The speed drinking machine/water boiling machine
[technical field]
The invention belongs to the water appliance technical field, be specifically related to a kind of fast drinking machine/water boiling machine.
[background technology]
Continuous improvement along with living standard, people to the requirement of household electrical appliance with more and more higher, nowadays water heater on the market, various in style, but universal functionality is single, has directly electric heating body directly to be inserted in the water to heat, and its boiling water storage device is mainly concentrated heat tracing to certain water yield, this just causes, and water power mixes, boiling repeatedly, and energy consumption is big.In addition, the boiling water device that some can Fast Heating also appears on the present market, but universal functionality is simple, structural design is unreasonable, the long-term very easily breed bacteria of its water flow inside passage of back of using, not easy to clean again, cause water pollution easily, influence the healthy of people, be not suitable for modern's dietetic hygiene demand.
[summary of the invention]
It is little to the invention provides a kind of volume, good looking appearance, and control is convenient, and runner is reasonable, is convenient to clean body water flow inside passage, is easy to temperature adjustment, supplies with the fast drinking machine/water boiling machine of hot water immediately.
For achieving the above object, the invention provides following technical scheme:
A kind of fast drinking machine/water boiling machine comprises base, shell, water tank, water supply installation and heater, and shell is fixed on the base, and heater is installed on the front side of shell, and water tank is arranged at the rear side of shell, and water supply installation is installed in the base; Be provided with the water temperature control device that is communicated with and controls by control current size the heater leaving water temperature with water supply installation in the enclosure; Described water supply installation comprises water inlet pipe, trap, first three-way pipe, water pump and the outlet pipe that is communicated with water tank, first three-way pipe and water inlet pipe and trap are communicated with and are connected in the water inlet of water pump, and the water outlet of water pump is supplied water to water temperature control device by outlet pipe; Described heater comprises heat-generating pipe, heat-generating pipe holder and goes out water assembly, heat-generating pipe is installed on the heat-generating pipe holder and is fixed in the shell front side in the lump, the heat-generating pipe top is connected with out water assembly and outwards supplies water, and the heat-generating pipe lower end is provided with the feed pipe that is communicated with water temperature control device; Described water temperature control device comprises main body base and overflow control part, main body base is installed in the shell, the main body base upper end is provided with the overflow launder that is communicated with the outlet pipe of water pump, be provided with in overflow launder one side of main body base and accept the return flume that overflow launder overflows water, also be provided with by described feed pipe at the bottom land of overflow launder and be communicated with heat-generating pipe lower port on the heater and to the tap hole of its water supply, the bottom of return flume is connected with the water inlet of water pump by the trap of water supply installation; Described overflow control part is installed on the overflow trough inner water and overflows overfall place in return flume, and can control the height of overfall place water level; By the height of control overfall place water level, control overflow launder with respect to the water-head of heater, and then control the current size that overflow launder is supplied with to heater, thus the leaving water temperature of controlling out water assembly heat time heating time of current in the control heater.
Further, described overflow control part is by the temperature control knob, rotation axis, gear is formed with the overflow control panel with tooth bar, integrally formed and being fixed on the cover plate that overflow launder and return flume upside arrange of rotating of gear and rotation axis, rotation axis stretches out shell and in its end the temperature control knob is installed, the overfall place of overflow launder is provided with is convenient to the sliding tray that the overflow control panel slides up and down water level height in the control overflow launder, gear on the rotation axis is meshed with the tooth bar of overflow control panel upper end, temperature control knob drive knob axle and gear rotate and drive the overflow control panel and slide up and down in the sliding tray at overfall place, and then the height of the interior water level of control overflow launder.
Further, on the main body base of water temperature control device, also be provided with the magnetic float induction groove that is communicated with and is lower than the tap hole water level with overflow launder, in magnetic float induction groove, the magnetic float anti-dry burning device that prevents the heater dry combustion method is installed, this magnetic float anti-dry burning device is by the floating box of magnetic, guide rod and microswitch are formed, the floating box of magnetic is installed on the guide rod of magnetic float induction trench bottom and can slides up and down along guide rod, on the magnetic float induction groove that is arranged at the floating box downside of magnetic of microswitch correspondence, on the switch contact of microswitch a magnet B is installed, is equipped with one in the floating box of corresponding magnetic and produces the magnet A of incorgruous repulsive force with magnet B.When magnetic float induction trough inner water position was lower than overflow launder tap hole water level, the magnet A promotion magnet B in the floating box of magnetic and the switch contact of microswitch moved to disconnect the working power of heater, dry combustion method heat-generating pipe when preventing the heater lack of water.
Further, between the heating tube of heater and feed pipe, also be provided with second three-way pipe that is communicated with both, between the water inlet of trap and water pump, be provided with the 3rd three-way pipe that is communicated with both, be provided with " ten " font four-way pipe that is communicated with both between second three-way pipe and the 3rd three-way pipe, be equipped with on " ten " font four-way pipe and stop up the water blockoff plug that second three-way pipe is communicated with the 3rd three-way pipe.Make the water stream channel involution of the water inlet of water supply installation charging pump and heating tube airtight; The long-term boiler that uses is easy to generate incrustation scale, breed bacteria, when water tank, heating tube and supply channel need clean, open the lower shoe of base, take out the water blockoff plug, at this moment second three-way pipe is communicated with the 3rd three-way pipe, makes the water stream channel of supply channel, return flume and the heating tube of water tank form connection like this, and the water stain of (comprising the water in the heating tube) remnants flows out body from " ten " font four-way pipe mouth of pipe bottom in interior all water pipes of body thereby make; Often clean the water stream channel of internal body, thereby guaranteed the sanitation and hygiene of boiling water machine inside, be conducive to people's health.
Further, describedly go out water assembly and be made up of eliminator plate, block water cover plate and faucet, the cover plate that blocks water is covered on the upside of eliminator plate, and faucet is installed on the front end downside of eliminator plate.
Further, the heat-generating pipe upper and lower end of described heater is respectively equipped with the silica gel sheath of being convenient to be tightly connected.
Further, described shell front side also is provided with the front apron for the heated sealed device, and the downside of front apron is equipped be used to the water containing base that collects faucet leakage water, also is provided with the dividing plate that is filled with water on water containing base.
Further, on the front apron of water containing base upside, also be provided with for the water tumbler pallet of placing water tumbler.
Further, silica gel discharge water plate, self-locking spring and spring fixed column are installed in the dewatering orifice of described water tank bottom, spring and spring fixed column discharged water silica gel in the self-styled dewatering orifice of being fixed in water tank bottom of plate when water tank was extracted the continuous water of shell out, and the mouth of pipe of corresponding water supply installation water inlet pipe is provided with and prevents the silica gel water proof ring, anti-backflow spring and the splash guard that flow backwards.
The invention has the beneficial effects as follows:
The present invention is by being installed on the overflow control part at overflow launder overfall place, the height of control overfall place water level, control overflow launder with respect to the water-head of heater, and then the control overflow launder is to the current size of heater supply, thereby the leaving water temperature of controlling out water assembly heat time heating time of current in the control heater, simple in structure, leaving water temperature is adjustable at any time, and is convenient and practical.
On the main body base of water temperature control device, also be provided with magnetic float induction groove, in magnetic float induction groove, magnetic float anti-dry burning device is installed, during work, when the water level in the magnetic float induction groove is lower than overflow launder tap hole water level, magnetic float anti-dry burning device moves to cut off the working power of heater, dry combustion method heat-generating pipe when preventing the heater lack of water by the switch contact that disconnects microswitch.
In addition, be provided with also in base that water stream channel with supply channel, return flume and the heating tube of water tank is communicated with simultaneously " ten " font four-way pipe, the water blockoff plug of the above pipeline connection of shutoff is installed on " ten " font four-way pipe; The long-term boiling water machine that uses is easy to generate incrustation scale, breed bacteria, work as water tank, when heating tube and supply channel need clean, open the lower shoe of base, take out the water blockoff plug, at this moment second three-way pipe is communicated with the 3rd three-way pipe, make the supply channel of water tank like this, the water stream channel of return flume and heating tube forms and is communicated with, the water stain of (comprising the water in the heating tube) remnants flows out body from " ten " font four-way pipe mouth of pipe bottom in interior all water pipes of body thereby make, can easily clean the water stream channel of internal body, thereby guarantee the sanitation and hygiene of boiling water machine inside.
[description of drawings]
Fig. 1 is blast structural representation of the present invention;
Fig. 2 is the sectional structure enlarged diagram of agent structure of the present invention;
Fig. 3 is the stereochemical structure enlarged diagram of agent structure of the present invention;
Fig. 4 is the pipeline annexation enlarged diagram of agent structure of the present invention;
Fig. 5 is agent structure bottom pipeline annexation enlarged diagram among Fig. 4;
Fig. 6 is stereochemical structure enlarged diagram of the present invention;
The invention will be further described below in conjunction with drawings and Examples.
[specific embodiment]
The speed drinking machine/water boiling machine to shown in Figure 6, comprises base 1, shell 2, water tank 3, water supply installation 4 and heater 5 as Fig. 1, shell 2 is fixed on the base 1, heater 5 is installed on the front side of shell 2, and the rear side that is installed on shell 2 that water tank 3 can pull and push, water supply installation 4 are installed in the base 1; In shell 2, be provided with the water temperature control device 6 that is communicated with and controls by control current size heater 5 leaving water temperatures with water supply installation 4; Described water supply installation 4 comprises water inlet pipe 40, trap 41, first three-way pipe 42, water pump 43 and the outlet pipe 44 that is communicated with water tank 3, first three-way pipe 42 and water inlet pipe 40 and trap 41 are communicated with and are connected in the water inlet of water pump 43, and the water outlet of water pump 43 is supplied water to water temperature control device 6 by outlet pipe 44; Described heater 5 comprises heat-generating pipe 50, heat-generating pipe holder 51 and goes out water assembly 52, heat-generating pipe 50 is installed on the heat-generating pipe holder 51 and is fixed in the lump in shell 2 front sides, heat-generating pipe 50 tops are connected with out water assembly 52 and outwards supply water, heat-generating pipe 50 lower ends are provided with the feed pipe 53 that is communicated with water temperature control device 6, and heat-generating pipe 50 upper and lower ends are respectively equipped with the silica gel sheath of being convenient to be tightly connected 54; Described water temperature control device 6 comprises main body base 60 and overflow control part 61, main body base 60 is installed in the shell 2, main body base 60 upper ends are provided with the overflow launder 600 that is communicated with the outlet pipe 44 of water pump 43, be provided with in overflow launder 600 1 sides of main body base 60 and accept the return flume 601 that overflow launder 600 overflows water, also be provided with by described feed pipe 53 at the bottom land of overflow launder 600 and be communicated with heat-generating pipe 50 lower port on the heater 5 and to the tap hole 600a of its water supply, the bottom of return flume 601 is connected with the water inlet of water pump 43 by the trap 41 of water supply installation 4; Described overflow control part 61 is installed on water in the overflow launder 600 and overflows overfall 600b place in return flume 601, and can control the height of overfall 600b place water level; Height by control overfall 600b place water level, control overflow launder 600 with respect to the water-head of heater 5, and then control the current size that overflow launder 600 is supplied with to heater 5, thereby the leaving water temperature of controlling out water assembly 52 heat time heating time of current in the control heater.
Extremely shown in Figure 6 as Fig. 1, overflow control part 61 is by temperature control knob 610, rotation axis 611, gear 612 is formed with the overflow control panel 613 with tooth bar, integrally formed and being fixed on the cover plate 62 that overflow launder 600 and return flume 601 upsides arrange of rotating of gear 612 and rotation axis 611, rotation axis 611 stretches out shell 2 and in its end temperature control knob 610 is installed, the overfall 600b place of overflow launder 600 is provided with is convenient to the sliding tray 614 that overflow control panel 613 slides up and down water level height in the control overflow launder 600, gear 612 on the rotation axis 611 is meshed with the tooth bar 613a of overflow control panel 613 upper ends, temperature control knob 610 drive knob axles 611 and gear 612 rotate and drive overflow control panel 613 and slide up and down in the sliding tray 614 at overfall 600b place, and then the height of control overflow launder 600 interior water levels.Simultaneously, on the main body base 60 of water temperature control device 6, also be provided with and be communicated with overflow launder 600 and the magnetic float induction groove 7 of low tap hole 600a water level thereon, in magnetic float induction groove 7, the magnetic float anti-dry burning device 8 that prevents the heater dry combustion method is installed, this magnetic float anti-dry burning device 8 is by the floating box 80 of magnetic, guide rod 81 and microswitch (not shown) are formed, the floating box 80 of magnetic is installed on the guide rod 81 of magnetic float induction groove 7 bottoms and can slides up and down along guide rod, on the magnetic float induction groove 7 that is arranged at floating box 80 downsides of magnetic of microswitch correspondence, one magnet B (not shown) is installed on the switch contact of microswitch, is equipped with one in the floating box 80 of corresponding magnetic and produces the magnet A (not shown) of incorgruous repulsive force with magnet B.When water level is lower than overflow launder 600 tap hole 660a water levels in the magnetic float induction groove 7, the floating box 80 interior magnet A of magnetic promote magnet B and microswitch under downward gravity effect switch contact moves to disconnect the working power of heater 5, dry combustion method heat-generating pipe 50 when preventing heater 5 lacks of water.
As shown in Figure 4 and Figure 5, between the heating tube 50 of heater 5 and feed pipe 53, also be provided with second three-way pipe 55 that is communicated with both, between the water inlet of trap 41 and water pump 43, be provided with the 3rd three-way pipe 45 that is communicated with both, be provided with " ten " font four-way pipe 9 that is communicated with both between second three-way pipe 55 and the 3rd three-way pipe 45, be equipped with on " ten " font four-way pipe 9 and stop up the water blockoff plug 90 that second three-way pipe 55 is communicated with the 3rd three-way pipe 45.Make the water stream channel involution of the water inlet of water supply installation 4 charging pumps 43 and heating tube 50 airtight; Because the long-term boiler that uses is easy to generate incrustation scale, breed bacteria, when water tank 3, heating tube 50 and supply channel need clean, open the lower shoe of base 1, take out water blockoff plug 90, at this moment second three-way pipe 55 is communicated with the 3rd three-way pipe 45, make the water stream channel of supply channel, return flume 601 and the heating tube 50 of water tank 3 form connection like this, the water stain of (comprising the water in the heating tube) remnants flows out body from " ten " font four-way pipe 9 mouth of pipe bottom in interior all water pipes of body thereby make; Be convenient to often clean the water stream channel of internal body, thereby guaranteed the sanitation and hygiene of boiling water machine inside, improve user's the health of drinking.
Wherein, as shown in Figure 1, go out water assembly 52 and be made up of eliminator plate 520, block water cover plate 521 and faucet 522, the cover plate 521 that blocks water is covered on the upside of eliminator plate 520, and faucet 522 is installed on the front end downside of eliminator plate 520.Also be provided with the front apron 20 for the heated sealed device in shell 2 front sides, the downside of front apron 20 is equipped be used to collecting faucet and leaks the water containing base 21 of water, also is provided with the dividing plate 210 that is filled with water on water containing base 21.On the front apron 20 of water containing base 21 upsides, also be provided with for the water tumbler pallet 22 of placing water tumbler.
In addition, as shown in Figure 1, silica gel discharge water plate 31, self-locking spring 32 and spring fixed column 33 are installed in the dewatering orifice 30 of water tank 3 bottoms, in self-locking spring 32 and spring fixed column 33 discharge water silica gel the self-styled dewatering orifice 30 of being fixed in water tank 3 bottoms of plate 31 when water tank 3 is extracted the continuous water of shells 2 out, prevent that it from leaking; The mouth of pipe of corresponding water supply installation 4 water inlet pipes 40 is provided with and prevents from silica gel water proof ring 40a, the anti-backflow spring 40b and the splash guard 40c that flow backwards from preventing that the water that water tank 3 is extracted out in back water supply installations 4 water inlet pipes 40 from refluxing.
During work, rear side takes out transparent water tank 3 from shell 2, put into the water tank location of shell 2 rear sides after in water tank 3, filling water, turn on the power switch, water in the water tank 3 enters water pump 43 by water inlet pipe 40 through first three-way pipe 42, water upwards enters the overflow launder 600 of main body base 60 through outlet pipe 44 under the effect of water pump 43, here a part of water enters in the magnetic float induction groove 7 and enters by tap hole 600a, feed pipe 53 in the heat-generating pipe 50 of heater 5; Another passes back into water pump 43 through trap 41, the 3rd three-way pipe 45 and forms water circulation after partly dividing inflow return flume 601 after overflow control panel 613 is regulated height of water level.When needs are regulated water temperature, rotate the temperature control knob 610 outside the overflow control panel 613, temperature control knob 610 drives rotation axis 611 and rotates, circular gear 612 on the rotation axis 611 and the 613a engagement on the overflow control panel 613, rotation axis 611 rotates and upwards promotes upwards rising of overflow control panel 613, obstruct enters the water of overflow launder 600 to return flume 601 shuntings from water pump 43, thereby the water level of 600 fens stream interfaces of overflow launder is increased thereupon, the water flow pressure that flows into overflow launder 600 tap hole 600a strengthens, water velocity increases, the water velocity that enters heating tube 50 in same heat time heating time is accelerated, and just more short to the heat time heating time of water, water temperature then reduces.Otherwise, turn down overflow control panel 613, enter that the water some of overflow launder 600 is very fast to be flowed back into return flume 601 by shunting, the water flow velocity that flows into tap hole 600a reduces, and current are more slow, in equal heat time heating time, current are more slow, and heat time heating time is more long, and water temperature is then more high.
The above embodiment just is preferred embodiment of the present invention; be not to limit practical range of the present invention with this; all shapes according to the present invention, structure and principle are done apparent change; and other every changes that do not break away from essence of the present invention, all should be covered by in protection scope of the present invention.