CN103226662B - 一种河网密度空间化方法 - Google Patents
一种河网密度空间化方法 Download PDFInfo
- Publication number
- CN103226662B CN103226662B CN201310146468.7A CN201310146468A CN103226662B CN 103226662 B CN103226662 B CN 103226662B CN 201310146468 A CN201310146468 A CN 201310146468A CN 103226662 B CN103226662 B CN 103226662B
- Authority
- CN
- China
- Prior art keywords
- river system
- area
- river
- buffer zone
- different brackets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种河网密度空间化方法,它首先对区域进行网格划分,其次利用层次分析法,根据不同等级河系的影响范围和致灾效能的不同,确定不同等级河系的影响权重系数,结合GIS(地理信息系统)软件功能获取单位格网内不同等级河网的缓冲面积,然后通过面积加权法计算出空间网格河网密度。该技术方案避免以往方法的局限性,能很好地反映不同等级河系的影响范围和致灾效能,具有较高的学性和合理性。
Description
技术领域
本发明公开了一种河网密度空间化方法,属于气象灾害风险综合区划技术领域。
背景技术
在热带气旋、暴雨洪涝的孕灾环境分析中,河网水系的区域性分布特征是至关重要的影响因素,在很大程度上决定了评价区域遭受洪涝侵袭的难易程度。河网密集程度和河流级别是河网水系的区域性分布特征的两个重要因素,例如在河槽汇流超过河道及水库的蓄洪和排泄能力以后,水流就会向河道周边蔓延、泛滥,假若该地区河网密布且均发生漫堤现象时,就会形成严重且难以抵御的洪涝灾害;传统的方法假定不同级别的河系的影响范围和致灾效能相同,对区域河网密度进行分析和计算,从而实现河网密度的空间化,而实际情况中干流要较一级支流、一级支流较二级支流具有更强的影响范围和致灾效能,所以传统方法对河网密度的空间化具有局限性。
发明内容
为了实现对区域河网密度的空间化,避免以往方法的局限性,提高方法的合理性和适用性,本发明的目的是提供一种利用层次分析法,根据不同等级河系影响范围和致灾效能的不同,确定各等级河系的权重系数,然后通过面积加权法获得单位网格内的河网缓冲区面积,即河网密度,来实现对河网密度空间化方法。
本发明为实现上述发明目的采用如下技术方案,一种河网密度空间化方法,其特征在于,包括如下步骤:
步骤(1)利用GIS软件中的网格划分功能对河系所在区域进行网格划分;
步骤(2)引用层次分析法确定不同等级河系的权重系数Wi;
步骤(3)利用GIS软件中的缓冲区分析功能,设置缓冲区半径Ri,分别对不同等级的河系进行缓冲区分析,生成代表该河系的影响范围和致灾效能的河系缓冲区;
步骤(4)利用GIS软件中的叠加分析功能,分别对不同等级河系的缓冲区和网格区域进行求交分析,利用网格单元打断河系缓冲区,即连续的一条河系缓冲区被不同的单位网格分割成若干段;
步骤(5)在进行过求交分析后,从生成的结果数据集中提取相应的网格单元中被打断的河系缓冲区段的面积字段信息area,不同等级河系求交分析后生成的面积字段分别记作areai,通过GIS软件中的数据集追加列功能把area字段分别赋予给网格区域数据集;
步骤(6)在网格区域数据集中新建河网密度字段,结合GIS软件中的更新列功能,利用面积加权法,计算出单位网格内的河网缓冲面积,即河网密度M;
上述步骤中,i代表河系等级,i的取值范围是自然数。
进一步的,步骤(2)中所述不同等级河系的权重系数Wi的具体计算方式为:
(201)构造判断矩阵:判断矩阵中的元素axy采用1-9及其倒数的标度方法,其中x、y均表示河系等级,x、y的取值范围是自然数,axy表示第x级河流相对于第y级河流的比较结果,且axy=1/ayx,相互比较不同等级河流的重要性,用数字化的比值来定义比较结果;
(202)根据判断矩阵,计算判断矩阵的特征根和特征向量:对判断矩阵A,计算矩阵满足AW=λMaxW的最大特征根与特征向量,式中λMax为判断矩阵A的最大特征根,W为对应于λMax的正规化特征向量,最大特征根λMax对应的特征向量归一化为:W=(W1,W2,…,Wi),其中Wi即为各等级河系的权重系数,i代表河系等级,i的取值范围是自然数;
(203)一致性检验:一致性检验涉及一致性指标C.I.,平均随机一致性指标R.I.,一致性比例C.R.,一致性检验的步骤如下:
(2031)计算一致性指标C.I.,其中n为矩阵阶数;
(2032)确定相应的平均随机一致性指标R.I.;
(2033)计算一致性比例C.R.并进行判断,
当C.R.<0.1时,认为判断矩阵的一致性可以接受的;
当C.R.>0.1时,认为判断矩阵不符合一致性要求,需要对该判断矩阵进行重新修正。
进一步的,步骤(6)中所述河网密度M,其具体计算方式为:
通过公式M=area1╳W1+area2╳W2+area3╳W3+…+areai╳Wi,计算出单位网格内的河网缓冲面积,即河网密度M=(M1,M2,…Mt),其中,t为网格单元编号。
进一步的,所述步骤(1)中对河系所在区域进行网格划分,每个网格单元的划分标准为100m╳100m。
本发明采用以上技术方案与现有技术相比,具有以下技术效果:
1、传统方法中,河网密度的表达方式主要为单位格网内的河网水系长度,但是在洪涝灾害风险区划中,需要考虑河网缓冲范围以及不同河系等级的致灾效能,所以该技术方案中用单位格网内不同河网等级的缓冲面积来表达河网密度,该技术方案避免以往方法的局限性,提高了方法的合理性和适用性;
2、该技术方案中,利用层次分析法确定不同级别河系的权重,通过面积加权法来求出单位网格内的河网缓冲面积,即河网密度,很好地反映了不同等级河系的影响范围和致灾效能,具有较高的科学性和合理性。
附图说明
图1为河网密度空间化流程图。
图2为河系所在区域网格单元图。
图3为实施例中一级河流的缓冲区图。
图4为实施例中二级河流的缓冲区图。
图5为实施例中三级河流的缓冲区图。
图6为实施例中一级河流缓冲区与网格区域的求交分析图。
具体实施方式
下面结合附图对本发明的技术方案做进一步的详细说明:
以上海市嘉定区河网密度空间化为例,一种河网密度空间化方法的技术流程如图1所示,具体包括如下步骤:
步骤1、利用GIS软件中的网格划分功能,对上海市嘉定区进行网格划分,每个网格单元的划分标准为100m╳100m,如图2所示,为上海市嘉定区网格单元图;
步骤2、将嘉定区范围内河流分为三个等级,引用层次分析法确定上海市嘉定区一级河流、二级河流和三级河流的权重系数。建立评判数值标准如下:
河系之间比较 | 量化值 |
同等重要 | 1 |
稍微重要 | 3 |
较强重要 | 5 |
计算得到最大特征根λMax=3.0385,最大特征向量为(-0.9161,-0.3715,-0.1506)。
计算得到:
查表得到平均随机一致性指标R.I.标准值如下表:
计算得到:
对最大特征向量标准化处理后得到各级河流影响权重:W=(0.64,0.26,0.10);
步骤3、利用GIS软件中的缓冲区分析功能,设置缓冲区半径R(R1=0.5km,R2=1.0km,R3=1.5km),分别对一级河流、二级河流和三级河流进行缓冲区分析,生成河系缓冲区(河系缓冲区代表的是该河系的影响范围和致灾效能),如图3、图4、图5所示,分别为上海市嘉定区一级河流、二级河流、三级河流的缓冲区图;
步骤4、利用GIS软件中的叠加分析功能,分别对三种等级河系的缓冲区和网格区域进行求交分析,目的是利用网格单元打断河系缓冲区,即连续的一条河系缓冲区被不同的单位网格分割成若干段,如图6所示,为上海市嘉定区一级河流缓冲区与网格区域的求交分析图;
步骤5、在进行过求交分析后,从生成的结果数据集中提取面积area字段信息,area为相应的网格单元中被打断的河系缓冲区段的面积,不同等级河系求交分析后生成的面积字段记作areai,通过GIS软件中的数据集追加列功能分别把areai字段赋予给网格区域数据集,如下表所示(局部数据,单位km2):
网格id | area1 | area2 | area3 |
1 | 0.03 | 0.07 | 0.12 |
2 | 0.08 | 1.12 | 0.18 |
… | … | … | … |
步骤6、在网格区域数据集中新建河网密度字段M,结合GIS软件中的更新列功能,利用面积加权法,即通过公式M=area1╳W1+area2╳W2+area3╳W3+…+areai╳Wi,计算出单位网格内的河网缓冲面积,即河网密度M=(M1,M2,…Mt),t为网格单元编号,如下表所示(单位:km2):
网格id | area1 | area2 | area3 | M |
1 | 0.03 | 0.07 | 0.12 | 0.052 |
2 | 0.08 | 1.12 | 0.18 | 0.364 |
… | … | … | … | … |
Claims (4)
1.一种河网密度空间化方法,其特征在于,包括如下步骤:
步骤(1)利用GIS软件中的网格划分功能对河系所在区域进行网格划分;
步骤(2)引用层次分析法确定不同等级河系的权重系数Wi;
步骤(3)利用GIS软件中的缓冲区分析功能,设置缓冲区半径Ri,分别对不同等级的河系进行缓冲区分析,生成代表该河系的影响范围和致灾效能的河系缓冲区;
步骤(4)利用GIS软件中的叠加分析功能,分别对不同等级河系的缓冲区和网格区域进行求交分析,利用网格单元打断河系缓冲区,即连续的一条河系缓冲区被不同的单位网格分割成若干段;
步骤(5)在进行过求交分析后,从生成的结果数据集中提取相应的网格单元中被打断的河系缓冲区段的面积字段信息area,不同等级河系求交分析后生成的面积字段分别记作areai,通过GIS软件中的数据集追加列功能把area字段分别赋予给网格区域数据集;
步骤(6)在网格区域数据集中新建河网密度字段,结合GIS软件中的更新列功能,利用面积加权法,计算出单位网格内的河网缓冲面积,即河网密度M;
上述步骤中,i代表河系等级,i的取值范围是自然数。
2.如权利要求1所述的一种河网密度空间化方法,其特征在于,步骤(2)中所述不同等级河系的权重系数Wi的具体计算方式为:
(201)构造判断矩阵:判断矩阵中的元素axy采用1-9及其倒数的标度方法,其中x、y均表示河系等级,x、y的取值范围是自然数,axy表示第x级河流相对于第y级河流的比较结果,且axy=1/ayx,相互比较不同等级河流的重要性,用数字化的比值来定义比较结果;
(202)根据判断矩阵,计算判断矩阵的特征根和特征向量:对判断矩阵A,计算矩阵满足AW=λMaxW的最大特征根与特征向量,式中λMax为判断矩阵A的最大特征根,W为对应于λMax的正规化特征向量,最大特征根λMax对应的特征向量归一化为:W=(W1,W2,…,Wi),其中Wi即为各等级河系的权重系数,i代表河系等级,i的取值范围是自然数;
(203)一致性检验:一致性检验涉及一致性指标C.I.,平均随机一致性指标R.I.,一致性比例C.R.,一致性检验的步骤如下:
(2031)计算一致性指标C.I.
其中n为矩阵阶数;
(2032)确定相应的平均随机一致性指标R.I.;
(2033)计算一致性比例C.R.并进行判断
当C.R.<0.1时,认为判断矩阵的一致性可以接受的,
当C.R.>0.1时,认为判断矩阵不符合一致性要求,需要对该判断矩阵进行重新修正。
3.如权利要求1所述的一种河网密度空间化方法,其特征在于,步骤(6)中所述河网密度M,其具体计算方式为:
通过公式M=area1╳W1+area2╳W2+area3╳W3+…+areai╳Wi,计算出单位网格内的河网缓冲面积,即河网密度M=(M1,M2,…Mt),其中,t为网格单元编号。
4.如权利要求1所述的一种河网密度空间化方法,其特征在于:所述步骤(1)中对河系所在区域进行网格划分,每个网格单元的划分标准为100m╳100m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310146468.7A CN103226662B (zh) | 2013-04-24 | 2013-04-24 | 一种河网密度空间化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310146468.7A CN103226662B (zh) | 2013-04-24 | 2013-04-24 | 一种河网密度空间化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103226662A CN103226662A (zh) | 2013-07-31 |
CN103226662B true CN103226662B (zh) | 2016-01-06 |
Family
ID=48837107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310146468.7A Active CN103226662B (zh) | 2013-04-24 | 2013-04-24 | 一种河网密度空间化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103226662B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108133331B (zh) * | 2018-01-15 | 2021-07-16 | 黄河水利委员会黄河水利科学研究院 | 一种黄河下游宽滩区滞洪沉沙功能和减灾效应的评价方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5323317A (en) * | 1991-03-05 | 1994-06-21 | Hampton Terry L | Method and apparatus for determining runoff using remote geographic sensing |
CN101482612A (zh) * | 2009-01-21 | 2009-07-15 | 华东师范大学 | 基于地理信息系统技术的河网地区水系连通性测度方法 |
CN101962961A (zh) * | 2010-09-20 | 2011-02-02 | 中国科学院南京地理与湖泊研究所 | 水体污染底泥生态疏浚范围的确定方法 |
CN102364503A (zh) * | 2011-05-26 | 2012-02-29 | 程红光 | 基于水资源变化的流域突发性事故风险分区方法 |
CN102509172A (zh) * | 2011-10-25 | 2012-06-20 | 南京大学 | 一种基于gis技术的土地利用碳排放减量化控制优化方法 |
CN102982392A (zh) * | 2012-11-07 | 2013-03-20 | 中国科学院亚热带农业生态研究所 | 一种基于地理信息系统的农业鼠害暴发风险指数评价方法 |
-
2013
- 2013-04-24 CN CN201310146468.7A patent/CN103226662B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5323317A (en) * | 1991-03-05 | 1994-06-21 | Hampton Terry L | Method and apparatus for determining runoff using remote geographic sensing |
CN101482612A (zh) * | 2009-01-21 | 2009-07-15 | 华东师范大学 | 基于地理信息系统技术的河网地区水系连通性测度方法 |
CN101962961A (zh) * | 2010-09-20 | 2011-02-02 | 中国科学院南京地理与湖泊研究所 | 水体污染底泥生态疏浚范围的确定方法 |
CN102364503A (zh) * | 2011-05-26 | 2012-02-29 | 程红光 | 基于水资源变化的流域突发性事故风险分区方法 |
CN102509172A (zh) * | 2011-10-25 | 2012-06-20 | 南京大学 | 一种基于gis技术的土地利用碳排放减量化控制优化方法 |
CN102982392A (zh) * | 2012-11-07 | 2013-03-20 | 中国科学院亚热带农业生态研究所 | 一种基于地理信息系统的农业鼠害暴发风险指数评价方法 |
Non-Patent Citations (4)
Title |
---|
GIS支持下的河网密度提取及其在洪水危险性分析中的应用;黄诗峰 等;《自然灾害学报》;20011130;第10卷(第4期);第129-132页 * |
基于SRTM的数字河网提取及其应用;曹玲玲 等;《人民长江》;20070831;第38卷(第8期);第150-152页 * |
基于气象预测数据的中国洪涝灾害危险性评估与预警研究;马国斌 等;《灾害学》;20110731;第26卷(第3期);第8-12、17页 * |
西部地区现代农业发展评价研究;雷玲;《中国博士学位全文数据库 经济与管理科学辑》;20121115(第11期);第J149-86页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103226662A (zh) | 2013-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jothityangkoon et al. | Assessing the impact of climate and land use changes on extreme floods in a large tropical catchment | |
Li et al. | The influence of land urbanization on landslides: An empirical estimation based on Chinese provincial panel data | |
Zhang et al. | Correlation between flood frequency and geomorphologic complexity of rivers network–a case study of Hangzhou China | |
Jain et al. | Comparative assessment of three approaches for deriving stream power plots along long profiles in the upper Hunter River catchment, New South Wales, Australia | |
Yan et al. | Drought evolution characteristics and precipitation intensity changes during alternating dry–wet changes in the Huang–Huai–Hai River basin | |
CN107688906B (zh) | 多方法融合的输电线路气象要素降尺度分析系统及方法 | |
Mandal et al. | Quantification of uncertainty in the assessment of future streamflow under changing climate conditions | |
Keijsers et al. | Calibration and resolution effects on model performance for predicting shallow landslide locations in Taiwan | |
Obeysekera et al. | Scenario-based projection of extreme sea levels | |
Huang et al. | The impact of climate change on rainfall frequency in Taiwan | |
CN105427187A (zh) | 配电线路抗风能力评估方法和系统 | |
Tan et al. | A geospatial information quantity model for regional landslide risk assessment | |
CN113420458A (zh) | 一种风场数据精细化处理方法、装置、终端及介质 | |
CN105868443A (zh) | 一种微地形微气象要素场的构建方法 | |
CN103226662B (zh) | 一种河网密度空间化方法 | |
Nobert et al. | Estimation of design floods in ungauged catchments using a regional index flood method. A case study of Lake Victoria Basin in Kenya | |
CN104123671B (zh) | 气象参证站分区方法 | |
CN108828332A (zh) | 一种计算雷电定位系统探测效率的方法 | |
Nojumuddin et al. | Identification of rainfall patterns in Johor | |
Ghasemizade et al. | Estimation of design flood hydrograph for an ungauged watershed | |
Stojkovic et al. | Mixed general extreme value distribution for estimation of future precipitation quantiles using a weighted ensemble-case study of the Lim River Basin (Serbia) | |
Burton et al. | Stochastic rainfall modelling for the assessment of urban flood hazard in a changing climate | |
Jian et al. | Channel sedimentation and erosion of the Jiangsu reach of the Yangtze River during the last 44 years | |
Teng et al. | Early warning index of flash flood disaster: a case study of Shuyuan watershed in Qufu City | |
CN104008305B (zh) | 用于千万千瓦风电基地的可发电风资源分布估计方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190103 Address after: 210000 6/F, Building 2, Zhicheng Park, No. 6 Zhida Road, Jiangbei New District, Nanjing City, Jiangsu Province Patentee after: Nanjing Xinatmospheric image science and Technology Research Institute Co., Ltd. Address before: 210044 Ning six road, Pukou District, Nanjing, Jiangsu Province, No. 219 Patentee before: Nanjing University of Information Science and Technology |
|
TR01 | Transfer of patent right |