的镁板坯通过输送辊道送进轧机进行轧制,在此输送过程中镁板坯在由加热炉出来输进轧机的过程中及在往复轧制的过程中,受外界冷空气的影响,镁板坯的外层的温度会发生变化,上下左右外层温度与中间的温度都会产生温差,将导致轧制后的镁板材两侧边缘会产生不均匀的裂纹,而且还会造成镁板周边应力不均,影响镁板材的力学性能。为获得合格的镁板材,往往是将轧制后的镁板材通过机加工剥去外表有裂纹的部分,只取中间部分应用,这将会造成很大的浪费。
发明内容
本发明的目的是提供一种输送辊道的保温装置,可有效地克服现有技术存在的缺点。
本发明目的是这样实现的,如图1、2所示,它是将轧机14前后的辊道组上分别安装一个在箱内装有压力传感器和温度传感器的辊道保温箱1和1',所述的轧机前后的辊道组是指辊道组长度L是轧制后镁板材长度的1.2倍,现以轧机右侧的辊道箱为例:在该辊道保温箱1的外侧安装有一个箱内装有温度传感器11和压力传感器10的热空气制备箱9,该热空气制备箱9通过其上安有高温调速阀13的热空气输送管12与辊道保温箱1的底部相连通,同时,热空气制备箱9还通过其上面安装有鼓风机5及过滤器4的热空气回收管3与辊道保温箱1内输送辊的上侧相连通,热空气制备箱9还通过鼓风机8和过滤器7与用于补充空气的补气管6连通。热空气回收管3和补气管6分别与热空气制备箱9连接处均安装有单向阀27、27'。图3为辊道保温箱1的横向剖视图,辊道保温箱1内周边安装有保温层23,辊道保温箱腔内上面安装有热空气回收装置21,辊道保温箱腔内下面安装有空气均匀扩散器25。
本发明优点及积极效果是:
1、将轧机前后辊道组由原来的敞开式改变为半封闭式,保证了轧机前后输送辊道组与周围环境隔离,从而保证了在轧制过程中轧件温度不受到外部温度变化的影响。例如,由于镁板的燃点为650摄氏度,轧制镁板时的最优温度为400摄氏度,如果封闭轧制,当轧机内的温度高于650摄氏度时,会引起镁板的自燃,严重时,会导致安全事故。但是,如果将轧机裸露在空气中,不能保证镁板表面温度和中心温度相同,严重影响轧制后镁板的力学性能以及生产效率,所以采用半封闭机构。
2、采用热空气循环保温的方法,优点是,可以在镁板的周围形成恒温层,保证镁板轧制需要的温度,并且使镁板的表层和中心的温度一致,传统的电热丝利用热辐射的方式,镁板的受热会不均匀,轧制后,易出现力学性能差,残余应力大。
3、采用热空气的循环方式,一定温度的热空气从热空气制备箱送出之后,从输送辊的下面送入辊道保温箱,对镁板保温的热空气是自下而上循环进行的,给镁板一个一定温度的气体保护层,循环流动的气体从上面的管道收集,轧辊上侧安装热空气回收罩,把带有余热的空气经过过滤器,再输送回热空气制备装箱,循环利用节省热源。
4、采用智能温度、压力控制系统,对输送辊道上下两侧空间的温度进行实时监测,并对输送辊箱体内的压力进行实时监测,在输送热空气的管路上安装高温调速阀,调节热空气的流速,保证镁板轧制时具有的合理温度和压力。
附图说明:
图1为本发明立体结构示意图;
图2为本发明的结构俯视图;
图3为图2的正视图;
图4为图3中A-A的剖视图;
图中:1-辊道保温箱,2-辊道电动机,3-热空气回收管道,4-过滤器,5、8-鼓风机,6-补气管道,7-过滤器,9-热空气制备箱,10-压力传感器,11-温度传感器,12-热空气输送管道,13-高温调速阀,14-轧机,15-安装在轧机上面的热空气回收罩,16-轧机主电机,17-减速箱,18-万向接轴,19-输送辊道,20-镁板坯,21-热空气回收装置,22-热空气回收支管道,23-保温层,24-保温箱壳体,25-空气均匀扩散器,26-热空气输送支管道,27、27'-单向阀。
具体实施方式
轧制生产前,首先将热空气制备箱9的加热电源打开,通过电阻丝将热空气制备箱9内气体加热至设定的温度,通过热空气管道12将热空气输送到辊道保温箱1内,使辊道保温箱1内的温度保持在轧制镁板时的合理温度,再将加热了的镁板坯传送至辊道保温箱1中,然后进入轧机轧制,同时,将辊道保温箱1中降了温的热空气通过热空气回收装置21及热空气回收支管道22、和热空气回收管道3及管道上安装的过滤器4、鼓风机5,将热空气输入到热空气制备箱9内进行循环加热,同时,通过补气管道6及过滤器7和鼓风机8将新鲜空气输入到热空气制备箱9内,用以补充循环流失的热空气。

Claims (1)

1.一种轧制镁合金输送辊道的保温装置,其结构特征是在轧机(14)的前后输送辊道组上分别安装了一个在其箱内装有压力传感器和温度传感器的辊道保温箱(1,1'),在轧机(14)的前输送辊道组上的辊道保温箱(1)的外侧安装一个箱内装有压力传感器(10)和温度传感器(11)的热空气制备箱(9),该热空气制备箱(9)通过其上安装有高温调速阀(13)的热空气输送管道(12)与辊道保温箱(1)的底部相连通,同时,热空气制备箱(9)还通过其上面安装有鼓风机(5)、过滤器(4)的热空气回收管道(3)与辊道保温箱(1)内输送辊道上侧相连通,热空气制备箱(9)还通过鼓风机(8)和过滤器(7)与用于补充空气的补气管道(6)相连通,热空气回收管道(3)和补气管道(6)分别与热空气制备箱(9)连接处均分别安装有单向阀(27,27'),辊道保温箱(1)内周边安装有保温层(23),辊道保温箱腔内上面安装有热空气回收装置(21),辊道保温箱腔内下面安装有热空气均匀扩散器(25);轧机(14)的后输送辊道组上的辊道保温箱(1')的构造与前输送辊道组上的辊道保温箱(1)的构造相同。
CN201310163919.8A 2013-05-07 2013-05-07 一种轧制镁合金输送辊道的保温装置 Expired - Fee Related CN103240281B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310163919.8A CN103240281B (zh) 2013-05-07 2013-05-07 一种轧制镁合金输送辊道的保温装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310163919.8A CN103240281B (zh) 2013-05-07 2013-05-07 一种轧制镁合金输送辊道的保温装置

Publications (2)

Publication Number Publication Date
CN103240281A CN103240281A (zh) 2013-08-14
CN103240281B true CN103240281B (zh) 2015-05-20

Family

ID=48920352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310163919.8A Expired - Fee Related CN103240281B (zh) 2013-05-07 2013-05-07 一种轧制镁合金输送辊道的保温装置

Country Status (1)

Country Link
CN (1) CN103240281B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105149352B (zh) * 2015-09-30 2017-11-07 中镁镁业有限公司 变形镁合金板带材在线补温、恒温轧制与卷取的方法
CN112845638B (zh) * 2020-12-30 2022-09-27 哈尔滨工业大学(威海) 金属丝拉拔设备

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203408987U (zh) * 2013-05-07 2014-01-29 太原科技大学 一种轧制镁合金输送辊道的保温装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3351368B2 (ja) * 1998-12-14 2002-11-25 日本鋼管株式会社 鋼材の圧延方法
WO2004000476A1 (en) * 2002-06-07 2003-12-31 Nippon Steel Corporation Hot rolling method and apparatus for hot steel sheet
JP5264140B2 (ja) * 2007-10-16 2013-08-14 Ihiメタルテック株式会社 マグネシウム合金熱間圧延装置
CN102125932B (zh) * 2010-12-16 2012-11-07 重庆研镁科技有限公司 一种镁合金热轧装置及轧制加热的方法
US9248482B2 (en) * 2011-03-11 2016-02-02 Fata Hunter, Inc. Magnesium roll mill

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203408987U (zh) * 2013-05-07 2014-01-29 太原科技大学 一种轧制镁合金输送辊道的保温装置

Also Published As

Publication number Publication date
CN103240281A (zh) 2013-08-14

Similar Documents

Publication Publication Date Title
CN206019184U (zh) 利用生物质燃料的果蔬烘干机
CN203443278U (zh) 一种陶瓷远红外聚氨酯合成革涂层烘箱
CN206618240U (zh) 一种节能的热风烘燥装置
CN103240281B (zh) 一种轧制镁合金输送辊道的保温装置
CN203408987U (zh) 一种轧制镁合金输送辊道的保温装置
CN103350189B (zh) 铸造废砂干燥、冷却的方法及设备
CN203642645U (zh) 一种干燥系统
CN107976017A (zh) 一种具有空气预热与回热功能的太阳能烘干房
CN204881147U (zh) 用于无烟无臭节能环保排蜡的隧道窑
CN204359061U (zh) 一种腊肠烘房
CN102517834B (zh) 智能pid控制的防油污定型机余热回收器及其温控方法
CN105180650A (zh) 一种用于无烟无臭节能环保排蜡的隧道窑
CN205351967U (zh) 中低温循环干燥设备
CN204128177U (zh) 一种新型的热风烘箱
CN205002539U (zh) 带风管的余热回收式烘干机组
CN104499340A (zh) 一种浸渍纸干燥箱的保温箱壁
CN104534860A (zh) 一种浸渍纸干燥箱的高效保温箱壁
CN208679409U (zh) 一种蒸汽磨除尘器预热装置
CN107097376A (zh) 一种玻璃纤维棉毡连续压力成型装置
CN206160638U (zh) 超硬砂轮烘干装置
CN201876146U (zh) 窑炉余热利用系统
CN202635574U (zh) 一种用于烟叶烘烤的除湿热回收利用装置
CN204294475U (zh) 一种用于干燥箱的废热回收装置
CN205874205U (zh) 一种玻璃钢化炉热循环的强制对流装置
CN104154751A (zh) 铸石生产中热能源再利用系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

CF01 Termination of patent right due to non-payment of annual fee