CN103231187A - Soldering device - Google Patents

Soldering device Download PDF

Info

Publication number
CN103231187A
CN103231187A CN201310171304XA CN201310171304A CN103231187A CN 103231187 A CN103231187 A CN 103231187A CN 201310171304X A CN201310171304X A CN 201310171304XA CN 201310171304 A CN201310171304 A CN 201310171304A CN 103231187 A CN103231187 A CN 103231187A
Authority
CN
China
Prior art keywords
steel ball
forming cover
handle
jacket
moulding cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310171304XA
Other languages
Chinese (zh)
Other versions
CN103231187B (en
Inventor
程鸿林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhonglei Optoelectronics Co ltd
Original Assignee
SUZHOU BOXUN INSTRUMENTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU BOXUN INSTRUMENTS CO Ltd filed Critical SUZHOU BOXUN INSTRUMENTS CO Ltd
Priority to CN201310171304.XA priority Critical patent/CN103231187B/en
Publication of CN103231187A publication Critical patent/CN103231187A/en
Application granted granted Critical
Publication of CN103231187B publication Critical patent/CN103231187B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pressure Vessels And Lids Thereof (AREA)
  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)

Abstract

本发明公开了一种焊补装置,包括成型罩、夹套、带柄钢球和石棉环条;夹套为三臂弹性夹具,其圆形口直径略大于成型罩圆形上开口,成型罩底部有方形槽,可放置石棉环条。带柄钢球可以为硬质橡胶材料。焊补前,将夹套三条夹臂从成型罩圆形上开口缩形伸入,再将带柄钢球从成型罩方形下开口置入夹套三条夹臂中间,可以成悬空夹紧状态,并将石棉环条均匀的嵌于成型罩的底部方形槽中。焊补后,用硬物推动带柄钢球,并将夹套从成型罩中拔出,此时沿成型罩圆形上开口方向拉钢球柄,直至受压封闭。本发明所述的焊补装置结构简单、可在短时间内做到不必要对气、液容器进行停输或降压的前提下,进行修复漏点并瞬间止漏。

Figure 201310171304

The invention discloses a welding repair device, which comprises a forming cover, a jacket, a steel ball with a handle and an asbestos ring strip; There is a square groove at the bottom to place asbestos ring strips. The steel ball with handle can be hard rubber material. Before welding repair, shrink and extend the three clamp arms of the jacket from the circular upper opening of the forming cover, and then place the steel ball with handle from the square lower opening of the forming cover into the middle of the three clamp arms of the jacket, which can be in a suspended clamping state. And the asbestos ring strips are evenly embedded in the square groove at the bottom of the forming cover. After welding repair, use a hard object to push the steel ball with handle, and pull out the jacket from the forming cover. At this time, pull the steel ball handle along the direction of the circular upper opening of the forming cover until it is closed under pressure. The welding repair device of the present invention has a simple structure, and can repair leaks and stop leaks instantaneously under the premise of unnecessary stoppage or depressurization of gas and liquid containers in a short period of time.

Figure 201310171304

Description

一种焊补装置A welding repair device

  the

【技术领域】【Technical field】

本发明涉及机械构造领域,尤其涉及一种焊补装置。 The invention relates to the field of mechanical structures, in particular to a welding repair device.

【背景技术】【Background technique】

随着一些容器、管道运行时间的持续增长,材质老化日趋严重,其表面产生裂缝或砂眼后,成喷射状泄漏,由于容器内的压力,直接用电焊焊补是达不到目的的,泄漏量只会越补越大。目前对于气、液容器的表面砂眼、裂缝等的封补抢修,一个是采用停输介质,进行捻压或加入塞具阻止其渗漏,再加入弧板焊接或卡具,达到堵漏的目的。另一种方法如图七所示,主要由固定支架8和压紧螺钉1组成,压紧螺钉1的前端设有连接帽3并与压紧垫块4连接为一体,在压紧垫块4下面设有密封垫片5。通常泄漏是由于腐蚀、开裂、受力变形等原因造成,所以此种办法的堵压密封效果一般很难奏效。即使该方法勉强可行,却不是长久之计,最终还是要进行二次作业,在停输介质后再进行焊补作业,未能一次性解决问题。现有的堵漏方法虽然可行,但是容易造成机械设备的损坏,另一方面该种方法及不安全,如果压力有所变动动,塞具将有可能受力弹出,造成恶性事故的发生。 With the continuous increase of the running time of some containers and pipelines, the aging of the material is becoming more and more serious. After cracks or sand holes appear on the surface, they leak in a spray shape. Due to the pressure in the container, it is impossible to directly repair the purpose by electric welding. It will only get bigger and bigger. At present, for the sealing and emergency repair of trachoma and cracks on the surface of gas and liquid containers, one is to use the stop medium, twist and press or add plugs to prevent leakage, and then add arc plate welding or fixtures to achieve the purpose of plugging . Another method, as shown in Figure 7, is mainly composed of a fixing bracket 8 and a compression screw 1. The front end of the compression screw 1 is provided with a connecting cap 3 and is connected with the compression pad 4 as a whole. A sealing gasket 5 is provided below. Usually leakage is caused by reasons such as corrosion, cracking, stress deformation, etc., so the sealing effect of this method is generally difficult to be effective. Even if this method is barely feasible, it is not a long-term solution. In the end, a secondary operation is required, and the welding repair operation is performed after the medium is stopped, which fails to solve the problem once. Although the existing plugging method is feasible, it is easy to cause damage to mechanical equipment. On the other hand, this method is not safe. If the pressure fluctuates, the plug may be ejected by force, resulting in a vicious accident.

【发明内容】【Content of invention】

针对现有技术的缺点,本发明的目的在于提供一种安全可靠,操作简便,使用性强,且对于一般的气、液容器不必进行停输或降压的焊补装置。 Aiming at the shortcomings of the prior art, the purpose of the present invention is to provide a welding repair device that is safe, reliable, easy to operate, and strong in usability, and does not need to stop or reduce pressure for general gas and liquid containers.

本发明采用的技术方案是:一种焊补装置,其特征在于:包括成型罩、夹套、带柄钢球和石棉环条;夹套为三臂弹性夹具,其圆形口直径略大于成型罩圆形上开口,成型罩底部有方形槽,可放置石棉环条。 The technical solution adopted in the present invention is: a welding repair device, characterized in that it includes a forming cover, a jacket, a handle steel ball and an asbestos ring strip; the jacket is a three-arm elastic clamp, and the diameter of its circular opening is slightly larger The upper opening of the cover is circular, and there is a square groove at the bottom of the forming cover, which can place asbestos ring strips.

进一步的,带柄钢球可以为硬质橡胶材料的圆球。 Further, the steel ball with a handle can be a hard rubber ball.

进一步的,焊补前,将夹套三条夹臂从成型罩圆形上开口缩形伸入,再将带柄钢球从成型罩方形下开口置入夹套三条夹臂中间,可以成悬空夹紧状态,并将石棉环条均匀的嵌于成型罩的底部方形槽中。 Further, before the welding repair, the three clamping arms of the jacket are retracted and extended from the circular upper opening of the forming cover, and then the steel ball with a handle is inserted into the middle of the three clamping arms of the jacket from the square lower opening of the forming cover to form a suspended clamp. Tight state, and evenly embed the asbestos ring strips in the square groove at the bottom of the forming cover.

进一步的,焊补后,用硬物推动带柄钢球,并将夹套从成型罩中拔出,此时沿成型罩圆形上开口方向拉钢球柄,直至受压封闭。 Further, after welding repair, push the steel ball with handle with a hard object, and pull out the jacket from the forming cover. At this time, pull the steel ball handle along the direction of the circular upper opening of the forming cover until it is closed under pressure.

本发明的有益效果在于:结构简单、可在短时间内做到不必要对气、液容器进行停输或降压的前提下,进行修复漏点并瞬间止漏。 The beneficial effect of the present invention is that the structure is simple, and the leakage point can be repaired and the leakage can be stopped instantaneously under the premise that the gas and liquid containers need not be stopped or depressurized in a short period of time.

【附图说明】【Description of drawings】

下面结合附图对本发明作进一步的描述。 The present invention will be further described below in conjunction with the accompanying drawings.

图1是本发明结构示意图; Fig. 1 is a structural representation of the present invention;

图2 是本发明焊接示意图; Fig. 2 is the welding schematic diagram of the present invention;

图3是本发明密封示意图; Fig. 3 is a schematic diagram of sealing of the present invention;

1、带柄钢球  2、夹套  3、成型罩  4、石棉环条  5、容器壁  6、砂眼  7、焊枪  1. Steel ball with handle 2. Jacket 3. Forming cover 4. Asbestos ring strip 5. Container wall 6. Trachoma 7. Welding torch

【具体实施方式】【Detailed ways】

参见附图,本发明采用了一种焊补装置,其特征在于:包括成型罩、夹套、带柄钢球和石棉环条;夹套为三臂弹性夹具,其圆形口直径略大于成型罩圆形上开口,成型罩底部有方形槽,可放置石棉环条。 Referring to the accompanying drawings, the present invention adopts a welding repair device, which is characterized in that it includes a forming cover, a jacket, a handle steel ball and an asbestos ring strip; the jacket is a three-arm elastic clamp, and the diameter of its circular opening is slightly larger than that of the forming The upper opening of the cover is circular, and there is a square groove at the bottom of the forming cover, which can place asbestos ring strips.

进一步的,带柄钢球可以为硬质橡胶材料的圆球。 Further, the steel ball with a handle can be a hard rubber ball.

进一步的,焊补前,将夹套三条夹臂从成型罩圆形上开口缩形伸入,再将带柄钢球从成型罩方形下开口置入夹套三条夹臂中间,可以成悬空夹紧状态,并将石棉环条均匀的嵌于成型罩的底部方形槽中。 Further, before the welding repair, the three clamping arms of the jacket are retracted and extended from the circular upper opening of the forming cover, and then the steel ball with a handle is inserted into the middle of the three clamping arms of the jacket from the square lower opening of the forming cover to form a suspended clamp. Tight state, and evenly embed the asbestos ring strips in the square groove at the bottom of the forming cover.

进一步的,焊补后,用硬物推动带柄钢球,并将夹套从成型罩中拔出,此时沿成型罩圆形上开口方向拉钢球柄,直至受压封闭。 Further, after welding repair, push the steel ball with handle with a hard object, and pull out the jacket from the forming cover. At this time, pull the steel ball handle along the direction of the circular upper opening of the forming cover until it is closed under pressure.

具体焊补步骤: Specific welding repair steps:

步骤1:将夹套连同夹套内的带柄钢球预先置于成型罩内。夹套为三臂弹性夹具,其圆形口直径略大于成型罩圆形上开口,夹套三条夹臂从成型罩圆形上开口缩形伸入,再将带柄钢球从成型罩方形下开口置入夹套三条夹臂中间,成悬空夹紧状态。 Step 1: Place the jacket and the steel ball with handle inside the jacket in the forming cover in advance. The jacket is a three-arm elastic clamp. The diameter of its circular mouth is slightly larger than the circular upper opening of the forming cover. The three clamping arms of the jacket are stretched from the circular upper opening of the forming cover. The opening is placed in the middle of the three clamping arms of the jacket to form a suspended clamping state.

步骤2:将石棉环条(用石棉成分条的目的是防止在后序焊接时的高温损坏)均匀的嵌于成型罩的底部方形槽中。劲量以容器壁泄漏处为中心,稍用微力(石棉条与容器壁达到不渗水)达到贴于容器壁,原漏于容器壁表面的液体通过石棉条的密封后进入成型罩,泄漏介质从裂缝或砂眼喷出后形成扩容,对成型罩底边与容器壁之间的焊接难度降低。 Step 2: Insert asbestos ring strips (the purpose of using asbestos component strips is to prevent high temperature damage during subsequent welding) evenly in the bottom square groove of the forming cover. The energy is centered on the leaking part of the container wall, and it sticks to the container wall with a little force (the asbestos strip and the container wall are impervious to water). Cracks or sand holes are ejected to form expansion, which reduces the difficulty of welding between the bottom edge of the forming cover and the container wall.

步骤3:此时成型罩底边与容器壁之间已无压力,可以对其进行焊接(打包满焊)作业。焊接过程中,泄漏介质沿带柄钢球周围通过成型罩圆形上开口流出,由于上开口直径远远大于泄漏点,所以不但压力降低,而且排放流量增大,可以完全排除安全隐患。 Step 3: At this time, there is no pressure between the bottom edge of the forming cover and the container wall, and welding (full packing and welding) can be performed on it. During the welding process, the leakage medium flows out through the circular upper opening of the forming cover along the circumference of the handle steel ball. Since the diameter of the upper opening is much larger than the leakage point, not only the pressure is reduced, but also the discharge flow is increased, which can completely eliminate potential safety hazards.

步骤4:成型罩底边与容器壁之间满焊接完毕后,用硬物将带柄钢球向下推出夹套,并将夹套从成型罩中拔出,此时沿成型罩圆形上开口方向拉钢球柄,直至受压封闭。 Step 4: After the full welding between the bottom edge of the forming cover and the container wall is completed, use a hard object to push the steel ball with handle downwards into the jacket, and pull the jacket out of the forming cover. Pull the steel ball handle in the opening direction until it is closed under pressure.

步骤5:以满焊形式将成型罩上口打包焊死。 Step 5: Pack and weld the upper part of the forming cover in the form of full welding.

在此说明了此发明的优选实施例,包括发明人用于实施本发明的已知最佳模式。优选实施例的变更对本领域普通技术人员而言在阅读上述说明后是显而易见的。发明人希望普通技术人员合理应用这样的变更,并且发明人认为与在此明确说明不同的应用也可以实现本发明。因此,本发明包括随附权利要求中所引用的主旨的所有修改及等效形式,这在适用的法律中是允许的。此外,上述要素的所有可能的变更的任何组合也被本发明所包含,除非在此另外指出或者在上下文中明显矛盾。 Preferred embodiments of this invention are described herein, including the best mode known to the inventors for carrying out the invention. Variations of the preferred embodiments may become apparent to those of ordinary skill in the art upon reading the foregoing description. The inventors expect skilled practitioners to employ such modifications appropriately, and the inventors believe that the invention may be practiced otherwise than as expressly described herein. Accordingly, this invention includes all modifications and equivalents of the subject matter recited in the claims appended hereto as permitted by applicable law. Moreover, any combination of all possible permutations of the above-described elements is encompassed by the invention unless otherwise indicated herein or otherwise clearly contradicted by context.

Claims (4)

1. a soldering device is characterized in that: comprise that having circle opens moulding cover, chuck, band handle steel ball and the asbestos ring bar of upper shed; Chuck is three arm spring chucks, and its circular port slightly larger in diameter is in the circular upper shed of moulding cover, and square groove is arranged at moulding cover bottom, can place the asbestos ring bar.
2. soldering device according to claim 1, it is characterized in that: band handle steel ball can be the ball of hard rubber material.
3. soldering device according to claim 1, it is characterized in that: before the soldering, three jig arm of chuck are stretched into from the circular upper shed contracting of moulding cover shape, to be with again in the middle of the handle steel ball inserts three jig arm of chuck from the square under shed of moulding cover, can become unsettled clamped condition, and the asbestos ring bar is embedded in uniformly in the bottom square groove of moulding cover.
4. soldering device according to claim 1, it is characterized in that: after the soldering, promote band handle steel ball with hard thing, and chuck is extracted from the moulding cover, draw steel ball handle along the circular upper shed direction of moulding cover this moment, seals until pressurized.
CN201310171304.XA 2013-05-11 2013-05-11 A kind of soldering device Expired - Fee Related CN103231187B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310171304.XA CN103231187B (en) 2013-05-11 2013-05-11 A kind of soldering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310171304.XA CN103231187B (en) 2013-05-11 2013-05-11 A kind of soldering device

Publications (2)

Publication Number Publication Date
CN103231187A true CN103231187A (en) 2013-08-07
CN103231187B CN103231187B (en) 2016-06-22

Family

ID=48879294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310171304.XA Expired - Fee Related CN103231187B (en) 2013-05-11 2013-05-11 A kind of soldering device

Country Status (1)

Country Link
CN (1) CN103231187B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358964A (en) * 2014-10-30 2015-02-18 北京市燃气集团有限责任公司 Self-protected under-pressure leakage plugging device and method for rushing to repair pipeline by using self-protected under-pressure leakage plugging device
CN108953992A (en) * 2018-09-29 2018-12-07 国网福建省电力有限公司 A kind of leaking stoppage valve and its working method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345793Y (en) * 1998-10-20 1999-10-27 高昌国 Globe stop valve
CN1279373A (en) * 1999-06-28 2001-01-10 中国人民武装警察部队学院 Emergency leakage blocking device
CN2752582Y (en) * 2003-11-07 2006-01-18 中国石油天然气股份有限公司 Pipeline non-stop conveying pressured leakage-stopping clamp
CN200996527Y (en) * 2006-12-27 2007-12-26 中芯国际集成电路制造(上海)有限公司 Pipeline band-pressure leaking stoppage
CN201803050U (en) * 2010-08-05 2011-04-20 新余泰达长林管道技术有限公司 Leakage blocking cover plate with pressure of steel pipeline
DE202012104362U1 (en) * 2012-11-13 2012-11-28 Birger Wendt Device for applying a magnetic seal and adapted magnetic seal therefor
CN203356864U (en) * 2013-05-11 2013-12-25 苏州博讯仪器有限公司 Welding repair device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345793Y (en) * 1998-10-20 1999-10-27 高昌国 Globe stop valve
CN1279373A (en) * 1999-06-28 2001-01-10 中国人民武装警察部队学院 Emergency leakage blocking device
CN2752582Y (en) * 2003-11-07 2006-01-18 中国石油天然气股份有限公司 Pipeline non-stop conveying pressured leakage-stopping clamp
CN200996527Y (en) * 2006-12-27 2007-12-26 中芯国际集成电路制造(上海)有限公司 Pipeline band-pressure leaking stoppage
CN201803050U (en) * 2010-08-05 2011-04-20 新余泰达长林管道技术有限公司 Leakage blocking cover plate with pressure of steel pipeline
DE202012104362U1 (en) * 2012-11-13 2012-11-28 Birger Wendt Device for applying a magnetic seal and adapted magnetic seal therefor
CN203356864U (en) * 2013-05-11 2013-12-25 苏州博讯仪器有限公司 Welding repair device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358964A (en) * 2014-10-30 2015-02-18 北京市燃气集团有限责任公司 Self-protected under-pressure leakage plugging device and method for rushing to repair pipeline by using self-protected under-pressure leakage plugging device
CN104358964B (en) * 2014-10-30 2016-03-09 北京市燃气集团有限责任公司 A kind of self-protection tape-pressure leakage clogging device and utilize its repairing pipeline method
CN108953992A (en) * 2018-09-29 2018-12-07 国网福建省电力有限公司 A kind of leaking stoppage valve and its working method

Also Published As

Publication number Publication date
CN103231187B (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN203099209U (en) Gas pipeline leakage gap isobaric electric hot melting plugging mechanism
CN103231187B (en) A kind of soldering device
CN204554225U (en) The outer pod apertures of a kind of first-aid clamp tears valve self-closing device open
CN102518908A (en) SF6 leakage plugging method of GIS (Gas Insulated Switchgear)
CN210135372U (en) Clamp for leaking stoppage under pressure
CN204116153U (en) A kind of band pressure testing ring bassoon water test unit
CN203679502U (en) Structure capable of reducing residual stress and used for a tube and tube plate welding method
CN102889965A (en) Water tank device for air cylinder airtight test
CN204789114U (en) Novel water jacket is sealed device
CN111289369A (en) Pipe expansion and pressure-resistant sealing detection device of surface cooler
CN101913123A (en) Device and method for manufacturing a heat pipe grinding wheel
CN203356864U (en) Welding repair device
CN201606621U (en) Leaking stoppage device of gas pipeline
CN211624580U (en) Maintenance and emergency rescue device for lining repair pipe
CN211693992U (en) External leaking stoppage reinforcing device for submarine pipeline
CN105414739B (en) A kind of tube sheet and the method for pipe big faying face friction soldering and sealing
CN204739362U (en) Spare Quick Leak Plug
CN209587471U (en) A kind of hole leakage blocking device
CN103851302A (en) Fast plugging device for pipeline and container
CN210292959U (en) Plugging plug for hydrogen chloride tail gas absorption graphite heat exchanger graphite pipe
CN210291075U (en) Safe convenient GIS equipment inflation connecting device
CN202188262U (en) On-line instant repair device for broken pipeline
CN201680079U (en) Steel welding type quick pipe joint
CN205244733U (en) Pipeline area water welding leaking stoppage ware
CN201103770Y (en) Clamp apparatus for blocking under pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Liu Ming

Inventor before: Cheng Honglin

COR Change of bibliographic data
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20160530

Address after: 1501, room 4, unit 1, TopOne Apartments, Hangzhou economic and Technological Development Zone, Zhejiang, Hangzhou 310018, China

Applicant after: Liu Ming

Address before: Office building 215000 Yushan road Jiangsu city Suzhou province high tech Industrial Development Zone Industrial Park Building 4 Room 401.

Applicant before: SUZHOU BOXUN INSTRUMENTS Co.,Ltd.

CB03 Change of inventor or designer information

Inventor after: Lin Xiaohua

Inventor before: Liu Ming

CB03 Change of inventor or designer information
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170816

Address after: 325208, Wenzhou, Zhejiang City, Ruian Province Ma island Zhenjiang West Village

Patentee after: Lin Xiaohua

Address before: 1501, room 4, unit 1, TopOne Apartments, Hangzhou economic and Technological Development Zone, Zhejiang, Hangzhou 310018, China

Patentee before: Liu Ming

TR01 Transfer of patent right

Effective date of registration: 20181101

Address after: 226215 10 group, four floor village, cooperation Town, Qidong City, Nantong, Jiangsu.

Patentee after: NANTONG QIWU AGRICULTURAL PRODUCTS Co.,Ltd.

Address before: 325208 Zhenjiang City, Ma Yu, Ruian, Wenzhou, Zhejiang

Patentee before: Lin Xiaohua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220922

Address after: No. 111, Yangqiao Village, Hehe Town, Qidong City, Nantong City, Jiangsu Province, 226000

Patentee after: Nantong Zhonglei Optoelectronics Co.,Ltd.

Address before: 226215 10 group, four floor village, cooperation Town, Qidong City, Nantong, Jiangsu.

Patentee before: NANTONG QIWU AGRICULTURAL PRODUCTS Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

CF01 Termination of patent right due to non-payment of annual fee