CN103236766A - Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator - Google Patents

Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator Download PDF

Info

Publication number
CN103236766A
CN103236766A CN2013101568173A CN201310156817A CN103236766A CN 103236766 A CN103236766 A CN 103236766A CN 2013101568173 A CN2013101568173 A CN 2013101568173A CN 201310156817 A CN201310156817 A CN 201310156817A CN 103236766 A CN103236766 A CN 103236766A
Authority
CN
China
Prior art keywords
magnetic pole
center
weight
strip plate
upper bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101568173A
Other languages
Chinese (zh)
Other versions
CN103236766B (en
Inventor
郑德江
张书友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadong Tianhuangping Pump Storage Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
Huadong Tianhuangping Pump Storage Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadong Tianhuangping Pump Storage Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical Huadong Tianhuangping Pump Storage Co Ltd
Priority to CN201310156817.3A priority Critical patent/CN103236766B/en
Publication of CN103236766A publication Critical patent/CN103236766A/en
Application granted granted Critical
Publication of CN103236766B publication Critical patent/CN103236766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The invention discloses a magnetic pole center positioning process used in the process of assembling and disassembling a magnetic pole of a generator, which comprises the following steps of preparing a strip board, wherein the length of the strip board is greater than the width of 1,080mm between upper rack support arms; searching a midpoint position in the length of the strip board, arranging a positioning point at the midpoint position and hanging a weight at the positioning point by a perpendicular line; searching a support arm center position of the two upper rack support arms and horizontally erecting the strip board on which the weight is hung between the two upper rack support arms, so that the perpendicular line and the support arm center position are positioned on the same straight line, wherein the weight is positioned above a magnetic yoke and is at a distance of 4 to 5cm with the magnetic yoke; and manually turning to enable the center line of the magnetic pole, the perpendicular line and the center position of the upper rack support arms to be positioned on the same straight line. According to the invention, the problem that the center cannot be accurately aligned in the process of assembling and disassembling the magnetic pole is solved; the problem that the magnetic pole is slantingly pulled and hoisted when being lifted by an electric hoist can be avoided; times of turning can be greatly reduced; the operating time of a high pressure oil injection pump is reduced; and working efficiency is improved.

Description

Pole center positioning process during the generator magnetic pole dismounting
Technical field
The present invention relates to be applied to the technology in generator dismounting field, particularly pole center positioning process during the generator magnetic pole dismounting.
Background technology
The generator unit is when machine maintenance now, pole center is definite by estimating by the service work personnel usually, the easy like this pole center location of causing is inaccurate, the service work personnel adjust the position of dismounting magnetic pole by artificial jiggering, perhaps the service work personnel think that the dismounting magnetic pole puts in place, but in fact the center exists deviation, and magnetic pole can tiltedly be drawn when lifting, causes damage easily.
Summary of the invention
The objective of the invention is to pole center positioning process when a kind of generator magnetic pole dismounting is provided.It can avoid magnetic pole to be hung and impaired by askew skewing when dismounting, and the number of times of minimizing jiggering is increased work efficiency, and reduces working strength of workers.
Technical scheme of the present invention: pole center positioning process during the generator magnetic pole dismounting, it is characterized in that, comprise the steps:
A. prepare a strip plate, the length of strip plate is greater than the width 1080mm between upper bracket-arm;
B, find the midpoint of strip plate length, in this midpoint one anchor point is set, articulate a weight at anchor point by vertical line;
C, find the support arm center between two upper bracket-arms, the strip plate level that is mounted with weight is set up between two upper bracket-arms, make vertical line and support arm center be positioned at same straight line, and weight being positioned at the top place of yoke, is 4-5cm apart from yoke;
D, by artificial jiggering, make the center line of magnetic pole and vertical line, upper bracket-arm be centered close to same straight line.
In the pole center positioning process, the strip plate is plank during aforesaid generator magnetic pole dismounting, and its length is 1500-1550mm, and width is 85-95mm, and thickness is 20-30mm.
Compared with prior art, the strip plate midpoint of the present invention between generator frame upper arm arranges anchor point, and the place articulates weight by vertical line at anchor point, finds pole center easily by artificial jiggering.The present invention is by above-mentioned technical scheme, make magnetic pole be parked in center between the upper bracket-arm, solved magnetic pole center problems of missing aim when dismounting, can avoid magnetic pole by the askew problem of hanging that skews of time appearance with the electric hoist lifting, can also significantly reduce the number of times that reduces jiggering, reduce high pressure oiling pump running time, reduce personnel labor intensity, increase work efficiency.
Description of drawings
Fig. 1 is structural representation of the present invention.
Being labeled as in the accompanying drawing: 1-upper bracket-arm, 2-magnetic pole, 3-strip plate, 4-vertical line, 5-weight, 6-yoke, 7-support arm center.
Embodiment
The present invention is further illustrated below in conjunction with drawings and Examples, but not as the foundation to the present invention's restriction.
Embodiment.Pole center positioning process during the generator magnetic pole dismounting comprises the steps: that A. prepares a strip plate 3, and the length of strip plate 3 is greater than the width 1080mm of 1 of upper bracket-arm;
B, find the midpoint of strip plate 3 length, in this midpoint one anchor point is set, articulate a weight 5 at anchor point by vertical line 4;
C, find the support arm center 7 between two upper bracket-arms 1, strip plate 3 level frames that are mounted with weight are set between two upper bracket-arms 1, make vertical line 4 and support arm center 7 be positioned at same straight line, and weight being positioned at the place, top of yoke 6, is 4-5cm apart from yoke;
D, by artificial jiggering, make the center line of magnetic pole 2 and vertical line, upper bracket-arm be centered close to same straight line.
Strip plate 3 can be plank, and its length is 1500-1550mm, and width is 85-95mm, and thickness is 20-30mm.Preferred sizes is that length is 1520mm, and width is 90mm, and thickness is 25mm.Size is more moderate like this, can stably be erected between the upper bracket-arm, not waste material.
The dismounting process of generator magnetic pole: prepare a strip plate 3, the length of strip plate 3 is greater than the width 1080mm of 1 of upper bracket-arm; Find the midpoint of strip plate 3 length, in this midpoint one anchor point is set, articulate a weight 5 at anchor point by vertical line 4; Find the support arm center 7 between two upper bracket-arms 1, strip plate 3 level frames that are mounted with weight are set between two upper bracket-arms 1, make vertical line 4 and support arm center be positioned at same straight line, and weight being positioned at the place, top of yoke 6, is 4-5cm apart from yoke; By artificial jiggering, make the center line of magnetic pole 2 and vertical line, upper bracket-arm be centered close to same straight line, the center of magnetic pole this moment between upper bracket-arm is namely between middle two screw rods of magnetic pole connecting line pressing plate.Carry out mark in the position of upper bracket-arm placement strip plate 3 then, when other magnetic poles of dismounting, strip plate 3 is placed on same position, very simple and efficient.
After the center of magnetic pole found accurately,, can avoid occurring because of the askew situation about being damaged of hanging that skews with magnetic pole lifting dismounting with electric hoist or other boom hoistings.

Claims (2)

1. pole center positioning process during the generator magnetic pole dismounting is characterized in that, comprises the steps:
A. prepare a strip plate (3), the length of strip plate (3) is greater than the width 1080mm between upper bracket-arm (1);
B, find the midpoint of strip plate (3) length, in this midpoint one anchor point is set, articulate a weight (5) at anchor point by vertical line (4);
C, find the support arm center (7) between two upper bracket-arms (1), strip plate (3) level frame that is mounted with weight is set between two upper bracket-arms (1), make vertical line (4) and support arm center (7) be positioned at same straight line, and weight is positioned at the place, top of yoke (6), is 4-5cm apart from yoke;
D, by artificial jiggering, make the center line of magnetic pole (2) and vertical line, upper bracket-arm be centered close to same straight line.
2. pole center positioning process during generator magnetic pole dismounting according to claim 1, it is characterized in that: described strip plate (3) is plank, and its length is 1500-1550mm, and width is 85-95mm, and thickness is 20-30mm.
CN201310156817.3A 2013-04-28 2013-04-28 Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator Active CN103236766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310156817.3A CN103236766B (en) 2013-04-28 2013-04-28 Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310156817.3A CN103236766B (en) 2013-04-28 2013-04-28 Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator

Publications (2)

Publication Number Publication Date
CN103236766A true CN103236766A (en) 2013-08-07
CN103236766B CN103236766B (en) 2015-07-22

Family

ID=48884789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310156817.3A Active CN103236766B (en) 2013-04-28 2013-04-28 Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator

Country Status (1)

Country Link
CN (1) CN103236766B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1337028A2 (en) * 1995-05-02 2003-08-20 Oppama Industry Co., Ltd. A magneto electric generator rotor
CN1937368A (en) * 2006-10-16 2007-03-28 四川东风电机厂有限公司 Water wheel generator polecore assembling process
CN101404431A (en) * 2008-07-24 2009-04-08 哈尔滨电机厂有限责任公司 Pole core assembly technique for punching quadrant iron type through-flow generator
CN101640457A (en) * 2008-07-31 2010-02-03 上海电气集团上海电机厂有限公司 Method for installing magnetic poles of AC/AC variable-frequency steel-rolling motor rotors
CN102403864A (en) * 2011-11-14 2012-04-04 株洲南车时代电气股份有限公司 Permanent-magnet motor suitable for batch production and magnetic pole locating method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1337028A2 (en) * 1995-05-02 2003-08-20 Oppama Industry Co., Ltd. A magneto electric generator rotor
CN1937368A (en) * 2006-10-16 2007-03-28 四川东风电机厂有限公司 Water wheel generator polecore assembling process
CN101404431A (en) * 2008-07-24 2009-04-08 哈尔滨电机厂有限责任公司 Pole core assembly technique for punching quadrant iron type through-flow generator
CN101640457A (en) * 2008-07-31 2010-02-03 上海电气集团上海电机厂有限公司 Method for installing magnetic poles of AC/AC variable-frequency steel-rolling motor rotors
CN102403864A (en) * 2011-11-14 2012-04-04 株洲南车时代电气股份有限公司 Permanent-magnet motor suitable for batch production and magnetic pole locating method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘云: "《水轮发电机故障处理与检修》", 31 December 2002, article "转子磁极挂装", pages: 211-216 *
富丹华等: "《水轮发电机组及辅助设备运行与维修》", 31 January 2005, article "立式机组固定部件中心找正", pages: 128-130 *
杨光等: "永磁三相同步电动机装配工艺", 《防爆电机》, vol. 47, no. 6, 31 December 2012 (2012-12-31), pages 57 - 58 *

Also Published As

Publication number Publication date
CN103236766B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN201848508U (en) Automatic dip-coating device for sand core
CN201961961U (en) Tool for hoisting crankshaft of high-pressure plunger pump
CN103303787B (en) Clamping device for lifting assembled shear web plates in wind turbine blade
CN202626328U (en) Electrophoretic tank for curing section bars
CN202186835U (en) Device for hoisting motor stator
CN203474231U (en) Steel bar tower safety hoisting device
CN103236766B (en) Magnetic pole center positioning process used in process of assembling and disassembling magnetic pole of generator
CN104129730B (en) A kind of transformer and JP cabinet dismounting suspender
CN203728448U (en) Light mounting and dismounting frame for tower crane
CN206646424U (en) A kind of express highway intelligent speed limit direction board
CN102182406A (en) Device for replacing and lifting hair plait of oil pumping unit
CN201817243U (en) Platform and device for replacing conductor rail
CN203998724U (en) A kind of tower machine attached wall assembling and disassembling stand
CN204342318U (en) Single pulley type crane arm pull bar
CN203333145U (en) Self-separation type special lifting tool for cylinder-shaped proximate matter
CN202657821U (en) Impeller assembly-disassembly lifting device of no-split centrifugal compressor
CN203781628U (en) Hoisting tool for rectangular steel plate
CN202591916U (en) A hydraulic cylinder hinge pin installation device
CN102756988A (en) Movable sling for mounting expansion joint of comb plate
CN202829430U (en) Movable type lifting appliance for comb plate expansion joint installation
CN201704012U (en) Spacing rod hoisting device
CN204096975U (en) A kind of rolling box renovates lifting appliance
CN205089695U (en) Can split type large -scale condensate pump
CN213923819U (en) Hoisting frame convenient to assemble and used for mechanical equipment
CN203345912U (en) Portable special suspension tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant