CN103226210A
CN103226210A CN2013101109986A CN201310110998A CN103226210A CN 103226210 A CN103226210 A CN 103226210A CN 2013101109986 A CN2013101109986 A CN 2013101109986A CN 201310110998 A CN201310110998 A CN 201310110998A CN 103226210 A CN103226210 A CN 103226210A
Authority
CN
China
Prior art keywords
data
depth migration
velocity field
trap
stack depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101109986A
Other languages
Chinese (zh)
Other versions
CN103226210B (en
Inventor
谢会文
彭更新
李勇
雷刚林
吴超
马玉杰
李青
徐振平
杨宪彰
张敬洲
王兴军
陈元勇
许安明
玛丽克
唐雁刚
李伟
王媛
吴庆宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310110998.6A priority Critical patent/CN103226210B/en
Publication of CN103226210A publication Critical patent/CN103226210A/en
Application granted granted Critical
Publication of CN103226210B publication Critical patent/CN103226210B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for realizing encirclement, which comprises the following steps of 1: converting the prestack depth migration data H (x, y, z) from the depth domain to the time domain data T (x, y, z) using the prestack depth migration velocity field V (x, y, z); step 2: interpreting the deep-time conversion data into a graph to obtain the T0 graphs; and step 3: correcting the velocity field by using regional geological knowledge; and 4, step 4: using the corrected prestack depth migration velocity field V1(x, y, z) shifting the T0 graph such as the depth-time transformation data into a final structural diagram H1(x, y, z). The invention utilizes the time domain data of the deep time conversion to carry out the structural explanation, and then according to the non-seismic and drilled data of the research area to control the speed, the depth migration velocity field is properly adjusted to finish the variable speed mapping to obtain the structural diagram, thus the structure can be realized without depending on the seismic imaging speed, and the trap research precision is improved.

Description

Method is implemented in a kind of trap
Technical field
The present invention relates to technical field of petroleum exploration, method is implemented in particularly a kind of trap.
Background technology
Implement in the work in the existing complicated in front of the mountains trap of being undertaken by seismic data, mainly contain two kinds of basic skills: time domain data change hasty map implements trap and method is implemented in the pre-stack depth migration trap.But there is following deficiency in above-mentioned two kinds of methods:
1. method is implemented in the trap of time domain data change hasty map
This method general using time domain seismic data interpretation goes out the three-dimensional structure model, utilizes speed change to become diagram technology to finish then and changes deeply when vertical, obtains structural map.It is little at stratigraphic dip, it is higher that precision is implemented in the less regional trap of speed horizontal change, but the area big at the inclination angle, that velocity variations is violent, the time domain seismic data can not accurately be offset playback with geologic body, only depend on vertical time dark conversion can't accurately implement trap, at having proposed figure folk prescription method territory settling time data side-play amount problem in this problem prior art, the time utilize mathematical algorithm with geologic body skew playback again after the dark conversion.
2. method is implemented in the pre-stack depth migration trap
This method can be implemented trap more accurately owing to have remarkable advantages on the principle, and in complex area in front of the mountains, prestack depth data skew playback is better than time migration after stack and pre-stack time migration, can implement structure more exactly.
But, but in the process of the present application people invention technical scheme in realizing the embodiment of the present application, find that there is following technical matters at least in above-mentioned technology:
1. time migration after stack and pre-stack time migration are owing to be subjected to the restriction of self principle to only depend on vertical time dark conversion can't accurately implement trap geologic body skew playback;
2. figure needs the artificial side-play amount of setting partially, and trap is implemented precision and is restricted;
3. though pre-stack depth migration skew playback is better than the time domain data, influenced seriously by data quality and anisotropy, often there is trap in its image taking speed, causes structural feature inaccurate, and bigger with the real error of boring, it is on the low side that precision is implemented in trap;
The pre-stack depth migration cycle longer, be difficult to satisfy more and more faster exploration rhythm;
5. the pre-stack depth migration reduced price is high, if it is lower than too to carry out pre-stack depth migration processing consumption after every wheel well finishes.
Summary of the invention
The object of the present invention is to provide a kind of trap to implement method and solved the limitation problem in the oil-gas exploration process in the prior art, provide a kind of more accurately, economical, method is implemented in trap apace.
In order to achieve the above object, the technical solution used in the present invention is:
Method is implemented in a kind of trap, it is characterized in that: step 1: utilize pre-stack depth migration velocity field V (x, y, z) with pre-stack depth migration data H (x, y, z) by Depth Domain be converted to time domain data T (x, y, z); Step 2: converting data makes an explanation into figure when dark, obtains waiting T0 figure; Step 3: utilize areal geology understanding erection rate field; Step 4: utilize revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(x, y, z).
Further, utilize pre-stack depth migration velocity field V (x, y, z) with pre-stack depth migration data H (x, y, z) by Depth Domain be converted to time domain data T (computing formula z) is for x, y: T (x, y, z)=H (x, y, z)/V (x, y, z).
Further, utilize areal geology understanding erection rate field to be specially: utilize geological knowledge control rate horizontal change rule, (x, y z) obtain rational velocity field V to revise pre-stack depth migration velocity field V 1(x, y, z).
Further, described geological knowledge control rate horizontal change rule is specially: drilling well, non-earthquake and the outfall fan regularity of distribution.
Further, utilize revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(z): computing formula is: H for x, y 1(x, y, z)=T (x, y, z) * V 1(x, y, z).
Compared with prior art, the beneficial effect that technical solution of the present invention produces is: the present invention utilizes pre-stack depth migration imaging speed that the pre-stack depth migration data is converted to the time domain data, the territory data is carried out structure elucidation to utilize when dark switching time, again according to the non-earthquake of study area and drilling data to the control of speed, the depth shift velocity field suitably adjusted to finish become hasty map and obtain structural map, so just can not rely on seismic imaging speed and implement structure, improve trap research precision.
Description of drawings
Accompanying drawing 1 provides a kind of trap of the embodiment of the invention to implement the process flow diagram of method.
Embodiment
Method is implemented in a kind of trap in the embodiment of the invention, this method utilizes pre-stack depth migration imaging speed that the pre-stack depth migration data is converted to the time domain data, the territory data is carried out structure elucidation to utilize when dark switching time, again according to the non-earthquake of study area and drilling data to the control of speed, the depth shift velocity field suitably adjusted to finish become hasty map and obtain structural map, so just can not rely on seismic imaging speed and implement structure, improve trap research precision.
Embodiment one:
As shown in Figure 1, the disclosed a kind of trap of this method embodiment is implemented method and is comprised:
Step 1: utilize pre-stack depth migration velocity field V (x, y, z) with pre-stack depth migration data H (x, y, z) by Depth Domain be converted to time domain data T (x, y, z);
Step 2: converting data makes an explanation into figure when dark, obtains waiting T0 figure;
Step 3: utilize areal geology understanding erection rate field;
Step 4: utilize revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(x, y, z).
Further, utilize pre-stack depth migration velocity field V (x, y, z) with pre-stack depth migration data H (x, y, z) by Depth Domain be converted to time domain data T (computing formula z) is for x, y: T (x, y, z)=H (x, y, z)/V (x, y, z).
Further, utilize areal geology understanding erection rate field to be specially: utilize geological knowledge control rate horizontal change rule, (x, y z) obtain rational velocity field V to revise pre-stack depth migration velocity field V 1(x, y, z).
Further, described geological knowledge control rate horizontal change rule is specially: drilling well, non-earthquake and the outfall fan regularity of distribution.
Further, utilize revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(z): computing formula is: H for x, y 1(x, y, z)=T (x, y, z) * V 1(x, y, z).
Embodiment two:
The skew of the forward modeling result data in KS area shows, time migration after stack also is difficult to geologic body skew playback under the situation of known formation true velocity, the relative master pattern in time migration after stack trap position is offset to the stratum downdip direction, pre-stack depth migration then can be with geologic body skew playback, and converting data also can be substantially with geologic body skew playback when dark accordingly.
Bore from real, converting data has significantly improved data skew playback precision when dark.The embodiment of the invention is as follows in the realization effect of this area:
1, the calibration result of drilling well shows that time migration after stack can not make high steep stratum and the mild stratum of angle be offset playback simultaneously simultaneously, if make high steep stratum skew playback, then the less stratum of angle then can overmigration, if make the skew playback of the less stratum of angle, angle layer significantly again can the side-play amount deficiency, converting data then can make the skew playback of different angle stratum simultaneously when dark, and the error basic controlling is within tolerance interval.
It is more reasonable to change the zone of interest skew when 2, real brill confirmation is dark, and high point, position of fault are also more identical with drilling well.
Influenced by pre-stack depth migration velocity field details less, reliable and stable for converting data when 3, dark.
4, accelerated exploration rhythm greatly.The storehouse car in front of the mountains cycle of a wheel well very long, often will be above 1 year, therefore every wheel well goes out must go up behind the result at once and bores the next round well location, if waiting for that pre-stack depth migration is handled at least again needs 2 months, and conversion is implemented trap again and only needed about 2 week when dark.
5, saved cost greatly, earthquake pre-stack depth migration reduced price in front of the mountains is high, and when dark conversion to implement trap cheap.
2010-2011 utilizes this technological achievement to carry out primary study in a plurality of work areas in the Tarim Basin, implements a plurality of structural trappings, on bore many mouthfuls of well locations, shortened research cycle, saved processing cost, advanced the gas prospecting in this district.
Embodiment three:
Restrain dark 1-2 3-D seismics work area and can be divided into three main synthems from top to bottom: salt suprastructure, gypsum-salt rock synthem, salt infrastructure.The salt suprastructure is high steep, and the exploration zone of interest is the salt infrastructure, buries dark.Because the ground floor height is steep, the skew playback of time migration after stack data is inaccurate, causes the design of KS1 well salt top to bore 1000m shallow than real.Though pre-stack depth migration skew playback is better than the time migration after stack data, because seismic data quality is poor, the ground floor height is steep, anisotropy is serious, causes data and real boring to differ greatly.This district's gas reservoir is subjected to structure control, and real the boring of KS1 well taken off zone of interest 132m gas-bearing formation, water breakthrough not, and the structure amplitude has only 50m on the pre-stack depth migration structural map, obviously is not inconsistent with real boring.KS101 well then pre-stack depth migration has then bored 300m dark than real.Because well error difference is big, mainly concentrates on and constructs on the axis, is difficult to simulate a suitable correction error trend surface, can not proofread and correct by the error trend surface and obtain rational structural map, cause estimating well location and dispose difficulty, gas reservoir is estimated difficulty.If handle, then be that cycle or expense all can't satisfy the demands and control the pre-stack depth migration that carries out a new round by new well data.Taked dark time conversion trap method that trap is implemented again at this district in this case.
Particularly, the embodiment of the invention is as follows in the realization effect of this area:
1, utilize the pre-stack depth migration velocity field to finish the dark time conversion of pre-stack depth migration data
Converting data is identical with pre-stack depth migration data structure vertical position when dark, demarcation by well, no matter be high steep stratum of shallow-layer or zone of interest, converting data skew accuracy all is better than the time migration after stack data when dark, substantially can be with geologic body skew playback.
2, converting data carries out the holostrome position and explains when dark
Utilize drilling data that earthquake, geologic horizon are carried out meticulous demarcation.Earthquake, well data, non-seismic facies are finished whole district's structure elucidation in conjunction with setting up the structure elucidation model, and the T0 that waits that obtains each layer position schemes.
3, utilize T0 such as each layer position figure to extract each layer position average velocity planimetric map.
To recently, the pre-stack depth migration velocity field is obviously unreasonable in western part, work area from zone of interest average velocity and well speed, and KSx4 well average velocity is lower than KSx1 well average velocity, and the pre-stack depth migration speed trend then in contrast.
4, utilize well speed degree, gravel bed to distribute to be familiar with each layer average velocity planimetric map is carried out plane correction, obtain final purpose layer average velocity planimetric map.
5, utilize each interval velocity planimetric map to become hasty map and obtain final structural map.
Become structural map to dispose to restrain wells such as dark 203,204,205,206,207,208 according to dark time conversion institute, wherein restrain dark 204 and restrain dark 207 and all bored and take off zone of interest, two mouthfuls of drilling wells show all when dark that it is that position of fault or structural feature substantially all match with the reality brill that conversion institute becomes structural map.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. method is implemented in a trap, it is characterized in that:
Step 1: utilize pre-stack depth migration velocity field V (x, y, z) with pre-stack depth migration data H (x, y, z) by Depth Domain be converted to time domain data T (x, y, z);
Step 2: converting data makes an explanation into figure when dark, obtains waiting T0 figure;
Step 3: utilize areal geology understanding erection rate field;
Step 4: utilize revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(x, y, z).
2. method is implemented in a kind of trap as claimed in claim 1, it is characterized in that: utilize pre-stack depth migration velocity field V (x, y, z) (x, y z) are converted to time domain data T (x by Depth Domain with pre-stack depth migration data H, y, z) computing formula is: and T (x, y, z)=H (x, y, z)/and V (x, y, z).
3. method is implemented in a kind of trap as claimed in claim 1, it is characterized in that, utilizes areal geology understanding erection rate field to be specially:
Utilize geological knowledge control rate horizontal change rule, (x, y z) obtain rational velocity field V to revise pre-stack depth migration velocity field V 1(x, y, z).
4. method is implemented in a kind of trap as claimed in claim 3, it is characterized in that, described geological knowledge control rate horizontal change rule is specially: drilling well, non-earthquake and the outfall fan regularity of distribution.
5. method is implemented in a kind of trap as claimed in claim 1, it is characterized in that, utilizes revised pre-stack depth migration velocity field V 1(z) T0 figure such as converting data becomes hasty map and obtains final structural map H when dark for x, y 1(computing formula z) is: H for x, y 1(x, y, z)=T (x, y, z) * V 1(x, y, z).
CN201310110998.6A 2013-04-01 2013-04-01 Method for realizing closure Active CN103226210B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310110998.6A CN103226210B (en) 2013-04-01 2013-04-01 Method for realizing closure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310110998.6A CN103226210B (en) 2013-04-01 2013-04-01 Method for realizing closure

Publications (2)

Publication Number Publication Date
CN103226210A true CN103226210A (en) 2013-07-31
CN103226210B CN103226210B (en) 2016-04-06

Family

ID=48836717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310110998.6A Active CN103226210B (en) 2013-04-01 2013-04-01 Method for realizing closure

Country Status (1)

Country Link
CN (1) CN103226210B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103885083A (en) * 2014-01-29 2014-06-25 上海石油天然气有限公司 Paleotectonic map mapping method and device thereof
CN103955007A (en) * 2014-05-20 2014-07-30 中国石油化工股份有限公司胜利油田分公司西部新区研究院 Comprehensive modeling method of complicated mountain front tectonic zone and established geologic structure model
CN104459783A (en) * 2014-12-11 2015-03-25 中国石油天然气集团公司 Method and device for recognizing structural trap
CN104678440A (en) * 2015-02-15 2015-06-03 山东科技大学 Well-constrained two-dimensional seismic variable velocity field nonlinear error correction method
CN103885083B (en) * 2014-01-29 2016-11-30 上海石油天然气有限公司 Paleotectonic map drawing methods and device
CN106569260A (en) * 2015-10-10 2017-04-19 中国石油化工股份有限公司 Two-dimensional earthquake speed change space correction mapping method for high steep structure regions
CN106918839A (en) * 2015-12-25 2017-07-04 中国石油天然气股份有限公司 Quantitative evaluation method and device for structural trap model
CN107229074A (en) * 2016-03-24 2017-10-03 中国石油化工股份有限公司 The variable speed mapping method and apparatus in low exploration activity field marine facies exploratory area
CN107688199A (en) * 2017-08-28 2018-02-13 中国石油集团川庆钻探工程有限公司地球物理勘探公司 A kind of stacking velocity field construction method suitable for two-dimentional low SNR data
CN108051860A (en) * 2017-11-28 2018-05-18 北京金双狐油气技术有限公司 A kind of method using trend surface form generating error correction face
CN113219533A (en) * 2021-05-18 2021-08-06 中海石油(中国)有限公司深圳分公司 Pre-stack time migration velocity modeling method, device, medium and electronic equipment
CN113933901A (en) * 2020-06-29 2022-01-14 中国石油天然气股份有限公司 Depth domain seismic data splicing method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2148838C1 (en) * 1999-06-16 2000-05-10 Нижне-Волжский научно-исследовательский институт геологии и геофизики Seismic data processing technique
WO2006021864A1 (en) * 2004-08-24 2006-03-02 Adams Steven L Method of estimating geological formation depths by converting interpreted seismic horizons from the time domain to the depth domain
CN102565853A (en) * 2011-12-20 2012-07-11 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for modeling velocity model of geologic structure
CN102967881A (en) * 2012-11-12 2013-03-13 中国石油天然气股份有限公司 Geological small-layer data deep-time conversion method and device for seismic data interpretation
CN102967882A (en) * 2012-11-16 2013-03-13 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for building layer velocity model of stratum

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2148838C1 (en) * 1999-06-16 2000-05-10 Нижне-Волжский научно-исследовательский институт геологии и геофизики Seismic data processing technique
WO2006021864A1 (en) * 2004-08-24 2006-03-02 Adams Steven L Method of estimating geological formation depths by converting interpreted seismic horizons from the time domain to the depth domain
CN102565853A (en) * 2011-12-20 2012-07-11 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for modeling velocity model of geologic structure
CN102967881A (en) * 2012-11-12 2013-03-13 中国石油天然气股份有限公司 Geological small-layer data deep-time conversion method and device for seismic data interpretation
CN102967882A (en) * 2012-11-16 2013-03-13 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for building layer velocity model of stratum

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
徐春贵等: "BS盆地北部陡坡带复杂小断块地震资料解释方法与变速成图", 《科技咨询》, no. 7, 3 March 2008 (2008-03-03) *
梁顺军等: "山地复杂构造地震成图方法探讨", 《石油物探》, vol. 42, no. 4, 25 December 2003 (2003-12-25), pages 530 - 537 *
王树华等: "变速成图方法及应用研究", 《中国海洋大学学报》, vol. 34, no. 1, 30 January 2004 (2004-01-30), pages 139 - 146 *
马海珍等: "地震速度场建立与变速构造成图的一种方法", 《石油地球物理勘探》, vol. 37, no. 1, 15 February 2002 (2002-02-15) *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103885083B (en) * 2014-01-29 2016-11-30 上海石油天然气有限公司 Paleotectonic map drawing methods and device
CN103885083A (en) * 2014-01-29 2014-06-25 上海石油天然气有限公司 Paleotectonic map mapping method and device thereof
CN103955007A (en) * 2014-05-20 2014-07-30 中国石油化工股份有限公司胜利油田分公司西部新区研究院 Comprehensive modeling method of complicated mountain front tectonic zone and established geologic structure model
CN104459783B (en) * 2014-12-11 2017-05-10 中国石油天然气集团公司 Method and device for recognizing structural trap
CN104459783A (en) * 2014-12-11 2015-03-25 中国石油天然气集团公司 Method and device for recognizing structural trap
CN104678440A (en) * 2015-02-15 2015-06-03 山东科技大学 Well-constrained two-dimensional seismic variable velocity field nonlinear error correction method
CN106569260B (en) * 2015-10-10 2019-01-08 中国石油化工股份有限公司 For high-dip structure area two-dimension earthquake speed change sky school drawing methods
CN106569260A (en) * 2015-10-10 2017-04-19 中国石油化工股份有限公司 Two-dimensional earthquake speed change space correction mapping method for high steep structure regions
CN106918839A (en) * 2015-12-25 2017-07-04 中国石油天然气股份有限公司 Quantitative evaluation method and device for structural trap model
CN106918839B (en) * 2015-12-25 2018-12-25 中国石油天然气股份有限公司 Quantitative evaluation method and device for structural trap model
CN107229074A (en) * 2016-03-24 2017-10-03 中国石油化工股份有限公司 The variable speed mapping method and apparatus in low exploration activity field marine facies exploratory area
CN107688199A (en) * 2017-08-28 2018-02-13 中国石油集团川庆钻探工程有限公司地球物理勘探公司 A kind of stacking velocity field construction method suitable for two-dimentional low SNR data
CN107688199B (en) * 2017-08-28 2019-03-29 中国石油集团东方地球物理勘探有限责任公司 A kind of stacking velocity field construction method suitable for two-dimentional low SNR data
CN108051860A (en) * 2017-11-28 2018-05-18 北京金双狐油气技术有限公司 A kind of method using trend surface form generating error correction face
CN108051860B (en) * 2017-11-28 2021-08-03 北京金双狐油气技术有限公司 Method for generating error correction surface by utilizing trend surface form
CN113933901A (en) * 2020-06-29 2022-01-14 中国石油天然气股份有限公司 Depth domain seismic data splicing method and device
CN113933901B (en) * 2020-06-29 2024-01-30 中国石油天然气股份有限公司 Depth domain seismic data splicing method and device
CN113219533A (en) * 2021-05-18 2021-08-06 中海石油(中国)有限公司深圳分公司 Pre-stack time migration velocity modeling method, device, medium and electronic equipment
CN113219533B (en) * 2021-05-18 2023-10-20 中海石油(中国)有限公司深圳分公司 Pre-stack time migration velocity modeling method and device, medium and electronic equipment

Also Published As

Publication number Publication date
CN103226210B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN103226210B (en) Method for realizing closure
CN106597533B (en) A kind of Depth Domain velocity modeling method for mountain front seism processing
Jiang et al. Sequence-stratigraphic architectures and sand-body distribution in Cenozoic rifted lacustrine basins, east China
CN104698497B (en) A kind of fine calibration of thin sand-mud interbed layer position
Karp et al. Structure and stratigraphy of the Lake Albert Rift, East Africa: Observations from seismic reflection and gravity data
CN104459782B (en) Seismic velocity modeling method and modeling unit using thin layer chromatography inversion
CN104360385A (en) Method for comprehensively establishing initial depth interval velocity model by combining seismogeology understanding
CN105956238A (en) Ancient landform restoration method and device
CN107783187A (en) It is a kind of that logging speed and seismic velocity are combined to the method for establishing 3D velocity field
CN109164487A (en) A kind of method based on model foundation average velocity field and finely at the method for figure
CN108121009A (en) Development late stage complex fault block velocity-variant depth mapping method
Aadil et al. 3D geological modeling of Punjab platform, Middle Indus Basin Pakistan through integration of Wireline logs and seismic data
CN105911592B (en) A kind of real three dimensional seismic data long wavelength's static correcting method for boring constraint
CN105652341B (en) Rapid quantitative ancient landform restoration method considering ancient structure influence
CN104459798A (en) Velocity modeling method based on RTM imaging
Baruch et al. Seismic stratigraphic analysis of the Barnett Shale and Ellenburger unconformity southwest of the core area of the Newark East field, Fort Worth Basin, Texas
Tari et al. Seismic expression of salt tectonics in the Sab’atayn Basin, onshore Yemen
Cai et al. Development features of volcanic rocks of the Yingcheng Formation and their relationship with fault structure in the Xujiaweizi Fault Depression, Songliao Basin, China
Li et al. Characteristics and origin of the Sinian-Permian fault system and its controls on the formation of paleo-carbonate reservoirs: A case study from Central Paleo-Uplift, Sichuan Basin, China
Khan et al. Structural Interpretation and Petrophysical Analysis for Reservoir Sand of Lower Goru, Miano Area, Central Indus Basin, Pakistan
Buday et al. Facies variations detected by well log correlation in a geothermal reservoir (Újfalu formation) around debrecen, Hungary
Zorina Sedimentation regime and accommodation space in the Middle Jurassic-Lower Cretaceous on the eastern Russian Plate
Woloszyn et al. 3D geological modeling of the transboundary Berzdorf–Radomierzyce basin in Upper Lusatia (Germany/Poland)
Hou et al. Tectonic-Sedimentary Interplay of a Multi-Sourced, Structurally-Confined Turbidite System in a Foreland Basin Setting: The Pennsylvanian Lower Atoka Formation, Ouachita Mountains, USA
Hailu* et al. Application of seismic amplitude attribute to the varying velocity mapping in the area of low amplitude structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant